Simara Calculation Sheet
Simara Calculation Sheet
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT FOR SIMARA CHILDREN CANCER
FOUNDATION, RIVERS STATE.
LOCATION
University of Port Harcourt Teaching Hospital, Choba, Obio Akpor L.G.A, Rivers state.
STRUCTURAL ENGINEER
Engr. Opeloyeru Basit
BOA Construction Company
Civil/Structural Engineering and Consultancy
Office No. 19, Looksmart complex opposite, Rhema Chapel, beside
DSTV, Akala Express, Ibadan, Oyo State.
Tel: 08163267631, 07014165680
E-mail: [email protected]
CLIENT
SIMARA CHILDREN CANCER FOUNDATION
PROPOSED COMMERCIAL DEVELOPMENT FOR SIMARA CHILDREN CANCER
FOUNDATION, RIVERS STATE.
GENERAL NOTES.
1. All drawings to be read in conjunction with Architect's Drawings, other Structural
Drawings and Specialists Drawings.
3. Foundation Structures, pending soil test reports, based on assumed Allowable ground
pressure, q= 150 kN/m2.
7. All construction joint positions are to be approved by the Engineer prior to casting, but
these should not be more than 10 meters apart.
BLOCKWORK
8. Hollow blockwork below ground slab level are to be filled with mass concrete.
Backfilling carried out simultaneously on both sides.
9. All 230mm wide Blockwork specified in the structural details are classified as Load
bearing. Any additional amendments to existing opening must be consulted with the
Engineer.
10. The bedding thickness of the block walls should not be more than 5mm.
.
TABLE OF CONTENTS.
1. General Notes.
2. Table of Contents.
3. Design Information.
Structural Analysis
4. Main Building
Structural Summary
ii. BS882.
SUBSOIL CONDITIONS
An assumption of an allowable soil pressure 150kN/m2 was made, pending a soil test
report.
FOUNDATION TYPE
Pad foundation to all structural members
MATERIAL DATA
i. Concrete
Characteristic strength fcu = 25N/mm2. Mass
density at 2400kg/m3
ii. Reinforcement
Characteristic strength, fy = 385N/mm2
Pad
Foundation
Analysis and
Design
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
F1
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C1 1 -100.1 -2.5 3.1 G+Q *F
2 -104.8 -3.1 3.1 (G+Q)P11 *F
3 -100.4 -2.4 3.3 (G+Q)P12 *F
4 -76.5 -0.7 3.1 (G+Q)P21 *F
5 -77.7 -2.4 1.4 (G+Q)P22 *F
6 -99.3 -2.3 3.1 (G+Q)P31 *F
7 -77.8 -2.4 1.7 (G+Q)P32 *F
8 -77.4 -0.8 3.1 (G+Q)P41 *F
9 -100.2 -2.4 2.9 (G+Q)P42 *F
10 -104.7 -3.1 3.1 (G+Q)P51 *F
11 -100.2 -2.4 3.2 (G+Q)P52 *F
12 -82.5 0.3 2.7 G+Q+Nx
13 -84.5 -4.3 2.5 G+Q-Nx
14 -84.5 -2.0 4.9 G+Q+Ny
15 -82.5 -2.0 0.2 G+Q-Ny
Column: 1C1
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 2 ((G+Q)P11 *F)
N= -104.8 kN Mx = 3.1 kN.m
My = 3.1 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 165.292 kN/m2 S-min = 91.439 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.1 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.16 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 121.9 kN V-eff = 126.5 kN
v= 0.36 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 12.0 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 121.9 kN V-eff = 126.5 kN
v= 0.36 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-2
F2
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C2 1 -229.5 -0.8 5.9 G+Q *F
2 -188.6 1.5 5.9 (G+Q)P11 *F
3 -229.1 -0.7 6.1 (G+Q)P12 *F
4 -205.0 -2.7 5.9 (G+Q)P21 *F
5 -192.9 -0.8 2.9 (G+Q)P22 *F
6 -233.7 -1.2 5.9 (G+Q)P31 *F
7 -192.9 -0.8 3.2 (G+Q)P32 *F
8 -199.8 -2.2 6.0 (G+Q)P41 *F
9 -228.9 -0.7 5.7 (G+Q)P42 *F
10 -189.5 1.3 5.9 (G+Q)P51 *F
11 -229.7 -0.8 6.0 (G+Q)P52 *F
12 -191.3 1.8 5.0 G+Q+Nx
13 -190.1 -3.1 4.8 G+Q-Nx
14 -191.8 -0.6 7.2 G+Q+Ny
15 -189.7 -0.7 2.6 G+Q-Ny
Column: 1C2
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -233.7 kN Mx = 1.2 kN.m
My = 5.9 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 181.297 kN/m2 S-min = 142.574 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 26.1 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.24 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.06 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 265.5 kN V-eff = 272.3 kN
v= 0.77 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 25.5 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 265.5 kN V-eff = 272.3 kN
v= 0.77 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F3
--------------------------------------------------------------------------------
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-3
Columns/Loadings:
Column Cmb N Mx My
1C3 1 -259.5 0.5 5.9 G+Q *F
2 -225.4 -1.9 5.9 (G+Q)P11 *F
3 -223.3 0.5 3.0 (G+Q)P12 *F
4 -212.3 2.6 5.9 (G+Q)P21 *F
5 -258.6 0.5 5.9 (G+Q)P22 *F
6 -210.4 2.5 5.9 (G+Q)P31 *F
7 -258.8 0.5 6.3 (G+Q)P32 *F
8 -269.5 0.1 6.0 (G+Q)P41 *F
9 -222.9 0.5 2.6 (G+Q)P42 *F
10 -217.4 -1.4 5.8 (G+Q)P51 *F
11 -259.7 0.5 6.0 (G+Q)P52 *F
12 -215.0 2.8 4.9 G+Q+Nx
13 -215.6 -2.0 4.8 G+Q-Nx
14 -216.4 0.4 7.2 G+Q+Ny
15 -214.3 0.4 2.6 G+Q-Ny
Column: 1C3
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -269.5 kN Mx = 0.1 kN.m
My = 6.0 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 199.632 kN/m2 S-min = 166.571 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 28.8 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.27 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 300.2 kN V-eff = 307.1 kN
v= 0.87 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 28.2 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 300.2 kN V-eff = 307.1 kN
v= 0.87 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F4
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C4 1 -262.3 -0.3 6.0 G+Q *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-4
F5
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C5 1 -272.5 0.1 6.1 G+Q *F
2 -228.2 -2.1 6.0 (G+Q)P11 *F
3 -272.9 0.2 6.2 (G+Q)P12 *F
4 -229.3 2.3 6.1 (G+Q)P21 *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-5
F6
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C6 1 -160.5 3.0 3.5 G+Q *F
2 -165.3 3.5 3.5 (G+Q)P11 *F
3 -160.6 3.0 3.5 (G+Q)P12 *F
4 -108.5 0.9 3.4 (G+Q)P21 *F
5 -138.3 3.0 1.7 (G+Q)P22 *F
6 -156.8 2.9 3.5 (G+Q)P31 *F
7 -138.4 2.9 2.1 (G+Q)P32 *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-6
F7
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C7 1 -104.7 -1.4 3.5 G+Q *F
2 -101.7 -1.5 3.5 (G+Q)P11 *F
3 -104.9 -1.4 3.6 (G+Q)P12 *F
4 -89.2 -0.7 3.5 (G+Q)P21 *F
5 -82.4 -1.4 1.8 (G+Q)P22 *F
6 -101.7 -1.4 3.5 (G+Q)P31 *F
7 -82.5 -1.4 2.3 (G+Q)P32 *F
