1.4.2 Level 3 Barchart
1.4.2 Level 3 Barchart
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
F9 INFILL DRILLING 2.0
2. PROJECT - 17/7/19 392d 03-May-19 03-Nov-20 03-Nov
MLS.1280 Design Basis Memorandum (AFC) 0d 26-Jul-19 Design Basis Memorandum (AFC)
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 2 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
PROJECT MANAGEMENT 60d 27-May-19 16-Aug-19 16-Aug-19, PROJECT MANAGEMENT
GN-104 - Site Visit, Drawings a
and Document Search 6d 12-Jun-19 19-Jun-19 19-Jun-19, GN-104 - Site Visit, Drawings and Document Search
DDE.1000 Site Visit, Drawings and Document 6d 12-Jun-19 19-Jun-19 Site Visit, Drawings and Document Search
Search
GN-105 - Design Basis Memorandum
Memor (DBM) 45d 27-May-19 26-Jul-19 26-Jul-19, GN-105 - Design Basis Memorandum (DBM)
DDE.1010 Design Basis Memorandum (DBM) 45d 27-May-19 26-Jul-19 Design Basis Memorandum (DBM)
DDE.1060 PROCESS AND UTILTY 58d 15-May-19 05-Aug-19 PROCESS AND UTILTY ADEQUACY CHECK
ADEQUACY CHECK
PR-201 - Process Flow Diagram (PFD), Utility Flow Diagram (U... 53d 15-May-19 29-Jul-19 29-Jul-19, PR-201 - Process Flow Diagram (PFD), Utility Flow Diagram (UFD) and Heat Material Balances (H&MB)
DDE.1070 HEAT AND MATERIAL BALANCE 53d 15-May-19 29-Jul-19 HEAT AND MATERIAL BALANCE
DDE.1080 PFD - PRODUCTION SYSTEM 53d 15-May-19 29-Jul-19 PFD - PRODUCTION SYSTEM
DDE.1090 PFD - RECEIVERS AND 53d 15-May-19 29-Jul-19 PFD - RECEIVERS AND LAUNCHERS
LAUNCHERS
DDE.1100 UFD - POWER GAS SYSTEM 53d 15-May-19 29-Jul-19 UFD - POWER GAS SYSTEM
DDE.1110 UFD - VENT, OPEN AND CLOSED 53d 15-May-19 29-Jul-19 UFD - VENT, OPEN AND CLOSED DRAIN SYSTEM
DRAIN SYSTEM
DDE.1120 UFD - FIREWATER SYSTEM 53d 15-May-19 29-Jul-19 UFD - FIREWATER SYSTEM
PR-202 - Line Sizing, Line List and Tie-in List 58d 15-May-19 05-Aug-19 05-Aug-19, PR-202 - Line Sizing, Line List and Tie-in List
DDE.1130 F9 PROCESS & UTILITY LINE 53d 15-May-19 29-Jul-19 F9 PROCESS & UTILITY LINE LIST
LIST
DDE.1140 PROCESS CALCULATION BOOK 58d 15-May-19 05-Aug-19 PROCESS CALCULATION BOOK
DDE.1170 Wellhead W-0130 and Flowlines 48d 15-May-19 19-Jul-19 Wellhead W-0130 and Flowlines
DDE.1180 Wellhead W-0140 and Flowlines 48d 15-May-19 19-Jul-19 Wellhead W-0140 and Flowlines
DDE.1190 Wellhead W-0160 and Flowlines 48d 15-May-19 19-Jul-19 Wellhead W-0160 and Flowlines
DDE.1210 Wellhead W-0170 and Flowlines 48d 15-May-19 19-Jul-19 Wellhead W-0170 and Flowlines
DDE.1220 Wellhead W-0190 and Flowlines 48d 15-May-19 19-Jul-19 Wellhead W-0190 and Flowlines
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 3 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.1270 Vent & Closed Drain Distribution 48d 15-May-19 19-Jul-19 Vent & Closed Drain Distribution
DDE.1280 Vent & Cosed Drain System 48d 15-May-19 19-Jul-19 Vent & Cosed Drain System
DDE.1290 Open Drain Caisson 48d 15-May-19 19-Jul-19 Open Drain Caisson
PR-205 - Relief, Vent & Blowdown
Blowdo Study 45d 03-Jun-19 02-Aug-19 02-Aug-19, PR-205 - Relief, Vent & Blowdown Study
DDE.1300 RELIEF, VENT AND BLOWDOWN 45d 03-Jun-19 02-Aug-19 RELIEF, VENT AND BLOWDOWN STUDY REPORT
STUDY REPORT
PR-206 - Process Control and Safeguarding 52d 23-May-19 02-Aug-19 02-Aug-19, PR-206 - Process Control and Safeguarding
DDE.1310 PROCESS CAUSE AND EFFECT 42d 23-May-19 19-Jul-19 PROCESS CAUSE AND EFFECT MATRIX (NORMAL MODE)
MATRIX (NORMAL MODE)
DDE.1320 PROCESS CAUSE AND EFFECT 42d 23-May-19 19-Jul-19 PROCESS CAUSE AND EFFECT MATRIX (SIPROD MODE)
MATRIX (SIPROD MODE)
DDE.1330 SAFETY ANALYSIS FUNCTION 42d 23-May-19 19-Jul-19 SAFETY ANALYSIS FUNCTION EVALUATION CHART (S.A.F.E)
EVALUATION CHART (S.A.F.E)
DDE.1340 PROCESS SAFEGUARDING 33d 19-Jun-19 02-Aug-19 PROCESS SAFEGUARDING MEMORANDUM REPORT (ADDENDUM)
MEMORANDUM REPORT
(ADDENDUM)
DDE.1350 PROCESS CONTROL AND 33d 19-Jun-19 02-Aug-19 PROCESS CONTROL AND SAFEGUARDING PHILOSOPHY (ADDENDUM)
SAFEGUARDING PHILOSOPHY
(ADDENDUM)
DDE.1390 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-UP) MAIN DECK & HELIDECK
CLASSIFICATION (RIG-UP) MAIN
DECK & HELIDECK
DDE.1400 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (SIPROD) MAIN DECK & HELIDECK
CLASSIFICATION (SIPROD) MAIN
DECK & HELIDECK
DDE.1410 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (WTI) MAIN DECK & HELIDECK
CLASSIFICATION (WTI) MAIN
DECK & HELIDECK
DDE.1420 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-DOWN) WELLHEAD ACCESS PLATFORM
CLASSIFICATION (RIG-DOWN)
WELLHEAD ACCESS PLATFORM
DDE.1430 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-UP) WELLHEAD ACCESS PLATFORM
CLASSIFICATION (RIG-UP)
WELLHEAD ACCESS PLATFORM
DDE.1440 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (SIPROD) WELLHEAD ACCESS PLATFORM
CLASSIFICATION (SIPROD)
WELLHEAD ACCESS PLATFORM
DDE.1450 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (WTI) WELLHEAD ACCESS PLATFORM
CLASSIFICATION (WTI)
WELLHEAD ACCESS PLATFORM
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 4 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.1460 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-DOWN) CELLAR DECK
CLASSIFICATION (RIG-DOWN)
CELLAR DECK
DDE.1470 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-UP) CELLAR DECK
CLASSIFICATION (RIG-UP)
CELLAR DECK
DDE.1480 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (SIPROD) CELLAR DECK
CLASSIFICATION (SIPROD)
CELLAR DECK
DDE.1490 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (WTI) CELLAR DECK
CLASSIFICATION (WTI) CELLAR
DECK
DDE.1500 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-DOWN) SUB-CELLAR AND SDV PUMP ACCESS DECK
CLASSIFICATION (RIG-DOWN)
SUB-CELLAR AND SDV PUMP
ACCESS DECK
