0% found this document useful (0 votes)
4 views

Simara Calculation Sheet

The document outlines the structural calculations for a proposed commercial development for the Simara Children Cancer Foundation in Rivers State, Nigeria. It includes details on the structural engineer, client, general notes, relevant building regulations, foundation types, and loading conditions. The document also provides specific analysis and design results for various structural components such as pad foundations, slabs, beams, and columns.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Simara Calculation Sheet

The document outlines the structural calculations for a proposed commercial development for the Simara Children Cancer Foundation in Rivers State, Nigeria. It includes details on the structural engineer, client, general notes, relevant building regulations, foundation types, and loading conditions. The document also provides specific analysis and design results for various structural components such as pad foundations, slabs, beams, and columns.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 127

STRUCTURAL CALCULATIONS

PROJECT
PROPOSED COMMERCIAL DEVELOPMENT FOR SIMARA CHILDREN CANCER
FOUNDATION, RIVERS STATE.

LOCATION
University of Port Harcourt Teaching Hospital, Choba, Obio Akpor L.G.A, Rivers state.

STRUCTURAL ENGINEER
Engr. Opeloyeru Basit
BOA Construction Company
Civil/Structural Engineering and Consultancy
Office No. 19, Looksmart complex opposite, Rhema Chapel, beside
DSTV, Akala Express, Ibadan, Oyo State.
Tel: 08163267631, 07014165680
E-mail: [email protected]

CLIENT
SIMARA CHILDREN CANCER FOUNDATION
PROPOSED COMMERCIAL DEVELOPMENT FOR SIMARA CHILDREN CANCER
FOUNDATION, RIVERS STATE.

GENERAL NOTES.
1. All drawings to be read in conjunction with Architect's Drawings, other Structural
Drawings and Specialists Drawings.

2. All dimensions are in meters and millimeters unless otherwise noted.

3. Foundation Structures, pending soil test reports, based on assumed Allowable ground
pressure, q= 150 kN/m2.

4. Concrete to be grade 25 i.e., Characteristic Strength at 28 days, fcu = 25N/mm2.

5. Reinforcement to be High Yield Steel Bars to BS4449 and BS4461 Characteristic


Strength fy= 385 N/mm2.

Abbreviation used in the drawing.

Y = Denotes High Yield Steel Bars.


T = Top
E.F. = Each Face
6. All blinding and Mass Concrete to be 1:2:4 (Cement: Sand: Aggregate)

7. All construction joint positions are to be approved by the Engineer prior to casting, but
these should not be more than 10 meters apart.

BLOCKWORK
8. Hollow blockwork below ground slab level are to be filled with mass concrete.
Backfilling carried out simultaneously on both sides.

9. All 230mm wide Blockwork specified in the structural details are classified as Load
bearing. Any additional amendments to existing opening must be consulted with the
Engineer.

10. The bedding thickness of the block walls should not be more than 5mm.
.
TABLE OF CONTENTS.
1. General Notes.

2. Table of Contents.

3. Design Information.

Relevant Building Regulations.

Structural Analysis

4. Main Building

Structural Summary

5. Pad Foundation Analysis and Design

6. Slab Analysis and Design

7. Beam Analysis and Design

8. Column Analysis and Design

9. Staircase Analysis and Design


RELEVANT BUILDING REGULATIONS AND DESIGN CODES.
i. BS8110: The Structural Use of Concrete Parts 1&2.

ii. BS882.

iii. CP3: Chapter V.

INTENDED USE OF STRUCTURE


EDUCATIONAL STRUCTURE

FIRE RESISTANCE REQUIREMENT


One hour for all elements.

GENERAL LOADING CONDITIONS


1. Floor Slab at 3.0kN/m2.

SUBSOIL CONDITIONS
An assumption of an allowable soil pressure 150kN/m2 was made, pending a soil test
report.

FOUNDATION TYPE
Pad foundation to all structural members

MATERIAL DATA

i. Concrete
Characteristic strength fcu = 25N/mm2. Mass
density at 2400kg/m3
ii. Reinforcement
Characteristic strength, fy = 385N/mm2
Pad
Foundation
Analysis and
Design
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1

PAD/PILE FOOTING RESULTS

F1
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C1 1 -100.1 -2.5 3.1 G+Q *F
2 -104.8 -3.1 3.1 (G+Q)P11 *F
3 -100.4 -2.4 3.3 (G+Q)P12 *F
4 -76.5 -0.7 3.1 (G+Q)P21 *F
5 -77.7 -2.4 1.4 (G+Q)P22 *F
6 -99.3 -2.3 3.1 (G+Q)P31 *F
7 -77.8 -2.4 1.7 (G+Q)P32 *F
8 -77.4 -0.8 3.1 (G+Q)P41 *F
9 -100.2 -2.4 2.9 (G+Q)P42 *F
10 -104.7 -3.1 3.1 (G+Q)P51 *F
11 -100.2 -2.4 3.2 (G+Q)P52 *F
12 -82.5 0.3 2.7 G+Q+Nx
13 -84.5 -4.3 2.5 G+Q-Nx
14 -84.5 -2.0 4.9 G+Q+Ny
15 -82.5 -2.0 0.2 G+Q-Ny
Column: 1C1
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 2 ((G+Q)P11 *F)
N= -104.8 kN Mx = 3.1 kN.m
My = 3.1 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 165.292 kN/m2 S-min = 91.439 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.1 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.16 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 121.9 kN V-eff = 126.5 kN
v= 0.36 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 12.0 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 121.9 kN V-eff = 126.5 kN
v= 0.36 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-2

F2
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C2 1 -229.5 -0.8 5.9 G+Q *F
2 -188.6 1.5 5.9 (G+Q)P11 *F
3 -229.1 -0.7 6.1 (G+Q)P12 *F
4 -205.0 -2.7 5.9 (G+Q)P21 *F
5 -192.9 -0.8 2.9 (G+Q)P22 *F
6 -233.7 -1.2 5.9 (G+Q)P31 *F
7 -192.9 -0.8 3.2 (G+Q)P32 *F
8 -199.8 -2.2 6.0 (G+Q)P41 *F
9 -228.9 -0.7 5.7 (G+Q)P42 *F
10 -189.5 1.3 5.9 (G+Q)P51 *F
11 -229.7 -0.8 6.0 (G+Q)P52 *F
12 -191.3 1.8 5.0 G+Q+Nx
13 -190.1 -3.1 4.8 G+Q-Nx
14 -191.8 -0.6 7.2 G+Q+Ny
15 -189.7 -0.7 2.6 G+Q-Ny
Column: 1C2
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -233.7 kN Mx = 1.2 kN.m
My = 5.9 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 181.297 kN/m2 S-min = 142.574 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 26.1 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.24 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.06 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 265.5 kN V-eff = 272.3 kN
v= 0.77 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 25.5 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 265.5 kN V-eff = 272.3 kN
v= 0.77 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F3
--------------------------------------------------------------------------------

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-3

Columns/Loadings:
Column Cmb N Mx My
1C3 1 -259.5 0.5 5.9 G+Q *F
2 -225.4 -1.9 5.9 (G+Q)P11 *F
3 -223.3 0.5 3.0 (G+Q)P12 *F
4 -212.3 2.6 5.9 (G+Q)P21 *F
5 -258.6 0.5 5.9 (G+Q)P22 *F
6 -210.4 2.5 5.9 (G+Q)P31 *F
7 -258.8 0.5 6.3 (G+Q)P32 *F
8 -269.5 0.1 6.0 (G+Q)P41 *F
9 -222.9 0.5 2.6 (G+Q)P42 *F
10 -217.4 -1.4 5.8 (G+Q)P51 *F
11 -259.7 0.5 6.0 (G+Q)P52 *F
12 -215.0 2.8 4.9 G+Q+Nx
13 -215.6 -2.0 4.8 G+Q-Nx
14 -216.4 0.4 7.2 G+Q+Ny
15 -214.3 0.4 2.6 G+Q-Ny
Column: 1C3
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -269.5 kN Mx = 0.1 kN.m
My = 6.0 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 199.632 kN/m2 S-min = 166.571 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 28.8 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.27 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 300.2 kN V-eff = 307.1 kN
v= 0.87 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 28.2 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 300.2 kN V-eff = 307.1 kN
v= 0.87 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F4
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C4 1 -262.3 -0.3 6.0 G+Q *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-4

2 -224.9 2.5 5.9 (G+Q)P11 *F


3 -261.8 -0.3 6.1 (G+Q)P12 *F
4 -217.2 -3.0 6.0 (G+Q)P21 *F
5 -225.6 -0.2 2.9 (G+Q)P22 *F
6 -213.0 -2.3 6.0 (G+Q)P31 *F
7 -225.7 -0.2 3.3 (G+Q)P32 *F
8 -218.5 1.8 5.9 (G+Q)P41 *F
9 -261.5 -0.2 5.6 (G+Q)P42 *F
10 -272.8 -0.1 6.0 (G+Q)P51 *F
11 -262.4 -0.2 6.0 (G+Q)P52 *F
12 -217.9 2.2 5.0 G+Q+Nx
13 -217.4 -2.6 4.9 G+Q-Nx
14 -218.7 -0.2 7.2 G+Q+Ny
15 -216.6 -0.2 2.6 G+Q-Ny
Column: 1C4
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -272.8 kN Mx = 0.1 kN.m
My = 6.0 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 201.924 kN/m2 S-min = 168.275 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 29.2 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.27 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 303.4 kN V-eff = 310.4 kN
v= 0.88 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 28.5 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 303.4 kN V-eff = 310.4 kN
v= 0.88 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F5
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C5 1 -272.5 0.1 6.1 G+Q *F
2 -228.2 -2.1 6.0 (G+Q)P11 *F
3 -272.9 0.2 6.2 (G+Q)P12 *F
4 -229.3 2.3 6.1 (G+Q)P21 *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-5

5 -235.2 0.1 3.0 (G+Q)P22 *F


6 -277.3 0.5 6.1 (G+Q)P31 *F
7 -235.3 0.1 3.4 (G+Q)P32 *F
8 -228.3 -2.2 6.0 (G+Q)P41 *F
9 -272.6 0.2 5.7 (G+Q)P42 *F
10 -224.4 2.1 6.1 (G+Q)P51 *F
11 -272.7 0.1 6.1 (G+Q)P52 *F
12 -225.9 2.5 5.0 G+Q+Nx
13 -226.4 -2.3 5.0 G+Q-Nx
14 -227.2 0.1 7.3 G+Q+Ny
15 -225.1 0.1 2.7 G+Q-Ny
Column: 1C5
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -277.3 kN Mx = 0.5 kN.m
My = 6.1 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 205.729 kN/m2 S-min = 169.770 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 29.7 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 307.8 kN V-eff = 314.9 kN
v= 0.89 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 29.1 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.29 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 307.8 kN V-eff = 314.9 kN
v= 0.89 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F6
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C6 1 -160.5 3.0 3.5 G+Q *F
2 -165.3 3.5 3.5 (G+Q)P11 *F
3 -160.6 3.0 3.5 (G+Q)P12 *F
4 -108.5 0.9 3.4 (G+Q)P21 *F
5 -138.3 3.0 1.7 (G+Q)P22 *F
6 -156.8 2.9 3.5 (G+Q)P31 *F
7 -138.4 2.9 2.1 (G+Q)P32 *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-6