8 -79.1 -1.0 3.5 (G+Q)P41 *F
9 -104.6 -1.3 3.1 (G+Q)P42 *F
10 -114.8 -1.1 3.6 (G+Q)P51 *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-7
F8
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C8 1 -173.5 0.7 6.0 G+Q *F
2 -156.7 1.3 6.0 (G+Q)P11 *F
3 -173.6 0.8 6.1 (G+Q)P12 *F
4 -150.0 -0.2 6.0 (G+Q)P21 *F
5 -138.1 0.7 3.0 (G+Q)P22 *F
6 -174.0 0.7 6.1 (G+Q)P31 *F
7 -138.2 0.7 3.5 (G+Q)P32 *F
8 -150.3 -0.1 6.0 (G+Q)P41 *F
9 -173.4 0.8 5.5 (G+Q)P42 *F
10 -156.0 1.2 6.0 (G+Q)P51 *F
11 -173.6 0.7 6.1 (G+Q)P52 *F
12 -143.6 3.0 4.9 G+Q+Nx
13 -145.1 -1.8 5.1 G+Q-Nx
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-8
F9
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C9 1 -83.4 1.2 3.4 G+Q *F
2 -69.3 0.6 3.4 (G+Q)P11 *F
3 -83.5 1.2 3.4 (G+Q)P12 *F
4 -86.0 1.2 3.4 (G+Q)P21 *F
5 -62.0 1.2 1.8 (G+Q)P22 *F
6 -83.7 1.2 3.5 (G+Q)P31 *F
7 -62.1 1.1 2.3 (G+Q)P32 *F
8 -85.7 1.2 3.4 (G+Q)P41 *F
9 -83.2 1.2 2.9 (G+Q)P42 *F
10 -69.3 0.6 3.4 (G+Q)P51 *F
11 -83.5 1.2 3.4 (G+Q)P52 *F
12 -71.1 3.3 2.7 G+Q+Nx
13 -68.2 -1.4 2.9 G+Q-Nx
14 -70.6 1.0 5.1 G+Q+Ny
15 -68.7 1.0 0.6 G+Q-Ny
Column: 1C9
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-9
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 4 ((G+Q)P21 *F)
N= -86.0 kN Mx = 1.2 kN.m
My = 3.4 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 137.105 kN/m2 S-min = 81.888 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 10.2 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.13 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 104.0 kN V-eff = 109.1 kN
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.7 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 9.9 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 104.0 kN V-eff = 109.1 kN
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 5.2 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F10
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C10 1 -116.9 1.8 -1.5 G+Q *F
2 -99.3 0.9 -1.4 (G+Q)P11 *F
3 -111.7 1.8 -1.6 (G+Q)P12 *F
4 -117.9 1.9 -1.6 (G+Q)P21 *F
5 -90.7 1.7 -0.7 (G+Q)P22 *F
6 -114.9 1.8 -1.5 (G+Q)P31 *F
7 -84.1 1.7 -0.2 (G+Q)P32 *F
8 -120.0 1.9 -1.6 (G+Q)P41 *F
9 -123.5 1.8 -2.0 (G+Q)P42 *F
10 -99.2 0.8 -1.5 (G+Q)P51 *F
11 -111.7 1.8 -1.6 (G+Q)P52 *F
12 -99.0 3.8 -1.4 G+Q+Nx
13 -96.1 -0.8 -1.1 G+Q-Nx
14 -98.4 1.5 1.1 G+Q+Ny
15 -96.7 1.5 -3.6 G+Q-Ny
Column: 1C10
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -123.5 kN Mx = 1.8 kN.m
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-10
My = 2.0 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 169.800 kN/m2 S-min = 124.185 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.5 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.16 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 139.6 kN V-eff = 142.5 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 12.5 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 139.6 kN V-eff = 142.5 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F11
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C11 1 -83.7 1.4 -3.0 G+Q *F
2 -70.3 0.8 -3.0 (G+Q)P11 *F
3 -83.8 1.3 -3.0 (G+Q)P12 *F
4 -85.4 1.3 -3.0 (G+Q)P21 *F
5 -62.2 1.3 -1.5 (G+Q)P22 *F
6 -69.5 0.7 -3.0 (G+Q)P31 *F
7 -83.5 1.4 -2.6 (G+Q)P32 *F
8 -83.3 1.2 -3.0 (G+Q)P41 *F
9 -62.3 1.3 -1.9 (G+Q)P42 *F
10 -86.5 1.6 -3.0 (G+Q)P51 *F
11 -83.8 1.3 -3.0 (G+Q)P52 *F
12 -71.3 3.4 -2.6 G+Q+Nx
13 -68.4 -1.2 -2.4 G+Q-Nx
14 -68.9 1.1 -0.2 G+Q+Ny
15 -70.9 1.1 -4.7 G+Q-Ny
Column: 1C11
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -86.5 kN Mx = 1.6 kN.m
My = 3.0 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-11
F12
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C12 1 -116.4 1.8 2.0 G+Q *F
2 -117.5 2.2 2.0 (G+Q)P11 *F
3 -111.1 1.8 2.0 (G+Q)P12 *F
4 -98.5 0.6 1.9 (G+Q)P21 *F
5 -90.5 1.8 1.0 (G+Q)P22 *F
6 -98.3 0.8 2.0 (G+Q)P31 *F
7 -122.9 1.8 2.4 (G+Q)P32 *F
8 -116.4 1.6 1.9 (G+Q)P41 *F
9 -84.0 1.8 0.6 (G+Q)P42 *F
10 -117.7 2.1 2.1 (G+Q)P51 *F
11 -111.1 1.8 2.0 (G+Q)P52 *F
12 -98.6 3.8 1.5 G+Q+Nx
13 -95.6 -0.8 1.7 G+Q-Nx
14 -96.3 1.5 4.0 G+Q+Ny
15 -97.9 1.5 -0.8 G+Q-Ny
Column: 1C12
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -122.9 kN Mx = 1.8 kN.m
My = 2.4 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 171.567 kN/m2 S-min = 121.325 kN/m2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-12
F13
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C13 1 -239.4 0.9 3.4 G+Q *F
2 -207.2 -0.1 3.4 (G+Q)P11 *F
3 -231.9 0.9 3.5 (G+Q)P12 *F
4 -215.2 1.5 3.4 (G+Q)P21 *F
5 -195.7 0.9 1.6 (G+Q)P22 *F
6 -216.4 1.6 3.3 (G+Q)P31 *F
7 -251.3 0.9 3.7 (G+Q)P32 *F
8 -237.5 0.8 3.4 (G+Q)P41 *F
9 -183.8 0.9 1.3 (G+Q)P42 *F
10 -207.8 0.0 3.4 (G+Q)P51 *F
11 -231.9 0.9 3.5 (G+Q)P52 *F
12 -198.1 3.1 2.7 G+Q+Nx
13 -199.6 -1.6 2.9 G+Q-Nx
14 -198.0 0.7 5.2 G+Q+Ny
15 -199.7 0.7 0.4 G+Q-Ny
Column: 1C13
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -251.3 kN Mx = 0.9 kN.m
My = 3.7 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 184.818 kN/m2 S-min = 159.880 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-13
F14
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C14 1 -240.2 0.9 -3.0 G+Q *F
2 -215.4 1.7 -3.1 (G+Q)P11 *F
3 -232.9 0.9 -3.1 (G+Q)P12 *F
4 -208.1 -0.4 -3.0 (G+Q)P21 *F
5 -196.5 0.9 -1.4 (G+Q)P22 *F
6 -238.6 0.9 -3.1 (G+Q)P31 *F
7 -184.6 0.9 -1.0 (G+Q)P32 *F
8 -211.0 -0.3 -3.0 (G+Q)P41 *F
9 -252.1 0.9 -3.4 (G+Q)P42 *F
10 -214.1 1.6 -3.1 (G+Q)P51 *F
11 -232.9 0.9 -3.1 (G+Q)P52 *F
12 -198.8 3.1 -2.6 G+Q+Nx
13 -200.3 -1.7 -2.4 G+Q-Nx
14 -200.4 0.7 -0.1 G+Q+Ny
15 -198.7 0.7 -4.9 G+Q-Ny
Column: 1C14
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -252.1 kN Mx = 0.9 kN.m
My = 3.4 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 184.559 kN/m2 S-min = 161.089 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 26.6 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-14
F15
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C15 1 -173.4 0.9 -5.7 G+Q *F
2 -156.9 1.5 -5.7 (G+Q)P11 *F
3 -173.5 0.8 -5.7 (G+Q)P12 *F
4 -150.2 -0.1 -5.8 (G+Q)P21 *F
5 -137.4 0.8 -2.9 (G+Q)P22 *F
6 -155.4 1.3 -5.7 (G+Q)P31 *F
7 -173.3 0.9 -5.3 (G+Q)P32 *F
8 -174.7 0.7 -5.8 (G+Q)P41 *F
9 -137.4 0.8 -3.3 (G+Q)P42 *F
10 -150.4 0.2 -5.7 (G+Q)P51 *F
11 -173.5 0.9 -5.7 (G+Q)P52 *F
12 -143.6 3.1 -4.8 G+Q+Nx
13 -144.9 -1.7 -4.6 G+Q-Nx
14 -143.2 0.7 -2.5 G+Q+Ny
15 -145.2 0.7 -7.0 G+Q-Ny
Column: 1C15