DDE.1510 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-UP) SUB-CELLAR AND SDV PUMP ACCESS DECK
CLASSIFICATION (RIG-UP)
SUB-CELLAR AND SDV PUMP
ACCESS DECK
DDE.1520 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (SIPROD) SUB-CELLAR AND SDV PUMP ACCESS DECK
CLASSIFICATION (SIPROD)
SUB-CELLAR AND SDV PUMP
ACCESS DECK
DDE.1530 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (WTI) SUB-CELLAR AND SDV PUMP ACCESS DECK
CLASSIFICATION (WTI)
SUB-CELLAR AND SDV PUMP
ACCESS DECK
DDE.1540 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-DOWN) ELEVATION LOOKING SOUTH
CLASSIFICATION (RIG-DOWN)
ELEVATION LOOKING SOUTH
DDE.1550 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-UP) ELEVATION LOOKING SOUTH
CLASSIFICATION (RIG-UP)
ELEVATION LOOKING SOUTH
DDE.1560 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (SIPROD) ELEVATION LOOKING SOUTH
CLASSIFICATION (SIPROD)
ELEVATION LOOKING SOUTH
DDE.1570 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (WTI) ELEVATION LOOKING SOUTH
CLASSIFICATION (WTI)
ELEVATION LOOKING SOUTH
DDE.1580 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-DOWN) ELEVATION LOOKING WEST
CLASSIFICATION (RIG-DOWN)
ELEVATION LOOKING WEST
DDE.1590 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (RIG-UP) ELEVATION LOOKING WEST
CLASSIFICATION (RIG-UP)
ELEVATION LOOKING WEST
DDE.1600 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (SIPROD) ELEVATION LOOKING WEST
CLASSIFICATION (SIPROD)
ELEVATION LOOKING WEST
DDE.1610 HAZARDOUS AREA 38d 12-Jun-19 02-Aug-19 HAZARDOUS AREA CLASSIFICATION (WTI) ELEVATION LOOKING WEST
CLASSIFICATION (WTI)
ELEVATION LOOKING WEST
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 5 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.1620 F9JT-A FACILITIES DESIGN 52d 23-May-19 05-Aug-19 F9JT-A FACILITIES DESIGN CONSIDERATION FOR SIPROD
CONSIDERATION FOR SIPROD
PR-212 - Flow Assurance Study 46d 07-Jun-19 12-Aug-19 12-Aug-19, PR-212 - Flow Assurance Study
DDE.1650 FLOW ASSURANCE STUDY 46d 07-Jun-19 12-Aug-19 FLOW ASSURANCE STUDY REPORT
REPORT
PIPING 55d 27-May-19 09-Aug-19 09-Aug-19, PIPING
PP-400 - Piping Design and Specification
Sp 45d 27-May-19 26-Jul-19 26-Jul-19, PP-400 - Piping Design and Specification
DDE.1670 Piping Material Class Specification 34d 27-May-19 11-Jul-19 Piping Material Class Specification
DDE.1680 Specifications for Manual Valves & 40d 27-May-19 19-Jul-19 Specifications for Manual Valves & Datasheets
Datasheets
DDE.1690 Technical Requisition Package for 45d 27-May-19 26-Jul-19 Technical Requisition Package for Manual Valves
Manual Valves
DDE.1700 SP Item List & Data Sheets 45d 27-May-19 26-Jul-19 SP Item List & Data Sheets
DDE.1710 Piping Design Basis 30d 27-May-19 05-Jul-19 Piping Design Basis
DDE.1720 Technical Requisition Package for 45d 27-May-19 26-Jul-19 Technical Requisition Package for SP Items
SP Items
PP-401 - Platform / Piping Layout
Lay Study and Design Optimization 40d 10-Jun-19 02-Aug-19 02-Aug-19, PP-401 - Platform / Piping Layout Study and Design Optimization
DDE.1730 PIPING PLAN DRAWING INDEX 40d 10-Jun-19 02-Aug-19 PIPING PLAN DRAWING INDEX
DDE.1740 PIPING KEY PLAN - MAIN DECK 40d 10-Jun-19 02-Aug-19 PIPING KEY PLAN - MAIN DECK AND HELIDECK
AND HELIDECK
DDE.1750 PIPING PLAN - MAIN DECK AREA 40d 10-Jun-19 02-Aug-19 PIPING PLAN - MAIN DECK AREA MD - 4
MD - 4
DDE.1760 PIPING PLAN - ABOVE CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - ABOVE CELLAR DECK AREA CD-2
DECK AREA CD-2
DDE.1780 PIPING PLAN - ABOVE CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - ABOVE CELLAR DECK AREA CD-3
DECK AREA CD-3
DDE.1790 PIPING PLAN - ABOVE CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - ABOVE CELLAR DECK AREA CD-4
DECK AREA CD-4
DDE.1800 PIPING PLAN - WELLHEAD 40d 10-Jun-19 02-Aug-19 PIPING PLAN - WELLHEAD ACCESS PLATFROM AREA WAP-1
ACCESS PLATFROM AREA WAP-1
DDE.1810 PIPING PLAN - WELLHEAD 40d 10-Jun-19 02-Aug-19 PIPING PLAN - WELLHEAD ACCESS PLATFROM AREA WAP-2
ACCESS PLATFROM AREA WAP-2
DDE.1820 PIPING PLAN - WELLHEAD 40d 10-Jun-19 02-Aug-19 PIPING PLAN - WELLHEAD ACCESS PLATFROM AREA WAP-3
ACCESS PLATFROM AREA WAP-3
DDE.1830 PIPING PLAN - CELLAR DECK 40d 10-Jun-19 02-Aug-19 PIPING PLAN - CELLAR DECK AREA CD-3
AREA CD-3
DDE.1840 PIPING PLAN - CELLAR DECK 40d 10-Jun-19 02-Aug-19 PIPING PLAN - CELLAR DECK AREA CD-5
AREA CD-5
DDE.1850 PIPING PLAN - CELLAR DECK 40d 10-Jun-19 02-Aug-19 PIPING PLAN - CELLAR DECK AREA CD-6
AREA CD-6
DDE.1860 PIPING PLAN - CELLAR DECK 40d 10-Jun-19 02-Aug-19 PIPING PLAN - CELLAR DECK AREA CD-7
AREA CD-7
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 6 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.1870 PIPING PLAN - SUB CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - SUB CELLAR DECK AREA SCD-2
DECK AREA SCD-2
DDE.1880 PIPING PLAN - SUB CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - SUB CELLAR DECK AREA SCD-3
DECK AREA SCD-3
DDE.1890 PIPING PLAN - SUB CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - SUB CELLAR DECK AREA SCD-5
DECK AREA SCD-5
DDE.1900 PIPING PLAN - SUB CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - SUB CELLAR DECK AREA SCD-6
DECK AREA SCD-6
DDE.1910 PIPING PLAN - SUB CELLAR 40d 10-Jun-19 02-Aug-19 PIPING PLAN - SUB CELLAR DECK AREA SCD-7
DECK AREA SCD-7
PP-402 - Piping Drawings and Material Take Off (MTO) 40d 10-Jun-19 02-Aug-19 02-Aug-19, PP-402 - Piping Drawings and Material Take Off (MTO)
A4040 Manual Valves MTO (Rig-Up, Well 40d 10-Jun-19 02-Aug-19 Manual Valves MTO (Rig-Up, Well Tie-In & Reinstatement)
Tie-In & Reinstatement)
DDE.1920 ISOMETRIC RIG DOWN INDEX 40d 10-Jun-19 02-Aug-19 ISOMETRIC RIG DOWN INDEX