8 -171.6 3.1 3.5 (G+Q)P41 *F


9 -160.3 3.0 3.0 (G+Q)P42 *F
10 -105.9 1.4 3.4 (G+Q)P51 *F
11 -160.6 3.0 3.5 (G+Q)P52 *F
12 -133.0 4.9 2.8 G+Q+Nx
13 -134.1 0.0 2.9 G+Q-Nx
14 -134.6 2.5 5.1 G+Q+Ny
15 -132.5 2.4 0.6 G+Q-Ny
Column: 1C6
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -171.6 kN Mx = 3.1 kN.m
My = 3.5 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 194.812 kN/m2 S-min = 136.028 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 18.3 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 191.8 kN V-eff = 196.5 kN
v= 0.55 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 4.2 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 18.2 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.22 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.03 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 191.8 kN V-eff = 196.5 kN
v= 0.55 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 4.7 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F7
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C7 1 -104.7 -1.4 3.5 G+Q *F
2 -101.7 -1.5 3.5 (G+Q)P11 *F
3 -104.9 -1.4 3.6 (G+Q)P12 *F
4 -89.2 -0.7 3.5 (G+Q)P21 *F
5 -82.4 -1.4 1.8 (G+Q)P22 *F
6 -101.7 -1.4 3.5 (G+Q)P31 *F
7 -82.5 -1.4 2.3 (G+Q)P32 *F
8 -79.1 -1.0 3.5 (G+Q)P41 *F
9 -104.6 -1.3 3.1 (G+Q)P42 *F
10 -114.8 -1.1 3.6 (G+Q)P51 *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-7

11 -104.9 -1.4 3.6 (G+Q)P52 *F


12 -88.2 1.3 2.9 G+Q+Nx
13 -87.2 -3.6 3.0 G+Q-Nx
14 -88.7 -1.1 5.2 G+Q+Ny
15 -86.7 -1.2 0.7 G+Q-Ny
Column: 1C7
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -114.8 kN Mx = 1.1 kN.m
My = 3.6 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 166.672 kN/m2 S-min = 109.964 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.4 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.16 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 131.3 kN V-eff = 136.7 kN
v= 0.39 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 12.1 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 131.3 kN V-eff = 136.7 kN
v= 0.39 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F8
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C8 1 -173.5 0.7 6.0 G+Q *F
2 -156.7 1.3 6.0 (G+Q)P11 *F
3 -173.6 0.8 6.1 (G+Q)P12 *F
4 -150.0 -0.2 6.0 (G+Q)P21 *F
5 -138.1 0.7 3.0 (G+Q)P22 *F
6 -174.0 0.7 6.1 (G+Q)P31 *F
7 -138.2 0.7 3.5 (G+Q)P32 *F
8 -150.3 -0.1 6.0 (G+Q)P41 *F
9 -173.4 0.8 5.5 (G+Q)P42 *F
10 -156.0 1.2 6.0 (G+Q)P51 *F
11 -173.6 0.7 6.1 (G+Q)P52 *F
12 -143.6 3.0 4.9 G+Q+Nx
13 -145.1 -1.8 5.1 G+Q-Nx

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-8

14 -145.4 0.6 7.2 G+Q+Ny


15 -143.4 0.6 2.7 G+Q-Ny
Column: 1C8
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -174.0 kN Mx = 0.7 kN.m
My = 6.1 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 198.022 kN/m2 S-min = 136.676 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 18.9 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.22 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 194.0 kN V-eff = 202.3 kN
v= 0.57 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 18.3 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.22 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.03 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 194.0 kN V-eff = 202.3 kN
v= 0.57 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 8.3 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F9
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C9 1 -83.4 1.2 3.4 G+Q *F
2 -69.3 0.6 3.4 (G+Q)P11 *F
3 -83.5 1.2 3.4 (G+Q)P12 *F
4 -86.0 1.2 3.4 (G+Q)P21 *F
5 -62.0 1.2 1.8 (G+Q)P22 *F
6 -83.7 1.2 3.5 (G+Q)P31 *F
7 -62.1 1.1 2.3 (G+Q)P32 *F
8 -85.7 1.2 3.4 (G+Q)P41 *F
9 -83.2 1.2 2.9 (G+Q)P42 *F
10 -69.3 0.6 3.4 (G+Q)P51 *F
11 -83.5 1.2 3.4 (G+Q)P52 *F
12 -71.1 3.3 2.7 G+Q+Nx
13 -68.2 -1.4 2.9 G+Q-Nx
14 -70.6 1.0 5.1 G+Q+Ny
15 -68.7 1.0 0.6 G+Q-Ny
Column: 1C9

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-9

bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 4 ((G+Q)P21 *F)
N= -86.0 kN Mx = 1.2 kN.m
My = 3.4 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 137.105 kN/m2 S-min = 81.888 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 10.2 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.13 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 104.0 kN V-eff = 109.1 kN
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.7 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 9.9 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 104.0 kN V-eff = 109.1 kN
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 5.2 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F10
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C10 1 -116.9 1.8 -1.5 G+Q *F
2 -99.3 0.9 -1.4 (G+Q)P11 *F
3 -111.7 1.8 -1.6 (G+Q)P12 *F
4 -117.9 1.9 -1.6 (G+Q)P21 *F
5 -90.7 1.7 -0.7 (G+Q)P22 *F
6 -114.9 1.8 -1.5 (G+Q)P31 *F
7 -84.1 1.7 -0.2 (G+Q)P32 *F
8 -120.0 1.9 -1.6 (G+Q)P41 *F
9 -123.5 1.8 -2.0 (G+Q)P42 *F
10 -99.2 0.8 -1.5 (G+Q)P51 *F
11 -111.7 1.8 -1.6 (G+Q)P52 *F
12 -99.0 3.8 -1.4 G+Q+Nx
13 -96.1 -0.8 -1.1 G+Q-Nx
14 -98.4 1.5 1.1 G+Q+Ny
15 -96.7 1.5 -3.6 G+Q-Ny
Column: 1C10
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -123.5 kN Mx = 1.8 kN.m

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-10

My = 2.0 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 169.800 kN/m2 S-min = 124.185 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.5 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.16 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 139.6 kN V-eff = 142.5 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 12.5 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 139.6 kN V-eff = 142.5 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F11
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C11 1 -83.7 1.4 -3.0 G+Q *F
2 -70.3 0.8 -3.0 (G+Q)P11 *F
3 -83.8 1.3 -3.0 (G+Q)P12 *F
4 -85.4 1.3 -3.0 (G+Q)P21 *F
5 -62.2 1.3 -1.5 (G+Q)P22 *F
6 -69.5 0.7 -3.0 (G+Q)P31 *F
7 -83.5 1.4 -2.6 (G+Q)P32 *F
8 -83.3 1.2 -3.0 (G+Q)P41 *F
9 -62.3 1.3 -1.9 (G+Q)P42 *F
10 -86.5 1.6 -3.0 (G+Q)P51 *F
11 -83.8 1.3 -3.0 (G+Q)P52 *F
12 -71.3 3.4 -2.6 G+Q+Nx
13 -68.4 -1.2 -2.4 G+Q-Nx
14 -68.9 1.1 -0.2 G+Q+Ny
15 -70.9 1.1 -4.7 G+Q-Ny
Column: 1C11
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -86.5 kN Mx = 1.6 kN.m
My = 3.0 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-11

h= 450.0 mm h-Tap = 0.0 mm


Soil Stresses:
S-max = 137.641 kN/m2 S-min = 82.414 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 10.1 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.13 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 104.5 kN V-eff = 109.0 kN
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 10.0 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 104.5 kN V-eff = 109.0 kN
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F12
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C12 1 -116.4 1.8 2.0 G+Q *F
2 -117.5 2.2 2.0 (G+Q)P11 *F
3 -111.1 1.8 2.0 (G+Q)P12 *F
4 -98.5 0.6 1.9 (G+Q)P21 *F
5 -90.5 1.8 1.0 (G+Q)P22 *F
6 -98.3 0.8 2.0 (G+Q)P31 *F
7 -122.9 1.8 2.4 (G+Q)P32 *F
8 -116.4 1.6 1.9 (G+Q)P41 *F
9 -84.0 1.8 0.6 (G+Q)P42 *F
10 -117.7 2.1 2.1 (G+Q)P51 *F
11 -111.1 1.8 2.0 (G+Q)P52 *F
12 -98.6 3.8 1.5 G+Q+Nx
13 -95.6 -0.8 1.7 G+Q-Nx
14 -96.3 1.5 4.0 G+Q+Ny
15 -97.9 1.5 -0.8 G+Q-Ny
Column: 1C12
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -122.9 kN Mx = 1.8 kN.m
My = 2.4 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 171.567 kN/m2 S-min = 121.325 kN/m2

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-12

Allowable Soil Stress will be amplified by the factor (x1.4) =


210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.7 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 139.0 kN V-eff = 142.6 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 12.6 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 139.0 kN V-eff = 142.6 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F13
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C13 1 -239.4 0.9 3.4 G+Q *F
2 -207.2 -0.1 3.4 (G+Q)P11 *F
3 -231.9 0.9 3.5 (G+Q)P12 *F
4 -215.2 1.5 3.4 (G+Q)P21 *F
5 -195.7 0.9 1.6 (G+Q)P22 *F
6 -216.4 1.6 3.3 (G+Q)P31 *F
7 -251.3 0.9 3.7 (G+Q)P32 *F
8 -237.5 0.8 3.4 (G+Q)P41 *F
9 -183.8 0.9 1.3 (G+Q)P42 *F
10 -207.8 0.0 3.4 (G+Q)P51 *F
11 -231.9 0.9 3.5 (G+Q)P52 *F
12 -198.1 3.1 2.7 G+Q+Nx
13 -199.6 -1.6 2.9 G+Q-Nx
14 -198.0 0.7 5.2 G+Q+Ny
15 -199.7 0.7 0.4 G+Q-Ny
Column: 1C13
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -251.3 kN Mx = 0.9 kN.m
My = 3.7 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 184.818 kN/m2 S-min = 159.880 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-13