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -174.7 kN Mx = 0.7 kN.m
My = 5.8 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 197.254 kN/m2 S-min = 138.668 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 18.8 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-15
F16
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C16 1 -148.3 -0.8 -5.6 G+Q *F
2 -135.5 -1.1 -5.5 (G+Q)P11 *F
3 -148.5 -0.8 -5.6 (G+Q)P12 *F
4 -133.1 0.0 -5.6 (G+Q)P21 *F
5 -112.8 -0.8 -2.8 (G+Q)P22 *F
6 -158.1 -0.5 -5.6 (G+Q)P31 *F
7 -148.2 -0.8 -5.2 (G+Q)P32 *F
8 -136.3 -1.2 -5.6 (G+Q)P41 *F
9 -112.9 -0.8 -3.2 (G+Q)P42 *F
10 -122.6 -0.1 -5.5 (G+Q)P51 *F
11 -148.5 -0.8 -5.6 (G+Q)P52 *F
12 -124.1 1.7 -4.7 G+Q+Nx
13 -123.0 -3.0 -4.5 G+Q-Nx
14 -122.5 -0.6 -2.3 G+Q+Ny
15 -124.6 -0.6 -6.9 G+Q-Ny
Column: 1C16
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -158.1 kN Mx = 0.5 kN.m
My = 5.6 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 181.792 kN/m2 S-min = 126.658 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.3 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 178.8 kN V-eff = 186.4 kN
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-16
F17
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C17 1 -221.6 -0.9 3.1 G+Q *F
2 -196.9 0.4 3.1 (G+Q)P11 *F
3 -214.1 -0.9 3.2 (G+Q)P12 *F
4 -202.2 -1.8 3.1 (G+Q)P21 *F
5 -174.0 -0.9 1.4 (G+Q)P22 *F
6 -229.0 -0.8 3.2 (G+Q)P31 *F
7 -228.6 -0.9 3.4 (G+Q)P32 *F
8 -202.1 -1.5 3.1 (G+Q)P41 *F
9 -167.1 -0.9 1.1 (G+Q)P42 *F
10 -189.6 0.0 3.0 (G+Q)P51 *F
11 -214.1 -0.9 3.2 (G+Q)P52 *F
12 -184.7 1.6 2.5 G+Q+Nx
13 -183.6 -3.1 2.6 G+Q-Nx
14 -183.3 -0.8 5.0 G+Q+Ny
15 -185.0 -0.8 0.2 G+Q-Ny
Column: 1C17
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -228.6 kN Mx = 0.9 kN.m
My = 3.4 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 197.545 kN/m2 S-min = 167.196 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 23.4 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.24 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.04 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 253.4 kN V-eff = 257.7 kN
v= 0.73 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-17
F18
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C18 1 -224.3 1.5 3.1 G+Q *F
2 -189.9 0.0 3.0 (G+Q)P11 *F
3 -216.7 1.5 3.3 (G+Q)P12 *F
4 -213.1 2.2 3.2 (G+Q)P21 *F
5 -176.7 1.5 1.5 (G+Q)P22 *F
6 -184.2 0.2 3.0 (G+Q)P31 *F
7 -231.2 1.5 3.4 (G+Q)P32 *F
8 -208.6 1.7 3.0 (G+Q)P41 *F
9 -169.7 1.5 1.2 (G+Q)P42 *F
10 -234.5 1.9 3.3 (G+Q)P51 *F
11 -216.7 1.5 3.2 (G+Q)P52 *F
12 -185.8 3.6 2.5 G+Q+Nx
13 -186.8 -1.1 2.6 G+Q-Nx
14 -185.4 1.2 5.0 G+Q+Ny
15 -187.2 1.3 0.2 G+Q-Ny
Column: 1C18
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -234.5 kN Mx = 1.9 kN.m
My = 3.3 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 204.380 kN/m2 S-min = 168.528 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 24.1 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.04 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 259.1 kN V-eff = 263.1 kN
v= 0.74 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.4 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 23.9 kN.m/m
K/K' = 0.05 < 1.0
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-18
F19
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C19 1 -203.2 2.7 -5.6 G+Q *F
2 -197.6 3.4 -5.5 (G+Q)P11 *F
3 -203.3 2.7 -5.5 (G+Q)P12 *F
4 -152.6 0.6 -5.7 (G+Q)P21 *F
5 -167.7 2.7 -2.8 (G+Q)P22 *F
6 -149.1 1.1 -5.6 (G+Q)P31 *F
7 -203.1 2.7 -5.2 (G+Q)P32 *F
8 -189.7 2.7 -5.6 (G+Q)P41 *F
9 -167.8 2.6 -3.1 (G+Q)P42 *F
10 -214.6 3.0 -5.6 (G+Q)P51 *F
11 -203.3 2.7 -5.6 (G+Q)P52 *F
12 -168.2 4.6 -4.6 G+Q+Nx
13 -169.2 -0.1 -4.6 G+Q-Nx
14 -167.6 2.2 -2.3 G+Q+Ny
15 -169.7 2.2 -6.9 G+Q-Ny
Column: 1C19
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -214.6 kN Mx = 3.0 kN.m
My = 5.6 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 202.592 kN/m2 S-min = 142.698 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 23.7 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.04 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 239.9 kN V-eff = 246.9 kN
v= 0.70 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 3.8 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 23.4 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.26 N/mm2 < v-max = 3.58 N/mm2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-19
F20
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C20 1 -269.9 0.2 -6.1 G+Q *F
2 -227.6 -2.0 -6.2 (G+Q)P11 *F
3 -270.1 0.2 -6.1 (G+Q)P12 *F
4 -226.5 2.4 -6.1 (G+Q)P21 *F
5 -232.1 0.2 -3.1 (G+Q)P22 *F
6 -222.2 2.2 -6.1 (G+Q)P31 *F
7 -269.8 0.2 -5.8 (G+Q)P32 *F
8 -275.8 0.4 -6.2 (G+Q)P41 *F
9 -232.2 0.2 -3.4 (G+Q)P42 *F
10 -226.0 -2.0 -6.1 (G+Q)P51 *F
11 -270.1 0.2 -6.1 (G+Q)P52 *F
12 -223.7 2.5 -5.1 G+Q+Nx
13 -224.2 -2.1 -5.0 G+Q-Nx
14 -222.9 0.2 -2.8 G+Q+Ny
15 -225.0 0.2 -7.3 G+Q-Ny
Column: 1C20
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -275.8 kN Mx = 0.4 kN.m
My = 6.2 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 204.727 kN/m2 S-min = 168.934 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 29.5 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.27 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 306.3 kN V-eff = 313.4 kN
v= 0.88 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 28.9 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.29 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-20
F21
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C21 1 -315.5 2.7 3.4 G+Q *F
2 -279.5 4.7 3.4 (G+Q)P11 *F
3 -308.0 2.7 3.5 (G+Q)P12 *F
4 -260.0 -0.6 3.3 (G+Q)P21 *F
5 -269.6 2.7 1.5 (G+Q)P22 *F
6 -282.4 4.3 3.2 (G+Q)P31 *F
7 -328.1 2.7 3.6 (G+Q)P32 *F
8 -314.1 2.7 3.5 (G+Q)P41 *F
9 -257.0 2.7 1.3 (G+Q)P42 *F
10 -258.5 -0.2 3.3 (G+Q)P51 *F
11 -308.1 2.7 3.5 (G+Q)P52 *F
12 -261.6 4.6 2.7 G+Q+Nx
13 -262.0 -0.1 2.8 G+Q-Nx
14 -260.9 2.2 5.2 G+Q+Ny
15 -262.7 2.2 0.3 G+Q-Ny
Column: 1C21
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -328.1 kN Mx = 2.7 kN.m
My = 3.6 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 204.884 kN/m2 S-min = 177.257 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 35.1 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 364.8 kN V-eff = 368.7 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.9 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 35.0 kN.m/m