DDE.1930 ISOMETRIC RIG UP INDEX 40d 10-Jun-19 02-Aug-19 ISOMETRIC RIG UP INDEX
DDE.1940 ISOMETRIC SIPROD INDEX 0d 10-Jun-19 10-Jun-19 ISOMETRIC SIPROD INDEX
DDE.1950 ISOMETRIC WELL TIE-IN INDEX 40d 10-Jun-19 02-Aug-19 ISOMETRIC WELL TIE-IN INDEX
PP-406 - PDMS 3D Modelling 40d 10-Jun-19 02-Aug-19 02-Aug-19, PP-406 - PDMS 3D Modelling
DDE.2050 90% Model Review Close Out 40d 10-Jun-19 02-Aug-19 90% Model Review Close Out Report
Report
ELECTRICAL 51d 31-May-19 09-Aug-19 09-Aug-19, ELECTRICAL
EL- 600 - Electrical Design Eng
Engineering for SIPROD/HUC for F9... 51d 31-May-19 09-Aug-19 09-Aug-19, EL- 600 - Electrical Design Engineering for SIPROD/HUC for F9JT-A Infill
DDE.2060 ELECTRICAL DRAWING INDEX 51d 31-May-19 09-Aug-19 ELECTRICAL DRAWING INDEX (SHEET 1 OF 2)
(SHEET 1 OF 2)
DDE.2070 ELECTRICAL POWER & CABLE 51d 31-May-19 09-Aug-19 ELECTRICAL POWER & CABLE LADDER LAYOUT MAIN DECK & HELIDECK
LADDER LAYOUT MAIN DECK &
HELIDECK
DDE.2080 ELECTRICAL POWER & CABLE 51d 31-May-19 09-Aug-19 ELECTRICAL POWER & CABLE LADDER LAYOUT CELLAR DECK
LADDER LAYOUT CELLAR DECK
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 7 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.2090 ELECTRICAL POWER & CABLE 51d 31-May-19 09-Aug-19 ELECTRICAL POWER & CABLE LADDER LAYOUT - ELECTRICAL & INSTRUMENT EQUIPMENT ROOM (SHEET 1 OF 2)
LADDER LAYOUT - ELECTRICAL
& INSTRUMENT EQUIPMENT
ROOM (SHEET 1 OF 2)
DDE.2100 ELECTRICAL OVERALL KEY 51d 31-May-19 09-Aug-19 ELECTRICAL OVERALL KEY SINGLE LINE DIAGRAM
SINGLE LINE DIAGRAM
DDE.2110 ELECTRICAL SINGLE LINE 51d 31-May-19 09-Aug-19 ELECTRICAL SINGLE LINE DIAGRAM 400V AC SWITCHBOARD SB-7750 (SHEET 1 OF 4)
DIAGRAM 400V AC
SWITCHBOARD SB-7750 (SHEET
1 OF 4)
DDE.2120 ELECTRICAL SINGLE LINE 51d 31-May-19 09-Aug-19 ELECTRICAL SINGLE LINE DIAGRAM 230V AC UPS DISTRIBUTION BOARD DB-7810 (SHEET 3 OF 3)
DIAGRAM 230V AC UPS
DISTRIBUTION BOARD DB-7810
(SHEET 3 OF 3)
DDE.2130 ELECTRICAL TYPICAL 51d 31-May-19 09-Aug-19 ELECTRICAL TYPICAL INSTALLATION DETAILS EARTHING (SHEET 3 OF 3)
INSTALLATION DETAILS
EARTHING (SHEET 3 OF 3)
DDE.2140 ELECTRICAL TYPICAL 51d 31-May-19 09-Aug-19 ELECTRICAL TYPICAL INSTALLATION DETAILS MISC. (SHEET 1 OF 2)
INSTALLATION DETAILS MISC.
(SHEET 1 OF 2)
DDE.2150 ELECTRICAL MULTI CABLE 51d 31-May-19 09-Aug-19 ELECTRICAL MULTI CABLE TRANSIT DETAILS (SHEET 1 OF 2)
TRANSIT DETAILS (SHEET 1 OF
2)
DDE.2160 ELECTRICAL CABLE SCHEDULE 51d 31-May-19 09-Aug-19 ELECTRICAL CABLE SCHEDULE POWER & CONTROL (SHEET 3)
POWER & CONTROL (SHEET 3)
DDE.2170 ELECTRICAL CABLE SCHEDULE 51d 31-May-19 09-Aug-19 ELECTRICAL CABLE SCHEDULE AC UPS (SHEET 7)
AC UPS (SHEET 7)
DDE.2180 ELECTRICAL BULK MTO 51d 31-May-19 09-Aug-19 ELECTRICAL BULK MTO SCHEDULE
SCHEDULE
EL-601 - Additional Studies/El
Studies/Electrical Host Tie-in Modification ... 51d 31-May-19 09-Aug-19 09-Aug-19, EL-601 - Additional Studies/Electrical Host Tie-in Modification Works and Scope of Supply
DDE.2190 Electrical Cable Sizing Report 51d 31-May-19 09-Aug-19 Electrical Cable Sizing Report
DDE.2200 Electrical Design Basis 51d 31-May-19 09-Aug-19 Electrical Design Basis
DDE.2210 Electrical Ex Register / Database 51d 31-May-19 09-Aug-19 Electrical Ex Register / Database
DDE.2220 Electrical UPS Adequacy Check 51d 31-May-19 09-Aug-19 Electrical UPS Adequacy Check Report
Report
DDE.2230 LV Motor Datsheet 51d 31-May-19 09-Aug-19 LV Motor Datsheet
DDE.2240 400V Switchboard Motor Starter 51d 31-May-19 09-Aug-19 400V Switchboard Motor Starter Modification Datasheet
Modification Datasheet
DDE.2270 System Modification Scope of Work 40d 17-Jun-19 09-Aug-19 System Modification Scope of Work
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 8 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.2290 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Instrument Location/ Cable Routing Layout Wellhead Access Platform (WAP-1)
Instrument Location/ Cable Routing
Layout Wellhead Access Platform
(WAP-1)
DDE.2300 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Instrument Location/ Cable Routing Layout Cellar Deck (CD-2)
Instrument Location/ Cable Routing
Layout Cellar Deck (CD-2)
DDE.2310 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Overall Control, Shutdown and Fire and Gas System Block Diagram
Overall Control, Shutdown and Fire
and Gas System Block Diagram
DDE.2320 F9JT-A Topside Instrumentation Wet 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Wet Gas Metering System Block Diagram
Gas Metering System Block Diagram
DDE.2330 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Monitoring & Control System (PMCS) Cable Block Diagram
Process Monitoring & Control
System (PMCS) Cable Block
Diagram
DDE.2340 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Safety Instrumented System (SIS) Cable Block Diagram
Safety Instrumented System (SIS)
Cable Block Diagram
DDE.2350 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Safety Instrumented Smart Well and Wet Gas Metering System Cable Block Diagram
Safety Instrumented Smart Well and
Wet Gas Metering System Cable
Block Diagram
DDE.2360 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Wellhead Control Panel - WHCP-0100 Hydraulic Power Unit Schematic
Wellhead Control Panel -
WHCP-0100 Hydraulic Power Unit
Schematic
DDE.2380 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Wellhead Control Panel - WHCP-0100 Control Module Schematic
Wellhead Control Panel -
WHCP-0100 Control Module
Schematic
DDE.2390 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Fusible Plug Loop Installation Schematic - FPP-8010
Fusible Plug Loop Installation
Schematic - FPP-8010
DDE.2400 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Siprod Alarm Panel Schematic