X Dir: Footing Design: M= 26.6 kN.m/m


K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.06 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 282.5 kN V-eff = 286.8 kN
v= 0.81 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 26.3 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.26 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 282.5 kN V-eff = 286.8 kN
v= 0.81 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 4.2 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F14
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C14 1 -240.2 0.9 -3.0 G+Q *F
2 -215.4 1.7 -3.1 (G+Q)P11 *F
3 -232.9 0.9 -3.1 (G+Q)P12 *F
4 -208.1 -0.4 -3.0 (G+Q)P21 *F
5 -196.5 0.9 -1.4 (G+Q)P22 *F
6 -238.6 0.9 -3.1 (G+Q)P31 *F
7 -184.6 0.9 -1.0 (G+Q)P32 *F
8 -211.0 -0.3 -3.0 (G+Q)P41 *F
9 -252.1 0.9 -3.4 (G+Q)P42 *F
10 -214.1 1.6 -3.1 (G+Q)P51 *F
11 -232.9 0.9 -3.1 (G+Q)P52 *F
12 -198.8 3.1 -2.6 G+Q+Nx
13 -200.3 -1.7 -2.4 G+Q-Nx
14 -200.4 0.7 -0.1 G+Q+Ny
15 -198.7 0.7 -4.9 G+Q-Ny
Column: 1C14
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -252.1 kN Mx = 0.9 kN.m
My = 3.4 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 184.559 kN/m2 S-min = 161.089 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 26.6 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-14

Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)


v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.06 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 283.3 kN V-eff = 287.2 kN
v= 0.81 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.1 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 26.3 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.26 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 283.3 kN V-eff = 287.2 kN
v= 0.81 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 3.9 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F15
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C15 1 -173.4 0.9 -5.7 G+Q *F
2 -156.9 1.5 -5.7 (G+Q)P11 *F
3 -173.5 0.8 -5.7 (G+Q)P12 *F
4 -150.2 -0.1 -5.8 (G+Q)P21 *F
5 -137.4 0.8 -2.9 (G+Q)P22 *F
6 -155.4 1.3 -5.7 (G+Q)P31 *F
7 -173.3 0.9 -5.3 (G+Q)P32 *F
8 -174.7 0.7 -5.8 (G+Q)P41 *F
9 -137.4 0.8 -3.3 (G+Q)P42 *F
10 -150.4 0.2 -5.7 (G+Q)P51 *F
11 -173.5 0.9 -5.7 (G+Q)P52 *F
12 -143.6 3.1 -4.8 G+Q+Nx
13 -144.9 -1.7 -4.6 G+Q-Nx
14 -143.2 0.7 -2.5 G+Q+Ny
15 -145.2 0.7 -7.0 G+Q-Ny
Column: 1C15
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -174.7 kN Mx = 0.7 kN.m
My = 5.8 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 197.254 kN/m2 S-min = 138.668 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 18.8 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-15

v= 0.02 N/mm2 < vc = 0.40 N/mm2


Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 194.7 kN V-eff = 202.6 kN
v= 0.57 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 18.2 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.22 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.03 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 194.7 kN V-eff = 202.6 kN
v= 0.57 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F16
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C16 1 -148.3 -0.8 -5.6 G+Q *F
2 -135.5 -1.1 -5.5 (G+Q)P11 *F
3 -148.5 -0.8 -5.6 (G+Q)P12 *F
4 -133.1 0.0 -5.6 (G+Q)P21 *F
5 -112.8 -0.8 -2.8 (G+Q)P22 *F
6 -158.1 -0.5 -5.6 (G+Q)P31 *F
7 -148.2 -0.8 -5.2 (G+Q)P32 *F
8 -136.3 -1.2 -5.6 (G+Q)P41 *F
9 -112.9 -0.8 -3.2 (G+Q)P42 *F
10 -122.6 -0.1 -5.5 (G+Q)P51 *F
11 -148.5 -0.8 -5.6 (G+Q)P52 *F
12 -124.1 1.7 -4.7 G+Q+Nx
13 -123.0 -3.0 -4.5 G+Q-Nx
14 -122.5 -0.6 -2.3 G+Q+Ny
15 -124.6 -0.6 -6.9 G+Q-Ny
Column: 1C16
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -158.1 kN Mx = 0.5 kN.m
My = 5.6 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 181.792 kN/m2 S-min = 126.658 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.3 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 178.8 kN V-eff = 186.4 kN

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-16

v= 0.53 N/mm2 < v-max = 3.58 N/mm2


Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.7 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 16.8 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 178.8 kN V-eff = 186.4 kN
v= 0.53 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 7.6 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F17
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C17 1 -221.6 -0.9 3.1 G+Q *F
2 -196.9 0.4 3.1 (G+Q)P11 *F
3 -214.1 -0.9 3.2 (G+Q)P12 *F
4 -202.2 -1.8 3.1 (G+Q)P21 *F
5 -174.0 -0.9 1.4 (G+Q)P22 *F
6 -229.0 -0.8 3.2 (G+Q)P31 *F
7 -228.6 -0.9 3.4 (G+Q)P32 *F
8 -202.1 -1.5 3.1 (G+Q)P41 *F
9 -167.1 -0.9 1.1 (G+Q)P42 *F
10 -189.6 0.0 3.0 (G+Q)P51 *F
11 -214.1 -0.9 3.2 (G+Q)P52 *F
12 -184.7 1.6 2.5 G+Q+Nx
13 -183.6 -3.1 2.6 G+Q-Nx
14 -183.3 -0.8 5.0 G+Q+Ny
15 -185.0 -0.8 0.2 G+Q-Ny
Column: 1C17
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -228.6 kN Mx = 0.9 kN.m
My = 3.4 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 197.545 kN/m2 S-min = 167.196 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 23.4 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.24 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.04 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 253.4 kN V-eff = 257.7 kN
v= 0.73 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-17

v= 0.00 N/mm2 < vc = 0.40 N/mm2


Y Dir: Footing Design: M= 23.1 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.05 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 253.4 kN V-eff = 257.7 kN
v= 0.73 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F18
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C18 1 -224.3 1.5 3.1 G+Q *F
2 -189.9 0.0 3.0 (G+Q)P11 *F
3 -216.7 1.5 3.3 (G+Q)P12 *F
4 -213.1 2.2 3.2 (G+Q)P21 *F
5 -176.7 1.5 1.5 (G+Q)P22 *F
6 -184.2 0.2 3.0 (G+Q)P31 *F
7 -231.2 1.5 3.4 (G+Q)P32 *F
8 -208.6 1.7 3.0 (G+Q)P41 *F
9 -169.7 1.5 1.2 (G+Q)P42 *F
10 -234.5 1.9 3.3 (G+Q)P51 *F
11 -216.7 1.5 3.2 (G+Q)P52 *F
12 -185.8 3.6 2.5 G+Q+Nx
13 -186.8 -1.1 2.6 G+Q-Nx
14 -185.4 1.2 5.0 G+Q+Ny
15 -187.2 1.3 0.2 G+Q-Ny
Column: 1C18
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -234.5 kN Mx = 1.9 kN.m
My = 3.3 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 204.380 kN/m2 S-min = 168.528 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 24.1 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.04 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 259.1 kN V-eff = 263.1 kN
v= 0.74 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.4 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 23.9 kN.m/m
K/K' = 0.05 < 1.0

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-18

As = 900.00 mm2/m Y16-200


Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.26 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.05 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 259.1 kN V-eff = 263.1 kN
v= 0.74 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 4.1 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F19
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C19 1 -203.2 2.7 -5.6 G+Q *F
2 -197.6 3.4 -5.5 (G+Q)P11 *F
3 -203.3 2.7 -5.5 (G+Q)P12 *F
4 -152.6 0.6 -5.7 (G+Q)P21 *F
5 -167.7 2.7 -2.8 (G+Q)P22 *F
6 -149.1 1.1 -5.6 (G+Q)P31 *F
7 -203.1 2.7 -5.2 (G+Q)P32 *F
8 -189.7 2.7 -5.6 (G+Q)P41 *F
9 -167.8 2.6 -3.1 (G+Q)P42 *F
10 -214.6 3.0 -5.6 (G+Q)P51 *F
11 -203.3 2.7 -5.6 (G+Q)P52 *F
12 -168.2 4.6 -4.6 G+Q+Nx
13 -169.2 -0.1 -4.6 G+Q-Nx
14 -167.6 2.2 -2.3 G+Q+Ny
15 -169.7 2.2 -6.9 G+Q-Ny
Column: 1C19
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -214.6 kN Mx = 3.0 kN.m
My = 5.6 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1200.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 202.592 kN/m2 S-min = 142.698 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 23.7 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.25 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.04 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 239.9 kN V-eff = 246.9 kN
v= 0.70 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 3.8 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 23.4 kN.m/m
K/K' = 0.05 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.26 N/mm2 < v-max = 3.58 N/mm2

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-19

Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)


v= 0.05 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 239.9 kN V-eff = 246.9 kN
v= 0.70 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 7.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F20
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C20 1 -269.9 0.2 -6.1 G+Q *F
2 -227.6 -2.0 -6.2 (G+Q)P11 *F
3 -270.1 0.2 -6.1 (G+Q)P12 *F
4 -226.5 2.4 -6.1 (G+Q)P21 *F
5 -232.1 0.2 -3.1 (G+Q)P22 *F
6 -222.2 2.2 -6.1 (G+Q)P31 *F
7 -269.8 0.2 -5.8 (G+Q)P32 *F
8 -275.8 0.4 -6.2 (G+Q)P41 *F
9 -232.2 0.2 -3.4 (G+Q)P42 *F
10 -226.0 -2.0 -6.1 (G+Q)P51 *F
11 -270.1 0.2 -6.1 (G+Q)P52 *F
12 -223.7 2.5 -5.1 G+Q+Nx
13 -224.2 -2.1 -5.0 G+Q-Nx
14 -222.9 0.2 -2.8 G+Q+Ny
15 -225.0 0.2 -7.3 G+Q-Ny
Column: 1C20
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -275.8 kN Mx = 0.4 kN.m
My = 6.2 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 204.727 kN/m2 S-min = 168.934 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 29.5 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.27 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 306.3 kN V-eff = 313.4 kN
v= 0.88 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 28.9 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.29 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-20

Vt = 306.3 kN V-eff = 313.4 kN


v= 0.88 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F21
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C21 1 -315.5 2.7 3.4 G+Q *F
2 -279.5 4.7 3.4 (G+Q)P11 *F
3 -308.0 2.7 3.5 (G+Q)P12 *F
4 -260.0 -0.6 3.3 (G+Q)P21 *F
5 -269.6 2.7 1.5 (G+Q)P22 *F
6 -282.4 4.3 3.2 (G+Q)P31 *F
7 -328.1 2.7 3.6 (G+Q)P32 *F
8 -314.1 2.7 3.5 (G+Q)P41 *F
9 -257.0 2.7 1.3 (G+Q)P42 *F
10 -258.5 -0.2 3.3 (G+Q)P51 *F
11 -308.1 2.7 3.5 (G+Q)P52 *F
12 -261.6 4.6 2.7 G+Q+Nx
13 -262.0 -0.1 2.8 G+Q-Nx
14 -260.9 2.2 5.2 G+Q+Ny
15 -262.7 2.2 0.3 G+Q-Ny
Column: 1C21
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -328.1 kN Mx = 2.7 kN.m
My = 3.6 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 204.884 kN/m2 S-min = 177.257 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 35.1 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 364.8 kN V-eff = 368.7 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.9 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 35.0 kN.m/m
K/K' = 0.08 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.11 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 364.8 kN V-eff = 368.7 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-21