K/K' = 0.08 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.11 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 364.8 kN V-eff = 368.7 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-21
F22
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C22 1 -314.6 -2.2 3.3 G+Q *F
2 -279.3 -4.0 3.3 (G+Q)P11 *F
3 -306.8 -2.2 3.5 (G+Q)P12 *F
4 -258.6 0.7 3.2 (G+Q)P21 *F
5 -269.4 -2.1 1.5 (G+Q)P22 *F
6 -314.8 -2.4 3.4 (G+Q)P31 *F
7 -326.9 -2.2 3.5 (G+Q)P32 *F
8 -275.3 -3.9 3.4 (G+Q)P41 *F
9 -257.1 -2.1 1.3 (G+Q)P42 *F
10 -262.3 0.9 3.1 (G+Q)P51 *F
11 -306.7 -2.2 3.4 (G+Q)P52 *F
12 -261.2 0.6 2.7 G+Q+Nx
13 -260.8 -4.2 2.7 G+Q-Nx
14 -260.1 -1.8 5.2 G+Q+Ny
15 -261.9 -1.8 0.3 G+Q-Ny
Column: 1C22
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -326.9 kN Mx = 2.2 kN.m
My = 3.5 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 202.988 kN/m2 S-min = 177.983 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 34.8 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 363.7 kN V-eff = 367.5 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.4 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 34.7 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.11 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 363.7 kN V-eff = 367.5 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 3.8 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-22
F23
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C23 1 -277.5 0.9 -6.2 G+Q *F
2 -235.5 3.3 -6.3 (G+Q)P11 *F
3 -277.2 0.8 -6.1 (G+Q)P12 *F
4 -230.2 -1.9 -6.2 (G+Q)P21 *F
5 -240.1 0.9 -3.2 (G+Q)P22 *F
6 -281.9 0.6 -6.2 (G+Q)P31 *F
7 -277.4 0.9 -5.8 (G+Q)P32 *F
8 -227.0 -1.5 -6.3 (G+Q)P41 *F
9 -240.1 0.9 -3.5 (G+Q)P42 *F
10 -234.3 3.2 -6.2 (G+Q)P51 *F
11 -277.2 0.9 -6.2 (G+Q)P52 *F
12 -230.8 3.1 -5.1 G+Q+Nx
13 -229.7 -1.6 -5.1 G+Q-Nx
14 -229.2 0.7 -2.8 G+Q+Ny
15 -231.3 0.7 -7.4 G+Q-Ny
Column: 1C23
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -281.9 kN Mx = 0.6 kN.m
My = 6.2 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 209.036 kN/m2 S-min = 171.850 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 30.1 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 312.2 kN V-eff = 319.4 kN
v= 0.90 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.7 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 29.5 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.29 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 312.2 kN V-eff = 319.4 kN
v= 0.90 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 7.2 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F24
--------------------------------------------------------------------------------
Columns/Loadings:
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-23
Column Cmb N Mx My
1C24 1 -152.3 -4.5 -1.8 G+Q *F
2 -155.9 -5.2 -1.8 (G+Q)P11 *F
3 -122.2 -4.6 -0.9 (G+Q)P12 *F
4 -119.3 -1.6 -1.7 (G+Q)P21 *F
5 -146.1 -4.5 -1.9 (G+Q)P22 *F
6 -151.7 -4.4 -1.8 (G+Q)P31 *F
7 -152.8 -4.5 -1.4 (G+Q)P32 *F
8 -117.3 -1.7 -1.7 (G+Q)P41 *F
9 -146.4 -4.5 -2.1 (G+Q)P42 *F
10 -158.4 -5.2 -1.8 (G+Q)P51 *F
11 -121.3 -4.6 -0.9 (G+Q)P52 *F
12 -126.0 -1.5 -1.4 G+Q+Nx
13 -127.5 -6.0 -1.5 G+Q-Nx
14 -128.8 -3.7 1.0 G+Q+Ny
15 -124.7 -3.7 -3.9 G+Q-Ny
Column: 1C24
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -158.4 kN Mx = 5.2 kN.m
My = 1.8 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 186.250 kN/m2 S-min = 122.819 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.2 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 179.2 kN V-eff = 186.2 kN
v= 0.53 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 7.1 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.6 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 179.2 kN V-eff = 186.2 kN
v= 0.53 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.5 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F25
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C25 1 -166.1 -1.2 1.3 G+Q *F
2 -125.4 0.3 1.3 (G+Q)P11 *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-24
F26
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C26 1 -106.7 0.5 2.7 G+Q *F
2 -92.6 0.0 2.7 (G+Q)P11 *F
3 -87.2 0.5 1.4 (G+Q)P12 *F
4 -99.3 0.8 2.8 (G+Q)P21 *F
5 -104.5 0.5 2.7 (G+Q)P22 *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-25
F27
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C27 1 -250.8 2.5 2.7 G+Q *F
2 -229.3 3.1 2.8 (G+Q)P11 *F
3 -242.7 2.5 2.9 (G+Q)P12 *F
4 -207.6 0.7 2.7 (G+Q)P21 *F
5 -210.6 2.4 1.0 (G+Q)P22 *F
6 -251.7 2.5 2.6 (G+Q)P31 *F
7 -263.2 2.5 2.8 (G+Q)P32 *F
8 -205.9 0.9 2.7 (G+Q)P41 *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-26
F28
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C28 1 -181.6 1.9 -5.9 G+Q *F
2 -169.2 2.3 -6.0 (G+Q)P11 *F
3 -180.8 1.9 -5.8 (G+Q)P12 *F
4 -150.0 0.6 -5.9 (G+Q)P21 *F
5 -147.3 1.8 -3.1 (G+Q)P22 *F
6 -181.6 1.9 -6.0 (G+Q)P31 *F
7 -181.6 1.9 -5.6 (G+Q)P32 *F
8 -150.0 0.6 -5.9 (G+Q)P41 *F
9 -147.2 1.8 -3.3 (G+Q)P42 *F
10 -169.2 2.2 -6.0 (G+Q)P51 *F
11 -180.9 1.9 -5.9 (G+Q)P52 *F
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-27
F29
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C29 1 -100.7 0.6 -1.9 G+Q *F
2 -90.5 0.3 -1.9 (G+Q)P11 *F
3 -70.6 0.6 -0.9 (G+Q)P12 *F
4 -104.3 0.7 -1.9 (G+Q)P21 *F
5 -98.0 0.5 -1.9 (G+Q)P22 *F
6 -100.4 0.6 -1.9 (G+Q)P31 *F
7 -101.0 0.6 -1.6 (G+Q)P32 *F
8 -104.9 0.7 -1.9 (G+Q)P41 *F
9 -97.8 0.5 -2.2 (G+Q)P42 *F
10 -90.2 0.2 -1.9 (G+Q)P51 *F
11 -70.5 0.6 -1.0 (G+Q)P52 *F
12 -85.6 2.8 -1.5 G+Q+Nx
13 -83.0 -1.8 -1.6 G+Q-Nx
14 -85.8 0.5 0.9 G+Q+Ny
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-28
F30
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C30 1 -11.7 0.2 -0.1 G+Q *F
2 -11.1 0.3 -0.1 (G+Q)P11 *F
3 -17.9 0.2 -0.1 (G+Q)P12 *F
4 -10.1 0.0 -0.1 (G+Q)P21 *F
5 -9.9 0.2 -0.1 (G+Q)P22 *F
6 -11.9 0.2 -0.1 (G+Q)P31 *F
7 -11.2 0.2 0.2 (G+Q)P32 *F
8 -9.7 0.1 -0.1 (G+Q)P41 *F
9 -10.1 0.2 -0.4 (G+Q)P42 *F
10 -11.3 0.2 -0.1 (G+Q)P51 *F
11 -18.2 0.2 -0.2 (G+Q)P52 *F
12 -8.4 2.4 0.0 G+Q+Nx
13 -12.4 -2.1 -0.1 G+Q-Nx
14 -7.9 0.1 2.3 G+Q+Ny
15 -12.9 0.2 -2.5 G+Q-Ny
Column: 1C30
bx = 225.0 mm by = 225.0 mm
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-29
F31
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C31 1 -24.1 0.5 -0.4 G+Q *F
2 -25.2 0.6 -0.4 (G+Q)P11 *F
3 -29.9 0.4 -0.4 (G+Q)P12 *F
4 -18.6 0.2 -0.3 (G+Q)P21 *F
5 -18.5 0.5 -0.3 (G+Q)P22 *F
