Advance PP and EWM Integration 1744096338
Advance PP and EWM Integration 1744096338
Introduction:
EWM and PP process integration enables the consumption of raw materials for production and
the receipt of finished goods back into the warehouse.
Workflow:
The process is initiated with the creation of a Production Order or Process Order in the
S/4HANA system. Subsequently, in the EWM system, components are picked against the
production order and staged in the Production Supply Area (PSA).
These components are then consumed at the work center during the manufacturing process to
produce the finished goods.
Key master data elements such as Work Center, Bill of Materials (BOM), and Routing play a
critical role in this process.
The process can be further designed to route the finished products back to the warehouse
using an Inbound Delivery from production.
Additionally, a Quality Inspection step can be incorporated through POSC before the finished
goods are moved to their final Putaway bins, ensuring product quality and compliance.
Staging Methods:
Single Order Staging --- It allows to Stage the Components for a Specific Order.
Cross Order Staging --- It allows to Stage multiple Components of Production Orders at
Same time
Crate Parts -- Components are staged in bulk and Replenished regularly based on stock
levels. Kanban is Usually used for Crate Parts.
Master Data : BOM’s , WorkCentre, Routing Master Data: Material Master , BOM’s ,
Resources , Production Version’s.
Production Order executes in Operation based Process order executes in Phases which is
which is Step-by-step formula and process-steps
Create Bins , Generate Activity Area and DO Sorting for the Bins for the Storage type 1005
14) Map SAP ERP order type to SAP EWM Doc. Type:
SPROIMGSCM EWMEWMInterfacesERP IntegrationProductionMap SAP ERP order
type to SAP EWM Doc type
15) Map SAP ERP Order type to SAP EWM Item type:
SPROIMGSCM EWMEWMInterfacesERP IntegrationProductionMap SAP ERP order
type to SAP EWM item type
18) Storage type for Picking the Raw Material ( Copied from 0010) , Availability Group as 003.
SPROIMGSCM EWMEWMMaster DataDefine Storage Type
Create Bins , Generate Activity Area and DO Sorting for the Bins PGPP
Extend the created raw materials for PRD Storage Location: ( T-Code : MMSC )
21). Create Finished Product with MRP Views and Work Scheduling Tab.
Extend the Finished Product into AFS and PRD Locations ( T-code : MMSC)
Save it
1) Maintain Product Group type and Product Group for Raw Materials in Basic Data 2 Tab ( T-
code : MM02)
---- 6718
---- 6719
2) Add version and Routing to Finished Product under work Scheduling Tab ( T-code : MM02)
4) Determine WPT:
Spro Sap ref IMG SCM EWM EWM Cross-process Settings Warehouse Task
Determine WPT
Create Bins, Generate Activity Area and Do Bin Sorting for both Storage types.
9) Putaway Strategies:
Spro Ref IMG SCM EWM EWM Goods Receipt Process Strategies
Storage Type Search Sequence
10) Maintain PACI in Product Master for the Finished Product (/n/scwm/mat1):
Testing:
Pre-requisite: Make Sure the Stock Type is P2 for the Raw Materials before Creating Production Order
in CO01.
Below is the Screen-shot for Reference:
Click on Enter:
Now Go to Operations:
Now Go to Components:
Now Check the Stock in PSA bin in the Monitor for Both products before Consumption
Now enter the HU/bin and Product and click on Enter and Click on F4 for Full Quantity
Consumption of the Product.
Press Enter and here the Product 6718 is Consumed and Goods Issue is Completed.
Press Enter and here Product 6719 is Consumed and Goods Issue is Completed.
Now Check the Goods Issue Status of the Product 6719 in the Monitor
Now Check the Movement type Triggered in S4 Side in the T-code MB51:
Now go to T-code : /n/scwm/PRDI and give Manufacturing Order in Open Advanced Search and
execute and you can find the Inbound Delivery Document as shown below:
Here the Finished Product 6720 is Received into the Warehouse and you can observe WPT , Goods
Movement bin and Stock type which got reflected
Now go to HU Tab:
Now Create the Warehouse Task and Confirm it , So that Warehouse order will be getting Created.
Now Confirm the Warehouse Order and final Putaway will be Done.