Vt = 0.0 kN V-eff = 3.8 kN


v= 0.00 N/mm2 < vc = 0.41 N/mm2

F22
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C22 1 -314.6 -2.2 3.3 G+Q *F
2 -279.3 -4.0 3.3 (G+Q)P11 *F
3 -306.8 -2.2 3.5 (G+Q)P12 *F
4 -258.6 0.7 3.2 (G+Q)P21 *F
5 -269.4 -2.1 1.5 (G+Q)P22 *F
6 -314.8 -2.4 3.4 (G+Q)P31 *F
7 -326.9 -2.2 3.5 (G+Q)P32 *F
8 -275.3 -3.9 3.4 (G+Q)P41 *F
9 -257.1 -2.1 1.3 (G+Q)P42 *F
10 -262.3 0.9 3.1 (G+Q)P51 *F
11 -306.7 -2.2 3.4 (G+Q)P52 *F
12 -261.2 0.6 2.7 G+Q+Nx
13 -260.8 -4.2 2.7 G+Q-Nx
14 -260.1 -1.8 5.2 G+Q+Ny
15 -261.9 -1.8 0.3 G+Q-Ny
Column: 1C22
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -326.9 kN Mx = 2.2 kN.m
My = 3.5 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 202.988 kN/m2 S-min = 177.983 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 34.8 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 363.7 kN V-eff = 367.5 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.4 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 34.7 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.11 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 363.7 kN V-eff = 367.5 kN
v= 1.04 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 3.8 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-22

F23
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C23 1 -277.5 0.9 -6.2 G+Q *F
2 -235.5 3.3 -6.3 (G+Q)P11 *F
3 -277.2 0.8 -6.1 (G+Q)P12 *F
4 -230.2 -1.9 -6.2 (G+Q)P21 *F
5 -240.1 0.9 -3.2 (G+Q)P22 *F
6 -281.9 0.6 -6.2 (G+Q)P31 *F
7 -277.4 0.9 -5.8 (G+Q)P32 *F
8 -227.0 -1.5 -6.3 (G+Q)P41 *F
9 -240.1 0.9 -3.5 (G+Q)P42 *F
10 -234.3 3.2 -6.2 (G+Q)P51 *F
11 -277.2 0.9 -6.2 (G+Q)P52 *F
12 -230.8 3.1 -5.1 G+Q+Nx
13 -229.7 -1.6 -5.1 G+Q-Nx
14 -229.2 0.7 -2.8 G+Q+Ny
15 -231.3 0.7 -7.4 G+Q-Ny
Column: 1C23
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -281.9 kN Mx = 0.6 kN.m
My = 6.2 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 209.036 kN/m2 S-min = 171.850 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 30.1 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 312.2 kN V-eff = 319.4 kN
v= 0.90 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.7 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 29.5 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.29 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 312.2 kN V-eff = 319.4 kN
v= 0.90 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 7.2 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F24
--------------------------------------------------------------------------------
Columns/Loadings:

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-23

Column Cmb N Mx My
1C24 1 -152.3 -4.5 -1.8 G+Q *F
2 -155.9 -5.2 -1.8 (G+Q)P11 *F
3 -122.2 -4.6 -0.9 (G+Q)P12 *F
4 -119.3 -1.6 -1.7 (G+Q)P21 *F
5 -146.1 -4.5 -1.9 (G+Q)P22 *F
6 -151.7 -4.4 -1.8 (G+Q)P31 *F
7 -152.8 -4.5 -1.4 (G+Q)P32 *F
8 -117.3 -1.7 -1.7 (G+Q)P41 *F
9 -146.4 -4.5 -2.1 (G+Q)P42 *F
10 -158.4 -5.2 -1.8 (G+Q)P51 *F
11 -121.3 -4.6 -0.9 (G+Q)P52 *F
12 -126.0 -1.5 -1.4 G+Q+Nx
13 -127.5 -6.0 -1.5 G+Q-Nx
14 -128.8 -3.7 1.0 G+Q+Ny
15 -124.7 -3.7 -3.9 G+Q-Ny
Column: 1C24
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -158.4 kN Mx = 5.2 kN.m
My = 1.8 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 186.250 kN/m2 S-min = 122.819 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.2 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 179.2 kN V-eff = 186.2 kN
v= 0.53 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 7.1 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.6 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 179.2 kN V-eff = 186.2 kN
v= 0.53 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.5 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F25
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C25 1 -166.1 -1.2 1.3 G+Q *F
2 -125.4 0.3 1.3 (G+Q)P11 *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-24

3 -147.7 -1.2 0.5 (G+Q)P12 *F


4 -161.4 -2.1 1.3 (G+Q)P21 *F
5 -158.8 -1.1 1.4 (G+Q)P22 *F
6 -153.1 -1.3 1.4 (G+Q)P31 *F
7 -158.7 -1.2 1.7 (G+Q)P32 *F
8 -127.6 -0.1 1.1 (G+Q)P41 *F
9 -178.2 -1.1 0.8 (G+Q)P42 *F
10 -172.2 -1.6 1.5 (G+Q)P51 *F
11 -135.7 -1.2 0.6 (G+Q)P52 *F
12 -138.8 1.4 1.1 G+Q+Nx
13 -137.9 -3.3 1.0 G+Q-Nx
14 -137.2 -1.0 3.5 G+Q+Ny
15 -139.6 -1.0 -1.4 G+Q-Ny
Column: 1C25
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -178.2 kN Mx = 1.1 kN.m
My = 0.8 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 179.652 kN/m2 S-min = 162.076 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.1 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 198.1 kN V-eff = 199.6 kN
v= 0.56 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.5 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.1 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 198.1 kN V-eff = 199.6 kN
v= 0.56 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.1 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F26
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C26 1 -106.7 0.5 2.7 G+Q *F
2 -92.6 0.0 2.7 (G+Q)P11 *F
3 -87.2 0.5 1.4 (G+Q)P12 *F
4 -99.3 0.8 2.8 (G+Q)P21 *F
5 -104.5 0.5 2.7 (G+Q)P22 *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-25

6 -94.5 0.7 2.7 (G+Q)P31 *F


7 -106.8 0.6 3.1 (G+Q)P32 *F
8 -122.2 0.4 2.7 (G+Q)P41 *F
9 -105.1 0.4 2.5 (G+Q)P42 *F
10 -81.9 0.3 2.7 (G+Q)P51 *F
11 -86.4 0.6 1.3 (G+Q)P52 *F
12 -88.9 2.8 2.3 G+Q+Nx
13 -89.2 -2.0 2.2 G+Q-Nx
14 -89.8 0.4 4.6 G+Q+Ny
15 -88.3 0.4 0.0 G+Q-Ny
Column: 1C26
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -122.2 kN Mx = 0.4 kN.m
My = 2.7 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 164.305 kN/m2 S-min = 127.107 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.3 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.16 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 138.3 kN V-eff = 142.4 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.5 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 12.0 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.16 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 138.3 kN V-eff = 142.4 kN
v= 0.40 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 4.1 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F27
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C27 1 -250.8 2.5 2.7 G+Q *F
2 -229.3 3.1 2.8 (G+Q)P11 *F
3 -242.7 2.5 2.9 (G+Q)P12 *F
4 -207.6 0.7 2.7 (G+Q)P21 *F
5 -210.6 2.4 1.0 (G+Q)P22 *F
6 -251.7 2.5 2.6 (G+Q)P31 *F
7 -263.2 2.5 2.8 (G+Q)P32 *F
8 -205.9 0.9 2.7 (G+Q)P41 *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-26

9 -197.9 2.4 0.9 (G+Q)P42 *F


10 -230.1 3.0 2.8 (G+Q)P51 *F
11 -243.0 2.5 2.8 (G+Q)P52 *F
12 -208.2 4.5 2.3 G+Q+Nx
13 -208.4 -0.3 2.1 G+Q-Nx
14 -207.6 2.1 4.7 G+Q+Ny
15 -209.1 2.1 -0.3 G+Q-Ny
Column: 1C27
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -263.2 kN Mx = 2.5 kN.m
My = 2.8 kN.m
Footing Dimensions:
Lx = 1300.0 mm Ly = 1300.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 194.067 kN/m2 S-min = 164.761 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 27.8 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.26 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 294.1 kN V-eff = 297.4 kN
v= 0.84 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.9 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 27.7 kN.m/m
K/K' = 0.06 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.27 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.08 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 294.1 kN V-eff = 297.4 kN
v= 0.84 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 3.3 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F28
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C28 1 -181.6 1.9 -5.9 G+Q *F
2 -169.2 2.3 -6.0 (G+Q)P11 *F
3 -180.8 1.9 -5.8 (G+Q)P12 *F
4 -150.0 0.6 -5.9 (G+Q)P21 *F
5 -147.3 1.8 -3.1 (G+Q)P22 *F
6 -181.6 1.9 -6.0 (G+Q)P31 *F
7 -181.6 1.9 -5.6 (G+Q)P32 *F
8 -150.0 0.6 -5.9 (G+Q)P41 *F
9 -147.2 1.8 -3.3 (G+Q)P42 *F
10 -169.2 2.2 -6.0 (G+Q)P51 *F
11 -180.9 1.9 -5.9 (G+Q)P52 *F

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-27

12 -150.5 4.0 -4.8 G+Q+Nx


13 -151.8 -0.8 -5.0 G+Q-Nx
14 -150.2 1.6 -2.6 G+Q+Ny
15 -152.1 1.6 -7.2 G+Q-Ny
Column: 1C28
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 6 ((G+Q)P31 *F)
N= -181.6 kN Mx = 1.9 kN.m
My = 6.0 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 209.094 kN/m2 S-min = 138.272 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 19.8 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.23 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 201.4 kN V-eff = 209.5 kN
v= 0.59 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 19.3 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.24 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.03 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 201.4 kN V-eff = 209.5 kN
v= 0.59 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F29
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C29 1 -100.7 0.6 -1.9 G+Q *F
2 -90.5 0.3 -1.9 (G+Q)P11 *F
3 -70.6 0.6 -0.9 (G+Q)P12 *F
4 -104.3 0.7 -1.9 (G+Q)P21 *F
5 -98.0 0.5 -1.9 (G+Q)P22 *F
6 -100.4 0.6 -1.9 (G+Q)P31 *F
7 -101.0 0.6 -1.6 (G+Q)P32 *F
8 -104.9 0.7 -1.9 (G+Q)P41 *F
9 -97.8 0.5 -2.2 (G+Q)P42 *F
10 -90.2 0.2 -1.9 (G+Q)P51 *F
11 -70.5 0.6 -1.0 (G+Q)P52 *F
12 -85.6 2.8 -1.5 G+Q+Nx
13 -83.0 -1.8 -1.6 G+Q-Nx
14 -85.8 0.5 0.9 G+Q+Ny