6 -24.2 0.5 -0.4 (G+Q)P31 *F
7 -23.6 0.5 -0.1 (G+Q)P32 *F
8 -19.5 0.2 -0.3 (G+Q)P41 *F
9 -18.4 0.4 -0.6 (G+Q)P42 *F
10 -24.1 0.5 -0.4 (G+Q)P51 *F
11 -30.5 0.5 -0.5 (G+Q)P52 *F
12 -22.5 2.7 -0.3 G+Q+Nx
13 -18.7 -1.9 -0.4 G+Q-Nx
14 -17.9 0.4 2.0 G+Q+Ny
15 -23.3 0.4 -2.7 G+Q-Ny
Column: 1C31
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 15 (G+Q-Ny)
N= -23.3 kN Mx = 0.4 kN.m
My = 2.7 kN.m
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-30
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 65.597 kN/m2 S-min = 28.127 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 4.9 kN.m/m
K/K' = 0.01 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.06 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 44.5 kN V-eff = 48.6 kN
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 4.6 kN.m/m
K/K' = 0.01 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 44.5 kN V-eff = 48.6 kN
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F35
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C35 1 -161.6 -1.4 -1.8 G+Q *F
2 -149.0 -1.7 -1.8 (G+Q)P11 *F
3 -154.2 -1.3 -1.8 (G+Q)P12 *F
4 -136.1 -0.4 -1.8 (G+Q)P21 *F
5 -138.7 -1.3 -0.8 (G+Q)P22 *F
6 -152.6 -1.6 -1.7 (G+Q)P31 *F
7 -127.2 -1.3 -0.4 (G+Q)P32 *F
8 -127.2 -0.7 -1.7 (G+Q)P41 *F
9 -173.2 -1.3 -2.1 (G+Q)P42 *F
10 -167.0 -1.2 -1.9 (G+Q)P51 *F
11 -154.2 -1.4 -1.8 (G+Q)P52 *F
12 -135.3 1.3 -1.5 G+Q+Nx
13 -134.2 -3.5 -1.4 G+Q-Nx
14 -135.6 -1.1 1.0 G+Q+Ny
15 -133.9 -1.1 -3.9 G+Q-Ny
Column: 1C35
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -173.2 kN Mx = 1.3 kN.m
My = 2.1 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-31
Soil Stresses:
S-max = 182.072 kN/m2 S-min = 151.333 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.3 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 193.3 kN V-eff = 196.1 kN
v= 0.55 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.8 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.2 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 193.3 kN V-eff = 196.1 kN
v= 0.55 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.8 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F36
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C36 1 -164.0 1.9 -1.9 G+Q *F
2 -159.8 2.7 -2.0 (G+Q)P11 *F
3 -156.6 1.9 -1.9 (G+Q)P12 *F
4 -128.7 0.1 -1.8 (G+Q)P21 *F
5 -141.2 1.9 -0.9 (G+Q)P22 *F
6 -150.1 2.0 -1.9 (G+Q)P31 *F
7 -129.7 1.8 -0.5 (G+Q)P32 *F
8 -176.0 2.0 -2.0 (G+Q)P41 *F
9 -175.5 1.9 -2.2 (G+Q)P42 *F
10 -126.4 0.6 -1.7 (G+Q)P51 *F
11 -156.6 1.9 -1.9 (G+Q)P52 *F
12 -136.1 3.9 -1.6 G+Q+Nx
13 -137.3 -0.8 -1.5 G+Q-Nx
14 -137.6 1.6 0.9 G+Q+Ny
15 -135.8 1.5 -4.0 G+Q-Ny
Column: 1C36
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -176.0 kN Mx = 2.0 kN.m
My = 2.0 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 187.166 kN/m2 S-min = 150.963 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-32
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.7 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 196.0 kN V-eff = 198.8 kN
v= 0.56 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.8 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.7 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 196.0 kN V-eff = 198.8 kN
v= 0.56 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.7 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2
F37
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C37 1 -317.7 2.8 -3.4 G+Q *F
2 -260.8 -0.3 -3.3 (G+Q)P11 *F
3 -310.5 2.8 -3.4 (G+Q)P12 *F
4 -282.0 4.5 -3.5 (G+Q)P21 *F
5 -271.6 2.8 -1.7 (G+Q)P22 *F
6 -318.2 3.1 -3.5 (G+Q)P31 *F
7 -259.1 2.8 -1.4 (G+Q)P32 *F
8 -264.4 -0.4 -3.2 (G+Q)P41 *F
9 -330.5 2.9 -3.6 (G+Q)P42 *F
10 -277.9 4.3 -3.5 (G+Q)P51 *F
11 -310.2 2.8 -3.5 (G+Q)P52 *F
12 -263.3 4.7 -2.8 G+Q+Nx
13 -263.8 0.0 -2.8 G+Q-Nx
14 -264.5 2.3 -0.4 G+Q+Ny
15 -262.7 2.3 -5.2 G+Q-Ny
Column: 1C37
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -330.5 kN Mx = 2.9 kN.m
My = 3.6 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 206.476 kN/m2 S-min = 178.101 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 35.3 kN.m/m
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-33
F38
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C38 1 -305.3 -3.0 -3.5 G+Q *F
2 -256.6 0.7 -3.4 (G+Q)P11 *F
3 -297.2 -3.1 -3.4 (G+Q)P12 *F
4 -267.9 -5.3 -3.5 (G+Q)P21 *F
5 -259.8 -3.0 -1.7 (G+Q)P22 *F
6 -271.2 -4.7 -3.3 (G+Q)P31 *F
7 -247.3 -3.0 -1.5 (G+Q)P32 *F
8 -248.5 -0.2 -3.4 (G+Q)P41 *F
9 -316.9 -3.1 -3.6 (G+Q)P42 *F
10 -310.0 -2.6 -3.7 (G+Q)P51 *F
11 -298.1 -3.0 -3.5 (G+Q)P52 *F
12 -253.6 -0.1 -2.8 G+Q+Nx
13 -253.1 -4.9 -2.9 G+Q-Nx
14 -254.3 -2.5 -0.4 G+Q+Ny
15 -252.5 -2.5 -5.3 G+Q-Ny
Column: 1C38
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -316.9 kN Mx = 3.1 kN.m
My = 3.6 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 200.018 kN/m2 S-min = 170.728 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 34.2 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-34
F39
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C39 1 -299.1 3.0 -3.6 G+Q *F
2 -252.7 -0.4 -3.6 (G+Q)P11 *F
3 -247.5 3.0 -1.8 (G+Q)P12 *F
4 -268.3 4.8 -3.5 (G+Q)P21 *F
5 -290.7 3.0 -3.7 (G+Q)P22 *F
6 -263.7 4.7 -3.5 (G+Q)P31 *F
7 -290.7 3.0 -3.3 (G+Q)P32 *F
8 -306.8 2.5 -3.8 (G+Q)P41 *F
9 -241.5 3.0 -2.3 (G+Q)P42 *F
10 -249.5 0.3 -3.4 (G+Q)P51 *F
11 -305.1 3.0 -3.5 (G+Q)P52 *F
12 -248.0 4.8 -2.9 G+Q+Nx
13 -248.3 0.1 -3.0 G+Q-Nx
14 -249.2 2.5 -0.5 G+Q+Ny
15 -247.1 2.5 -5.4 G+Q-Ny
Column: 1C39
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -306.8 kN Mx = 2.5 kN.m
My = 3.8 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 193.935 kN/m2 S-min = 166.541 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 33.2 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-35
F40
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C40 1 -311.9 -1.4 -3.8 G+Q *F
2 -260.3 1.7 -3.7 (G+Q)P11 *F
3 -304.0 -1.3 -3.7 (G+Q)P12 *F
4 -274.6 -3.8 -3.8 (G+Q)P21 *F
5 -265.8 -1.4 -2.0 (G+Q)P22 *F
6 -315.2 -1.7 -3.8 (G+Q)P31 *F
7 -254.0 -1.4 -1.8 (G+Q)P32 *F
8 -270.1 -3.3 -3.8 (G+Q)P41 *F
9 -322.9 -1.3 -3.9 (G+Q)P42 *F
10 -261.5 1.5 -3.7 (G+Q)P51 *F
11 -304.7 -1.4 -3.8 (G+Q)P52 *F
12 -259.4 1.3 -3.0 G+Q+Nx
13 -258.3 -3.5 -3.2 G+Q-Nx
14 -259.7 -1.1 -0.7 G+Q+Ny
15 -257.9 -1.1 -5.6 G+Q-Ny
Column: 1C40
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -322.9 kN Mx = 1.3 kN.m