Siprod Alarm Panel Schematic
DDE.2410 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Instrument Air Line Distribution Schematic
Instrument Air Line Distribution
Schematic
DDE.2420 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Deluge Panel Control Schematic
Deluge Panel Control Schematic
DDE.2430 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Wellhead Control Panel - WHCP-0100 General Panel Layout
Wellhead Control Panel -
WHCP-0100 General Panel Layout
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 9 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.2440 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Index of Sheet & Revision
Process Hook-Ups Index of Sheet &
Revision
DDE.2450 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Notes
Process Hook-Ups Notes
DDE.2460 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Summary of Materials
Process Hook-Ups Summary of
Materials
DDE.2470 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Pressure Transmitter/ Gauge-Gas
Process Hook-Ups Pressure
Transmitter/ Gauge-Gas
DDE.2480 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Pressure Gauge (X'Mas Tree)
Process Hook-Ups Pressure Gauge
(X'Mas Tree)
DDE.2490 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Pressure Transmitter-Gas
Process Hook-Ups Pressure
Transmitter-Gas
DDE.2500 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Temperature Transmitter
Process Hook-Ups Temperature
Transmitter
DDE.2510 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups A-6820 C.I Injection Package Tubing Interfaces
Process Hook-Ups A-6820 C.I
Injection Package Tubing Interfaces
DDE.2520 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups A-6810 Methanol Injection Package Tubing Interfaces
Process Hook-Ups A-6810 Methanol
Injection Package Tubing Interfaces
DDE.2530 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Hydraulic Supply Line to Wellhead
Process Hook-Ups Hydraulic Supply
Line to Wellhead
DDE.2540 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Process Hook-Ups Choke Valve
Process Hook-Ups Choke Valve
DDE.2550 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Installation Details - Cover Sheet
Installation Details - Cover Sheet
DDE.2560 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Installation Details - Notes
Installation Details - Notes
DDE.2570 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Installation Details - Summary of Materials
Installation Details - Summary of
Materials
DDE.2580 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Installation Details - Instrument Mounting Stand - Type S1
Installation Details - Instrument
Mounting Stand - Type S1
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 10 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.2590 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Installation Details - Wellhead Tubing Interface Plate
Installation Details - Wellhead
Tubing Interface Plate
DDE.2600 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Installation Details - WGM Mounting Stand
Installation Details - WGM Mounting
Stand
DDE.2610 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Installation Details - Instrument Mounting Stand Kill Knob SIPROD Interface Panel
Installation Details - Instrument
Mounting Stand Kill Knob SIPROD
Interface Panel
DDE.2620 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation PMCS Input and Output Schedule
PMCS Input and Output Schedule
DDE.2630 F9JT-A Topside Instrumentation SIS 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation SIS Input and Output Schedule
Input and Output Schedule
DDE.2640 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Instrument Schedule
Instrument Schedule
DDE.2650 F9JT-A Topside Instrumentation 0d 17-Jun-19 17-Jun-19 F9JT-A Topside Instrumentation Alarm Trip & Controller Setting List
Alarm Trip & Controller Setting List
DDE.2660 F9JT-A Topside Instrumentation 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Instrumentation Cable Schedule
Cable Schedule
DDE.2670 Instrumentation Material Take-Off 40d 17-Jun-19 09-Aug-19 Instrumentation Material Take-Off
DDE.2690 Technical Requisition Package for 40d 17-Jun-19 09-Aug-19 Technical Requisition Package for Wet Gas Metering
Wet Gas Metering
DDE.2700 Datasheet for Pressure Gauges 40d 17-Jun-19 09-Aug-19 Datasheet for Pressure Gauges
DDE.2710 Datasheet for Pressure Transmitters 40d 17-Jun-19 09-Aug-19 Datasheet for Pressure Transmitters
DDE.2720 Datasheet for Temperature 40d 17-Jun-19 09-Aug-19 Datasheet for Temperature Transmitters
Transmitters
DDE.2730 Datasheet for Choke Valves 40d 17-Jun-19 09-Aug-19 Datasheet for Choke Valves
DDE.2740 Datasheet for Wet Gas Meter 40d 17-Jun-19 09-Aug-19 Datasheet for Wet Gas Meter
DDE.2750 Datasheet for Restriction Orifices 40d 17-Jun-19 09-Aug-19 Datasheet for Restriction Orifices
DDE.2760 Datasheet for Kill Knob 40d 17-Jun-19 09-Aug-19 Datasheet for Kill Knob
STRUCTURAL 40d 17-Jun-19 09-Aug-19 09-Aug-19, STRUCTURAL
ST-800 - Structural Design Basis
Bas and Brief 40d 17-Jun-19 09-Aug-19 09-Aug-19, ST-800 - Structural Design Basis and Brief
DDE.2770 Structural Design Basis 40d 17-Jun-19 09-Aug-19 Structural Design Basis
ST-801 - Static In-place Analysis
Analys for the Existing Platform (Top... 40d 17-Jun-19 09-Aug-19 09-Aug-19, ST-801 - Static In-place Analysis for the Existing Platform (Topsides and Substructure)
DDE.2780 F9JT-A Topsides In-place 40d 17-Jun-19 09-Aug-19 F9JT-A Topsides In-place Re-analysis Report
Re-analysis Report