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-28

15 -82.8 0.5 -4.0 G+Q-Ny


Column: 1C29
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -104.9 kN Mx = 0.7 kN.m
My = 1.9 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 143.973 kN/m2 S-min = 112.785 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 10.7 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 121.9 kN V-eff = 124.7 kN
v= 0.35 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 10.6 kN.m/m
K/K' = 0.02 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 121.9 kN V-eff = 124.7 kN
v= 0.35 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F30
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C30 1 -11.7 0.2 -0.1 G+Q *F
2 -11.1 0.3 -0.1 (G+Q)P11 *F
3 -17.9 0.2 -0.1 (G+Q)P12 *F
4 -10.1 0.0 -0.1 (G+Q)P21 *F
5 -9.9 0.2 -0.1 (G+Q)P22 *F
6 -11.9 0.2 -0.1 (G+Q)P31 *F
7 -11.2 0.2 0.2 (G+Q)P32 *F
8 -9.7 0.1 -0.1 (G+Q)P41 *F
9 -10.1 0.2 -0.4 (G+Q)P42 *F
10 -11.3 0.2 -0.1 (G+Q)P51 *F
11 -18.2 0.2 -0.2 (G+Q)P52 *F
12 -8.4 2.4 0.0 G+Q+Nx
13 -12.4 -2.1 -0.1 G+Q-Nx
14 -7.9 0.1 2.3 G+Q+Ny
15 -12.9 0.2 -2.5 G+Q-Ny
Column: 1C30
bx = 225.0 mm by = 225.0 mm

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-29

Effects: Critical Combination = 15 (G+Q-Ny)


N= -12.9 kN Mx = 0.2 kN.m
My = 2.5 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 52.341 kN/m2 S-min = 20.570 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 3.9 kN.m/m
K/K' = 0.01 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.05 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 34.6 kN V-eff = 38.3 kN
v= 0.11 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 3.6 kN.m/m
K/K' = 0.01 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.05 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 34.6 kN V-eff = 38.3 kN
v= 0.11 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F31
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C31 1 -24.1 0.5 -0.4 G+Q *F
2 -25.2 0.6 -0.4 (G+Q)P11 *F
3 -29.9 0.4 -0.4 (G+Q)P12 *F
4 -18.6 0.2 -0.3 (G+Q)P21 *F
5 -18.5 0.5 -0.3 (G+Q)P22 *F
6 -24.2 0.5 -0.4 (G+Q)P31 *F
7 -23.6 0.5 -0.1 (G+Q)P32 *F
8 -19.5 0.2 -0.3 (G+Q)P41 *F
9 -18.4 0.4 -0.6 (G+Q)P42 *F
10 -24.1 0.5 -0.4 (G+Q)P51 *F
11 -30.5 0.5 -0.5 (G+Q)P52 *F
12 -22.5 2.7 -0.3 G+Q+Nx
13 -18.7 -1.9 -0.4 G+Q-Nx
14 -17.9 0.4 2.0 G+Q+Ny
15 -23.3 0.4 -2.7 G+Q-Ny
Column: 1C31
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 15 (G+Q-Ny)
N= -23.3 kN Mx = 0.4 kN.m
My = 2.7 kN.m

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-30

Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 65.597 kN/m2 S-min = 28.127 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 4.9 kN.m/m
K/K' = 0.01 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.06 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 44.5 kN V-eff = 48.6 kN
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 4.6 kN.m/m
K/K' = 0.01 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.07 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 44.5 kN V-eff = 48.6 kN
v= 0.14 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F35
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C35 1 -161.6 -1.4 -1.8 G+Q *F
2 -149.0 -1.7 -1.8 (G+Q)P11 *F
3 -154.2 -1.3 -1.8 (G+Q)P12 *F
4 -136.1 -0.4 -1.8 (G+Q)P21 *F
5 -138.7 -1.3 -0.8 (G+Q)P22 *F
6 -152.6 -1.6 -1.7 (G+Q)P31 *F
7 -127.2 -1.3 -0.4 (G+Q)P32 *F
8 -127.2 -0.7 -1.7 (G+Q)P41 *F
9 -173.2 -1.3 -2.1 (G+Q)P42 *F
10 -167.0 -1.2 -1.9 (G+Q)P51 *F
11 -154.2 -1.4 -1.8 (G+Q)P52 *F
12 -135.3 1.3 -1.5 G+Q+Nx
13 -134.2 -3.5 -1.4 G+Q-Nx
14 -135.6 -1.1 1.0 G+Q+Ny
15 -133.9 -1.1 -3.9 G+Q-Ny
Column: 1C35
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -173.2 kN Mx = 1.3 kN.m
My = 2.1 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-31

Soil Stresses:
S-max = 182.072 kN/m2 S-min = 151.333 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.3 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 193.3 kN V-eff = 196.1 kN
v= 0.55 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 1.8 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.2 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 193.3 kN V-eff = 196.1 kN
v= 0.55 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.8 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F36
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C36 1 -164.0 1.9 -1.9 G+Q *F
2 -159.8 2.7 -2.0 (G+Q)P11 *F
3 -156.6 1.9 -1.9 (G+Q)P12 *F
4 -128.7 0.1 -1.8 (G+Q)P21 *F
5 -141.2 1.9 -0.9 (G+Q)P22 *F
6 -150.1 2.0 -1.9 (G+Q)P31 *F
7 -129.7 1.8 -0.5 (G+Q)P32 *F
8 -176.0 2.0 -2.0 (G+Q)P41 *F
9 -175.5 1.9 -2.2 (G+Q)P42 *F
10 -126.4 0.6 -1.7 (G+Q)P51 *F
11 -156.6 1.9 -1.9 (G+Q)P52 *F
12 -136.1 3.9 -1.6 G+Q+Nx
13 -137.3 -0.8 -1.5 G+Q-Nx
14 -137.6 1.6 0.9 G+Q+Ny
15 -135.8 1.5 -4.0 G+Q-Ny
Column: 1C36
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -176.0 kN Mx = 2.0 kN.m
My = 2.0 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 187.166 kN/m2 S-min = 150.963 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-32

210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 17.7 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 196.0 kN V-eff = 198.8 kN
v= 0.56 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.8 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.7 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 196.0 kN V-eff = 198.8 kN
v= 0.56 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.7 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F37
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C37 1 -317.7 2.8 -3.4 G+Q *F
2 -260.8 -0.3 -3.3 (G+Q)P11 *F
3 -310.5 2.8 -3.4 (G+Q)P12 *F
4 -282.0 4.5 -3.5 (G+Q)P21 *F
5 -271.6 2.8 -1.7 (G+Q)P22 *F
6 -318.2 3.1 -3.5 (G+Q)P31 *F
7 -259.1 2.8 -1.4 (G+Q)P32 *F
8 -264.4 -0.4 -3.2 (G+Q)P41 *F
9 -330.5 2.9 -3.6 (G+Q)P42 *F
10 -277.9 4.3 -3.5 (G+Q)P51 *F
11 -310.2 2.8 -3.5 (G+Q)P52 *F
12 -263.3 4.7 -2.8 G+Q+Nx
13 -263.8 0.0 -2.8 G+Q-Nx
14 -264.5 2.3 -0.4 G+Q+Ny
15 -262.7 2.3 -5.2 G+Q-Ny
Column: 1C37
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -330.5 kN Mx = 2.9 kN.m
My = 3.6 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 206.476 kN/m2 S-min = 178.101 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 35.3 kN.m/m

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-33

K/K' = 0.07 < 1.0


As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.10 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 367.2 kN V-eff = 371.0 kN
v= 1.05 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 35.3 kN.m/m
K/K' = 0.08 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.31 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.11 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 367.2 kN V-eff = 371.0 kN
v= 1.05 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F38
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C38 1 -305.3 -3.0 -3.5 G+Q *F
2 -256.6 0.7 -3.4 (G+Q)P11 *F
3 -297.2 -3.1 -3.4 (G+Q)P12 *F
4 -267.9 -5.3 -3.5 (G+Q)P21 *F
5 -259.8 -3.0 -1.7 (G+Q)P22 *F
6 -271.2 -4.7 -3.3 (G+Q)P31 *F
7 -247.3 -3.0 -1.5 (G+Q)P32 *F
8 -248.5 -0.2 -3.4 (G+Q)P41 *F
9 -316.9 -3.1 -3.6 (G+Q)P42 *F
10 -310.0 -2.6 -3.7 (G+Q)P51 *F
11 -298.1 -3.0 -3.5 (G+Q)P52 *F
12 -253.6 -0.1 -2.8 G+Q+Nx
13 -253.1 -4.9 -2.9 G+Q-Nx
14 -254.3 -2.5 -0.4 G+Q+Ny
15 -252.5 -2.5 -5.3 G+Q-Ny
Column: 1C38
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -316.9 kN Mx = 3.1 kN.m
My = 3.6 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 200.018 kN/m2 S-min = 170.728 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 34.2 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-34

v= 0.29 N/mm2 < v-max = 3.58 N/mm2


Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 353.9 kN V-eff = 357.8 kN
v= 1.01 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 34.1 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.10 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 353.9 kN V-eff = 357.8 kN
v= 1.01 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F39
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C39 1 -299.1 3.0 -3.6 G+Q *F
2 -252.7 -0.4 -3.6 (G+Q)P11 *F
3 -247.5 3.0 -1.8 (G+Q)P12 *F
4 -268.3 4.8 -3.5 (G+Q)P21 *F
5 -290.7 3.0 -3.7 (G+Q)P22 *F
6 -263.7 4.7 -3.5 (G+Q)P31 *F
7 -290.7 3.0 -3.3 (G+Q)P32 *F
8 -306.8 2.5 -3.8 (G+Q)P41 *F
9 -241.5 3.0 -2.3 (G+Q)P42 *F
10 -249.5 0.3 -3.4 (G+Q)P51 *F
11 -305.1 3.0 -3.5 (G+Q)P52 *F
12 -248.0 4.8 -2.9 G+Q+Nx
13 -248.3 0.1 -3.0 G+Q-Nx
14 -249.2 2.5 -0.5 G+Q+Ny
15 -247.1 2.5 -5.4 G+Q-Ny
Column: 1C39
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 8 ((G+Q)P41 *F)
N= -306.8 kN Mx = 2.5 kN.m
My = 3.8 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 193.935 kN/m2 S-min = 166.541 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 33.2 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.28 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-35

Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)