My = 3.9 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 199.683 kN/m2 S-min = 177.213 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 34.3 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.29 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 359.8 kN V-eff = 364.0 kN
v= 1.03 N/mm2 < v-max = 3.58 N/mm2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-36
F32
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C32 1 -107.1 -3.1 -3.8 G+Q *F
2 -107.6 -3.1 -3.8 (G+Q)P11 *F
3 -107.4 -3.1 -3.6 (G+Q)P12 *F
4 -84.8 -1.6 -3.8 (G+Q)P21 *F
5 -84.4 -3.1 -2.1 (G+Q)P22 *F
6 -107.1 -3.1 -3.8 (G+Q)P31 *F
7 -107.0 -3.1 -3.5 (G+Q)P32 *F
8 -84.8 -1.5 -3.8 (G+Q)P41 *F
9 -84.5 -3.1 -2.3 (G+Q)P42 *F
10 -107.6 -3.1 -3.8 (G+Q)P51 *F
11 -107.4 -3.1 -3.7 (G+Q)P52 *F
12 -88.3 -0.3 -3.0 G+Q+Nx
13 -90.3 -4.8 -3.2 G+Q-Nx
14 -88.3 -2.6 -0.8 G+Q+Ny
15 -90.3 -2.5 -5.5 G+Q-Ny
Column: 1C32
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -107.6 kN Mx = 3.1 kN.m
My = 3.8 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 172.829 kN/m2 S-min = 89.523 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.6 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 124.5 kN V-eff = 130.3 kN
v= 0.37 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-37
F33
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C33 1 -146.8 -4.6 1.5 G+Q *F
2 -148.1 -4.6 1.5 (G+Q)P11 *F
3 -141.5 -4.6 1.8 (G+Q)P12 *F
4 -115.4 -2.3 1.6 (G+Q)P21 *F
5 -119.3 -4.5 0.6 (G+Q)P22 *F
6 -146.7 -4.6 1.5 (G+Q)P31 *F
7 -153.8 -4.6 1.8 (G+Q)P32 *F
8 -115.4 -2.3 1.6 (G+Q)P41 *F
9 -112.2 -4.5 0.4 (G+Q)P42 *F
10 -148.1 -4.6 1.5 (G+Q)P51 *F
11 -141.5 -4.6 1.7 (G+Q)P52 *F
12 -121.2 -1.5 1.4 G+Q+Nx
13 -123.3 -6.0 1.2 G+Q-Nx
14 -121.3 -3.8 3.7 G+Q+Ny
15 -123.1 -3.8 -1.2 G+Q-Ny
Column: 1C33
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -153.8 kN Mx = 4.6 kN.m
My = 1.8 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 179.474 kN/m2 S-min = 121.971 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 16.7 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 174.7 kN V-eff = 181.0 kN
v= 0.51 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.0 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-38
F34
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C34 1 -139.1 -3.4 -2.2 G+Q *F
2 -145.1 -4.3 -2.2 (G+Q)P11 *F
3 -134.1 -3.4 -2.1 (G+Q)P12 *F
4 -106.7 -0.9 -2.2 (G+Q)P21 *F
5 -111.6 -3.3 -1.2 (G+Q)P22 *F
6 -138.6 -3.3 -2.2 (G+Q)P31 *F
7 -104.5 -3.3 -1.0 (G+Q)P32 *F
8 -107.4 -1.0 -2.2 (G+Q)P41 *F
9 -146.4 -3.4 -2.3 (G+Q)P42 *F
10 -144.9 -4.2 -2.2 (G+Q)P51 *F
11 -133.9 -3.4 -2.2 (G+Q)P52 *F
12 -114.9 -0.5 -1.7 G+Q+Nx
13 -116.9 -5.1 -1.9 G+Q-Nx
14 -116.7 -2.8 0.7 G+Q+Ny
15 -115.0 -2.8 -4.3 G+Q-Ny
Column: 1C34
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 2 ((G+Q)P11 *F)
N= -145.1 kN Mx = 4.3 kN.m
My = 2.2 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 207.514 kN/m2 S-min = 129.667 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 15.1 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 160.1 kN V-eff = 166.4 kN
v= 0.47 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 15.3 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-39
Project: SIMARACHILDRENCANCERFOUNDATION
Slab
Analysis and
Design
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1
NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-5
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-6
Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-7
Project: SIMARACHILDRENCANCERFOUNDATION
Beam
Analysis and
Design
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1
Axis: 1 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B1 L=4425mm 1B2 L=1725mm 1B3 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
37.252 38.074
29.497 29.92
14.293 26.246 13.748
Moment
(Env.)
-38.555 -38.467
Bending (Top Edge) ...
M (kN.m) 14.3 37.3 29.5 26.9 29.9 38.1 0.0 13.7
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.12 0.32 0.25 0.23 0.26 0.33 0.00 0.12
x (mm) 45.22 53.37 45.22 45.22 45.22 54.63 45.22 45.22
As (mm2) 110.42 290.54 227.88 207.92 231.14 297.39 0.13 106.21
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 13.7 38.6 1.8 1.4 38.5 14.3
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.13 0.33 0.02 0.01 0.33 0.13
x (mm) 43.33 55.37 43.33 43.33 55.23 43.33
As (mm2) 110.43 301.41 14.40 11.39 300.67 115.41
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 40.3 50.5 17.4 17.9 50.9 40.0
v (N/mm2) 0.44 0.55 0.19 0.20 0.56 0.44
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 52.07 OK --- 10.87 < 52.18 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-2
Axis: 1 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B1 L=4425mm 2B2 L=1725mm 2B3 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Moment 0.393
(Env.)
-2.314 -2.266
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-3
Axis: 2 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B12 L=4425mm 1B13 L=1725mm 1B14 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
63.139 64.94
51.681 50.897
22.835 45.384 24.651
Moment
(Env.)
-62.805 -69.777
Bending (Top Edge) ...
M (kN.m) 22.8 0.0 63.1 51.7 46.4 50.9 64.9 24.7
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.20 0.00 0.54 0.44 0.40 0.44 0.56 0.21
x (mm) 45.22 45.22 95.13 76.07 67.63 74.80 98.21 45.22
As (mm2) 176.41 0.34 517.85 414.12 368.18 407.21 534.66 190.44
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 22.6 62.8 2.2 1.9 69.8 24.6
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.21 0.54 0.02 0.02 0.60 0.23
x (mm) 43.33 94.56 43.33 43.33 106.64 43.33
As (mm2) 182.60 514.75 17.74 15.16 580.55 198.03
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 64.8 82.7 29.9 27.4 87.3 69.4
v (N/mm2) 0.71 0.90 0.33 0.30 0.95 0.76
vc (N/mm2) 0.48 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 40.51 OK --- 10.87 < 36.39 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-4
Axis: 2 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B12 L=4425mm 2B13 L=1725mm 2B14 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.01 5.523
3.658 3.093
2.69
0.753
Moment
(Env.)
-1.714 -2.098
-2.512
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-5
Axis: 2a Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B41 L=1800mm 1B23 L=4425mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
33.201
25.862
12.058
Moment
(Env.) -2.018
-32.581
Bending (Top Edge) ...