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 11 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.2790 F9JT-A Substructure In-place 40d 17-Jun-19 09-Aug-19 F9JT-A Substructure In-place Re-analysis Report
Re-analysis Report
DDE.2810 F9JT-A Topside Main Deck Framing 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Main Deck Framing Plan
Plan
DDE.2820 F9JT-A Topside Main Deck Handrail 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Main Deck Handrail and Floor Plan
and Floor Plan
DDE.2830 F9JT-A Topside Wellhead Hatch 40d 17-Jun-19 09-Aug-19 F9JT-A Topside Wellhead Hatch Cover & Access Hatch Cover Detail
Cover & Access Hatch Cover Detail
DDE.2840 F9JT-A Miscellaneous Design 40d 17-Jun-19 09-Aug-19 F9JT-A Miscellaneous Design Report
Report
DDE.2850 Temporary Mud Wall Protection Wall 40d 17-Jun-19 09-Aug-19 Temporary Mud Wall Protection Wall Layout Plan - 1
Layout Plan - 1
DDE.2860 Temporary Mud Wall Protection Wall 40d 17-Jun-19 09-Aug-19 Temporary Mud Wall Protection Wall Section and Details - 1
Section and Details - 1
DDE.2890 Escape Route, Fire Fighting, Safety 35d 10-Jun-19 26-Jul-19 Escape Route, Fire Fighting, Safety and Life Saving Appliances Layout Wellhead Access Platform
and Life Saving Appliances Layout
Wellhead Access Platform
DDE.2900 Escape Route, Fire Fighting, Safety 35d 10-Jun-19 26-Jul-19 Escape Route, Fire Fighting, Safety and Life Saving Appliances Layout Cellar Deck
and Life Saving Appliances Layout
Cellar Deck
DDE.2910 Fire Fighting, Life Saving, Safety 35d 10-Jun-19 26-Jul-19 Fire Fighting, Life Saving, Safety Equipment Specification and Datasheet
Equipment Specification and
Datasheet
SE-702 - Hazard Identification (HAZID) Study 35d 10-Jun-19 26-Jul-19 26-Jul-19, SE-702 - Hazard Identification (HAZID) Study
DDE.2920 HAZID Terms of Reference 35d 10-Jun-19 26-Jul-19 HAZID Terms of Reference
DDE.2930 HAZID Study Report 35d 10-Jun-19 26-Jul-19 HAZID Study Report
DDE.2940 HAZID Close Out Report 35d 10-Jun-19 26-Jul-19 HAZID Close Out Report
DDE.2950 HAZID Workshop 35d 10-Jun-19 26-Jul-19 HAZID Workshop
SE-703 - Fire and Explosion Analysis
A (FEA) 35d 10-Jun-19 26-Jul-19 26-Jul-19, SE-703 - Fire and Explosion Analysis (FEA)
DDE.2960 Assumption Register Report 35d 10-Jun-19 26-Jul-19 Assumption Register Report
DDE.2970 Fire and Explosion Study Report 35d 10-Jun-19 26-Jul-19 Fire and Explosion Study Report
DDE.2980 Blast Study Report 35d 10-Jun-19 26-Jul-19 Blast Study Report
DDE.2990 Assumption Register Workshop 35d 10-Jun-19 26-Jul-19 Assumption Register Workshop
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 12 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
DDE.3000 Thermal Radiation, Gas Dispersion 35d 10-Jun-19 26-Jul-19 Thermal Radiation, Gas Dispersion and Plume Study Report
and Plume Study Report
DDE.3040 SPEC FOR CHEMICAL 44d 31-May-19 31-Jul-19 SPEC FOR CHEMICAL INJECTION
INJECTION
ME-502 - Master Equipment Li
List 44d 31-May-19 31-Jul-19 31-Jul-19, ME-502 - Master Equipment List
DDE.3050 MASTER EQUIPMENT LIST 44d 31-May-19 31-Jul-19 MASTER EQUIPMENT LIST
WP1020 Volume 3 - Offshore Execution 30d 11-Oct-19 22-Nov-19 Volume 3 - Offshore Execution
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 13 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
PRC1030 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 11-Sep-19 07-Nov-19 07-Nov-19, MANUFACTURING / DELIVERIES
PRC1040 Engineering 5d 11-Sep-19 17-Sep-19 Engineering
PRC1050 Procurement 5d 18-Sep-19 24-Sep-19 Procurement
PRC1060 Production 25d 25-Sep-19 29-Oct-19 Production
PRC1070 FAT 2d 30-Oct-19 31-Oct-19 FAT
PRC1080 Delivery 5d 01-Nov-19 07-Nov-19 Delivery
BEAM 64d 12-Aug-19 07-Nov-19 07-Nov-19, BEAM
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
PRC1090 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
PRC1200 TBE 6d 21-Aug-19 28-Aug-19 TBE
PRC1210 CBE 6d 29-Aug-19 05-Sep-19 CBE
PRC1220 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 11-Sep-19 07-Nov-19 07-Nov-19, MANUFACTURING / DELIVERIES
PRC1230 Engineering 5d 11-Sep-19 17-Sep-19 Engineering
PRC1240 Procurement 5d 18-Sep-19 24-Sep-19 Procurement
PRC1250 Production 25d 25-Sep-19 29-Oct-19 Production
PRC1260 FAT 2d 30-Oct-19 31-Oct-19 FAT
PRC1270 Delivery 5d 01-Nov-19 07-Nov-19 Delivery
MUDWALL 64d 11-Sep-19 09-Dec-19 09-Dec-19, MUDWALL
BID/EVALUATE / AWARD 22d 11-Sep-19 10-Oct-19 10-Oct-19, BID/EVALUATE / AWARD
PRC1280 RFQ 7d 11-Sep-19 19-Sep-19 RFQ
PRC1290 TBE 6d 20-Sep-19 27-Sep-19 TBE
PRC1300 CBE 6d 30-Sep-19 07-Oct-19 CBE
PRC1310 PO Issuance 3d 08-Oct-19 10-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 11-Oct-19 09-Dec-19 09-Dec-19, MANUFACTURING / DELIVERIES
PRC1320 Engineering 5d 11-Oct-19 17-Oct-19 Engineering
PRC1330 Procurement 5d 18-Oct-19 24-Oct-19 Procurement
PRC1340 Production 25d 25-Oct-19 28-Nov-19 Production
PRC1350 FAT 2d 29-Nov-19 02-Dec-19 FAT
PRC1360 Delivery 5d 03-Dec-19 09-Dec-19 Delivery
ROD & BAR 64d 12-Aug-19 07-Nov-19 07-Nov-19, ROD & BAR
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
PRC1370 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
PRC1380 TBE 6d 21-Aug-19 28-Aug-19 TBE
PRC1390 CBE 6d 29-Aug-19 05-Sep-19 CBE
PRC1400 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 11-Sep-19 07-Nov-19 07-Nov-19, MANUFACTURING / DELIVERIES
PRC1410 Engineering 5d 11-Sep-19 17-Sep-19 Engineering
PRC1420 Procurement 5d 18-Sep-19 24-Sep-19 Procurement
PRC1430 Production 25d 25-Sep-19 29-Oct-19 Production
PRC1440 FAT 2d 30-Oct-19 31-Oct-19 FAT
PRC1450 Delivery 5d 01-Nov-19 07-Nov-19 Delivery
GRATING 64d 02-Oct-19 30-Dec-19 30-Dec-19, GRATING
BID/EVALUATE / AWARD 22d 02-Oct-19 31-Oct-19 31-Oct-19, BID/EVALUATE / AWARD
PRC1460 RFQ 7d 02-Oct-19 10-Oct-19 RFQ
PRC1470 TBE 6d 11-Oct-19 18-Oct-19 TBE