Vt = 344.1 kN V-eff = 348.2 kN
v= 0.98 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 2.7 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 33.1 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.10 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 344.1 kN V-eff = 348.2 kN
v= 0.98 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 4.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F40
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C40 1 -311.9 -1.4 -3.8 G+Q *F
2 -260.3 1.7 -3.7 (G+Q)P11 *F
3 -304.0 -1.3 -3.7 (G+Q)P12 *F
4 -274.6 -3.8 -3.8 (G+Q)P21 *F
5 -265.8 -1.4 -2.0 (G+Q)P22 *F
6 -315.2 -1.7 -3.8 (G+Q)P31 *F
7 -254.0 -1.4 -1.8 (G+Q)P32 *F
8 -270.1 -3.3 -3.8 (G+Q)P41 *F
9 -322.9 -1.3 -3.9 (G+Q)P42 *F
10 -261.5 1.5 -3.7 (G+Q)P51 *F
11 -304.7 -1.4 -3.8 (G+Q)P52 *F
12 -259.4 1.3 -3.0 G+Q+Nx
13 -258.3 -3.5 -3.2 G+Q-Nx
14 -259.7 -1.1 -0.7 G+Q+Ny
15 -257.9 -1.1 -5.6 G+Q-Ny
Column: 1C40
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 9 ((G+Q)P42 *F)
N= -322.9 kN Mx = 1.3 kN.m
My = 3.9 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly = 1400.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 199.683 kN/m2 S-min = 177.213 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 34.3 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.29 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.09 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 359.8 kN V-eff = 364.0 kN
v= 1.03 N/mm2 < v-max = 3.58 N/mm2

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-36

Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)


Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 34.1 kN.m/m
K/K' = 0.07 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.30 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.10 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 359.8 kN V-eff = 364.0 kN
v= 1.03 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F32
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C32 1 -107.1 -3.1 -3.8 G+Q *F
2 -107.6 -3.1 -3.8 (G+Q)P11 *F
3 -107.4 -3.1 -3.6 (G+Q)P12 *F
4 -84.8 -1.6 -3.8 (G+Q)P21 *F
5 -84.4 -3.1 -2.1 (G+Q)P22 *F
6 -107.1 -3.1 -3.8 (G+Q)P31 *F
7 -107.0 -3.1 -3.5 (G+Q)P32 *F
8 -84.8 -1.5 -3.8 (G+Q)P41 *F
9 -84.5 -3.1 -2.3 (G+Q)P42 *F
10 -107.6 -3.1 -3.8 (G+Q)P51 *F
11 -107.4 -3.1 -3.7 (G+Q)P52 *F
12 -88.3 -0.3 -3.0 G+Q+Nx
13 -90.3 -4.8 -3.2 G+Q-Nx
14 -88.3 -2.6 -0.8 G+Q+Ny
15 -90.3 -2.5 -5.5 G+Q-Ny
Column: 1C32
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 10 ((G+Q)P51 *F)
N= -107.6 kN Mx = 3.1 kN.m
My = 3.8 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 172.829 kN/m2 S-min = 89.523 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 12.6 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 124.5 kN V-eff = 130.3 kN
v= 0.37 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-37

Y Dir: Footing Design: M= 12.5 kN.m/m


K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.17 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 124.5 kN V-eff = 130.3 kN
v= 0.37 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F33
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C33 1 -146.8 -4.6 1.5 G+Q *F
2 -148.1 -4.6 1.5 (G+Q)P11 *F
3 -141.5 -4.6 1.8 (G+Q)P12 *F
4 -115.4 -2.3 1.6 (G+Q)P21 *F
5 -119.3 -4.5 0.6 (G+Q)P22 *F
6 -146.7 -4.6 1.5 (G+Q)P31 *F
7 -153.8 -4.6 1.8 (G+Q)P32 *F
8 -115.4 -2.3 1.6 (G+Q)P41 *F
9 -112.2 -4.5 0.4 (G+Q)P42 *F
10 -148.1 -4.6 1.5 (G+Q)P51 *F
11 -141.5 -4.6 1.7 (G+Q)P52 *F
12 -121.2 -1.5 1.4 G+Q+Nx
13 -123.3 -6.0 1.2 G+Q-Nx
14 -121.3 -3.8 3.7 G+Q+Ny
15 -123.1 -3.8 -1.2 G+Q-Ny
Column: 1C33
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 7 ((G+Q)P32 *F)
N= -153.8 kN Mx = 4.6 kN.m
My = 1.8 kN.m
Footing Dimensions:
Lx = 1100.0 mm Ly = 1100.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 179.474 kN/m2 S-min = 121.971 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 16.7 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 174.7 kN V-eff = 181.0 kN
v= 0.51 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 17.0 kN.m/m
K/K' = 0.04 < 1.0
As = 900.00 mm2/m Y16-200

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-38

Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)


v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.02 N/mm2 < vc = 0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 174.7 kN V-eff = 181.0 kN
v= 0.51 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

F34
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C34 1 -139.1 -3.4 -2.2 G+Q *F
2 -145.1 -4.3 -2.2 (G+Q)P11 *F
3 -134.1 -3.4 -2.1 (G+Q)P12 *F
4 -106.7 -0.9 -2.2 (G+Q)P21 *F
5 -111.6 -3.3 -1.2 (G+Q)P22 *F
6 -138.6 -3.3 -2.2 (G+Q)P31 *F
7 -104.5 -3.3 -1.0 (G+Q)P32 *F
8 -107.4 -1.0 -2.2 (G+Q)P41 *F
9 -146.4 -3.4 -2.3 (G+Q)P42 *F
10 -144.9 -4.2 -2.2 (G+Q)P51 *F
11 -133.9 -3.4 -2.2 (G+Q)P52 *F
12 -114.9 -0.5 -1.7 G+Q+Nx
13 -116.9 -5.1 -1.9 G+Q-Nx
14 -116.7 -2.8 0.7 G+Q+Ny
15 -115.0 -2.8 -4.3 G+Q-Ny
Column: 1C34
bx = 225.0 mm by = 225.0 mm
Effects: Critical Combination = 2 ((G+Q)P11 *F)
N= -145.1 kN Mx = 4.3 kN.m
My = 2.2 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h= 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 207.514 kN/m2 S-min = 129.667 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
210.000 kN/m2
As-min (Both Dir's) = 900.00 mm2/m
X Dir: Footing Design: M= 15.1 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.20 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 160.1 kN V-eff = 166.4 kN
v= 0.47 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.40 N/mm2
Y Dir: Footing Design: M= 15.3 kN.m/m
K/K' = 0.03 < 1.0
As = 900.00 mm2/m Y16-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v= 0.21 N/mm2 < v-max = 3.58 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-39

v= 0.00 N/mm2 < vc = 0.41 N/mm2


Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt = 160.1 kN V-eff = 166.4 kN
v= 0.47 N/mm2 < v-max = 3.58 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt = 0.0 kN V-eff = 0.0 kN
v= 0.00 N/mm2 < vc = 0.41 N/mm2

Project: SIMARACHILDRENCANCERFOUNDATION
Slab
Analysis and
Design
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1

SLAB ANALYSIS AND DESIGN REPORT

NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Material: C16/20 / Grade 385 (Type 2)

Slab Strip: X1 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S1 1 7.200 4425.00 0.0310 0.0240 270.9/565.49


124/150 3.000 4425.00 9.0 7.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 9.3Support As = 282.74/565.49 Top:Y12-200(T1)

1S2 1 7.200 5475.00 0.0320 0.0240 270.9/565.49


112/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)

Support Mc = 9.3Support As = 282.74/565.49 Top:Y12-200(T1)

1S3 1 7.200 4425.00 0.0310 0.0240 270.9/565.49


124/150 3.000 4425.00 9.0 7.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 9.3Support As = 282.74/565.49 Top:Y12-200(T1)

1S4 1 7.200 5700.00 0.0320 0.0240 270.9/565.49


112/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)

Support Mc = 9.3Support As = 282.74/565.49 Top:Y12-200(T1)

1S5 1 7.200 4425.00 0.0310 0.0240 270.9/565.49


124/150 3.000 4425.00 9.0 7.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X2 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2

(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)


Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S7 1 7.200 3975.00 0.0377 0.0285 270.9/565.49


124/150 3.000 4425.00 8.9 6.7 Bottom: Y12-200(B1)
Deflection Check: L/d = 32.06 < 52.0 *** Sufficient ***

Support Mc = 8.9Support As = 282.74/565.49 Top:Y12-200(T1)

1S8 1 7.200 3300.00 0.0476 0.0358 270.9/565.49


124/150 3.000 4425.00 7.7 5.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 26.61 < 52.0 *** Sufficient ***

Support Mc = 0.9Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X3 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S16 1 7.200 4425.00 0.0000 0.0000 270.9/565.49


112/150 3.000 1725.00 0.0 0.0 Bottom: Y12-200(B2)

Support Mc = 0.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S15 1 7.200 5475.00 0.0000 0.0000 270.9/565.49


112/150 3.000 1725.00 0.0 0.0 Bottom: Y12-200(B2)

Support Mc = 0.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S14 1 7.200 4425.00 0.0000 0.0000 270.9/565.49


112/150 3.000 1725.00 0.0 0.0 Bottom: Y12-200(B2)

Support Mc = 0.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S13 1 7.200 5700.00 0.0000 0.0000 270.9/565.49


112/150 3.000 1725.00 0.0 0.0 Bottom: Y12-200(B2)

Support Mc = 0.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S12 1 7.200 4425.00 0.0000 0.0000 270.9/565.49


112/150 3.000 1725.00 0.0 0.0 Bottom: Y12-200(B2)

Support Mc = 1.4Support As = 282.74/565.49 Top:Y12-200(T1)

1S11 1 7.200 2850.00 0.0320 0.0240 270.9/565.49


112/150 3.000 1725.00 1.4 1.1 Bottom: Y12-200(B2)

Support Mc = 1.4Support As = 282.74/565.49 Top:Y12-200(T1)

1S10 1 7.200 3975.00 0.0000 0.0000 270.9/565.49


112/150 3.000 1725.00 0.0 0.0 Bottom: Y12-200(B2)

Support Mc = 1.4Support As = 282.74/565.49 Top:Y12-200(T1)

1S9 1 7.200 3300.00 0.0320 0.0240 270.9/565.49


112/150 3.000 1725.00 1.4 1.1 Bottom: Y12-200(B2)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3

Support Mc = 0.2Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X4 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S17 1 7.200 4425.00 0.0310 0.0240 270.9/565.49


124/150 3.000 4425.00 9.0 7.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 8.4Support As = 282.74/565.49 Top:Y12-200(T1)

1S18 1 7.200 2850.00 0.0543 0.0408 270.9/565.49


124/150 3.000 4425.00 6.6 4.9 Bottom: Y12-200(B1)
Deflection Check: L/d = 22.98 < 52.0 *** Sufficient ***

Support Mc = 0.7Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X5 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S19 1 7.200 4425.00 0.0310 0.0240 270.9/565.49


124/150 3.000 4425.00 9.0 7.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 9.3Support As = 282.74/565.49 Top:Y12-200(T1)

1S20 1 7.200 5700.00 0.0320 0.0240 270.9/565.49


112/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)

Support Mc = 9.3Support As = 282.74/565.49 Top:Y12-200(T1)

1S21 1 7.200 4425.00 0.0310 0.0240 270.9/565.49


124/150 3.000 4425.00 9.0 7.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 8.4Support As = 282.74/565.49 Top:Y12-200(T1)