M (kN.m) 6.7 17.5 25.9 33.2 12.1
d (mm) 407.0 407.0 407.0 407.0 407.0
K/K' 0.06 0.15 0.22 0.29 0.10
x (mm) 45.22 45.22 45.22 47.23 45.22
As (mm2) 51.62 135.52 199.79 257.09 93.15
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 2.0 1.4 32.6 13.1
d (mm) 390.0 390.0 407.0 390.0
K/K' 0.02 0.01 0.28 0.12
x (mm) 43.33 43.33 46.29 43.33
As (mm2) 16.27 11.18 252.01 105.88
As' (mm2) 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 13.3 17.4 45.5 35.9
v (N/mm2) 0.15 0.19 0.50 0.39
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d --- 10.87 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-6
Axis: 2a Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B41 L=1800mm 2B23 L=4425mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
3.068 3.367
1.01 0.898
Moment
(Env.) -0.373
-2.439
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-7
Axis: 3 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B43 L=1800mm 1B15 L=4425mm 1B16 L=1725mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
53.333
33.893 29.531
25.257 32.376
29.126
Moment
(Env.) -1.016
-32.451
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-8
Axis: 3 Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B17 L=4425mm
BwxH (mm) 225 x 450
Flange BfxHf ---
66.953
24.478
Moment
(Env.)
-69.676
Bending (Top Edge) ...
M (kN.m) 67.0 24.5
d (mm) 407.0 407.0
K/K' 0.58 0.21
x (mm) 101.70 45.22
As (mm2) 553.62 189.10
As' (mm2) 0.00 0.00
As-min 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 2.8 69.7 24.7
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.60 0.23
x (mm) 43.33 106.47 43.33
As (mm2) 22.30 579.59 198.83
As' (mm2) 0.00 0.00 0.00
As-min 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 87.8 69.2
v (N/mm2) 0.96 0.76
vc (N/mm2) 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58
Vnom (kN) 121.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 36.45 OK
Provided Steel Areas (mm2)
Top Edge 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar 1Y16
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-9
Axis: 3 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B43 L=1800mm 2B15 L=4425mm 2B16 L=1725mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.431 5.144
2.554
1.544
Moment 0.052
(Env.) -0.957
-2.303
-3.51
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-10
Axis: 3 Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B17 L=4425mm
BwxH (mm) 225 x 300
Flange BfxHf ---
5.567
2.268
Moment
(Env.)
-2.318
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-11
Axis: 4 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B18 L=4425mm 1B19 L=1725mm 1B20 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
67.068 67.13
54.573 53.896
24.539 47.393 24.281
Moment
(Env.)
-69.337 -69.485
Bending (Top Edge) ...
M (kN.m) 24.5 67.1 54.6 48.4 53.9 67.1 24.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.21 0.58 0.47 0.42 0.46 0.58 0.21
x (mm) 45.22 101.90 80.79 70.83 79.68 102.01 45.22
As (mm2) 189.57 554.71 439.81 385.57 433.76 555.30 187.58
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 24.2 69.3 2.4 2.4 69.5 24.7
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.23 0.60 0.02 0.02 0.60 0.23
x (mm) 43.33 105.87 43.33 43.33 106.13 43.33
As (mm2) 194.72 576.34 19.18 19.25 577.75 199.11
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 69.1 87.8 28.7 29.6 87.9 69.1
v (N/mm2) 0.75 0.96 0.31 0.32 0.96 0.75
vc (N/mm2) 0.48 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.1 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 36.64 OK --- 10.87 < 36.56 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-12
Axis: 4 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B18 L=4425mm 2B19 L=1725mm 2B20 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.414 5.361
3.577 3.469
1.88 2.177
Moment -0.902
(Env.) -1.537 -1.243
-1.876 -1.813
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-13
Axis: 5 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B53 L=4425mm 1B54 L=1725mm 1B55 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
66.777 67.147
53.53 54.506
24.479 47.383 24.405
Moment
(Env.)
-69.476 -69.286
Bending (Top Edge) ...
M (kN.m) 24.5 66.8 53.5 48.2 54.5 67.1 24.4
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.21 0.57 0.46 0.41 0.47 0.58 0.21
x (mm) 45.22 101.39 79.08 70.48 80.68 102.04 45.22
As (mm2) 189.11 551.96 430.50 383.69 439.20 555.46 188.54
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 24.3 69.5 2.5 2.2 69.3 24.7
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.23 0.60 0.02 0.02 0.60 0.23
x (mm) 43.33 106.11 43.33 43.33 105.78 43.33
As (mm2) 195.58 577.67 20.32 17.54 575.85 198.83
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 69.2 87.8 29.1 28.9 87.9 69.0
v (N/mm2) 0.76 0.96 0.32 0.32 0.96 0.75
vc (N/mm2) 0.48 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 36.56 OK --- 10.87 < 36.67 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-14
Axis: 5 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B53 L=4425mm 2B54 L=1725mm 2B55 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.403 5.399
3.363 3.585
2.105 2.072
Moment -0.916
(Env.) -1.461 -1.494
-1.855 -1.863
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-15
Axis: 6 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B59 L=4425mm 1B60 L=1725mm 1B61 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
63.161
50.927
32.038 38.517
22.585
31.378 13.96
Moment
(Env.)
-38.648
-63.33
Bending (Top Edge) ...
M (kN.m) 22.6 0.0 63.2 50.9 39.9 32.0 38.5 0.0 14.0
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.19 0.00 0.54 0.44 0.34 0.28 0.33 0.00 0.12
x (mm) 45.22 45.22 95.16 74.85 57.37 45.48 55.31 45.22 45.22
As (mm2) 174.47 0.00 518.05 407.48 312.33 247.58 301.09 0.20 107.84
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 23.3 63.3 2.1 1.6 38.6 14.3
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.22 0.54 0.02 0.01 0.33 0.13
x (mm) 43.33 95.45 43.33 43.33 55.51 43.33
As (mm2) 187.64 519.63 16.87 12.85 302.19 114.93
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 64.9 82.8 32.9 16.6 50.9 40.2
v (N/mm2) 0.71 0.90 0.36 0.18 0.56 0.44
vc (N/mm2) 0.55 0.55 0.55 0.55 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 115.3
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 40.18 OK --- 10.87 < 51.97 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-16
Axis: 6 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B59 L=4425mm 2B60 L=1725mm 2B61 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.162
4.327
3.308 3.652
2.969
0.913
Moment
0.142
(Env.)
-2.087 -1.855 -2.133
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-17
Axis: 7 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B56 L=4425mm 1B57 L=1725mm 1B58 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
62.179
50.357
30.052 37.47
22.354
29.642 14.23
Moment
(Env.)
-38.296
-62.611
Bending (Top Edge) ...
M (kN.m) 22.4 62.2 50.4 39.2 30.8 37.5 14.2
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.19 0.53 0.43 0.34 0.26 0.32 0.12
x (mm) 45.22 93.49 73.93 56.29 45.22 53.70 45.22
As (mm2) 172.69 508.94 402.48 306.44 237.75 292.36 109.93
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 23.0 62.6 1.8 1.9 38.3 14.0
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.22 0.54 0.02 0.02 0.33 0.13
x (mm) 43.33 94.22 43.33 43.33 54.97 43.33
As (mm2) 185.49 512.94 14.62 14.94 299.25 112.62
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 64.5 82.1 32.8 16.5 50.3 40.2
v (N/mm2) 0.70 0.90 0.36 0.18 0.55 0.44
vc (N/mm2) 0.55 0.55 0.55 0.55 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 40.63 OK --- 10.87 < 52.38 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-18
Axis: 7 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B56 L=4425mm 2B57 L=1725mm 2B58 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.108
3.927 3.812
2.723 3.197
0.814
Moment
(Env.) 0.044
-2.124 -1.912 -2.161
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-19
Axis: 8 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B62 L=4425mm 1B63 L=1725mm 1B64 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
63.931 63.738
50.715 51.159
23.308 45.113 23.615
Moment
(Env.)
-65.593 -65.48
Bending (Top Edge) ...