PRC1480 CBE 6d 21-Oct-19 28-Oct-19 CBE
PRC1490 PO Issuance 3d 29-Oct-19 31-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 01-Nov-19 30-Dec-19 30-Dec-19, MANUFACTURING / DELIVERIES
PRC1500 Engineering 5d 01-Nov-19 07-Nov-19 Engineering
PRC1510 Procurement 5d 08-Nov-19 14-Nov-19 Procurement
PRC1520 Production 25d 15-Nov-19 19-Dec-19 Production
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 14 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
PRC1530 FAT 2d 20-Dec-19 23-Dec-19 FAT
PRC1540 Delivery 5d 24-Dec-19 30-Dec-19 Delivery
PIPING 129d 05-Aug-19 30-Jan-20 30-Jan-20, PIPING
BALL VALVE 124d 12-Aug-19 30-Jan-20 30-Jan-20, BALL VALVE
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
A2280 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
A2290 TBE 6d 21-Aug-19 28-Aug-19 TBE
A2300 CBE 6d 29-Aug-19 05-Sep-19 CBE
A2310 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 102d 11-Sep-19 30-Jan-20 30-Jan-20, MANUFACTURING / DELIVERIES
A2400 Engineering 10d 11-Sep-19 24-Sep-19 Engineering
A2410 Procurement 5d 25-Sep-19 01-Oct-19 Procurement
A2420 Production 80d 02-Oct-19 21-Jan-20 Production
A2430 FAT 2d 22-Jan-20 23-Jan-20 FAT
A2440 Delivery 5d 24-Jan-20 30-Jan-20 Delivery
GATE VALVE 64d 12-Aug-19 07-Nov-19 07-Nov-19, GATE VALVE
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
A5440 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
A5450 TBE 6d 21-Aug-19 28-Aug-19 TBE
A5460 CBE 6d 29-Aug-19 05-Sep-19 CBE
A5470 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 11-Sep-19 07-Nov-19 07-Nov-19, MANUFACTURING / DELIVERIES
A5480 Engineering 5d 11-Sep-19 17-Sep-19 Engineering
A5490 Procurement 5d 18-Sep-19 24-Sep-19 Procurement
A5500 Production 25d 25-Sep-19 29-Oct-19 Production
A5510 FAT 2d 30-Oct-19 31-Oct-19 FAT
A5520 Delivery 5d 01-Nov-19 07-Nov-19 Delivery
CHECK VALVE 64d 12-Aug-19 07-Nov-19 07-Nov-19, CHECK VALVE
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
A5530 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
A5540 TBE 6d 21-Aug-19 28-Aug-19 TBE
A5550 CBE 6d 29-Aug-19 05-Sep-19 CBE
A5560 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 11-Sep-19 07-Nov-19 07-Nov-19, MANUFACTURING / DELIVERIES
A5570 Engineering 5d 11-Sep-19 17-Sep-19 Engineering
A5580 Procurement 5d 18-Sep-19 24-Sep-19 Procurement
A5590 Production 25d 25-Sep-19 29-Oct-19 Production
A5600 FAT 2d 30-Oct-19 31-Oct-19 FAT
A5610 Delivery 5d 01-Nov-19 07-Nov-19 Delivery
INTEGRATED DBB VALVE 64d 16-Sep-19 12-Dec-19 12-Dec-19, INTEGRATED DBB VALVE
BID/EVALUATE / AWARD 22d 16-Sep-19 15-Oct-19 15-Oct-19, BID/EVALUATE / AWARD
A5620 RFQ 7d 16-Sep-19 24-Sep-19 RFQ
A5630 TBE 6d 25-Sep-19 02-Oct-19 TBE
A5640 CBE 6d 03-Oct-19 10-Oct-19 CBE
A5650 PO Issuance 3d 11-Oct-19 15-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 16-Oct-19 12-Dec-19 12-Dec-19, MANUFACTURING / DELIVERIES
A5660 Engineering 5d 16-Oct-19 22-Oct-19 Engineering
A5670 Procurement 5d 23-Oct-19 29-Oct-19 Procurement
A5680 Production 25d 30-Oct-19 03-Dec-19 Production
A5690 FAT 2d 04-Dec-19 05-Dec-19 FAT
A5700 Delivery 5d 06-Dec-19 12-Dec-19 Delivery
LINEPIPE 64d 05-Aug-19 31-Oct-19 31-Oct-19, LINEPIPE
BID/EVALUATE / AWARD 22d 05-Aug-19 03-Sep-19 03-Sep-19, BID/EVALUATE / AWARD
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 15 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
A5710 RFQ 7d 05-Aug-19 13-Aug-19 RFQ
A5720 TBE 6d 14-Aug-19 21-Aug-19 TBE
A5730 CBE 6d 22-Aug-19 29-Aug-19 CBE
A5740 PO Issuance 3d 30-Aug-19 03-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 04-Sep-19 31-Oct-19 31-Oct-19, MANUFACTURING / DELIVERIES
A5750 Engineering 5d 04-Sep-19 10-Sep-19 Engineering
A5760 Procurement 5d 11-Sep-19 17-Sep-19 Procurement
A5770 Production 25d 18-Sep-19 22-Oct-19 Production
A5780 FAT 2d 23-Oct-19 24-Oct-19 FAT
A5790 Delivery 5d 25-Oct-19 31-Oct-19 Delivery
FITTING & FLANGES 64d 05-Aug-19 31-Oct-19 31-Oct-19, FITTING & FLANGES
BID/EVALUATE / AWARD 22d 05-Aug-19 03-Sep-19 03-Sep-19, BID/EVALUATE / AWARD
A5800 RFQ 7d 05-Aug-19 13-Aug-19 RFQ
A5810 TBE 6d 14-Aug-19 21-Aug-19 TBE
A5820 CBE 6d 22-Aug-19 29-Aug-19 CBE
A5830 PO Issuance 3d 30-Aug-19 03-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 04-Sep-19 31-Oct-19 31-Oct-19, MANUFACTURING / DELIVERIES
A5840 Engineering 5d 04-Sep-19 10-Sep-19 Engineering
A5850 Procurement 5d 11-Sep-19 17-Sep-19 Procurement
A5860 Production 25d 18-Sep-19 22-Oct-19 Production
A5870 FAT 2d 23-Oct-19 24-Oct-19 FAT
A5880 Delivery 5d 25-Oct-19 31-Oct-19 Delivery
STUDBOLT & NUTS 64d 10-Sep-19 06-Dec-19 06-Dec-19, STUDBOLT & NUTS
BID/EVALUATE / AWARD 22d 10-Sep-19 09-Oct-19 09-Oct-19, BID/EVALUATE / AWARD
A6340 RFQ 7d 10-Sep-19 18-Sep-19 RFQ
A6350 TBE 6d 19-Sep-19 26-Sep-19 TBE
A6360 CBE 6d 27-Sep-19 04-Oct-19 CBE
A6370 PO Issuance 3d 07-Oct-19 09-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 10-Oct-19 06-Dec-19 06-Dec-19, MANUFACTURING / DELIVERIES
A6380 Engineering 5d 10-Oct-19 16-Oct-19 Engineering
A6390 Procurement 5d 17-Oct-19 23-Oct-19 Procurement
A6400 Production 25d 24-Oct-19 27-Nov-19 Production
A6410 FAT 2d 28-Nov-19 29-Nov-19 FAT
A6420 Delivery 5d 02-Dec-19 06-Dec-19 Delivery
GASKET 64d 10-Sep-19 06-Dec-19 06-Dec-19, GASKET
BID/EVALUATE / AWARD 22d 10-Sep-19 09-Oct-19 09-Oct-19, BID/EVALUATE / AWARD
A5890 RFQ 7d 10-Sep-19 18-Sep-19 RFQ
A5900 TBE 6d 19-Sep-19 26-Sep-19 TBE
A5910 CBE 6d 27-Sep-19 04-Oct-19 CBE
A5920 PO Issuance 3d 07-Oct-19 09-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 10-Oct-19 06-Dec-19 06-Dec-19, MANUFACTURING / DELIVERIES
A5930 Engineering 5d 10-Oct-19 16-Oct-19 Engineering
A5940 Procurement 5d 17-Oct-19 23-Oct-19 Procurement
A5950 Production 25d 24-Oct-19 27-Nov-19 Production