1S22 1 7.200 2850.00 0.0543 0.0408 270.9/565.49


124/150 3.000 4425.00 6.6 4.9 Bottom: Y12-200(B1)
Deflection Check: L/d = 22.98 < 52.0 *** Sufficient ***

Support Mc = 8.2Support As = 282.74/565.49 Top:Y12-200(T1)

1S23 1 7.200 3975.00 0.0377 0.0285 270.9/565.49


124/150 3.000 4425.00 8.9 6.7 Bottom: Y12-200(B1)
Deflection Check: L/d = 32.06 < 52.0 *** Sufficient ***

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4

Support Mc = 8.9Support As = 282.74/565.49 Top:Y12-200(T1)

1S24 1 7.200 3300.00 0.0476 0.0358 270.9/565.49


124/150 3.000 4425.00 7.7 5.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 26.61 < 52.0 *** Sufficient ***

Support Mc = 0.9Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y5 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S1 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


118/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)
Deflection Check: L/d = 37.5 < 52.0 *** Sufficient ***

Support Mc = 8.2Support As = 282.74/565.49 Top:Y12-200(T1)

1S16 1 7.200 1725.00 0.0630 0.0630 270.9/565.49


124/150 3.000 4425.00 2.8 2.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 8.2Support As = 282.74/565.49 Top:Y12-200(T1)

1S17 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


118/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)
Deflection Check: L/d = 37.5 < 52.0 *** Sufficient ***

Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y6 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.4Support As = 282.74/565.49 Top:Y12-200(T1)

1S2 1 7.200 4425.00 0.0435 0.0331 270.9/565.49


124/150 3.000 5475.00 12.7 9.6 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 11.2Support As = 284.64/565.49 Top:Y12-200(T1)

1S15 1 7.200 1725.00 0.1000 0.0860 270.9/565.49


124/150 3.000 5475.00 4.4 3.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 0.6Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y7 -- Storey: 1


---------------------------

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-5

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 282.74/565.49 Top:Y12-200(T1)

1S18 1 7.200 4425.00 0.0000 0.0240 270.9/565.49


112/150 3.000 2850.00 0.4 2.9 Bottom: Y12-200(B2)

Support Mc = 0.4Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y8 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S3 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


118/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)
Deflection Check: L/d = 37.5 < 52.0 *** Sufficient ***

Support Mc = 8.2Support As = 282.74/565.49 Top:Y12-200(T1)

1S14 1 7.200 1725.00 0.0630 0.0630 270.9/565.49


124/150 3.000 4425.00 2.8 2.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 8.2Support As = 282.74/565.49 Top:Y12-200(T1)

1S19 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


118/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)
Deflection Check: L/d = 37.5 < 52.0 *** Sufficient ***

Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y10 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

1S5 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


118/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)
Deflection Check: L/d = 37.5 < 52.0 *** Sufficient ***

Support Mc = 8.2Support As = 282.74/565.49 Top:Y12-200(T1)

1S12 1 7.200 1725.00 0.0630 0.0630 270.9/565.49


124/150 3.000 4425.00 2.8 2.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 8.2Support As = 282.74/565.49 Top:Y12-200(T1)

1S21 1 7.200 4425.00 0.0320 0.0240 270.9/565.49

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-6

118/150 3.000 4425.00 9.3 7.0 Bottom: Y12-200(B2)


Deflection Check: L/d = 37.5 < 52.0 *** Sufficient ***

Support Mc = 1.0Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y11 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.8Support As = 282.74/565.49 Top:Y12-200(T1)

1S7 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


112/150 3.000 3975.00 7.5 5.6 Bottom: Y12-200(B2)

Support Mc = 6.7Support As = 282.74/565.49 Top:Y12-200(T1)

1S10 1 7.200 1725.00 0.0630 0.0630 270.9/565.49


124/150 3.000 3975.00 2.8 2.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 6.7Support As = 282.74/565.49 Top:Y12-200(T1)

1S23 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


112/150 3.000 3975.00 7.5 5.6 Bottom: Y12-200(B2)

Support Mc = 0.8Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y12 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.3Support As = 282.74/565.49 Top:Y12-200(T1)

1S11 1 7.200 1725.00 0.0567 0.0424 270.9/565.49


124/150 3.000 2850.00 2.5 1.9 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 3.6Support As = 282.74/565.49 Top:Y12-200(T1)

1S22 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


112/150 3.000 2850.00 3.9 2.9 Bottom: Y12-200(B2)

Support Mc = 0.4Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y13 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.6Support As = 282.74/565.49 Top:Y12-200(T1)

Project: SIMARACHILDRENCANCERFOUNDATION
Project: SIMARACHILDRENCANCERFOUNDATION - BOA (*1JY-TUGZ-C7Z2-RZKM)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-7

1S8 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


112/150 3.000 3300.00 5.2 3.9 Bottom: Y12-200(B2)

Support Mc = 4.8Support As = 282.74/565.49 Top:Y12-200(T1)

1S9 1 7.200 1725.00 0.0616 0.0466 270.9/565.49


124/150 3.000 3300.00 2.7 2.1 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 4.8Support As = 282.74/565.49 Top:Y12-200(T1)

1S24 1 7.200 4425.00 0.0320 0.0240 270.9/565.49


112/150 3.000 3300.00 5.2 3.9 Bottom: Y12-200(B2)

Support Mc = 0.6Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y14 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.5Support As = 282.74/565.49 Top:Y12-200(T1)

1S4 1 7.200 4425.00 0.0455 0.0346 270.9/565.49


124/150 3.000 5700.00 13.3 10.1 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 11.4Support As = 289.74/565.49 Top:Y12-200(T1)

1S13 1 7.200 1725.00 0.0630 0.0630 270.9/565.49


124/150 3.000 5700.00 2.8 2.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 13.91 < 52.0 *** Sufficient ***

Support Mc = 11.4Support As = 289.74/565.49 Top:Y12-200(T1)

1S20 1 7.200 4425.00 0.0455 0.0346 270.9/565.49


124/150 3.000 5700.00 13.3 10.1 Bottom: Y12-200(B1)
Deflection Check: L/d = 35.69 < 52.0 *** Sufficient ***

Support Mc = 1.5Support As = 282.74/565.49 Top:Y12-200(T1)

Project: SIMARACHILDRENCANCERFOUNDATION
Beam
Analysis and
Design
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1

Axis: 1 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B1 L=4425mm 1B2 L=1725mm 1B3 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

37.252 38.074
29.497 29.92
14.293 26.246 13.748
Moment
(Env.)

-38.555 -38.467
Bending (Top Edge) ...
M (kN.m) 14.3 37.3 29.5 26.9 29.9 38.1 0.0 13.7
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.12 0.32 0.25 0.23 0.26 0.33 0.00 0.12
x (mm) 45.22 53.37 45.22 45.22 45.22 54.63 45.22 45.22
As (mm2) 110.42 290.54 227.88 207.92 231.14 297.39 0.13 106.21
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 13.7 38.6 1.8 1.4 38.5 14.3
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.13 0.33 0.02 0.01 0.33 0.13
x (mm) 43.33 55.37 43.33 43.33 55.23 43.33
As (mm2) 110.43 301.41 14.40 11.39 300.67 115.41
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 40.3 50.5 17.4 17.9 50.9 40.0
v (N/mm2) 0.44 0.55 0.19 0.20 0.56 0.44
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 52.07 OK --- 10.87 < 52.18 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-2

Axis: 1 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B1 L=4425mm 2B2 L=1725mm 2B3 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

3.759 3.344 3.68


3.161
1.859 2.099

Moment 0.393
(Env.)
-2.314 -2.266

Bending (Top Edge) ...


M (kN.m) 3.8 0.0 3.2 1.9 0.9 2.1 3.3 0.0 3.7
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.08 0.00 0.07 0.04 0.02 0.04 0.07 0.00 0.08
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 45.63 0.53 38.38 22.56 10.56 25.48 40.59 0.49 44.68
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.1 2.3 0.3 0.2 2.3 0.1
d (mm) 240.0 259.0 240.0 240.0 259.0 240.0
K/K' 0.00 0.05 0.01 0.00 0.05 0.00
x (mm) 26.67 28.78 26.67 26.67 28.78 26.67
As (mm2) 1.54 28.09 3.73 1.97 27.50 1.74
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.2 4.9 2.8 3.1 5.0 5.2
v (N/mm2) 0.09 0.08 0.05 0.05 0.08 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK --- 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-3

Axis: 2 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B12 L=4425mm 1B13 L=1725mm 1B14 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

63.139 64.94
51.681 50.897
22.835 45.384 24.651
Moment
(Env.)
-62.805 -69.777
Bending (Top Edge) ...
M (kN.m) 22.8 0.0 63.1 51.7 46.4 50.9 64.9 24.7
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.20 0.00 0.54 0.44 0.40 0.44 0.56 0.21
x (mm) 45.22 45.22 95.13 76.07 67.63 74.80 98.21 45.22
As (mm2) 176.41 0.34 517.85 414.12 368.18 407.21 534.66 190.44
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 22.6 62.8 2.2 1.9 69.8 24.6
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.21 0.54 0.02 0.02 0.60 0.23
x (mm) 43.33 94.56 43.33 43.33 106.64 43.33
As (mm2) 182.60 514.75 17.74 15.16 580.55 198.03
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 64.8 82.7 29.9 27.4 87.3 69.4
v (N/mm2) 0.71 0.90 0.33 0.30 0.95 0.76
vc (N/mm2) 0.48 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 40.51 OK --- 10.87 < 36.39 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16

Bottom Bar 3Y16 2Y16 3Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-4

Axis: 2 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B12 L=4425mm 2B13 L=1725mm 2B14 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.01 5.523
3.658 3.093
2.69
0.753
Moment
(Env.)
-1.714 -2.098
-2.512

Bending (Top Edge) ...


M (kN.m) 5.0 0.3 3.7 3.1 0.8 0.8 2.7 0.4 5.5
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.11 0.01 0.08 0.07 0.02 0.02 0.06 0.01 0.12
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 60.82 3.49 44.41 37.55 10.03 9.15 32.66 4.77 67.04
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 1.7 0.1 0.5 1.6 2.5 1.1 2.1
d (mm) 259.0 240.0 240.0 259.0 240.0 240.0 259.0
K/K' 0.04 0.00 0.01 0.03 0.06 0.03 0.04
x (mm) 28.78 26.67 26.67 28.78 26.67 26.67 28.78
As (mm2) 20.81 0.84 5.94 19.57 32.91 13.80 25.47
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.5 4.8 5.2 2.6 4.4 5.9
v (N/mm2) 0.09 0.08 0.09 0.05 0.08 0.10
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 6.66 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-5

Axis: 2a Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B41 L=1800mm 1B23 L=4425mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---

33.201
25.862
12.058
Moment
(Env.) -2.018

-32.581
Bending (Top Edge) ...
M (kN.m) 6.7 17.5 25.9 33.2 12.1
d (mm) 407.0 407.0 407.0 407.0 407.0
K/K' 0.06 0.15 0.22 0.29 0.10
x (mm) 45.22 45.22 45.22 47.23 45.22
As (mm2) 51.62 135.52 199.79 257.09 93.15
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 2.0 1.4 32.6 13.1
d (mm) 390.0 390.0 407.0 390.0
K/K' 0.02 0.01 0.28 0.12
x (mm) 43.33 43.33 46.29 43.33
As (mm2) 16.27 11.18 252.01 105.88
As' (mm2) 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 13.3 17.4 45.5 35.9
v (N/mm2) 0.15 0.19 0.50 0.39
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d --- 10.87 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-6

Axis: 2a Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B41 L=1800mm 2B23 L=4425mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---

3.068 3.367

1.01 0.898
Moment
(Env.) -0.373

-2.439

Bending (Top Edge) ...