M (kN.m) 23.3 63.9 50.7 46.0 51.2 63.7 23.6
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.20 0.55 0.44 0.40 0.44 0.55 0.20
x (mm) 45.22 96.48 74.51 66.90 75.23 96.15 45.22
As (mm2) 180.06 525.22 405.62 364.19 409.52 523.42 182.43
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 23.7 65.6 2.3 2.3 65.5 23.8
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.22 0.56 0.02 0.02 0.56 0.22
x (mm) 43.33 99.34 43.33 43.33 99.15 43.33
As (mm2) 190.91 540.79 18.34 18.46 539.73 191.50
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 66.6 84.7 28.3 28.4 84.6 66.7
v (N/mm2) 0.73 0.92 0.31 0.31 0.92 0.73
vc (N/mm2) 0.55 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 38.8 OK --- 10.87 < 38.87 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-20
Axis: 8 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B62 L=4425mm 2B63 L=1725mm 2B64 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.204 5.249
3.258 3.276
1.997 2.028
Moment -0.807
(Env.) -1.322 -1.29
-1.907 -1.906
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-21
Axis: 9 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B33 L=4425mm 1B34 L=1725mm 1B35 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
35.668 35.384
28.575 28.633
13.049 24.46 13.344
Moment
(Env.)
-35.495 -35.38
Bending (Top Edge) ...
M (kN.m) 13.0 35.7 28.6 25.1 28.6 35.4 13.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.11 0.31 0.25 0.22 0.25 0.30 0.11
x (mm) 45.22 50.96 45.22 45.22 45.22 50.53 45.22
As (mm2) 100.81 277.40 220.75 193.60 221.20 275.05 103.09
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 13.7 35.5 1.6 1.7 35.4 13.5
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.13 0.31 0.02 0.02 0.30 0.13
x (mm) 43.33 50.69 43.33 43.33 50.52 43.33
As (mm2) 110.57 275.97 13.17 13.33 275.02 108.87
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 38.2 48.2 16.7 17.0 48.0 38.2
v (N/mm2) 0.42 0.53 0.18 0.19 0.52 0.42
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 55.81 OK --- 10.87 < 55.96 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-22
Axis: 9 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B33 L=4425mm 2B34 L=1725mm 2B35 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Moment 0.511
(Env.)
-2.336 -2.333
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-23
Axis: A Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B4 L=4425mm 1B5 L=5475mm 1B6 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
12.788
Moment
(Env.)
-36.169 -43.855
-53.011
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-24
Axis: A Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B7 L=5700mm 1B8 L=4425mm 1B9 L=2850mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-25
Axis: A Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B10 L=3975mm 1B11 L=3300mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-26
Axis: A Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B4 L=4425mm 2B5 L=5475mm 2B6 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.757 5.724
4.411 4.311 4.734
3.319
Moment
(Env.) -1.423
-2.103
-3.197
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-27
Axis: A Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B7 L=5700mm 2B8 L=4425mm 2B9 L=2850mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
6.243 5.894
4.618
3.78
1.844 2.503
Moment
(Env.) -1.749
-0.894
-3.567
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-28
Axis: A Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B10 L=3975mm 2B11 L=3300mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
3.712
2.448 1.748 1.83
Moment
(Env.) -1.698 -1.424
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-29
Axis: B Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B44 L=4425mm 1B45 L=5475mm 1B46 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
17.736
Moment 11.775
(Env.)
-35.54
-49.902
-73.699
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-30
Axis: B Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B47 L=5700mm 1B48 L=4425mm 1B49 L=2850mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-31
Axis: B Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B50 L=3975mm 1B51 L=3300mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-32
Axis: B Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B44 L=4425mm 2B45 L=5475mm 2B46 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
6.669
5.692
4.145 4.021 4.243 4.364
Moment
(Env.) -2.084 -2.026
-2.91
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-33
Axis: B Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B47 L=5700mm 2B48 L=4425mm 2B49 L=2850mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
6.84 6.16
3.859 4.366
2.623 2.273
Moment
(Env.) -0.5420.011
-2.071
-3.148
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-34
Axis: B Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B50 L=3975mm 2B51 L=3300mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
3.506
2.473 2.375
1.563
Moment
(Env.) -1.763 -1.365
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-35
Axis: C Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B26 L=4425mm 1B24 L=2850mm 1B25 L=2625mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
56.655 47.296
34.761
19.341 14.456 12.986
Moment
2.841 5.843
(Env.) -11.392 -6.43
-54.039
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-36
Axis: C Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B27 L=4425mm 1B28 L=5700mm 1B29 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
42.049 43.934
Moment
(Env.)
-39.926 -40.266
-78.29
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-37
Axis: C Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B30 L=2850mm 1B31 L=3975mm 1B32 L=3300mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-38
Axis: C Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B26 L=4425mm 2B24 L=2850mm 2B25 L=2625mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
4.66
3.616 3.078
2.72 2.242
0.727
Moment 0.461
(Env.) -1.25
-0.256
-2.124
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-39
Axis: C Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B27 L=4425mm 2B28 L=5700mm 2B29 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
6.173 6.353
3.651 4.292 4.27 3.848
Moment
(Env.)
-2.169 -2.009
-3.215
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-40
Axis: C Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B30 L=2850mm 2B31 L=3975mm 2B32 L=3300mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-41
Axis: D Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B21 L=4425mm 1B22 L=2850mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
40.21
33.278
13.378
3.861
Moment
0.594
(Env.) -7.634
-38.498
Bending (Top Edge) ...
M (kN.m) 13.4 0.3 40.2 33.3 14.1 3.9
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.12 0.00 0.35 0.29 0.12 0.03
x (mm) 45.22 45.22 57.92 47.34 45.22 45.22
As (mm2) 103.35 1.95 315.30 257.72 109.09 29.83
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 14.1 38.5 0.0 7.6 4.5
d (mm) 390.0 407.0 390.0 407.0 390.0
K/K' 0.13 0.33 0.00 0.07 0.04
x (mm) 43.33 55.28 43.33 45.22 43.33
As (mm2) 113.90 300.93 0.11 58.98 36.18
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 39.9 51.4 31.9 14.8
v (N/mm2) 0.44 0.56 0.35 0.16
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3
Td (kN.m) 0.0 0.1
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 52.14 OK 7.0 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-42
Axis: D Storey: 1 (/ 2) Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B52 L=4425mm 1B36 L=5700mm 1B37 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-43
Axis: D Storey: 1 (/ 2) ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B38 L=2850mm 1B39 L=3975mm 1B40 L=3300mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-44
Axis: D Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B21 L=4425mm 2B22 L=2850mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
3.533 3.483
1.514 1.593
Moment
(Env.)
-1.125
-2.221
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-45
Axis: D Storey: 2 (/ 2) Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B52 L=4425mm 2B36 L=5700mm 2B37 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
5.883 6.17
4.718 4.99
4.156 3.439
Moment
(Env.) -1.493 -1.73
-3.707
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-46
Axis: D Storey: 2 (/ 2) ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B38 L=2850mm 2B39 L=3975mm 2B40 L=3300mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-47
Axis: E Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B42 L=2625mm
BwxH (mm) 225 x 450
Flange BfxHf ---
3.326
2.403
Moment
(Env.) -2.066
-2.518 -2.118
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-48
Axis: E Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B42 L=2625mm
BwxH (mm) 225 x 300
Flange BfxHf ---
0.997
0.634
Moment
(Env.)
-1.341
Bending (Top Edge) ...
M (kN.m) 0.6 1.0
d (mm) 259.0 259.0
K/K' 0.01 0.02
x (mm) 28.78 28.78
As (mm2) 7.70 12.10
As' (mm2) 0.00 0.00
As-min 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.8 1.3 0.5
d (mm) 240.0 259.0 240.0
K/K' 0.02 0.03 0.01
x (mm) 26.67 28.78 26.67
As (mm2) 9.86 16.28 6.77
As' (mm2) 0.00 0.00 0.00
As-min 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 2.8 3.2
v (N/mm2) 0.05 0.05
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58
Vnom (kN) 107.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 10.14 < 44.58 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12
Top Bar
Top SupBar
Side Bars
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-49
Project: SIMARACHILDRENCANCERFOUNDATION
Column
Analysis and
Design
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19
Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20
Project: SIMARACHILDRENCANCERFOUNDATION
Stairs
Analysis and
Design
STAIRCASE
TYPE 1
Flight 1
Riser = 150 mm
Thread = 300 mm
LOADINGS TO FLIGHT
Dead Load
Waist
Self weight (kN/sq.m) = 4.02
Steps
(kN/sq.m) = 0.00
Finishes (kN/sq.m) = 1.34
Gk = 5.37 kN/sq.m
Live Load
Design Load
1.4Gk + 1.6Qk = 10.72
say 14.00 kN/sq.m