A5960 FAT 2d 28-Nov-19 29-Nov-19 FAT
A5970 Delivery 5d 02-Dec-19 06-Dec-19 Delivery
SP ITEMS 64d 16-Aug-19 13-Nov-19 13-Nov-19, SP ITEMS
BID/EVALUATE / AWARD 22d 16-Aug-19 16-Sep-19 16-Sep-19, BID/EVALUATE / AWARD
A6430 RFQ 7d 16-Aug-19 26-Aug-19 RFQ
A6440 TBE 6d 27-Aug-19 03-Sep-19 TBE
A6450 CBE 6d 04-Sep-19 11-Sep-19 CBE
A6460 PO Issuance 3d 12-Sep-19 16-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 17-Sep-19 13-Nov-19 13-Nov-19, MANUFACTURING / DELIVERIES
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 16 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
A6470 Engineering 5d 17-Sep-19 23-Sep-19 Engineering
A6480 Procurement 5d 24-Sep-19 30-Sep-19 Procurement
A6490 Production 25d 01-Oct-19 04-Nov-19 Production
A6500 FAT 2d 05-Nov-19 06-Nov-19 FAT
A6510 Delivery 5d 07-Nov-19 13-Nov-19 Delivery
ELECTRICAL 71d 20-Sep-19 30-Dec-19 30-Dec-19, ELECTRICAL
CABLE TRAY 64d 20-Sep-19 19-Dec-19 19-Dec-19, CABLE TRAY
BID/EVALUATE / AWARD 22d 20-Sep-19 22-Oct-19 22-Oct-19, BID/EVALUATE / AWARD
A2320 RFQ 7d 20-Sep-19 01-Oct-19 RFQ
A2330 TBE 6d 01-Oct-19 09-Oct-19 TBE
A2340 CBE 6d 09-Oct-19 17-Oct-19 CBE
A2350 PO Issuance 3d 17-Oct-19 22-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 22-Oct-19 19-Dec-19 19-Dec-19, MANUFACTURING / DELIVERIES
A2450 Engineering 5d 22-Oct-19 29-Oct-19 Engineering
A2460 Procurement 5d 29-Oct-19 05-Nov-19 Procurement
A2470 Production 25d 05-Nov-19 10-Dec-19 Production
A2480 FAT 2d 10-Dec-19 12-Dec-19 FAT
A2490 Delivery 5d 12-Dec-19 19-Dec-19 Delivery
CABLE GLAND & ACCESORIES
ACCESORI 64d 01-Oct-19 30-Dec-19 30-Dec-19, CABLE GLAND & ACCESORIES
BID/EVALUATE / AWARD 22d 01-Oct-19 31-Oct-19 31-Oct-19, BID/EVALUATE / AWARD
A5980 RFQ 7d 01-Oct-19 10-Oct-19 RFQ
A5990 TBE 6d 10-Oct-19 18-Oct-19 TBE
A6000 CBE 6d 18-Oct-19 28-Oct-19 CBE
A6010 PO Issuance 3d 28-Oct-19 31-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 31-Oct-19 30-Dec-19 30-Dec-19, MANUFACTURING / DELIVERIES
A6020 Engineering 5d 31-Oct-19 07-Nov-19 Engineering
A6030 Procurement 5d 07-Nov-19 14-Nov-19 Procurement
A6040 Production 25d 14-Nov-19 19-Dec-19 Production
A6050 FAT 2d 19-Dec-19 23-Dec-19 FAT
A6060 Delivery 5d 23-Dec-19 30-Dec-19 Delivery
POWER CABLE 64d 20-Sep-19 19-Dec-19 19-Dec-19, POWER CABLE
BID/EVALUATE / AWARD 22d 20-Sep-19 22-Oct-19 22-Oct-19, BID/EVALUATE / AWARD
A6070 RFQ 7d 20-Sep-19 01-Oct-19 RFQ
A6080 TBE 6d 01-Oct-19 09-Oct-19 TBE
A6090 CBE 6d 09-Oct-19 17-Oct-19 CBE
A6100 PO Issuance 3d 17-Oct-19 22-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 22-Oct-19 19-Dec-19 19-Dec-19, MANUFACTURING / DELIVERIES
A6110 Engineering 5d 22-Oct-19 29-Oct-19 Engineering
A6120 Procurement 5d 29-Oct-19 05-Nov-19 Procurement
A6130 Production 25d 05-Nov-19 10-Dec-19 Production
A6140 FAT 2d 10-Dec-19 12-Dec-19 FAT
A6150 Delivery 5d 12-Dec-19 19-Dec-19 Delivery
TUBING & FITTING 64d 20-Sep-19 19-Dec-19 19-Dec-19, TUBING & FITTING
BID/EVALUATE / AWARD 22d 20-Sep-19 22-Oct-19 22-Oct-19, BID/EVALUATE / AWARD
A6160 RFQ 7d 20-Sep-19 01-Oct-19 RFQ
A6170 TBE 6d 01-Oct-19 09-Oct-19 TBE
A6180 CBE 6d 09-Oct-19 17-Oct-19 CBE
A6190 PO Issuance 3d 17-Oct-19 22-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 22-Oct-19 19-Dec-19 19-Dec-19, MANUFACTURING / DELIVERIES
A6200 Engineering 5d 22-Oct-19 29-Oct-19 Engineering
A6210 Procurement 5d 29-Oct-19 05-Nov-19 Procurement
A6220 Production 25d 05-Nov-19 10-Dec-19 Production
A6230 FAT 2d 10-Dec-19 12-Dec-19 FAT
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 17 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
A6240 Delivery 5d 12-Dec-19 19-Dec-19 Delivery
INSTRUMENTATION 64d 20-Sep-19 19-Dec-19 19-Dec-19, INSTRUMENTATION
INSTRUMENT CABLES 64d 20-Sep-19 19-Dec-19 19-Dec-19, INSTRUMENT CABLES
BID/EVALUATE / AWARD 22d 20-Sep-19 22-Oct-19 22-Oct-19, BID/EVALUATE / AWARD
A2360 RFQ 7d 20-Sep-19 01-Oct-19 RFQ
A2370 TBE 6d 01-Oct-19 09-Oct-19 TBE
A2380 CBE 6d 09-Oct-19 17-Oct-19 CBE
A2390 PO Issuance 3d 17-Oct-19 22-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 22-Oct-19 19-Dec-19 19-Dec-19, MANUFACTURING / DELIVERIES
A2500 Engineering 5d 22-Oct-19 29-Oct-19 Engineering
A2510 Procurement 5d 29-Oct-19 05-Nov-19 Procurement
A2520 Production 25d 05-Nov-19 10-Dec-19 Production
A2530 FAT 2d 10-Dec-19 12-Dec-19 FAT
A2540 Delivery 5d 12-Dec-19 19-Dec-19 Delivery
INSTRUMENT SUPPORT 64d 20-Sep-19 19-Dec-19 19-Dec-19, INSTRUMENT SUPPORT
BID/EVALUATE / AWARD 22d 20-Sep-19 22-Oct-19 22-Oct-19, BID/EVALUATE / AWARD
A6250 RFQ 7d 20-Sep-19 01-Oct-19 RFQ
A6260 TBE 6d 01-Oct-19 09-Oct-19 TBE
A6270 CBE 6d 09-Oct-19 17-Oct-19 CBE
A6280 PO Issuance 3d 17-Oct-19 22-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 22-Oct-19 19-Dec-19 19-Dec-19, MANUFACTURING / DELIVERIES
A6290 Engineering 5d 22-Oct-19 29-Oct-19 Engineering
A6300 Procurement 5d 29-Oct-19 05-Nov-19 Procurement
A6310 Production 25d 05-Nov-19 10-Dec-19 Production
A6320 FAT 2d 10-Dec-19 12-Dec-19 FAT
A6330 Delivery 5d 12-Dec-19 19-Dec-19 Delivery
FIELD INSTRUMENT 64d 20-Sep-19 19-Dec-19 19-Dec-19, FIELD INSTRUMENT
BID/EVALUATE / AWARD 22d 20-Sep-19 22-Oct-19 22-Oct-19, BID/EVALUATE / AWARD
A8350 RFQ 7d 20-Sep-19 01-Oct-19 RFQ
A8360 TBE 6d 01-Oct-19 09-Oct-19 TBE
A8370 CBE 6d 09-Oct-19 17-Oct-19 CBE
A8380 PO Issuance 3d 17-Oct-19 22-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 22-Oct-19 19-Dec-19 19-Dec-19, MANUFACTURING / DELIVERIES
A8390 Engineering 5d 22-Oct-19 29-Oct-19 Engineering
A8400 Procurement 5d 29-Oct-19 05-Nov-19 Procurement
A8410 Production 25d 05-Nov-19 10-Dec-19 Production
A8420 FAT 2d 10-Dec-19 12-Dec-19 FAT
A8430 Delivery 5d 12-Dec-19 19-Dec-19 Delivery
SIPROD DELUGE VALVE - REUSE
RE 64d 20-Sep-19 19-Dec-19 19-Dec-19, SIPROD DELUGE VALVE - REUSE
BID/EVALUATE / AWARD 22d 20-Sep-19 22-Oct-19 22-Oct-19, BID/EVALUATE / AWARD
A8440 RFQ 7d 20-Sep-19 01-Oct-19 RFQ
A8450 TBE 6d 01-Oct-19 09-Oct-19 TBE
A8460 CBE 6d 09-Oct-19 17-Oct-19 CBE
A8470 PO Issuance 3d 17-Oct-19 22-Oct-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 42d 22-Oct-19 19-Dec-19 19-Dec-19, MANUFACTURING / DELIVERIES
A8480 Engineering 5d 22-Oct-19 29-Oct-19 Engineering
A8490 Procurement 5d 29-Oct-19 05-Nov-19 Procurement
A8500 Production 25d 05-Nov-19 10-Dec-19 Production
A8510 SAT 2d 10-Dec-19 12-Dec-19 SAT
A8520 Delivery 5d 12-Dec-19 19-Dec-19 Delivery
LONG LEAD ITEMS (LLI) 137d 05-Aug-19 11-Feb-20 11-Feb-20, LONG LEAD ITEMS (LLI)
PIPING 137d 05-Aug-19 11-Feb-20 11-Feb-20, PIPING
CHOKE VALVE 132d 12-Aug-19 11-Feb-20 11-Feb-20, CHOKE VALVE
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 18 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
A2550 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
A2560 TBE 7d 21-Aug-19 29-Aug-19 TBE
A2570 CBE 6d 30-Aug-19 06-Sep-19 CBE
A2580 PO Issuance 2d 09-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 110d 11-Sep-19 11-Feb-20 11-Feb-20, MANUFACTURING / DELIVERIES
A2710 Engineering 15d 11-Sep-19 01-Oct-19 Engineering
A2720 Procurement 10d 02-Oct-19 15-Oct-19 Procurement
A2730 Production 75d 16-Oct-19 28-Jan-20 Production
A2740 FAT 5d 29-Jan-20 04-Feb-20 FAT
A2750 Delivery 5d 05-Feb-20 11-Feb-20 Delivery
LINEPIPE & FITTING (DUPLEX)
(DUPLE 97d 05-Aug-19 17-Dec-19 17-Dec-19, LINEPIPE & FITTING (DUPLEX)
BID/EVALUATE / AWARD 22d 05-Aug-19 03-Sep-19 03-Sep-19, BID/EVALUATE / AWARD
A2670 RFQ 7d 05-Aug-19 13-Aug-19 RFQ
A2680 TBE 6d 14-Aug-19 21-Aug-19 TBE
A2690 CBE 6d 22-Aug-19 29-Aug-19 CBE
A2700 PO Issuance 3d 30-Aug-19 03-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 75d 04-Sep-19 17-Dec-19 17-Dec-19, MANUFACTURING / DELIVERIES
A2860 Engineering 15d 04-Sep-19 24-Sep-19 Engineering
A2870 Procurement 10d 25-Sep-19 08-Oct-19 Procurement
A2880 Production 40d 09-Oct-19 03-Dec-19 Production
A2890 FAT 5d 04-Dec-19 10-Dec-19 FAT
A2900 Delivery 5d 11-Dec-19 17-Dec-19 Delivery
INSTRUMENT 132d 12-Aug-19 11-Feb-20 11-Feb-20, INSTRUMENT
WET GAS FLOWMETER 132d 12-Aug-19 11-Feb-20 11-Feb-20, WET GAS FLOWMETER
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
A2590 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
A2600 TBE 6d 21-Aug-19 28-Aug-19 TBE
A2610 CBE 6d 29-Aug-19 05-Sep-19 CBE
A2620 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 110d 11-Sep-19 11-Feb-20 11-Feb-20, MANUFACTURING / DELIVERIES
A2760 Engineering 15d 11-Sep-19 01-Oct-19 Engineering
A2770 Procurement 10d 02-Oct-19 15-Oct-19 Procurement
A2780 Production 75d 16-Oct-19 28-Jan-20 Production
A2790 FAT 5d 29-Jan-20 04-Feb-20 FAT
A2800 Delivery 5d 05-Feb-20 11-Feb-20 Delivery
WELLHEAD CONTROL MODULE
MODU 102d 12-Aug-19 31-Dec-19 31-Dec-19, WELLHEAD CONTROL MODULE
BID/EVALUATE / AWARD 22d 12-Aug-19 10-Sep-19 10-Sep-19, BID/EVALUATE / AWARD
A2630 RFQ 7d 12-Aug-19 20-Aug-19 RFQ
A2640 TBE 6d 21-Aug-19 28-Aug-19 TBE
A2650 CBE 6d 29-Aug-19 05-Sep-19 CBE
A2660 PO Issuance 3d 06-Sep-19 10-Sep-19 PO Issuance
MANUFACTURING / DELIVERIES
DELIVE 80d 11-Sep-19 31-Dec-19 31-Dec-19, MANUFACTURING / DELIVERIES
A2810 Engineering 10d 11-Sep-19 24-Sep-19 Engineering
A2820 Procurement 10d 25-Sep-19 08-Oct-19 Procurement
A2830 Production 50d 09-Oct-19 17-Dec-19 Production
A2840 FAT 5d 18-Dec-19 24-Dec-19 FAT
A2850 Delivery 5d 25-Dec-19 31-Dec-19 Delivery
ONSHORE PRE-FABRICATION
PRE-FABRIC 35d 17-Dec-19 21-Jan-20 21-Jan-20, ONSHORE PRE-FABRICATION
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 19 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
FAB1000 Siprod / Rig-up / WTI 140 & 160 30d 17-Dec-19 16-Jan-20 Siprod / Rig-up / WTI 140 & 160 Piping and Support fabrication (Estimated dia-inch - 1965)
Piping and Support fabrication
(Estimated dia-inch - 1965)
BLASTING & PAINTING 14d 08-Jan-20 21-Jan-20 21-Jan-20, BLASTING & PAINTING
FAB1030 Siprod / Rig-up / WTI 140 & 160 14d 08-Jan-20 21-Jan-20 Siprod / Rig-up / WTI 140 & 160 Piping and Support
Piping and Support
HUC1060 Removal Scope (E&I) 10d 29-Feb-20 10-Mar-20 Removal Scope (E&I)
PIPING 22d 27-Feb-20 20-Mar-20 20-Mar-20, PIPING
HUC1070 Scaffolding erection for piping 14d 27-Feb-20 12-Mar-20 Scaffolding erection for piping installation
installation
HUC1080 Removal scope 10d 29-Feb-20 10-Mar-20 Removal scope
HUC1090 Piping installation for FW, VH, DC, 18d 02-Mar-20 20-Mar-20 Piping installation for FW, VH, DC, NTand PG line
NTand PG line
STRUCTURAL 12d 05-Mar-20 17-Mar-20 17-Mar-20, STRUCTURAL
HUC1100 Structural installation (Mudwall / New 12d 05-Mar-20 17-Mar-20 Structural installation (Mudwall / New Hatchcover / Support)
Hatchcover / Support)
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone
F9 INFILL 2.0 PROJECT Page 20 of 20
Activity ID Activity Name REM DUR Start Finish Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
HUC1120 Valve & RO installation (SD Scope) 3d 17-Apr-20 20-Apr-20 Valve & RO installation (SD Scope)
HUC1130 ESD testing (SD Scope) 3d 17-Apr-20 20-Apr-20 ESD testing (SD Scope)
HUC1140 Rig Mobilization (by drilling) 7d 03-Apr-20 14-Apr-20 Rig Mobilization (by drilling)
HUC1150 Rig-up (by drilling) 6d 14-Apr-20 20-Apr-20 Rig-up (by drilling)
DRILLING CAMPAIGN 88d 20-Apr-20 17-Jul-20 17-Jul-20, DRILLING CAMPAIGN
A1330 Drilling Campaign* (by drilling) 88d 20-Apr-20 17-Jul-20 Drilling Campaign* (by drilling)
Actual Work Critical Remaining Work Summary Date Revision Checked Approved
17-Jul-19 F9 INFILL 2.0 PROJECT
Remaining Work Milestone