M (kN.m) 1.0 0.1 0.9 3.1 0.0 3.4
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.02 0.00 0.02 0.07 0.00 0.07
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 12.27 1.75 10.90 37.25 0.06 40.87
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.0 0.4 0.2 0.3 2.4 0.3
d (mm) 240.0 259.0 240.0 240.0 259.0 240.0
K/K' 0.00 0.01 0.01 0.01 0.05 0.01
x (mm) 26.67 28.78 26.67 26.67 28.78 26.67
As (mm2) 0.38 4.52 3.13 3.72 29.61 3.81
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 2.5 2.3 5.0 5.1
v (N/mm2) 0.04 0.04 0.09 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 6.95 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-7

Axis: 3 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B43 L=1800mm 1B15 L=4425mm 1B16 L=1725mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

53.333
33.893 29.531
25.257 32.376
29.126
Moment
(Env.) -1.016
-32.451

Bending (Top Edge) ...


M (kN.m) 5.7 15.0 25.3 32.4 0.0 33.9 30.0 40.2 53.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.05 0.13 0.22 0.28 0.00 0.29 0.26 0.35 0.46
x (mm) 45.22 45.22 45.22 45.99 45.22 48.27 45.22 57.94 78.76
As (mm2) 44.36 116.04 195.12 250.34 0.38 262.77 232.11 315.44 428.75
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 1.0 2.4 32.5 2.0
d (mm) 390.0 390.0 407.0 390.0
K/K' 0.01 0.02 0.28 0.02
x (mm) 43.33 43.33 46.10 43.33
As (mm2) 8.19 19.39 250.95 15.90
As' (mm2) 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 9.9 22.2 45.6 46.0 16.3 34.2
v (N/mm2) 0.11 0.24 0.50 0.50 0.18 0.37
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.55
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3 115.3
Td (kN.m) 0.1 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d --- 10.87 < 58.64 OK ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 603.19
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-8

Axis: 3 Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B17 L=4425mm
BwxH (mm) 225 x 450
Flange BfxHf ---

66.953

24.478
Moment
(Env.)

-69.676
Bending (Top Edge) ...
M (kN.m) 67.0 24.5
d (mm) 407.0 407.0
K/K' 0.58 0.21
x (mm) 101.70 45.22
As (mm2) 553.62 189.10
As' (mm2) 0.00 0.00
As-min 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 2.8 69.7 24.7
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.60 0.23
x (mm) 43.33 106.47 43.33
As (mm2) 22.30 579.59 198.83
As' (mm2) 0.00 0.00 0.00
As-min 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 87.8 69.2
v (N/mm2) 0.96 0.76
vc (N/mm2) 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58
Vnom (kN) 121.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 36.45 OK
Provided Steel Areas (mm2)
Top Edge 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar 1Y16

Bottom Bar 3Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-9

Axis: 3 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B43 L=1800mm 2B15 L=4425mm 2B16 L=1725mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.431 5.144

2.554
1.544
Moment 0.052
(Env.) -0.957
-2.303
-3.51

Bending (Top Edge) ...


M (kN.m) 1.5 0.2 0.1 2.6 0.4 5.4 5.1 2.0
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.03 0.01 0.00 0.05 0.01 0.12 0.11 0.04
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 18.75 2.94 0.63 31.00 5.29 65.93 62.45 24.49
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.0 0.9 1.0 0.8 2.3 1.7 3.5
d (mm) 240.0 259.0 240.0 240.0 259.0 259.0 240.0
K/K' 0.00 0.02 0.02 0.02 0.05 0.04 0.09
x (mm) 26.67 28.78 26.67 26.67 28.78 28.78 26.67
As (mm2) 0.24 11.15 12.54 10.33 27.95 21.20 45.99
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 3.3 1.5 4.6 5.8 7.0 4.4
v (N/mm2) 0.06 0.03 0.08 0.10 0.12 0.08
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 6.95 < 57.96 OK 17.08 < 57.96 OK 6.66 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-10

Axis: 3 Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B17 L=4425mm
BwxH (mm) 225 x 300
Flange BfxHf ---

5.567

2.268

Moment
(Env.)
-2.318

Bending (Top Edge) ...


M (kN.m) 2.3 0.2 5.6
d (mm) 259.0 259.0 259.0
K/K' 0.05 0.00 0.12
x (mm) 28.78 28.78 28.78
As (mm2) 27.53 2.38 67.59
As' (mm2) 0.00 0.00 0.00
As-min 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 1.1 2.3
d (mm) 240.0 259.0
K/K' 0.03 0.05
x (mm) 26.67 28.78
As (mm2) 14.23 28.14
As' (mm2) 0.00 0.00
As-min 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 4.4 6.0
v (N/mm2) 0.07 0.10
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58
Vnom (kN) 107.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-11

Axis: 4 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B18 L=4425mm 1B19 L=1725mm 1B20 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

67.068 67.13
54.573 53.896
24.539 47.393 24.281
Moment
(Env.)

-69.337 -69.485
Bending (Top Edge) ...
M (kN.m) 24.5 67.1 54.6 48.4 53.9 67.1 24.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.21 0.58 0.47 0.42 0.46 0.58 0.21
x (mm) 45.22 101.90 80.79 70.83 79.68 102.01 45.22
As (mm2) 189.57 554.71 439.81 385.57 433.76 555.30 187.58
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 24.2 69.3 2.4 2.4 69.5 24.7
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.23 0.60 0.02 0.02 0.60 0.23
x (mm) 43.33 105.87 43.33 43.33 106.13 43.33
As (mm2) 194.72 576.34 19.18 19.25 577.75 199.11
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 69.1 87.8 28.7 29.6 87.9 69.1
v (N/mm2) 0.75 0.96 0.31 0.32 0.96 0.75
vc (N/mm2) 0.48 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.1 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 36.64 OK --- 10.87 < 36.56 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16

Bottom Bar 3Y16 2Y16 3Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-12

Axis: 4 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B18 L=4425mm 2B19 L=1725mm 2B20 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.414 5.361
3.577 3.469
1.88 2.177

Moment -0.902
(Env.) -1.537 -1.243
-1.876 -1.813

Bending (Top Edge) ...


M (kN.m) 5.4 0.4 3.6 1.9 0.4 2.2 3.5 0.4 5.4
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.11 0.01 0.08 0.04 0.01 0.05 0.07 0.01 0.11
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 65.72 4.96 43.42 22.83 5.41 26.43 42.12 4.63 65.09
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 1.9 0.4 1.5 1.2 1.2 0.4 1.8
d (mm) 259.0 240.0 240.0 259.0 240.0 240.0 259.0
K/K' 0.04 0.01 0.04 0.02 0.03 0.01 0.04
x (mm) 28.78 26.67 26.67 28.78 26.67 26.67 28.78
As (mm2) 22.77 5.34 20.14 14.21 16.29 5.51 22.01
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.7 4.7 3.8 4.1 4.7 5.6
v (N/mm2) 0.10 0.08 0.06 0.07 0.08 0.10
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 6.66 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-13

Axis: 5 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B53 L=4425mm 1B54 L=1725mm 1B55 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

66.777 67.147
53.53 54.506
24.479 47.383 24.405
Moment
(Env.)

-69.476 -69.286
Bending (Top Edge) ...
M (kN.m) 24.5 66.8 53.5 48.2 54.5 67.1 24.4
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.21 0.57 0.46 0.41 0.47 0.58 0.21
x (mm) 45.22 101.39 79.08 70.48 80.68 102.04 45.22
As (mm2) 189.11 551.96 430.50 383.69 439.20 555.46 188.54
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 24.3 69.5 2.5 2.2 69.3 24.7
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.23 0.60 0.02 0.02 0.60 0.23
x (mm) 43.33 106.11 43.33 43.33 105.78 43.33
As (mm2) 195.58 577.67 20.32 17.54 575.85 198.83
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 69.2 87.8 29.1 28.9 87.9 69.0
v (N/mm2) 0.76 0.96 0.32 0.32 0.96 0.75
vc (N/mm2) 0.48 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 36.56 OK --- 10.87 < 36.67 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16

Bottom Bar 3Y16 2Y16 3Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-14

Axis: 5 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B53 L=4425mm 2B54 L=1725mm 2B55 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.403 5.399
3.363 3.585
2.105 2.072
Moment -0.916
(Env.) -1.461 -1.494
-1.855 -1.863

Bending (Top Edge) ...


M (kN.m) 5.4 0.4 3.4 2.1 0.4 2.1 3.6 0.4 5.4
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.11 0.01 0.07 0.04 0.01 0.04 0.08 0.01 0.11
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 65.59 4.83 40.83 25.56 4.92 25.15 43.52 5.06 65.54
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 1.9 0.4 1.5 1.2 1.5 0.5 1.9
d (mm) 259.0 240.0 240.0 259.0 240.0 240.0 259.0
K/K' 0.04 0.01 0.04 0.02 0.04 0.01 0.04
x (mm) 28.78 26.67 26.67 28.78 26.67 26.67 28.78
As (mm2) 22.52 5.82 19.15 14.07 19.57 6.36 22.61
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.7 4.6 4.0 4.0 4.7 5.7
v (N/mm2) 0.10 0.08 0.07 0.07 0.08 0.10
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 6.66 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-15

Axis: 6 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B59 L=4425mm 1B60 L=1725mm 1B61 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

63.161
50.927
32.038 38.517
22.585
31.378 13.96
Moment
(Env.)
-38.648
-63.33
Bending (Top Edge) ...
M (kN.m) 22.6 0.0 63.2 50.9 39.9 32.0 38.5 0.0 14.0
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.19 0.00 0.54 0.44 0.34 0.28 0.33 0.00 0.12
x (mm) 45.22 45.22 95.16 74.85 57.37 45.48 55.31 45.22 45.22
As (mm2) 174.47 0.00 518.05 407.48 312.33 247.58 301.09 0.20 107.84
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 23.3 63.3 2.1 1.6 38.6 14.3
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.22 0.54 0.02 0.01 0.33 0.13
x (mm) 43.33 95.45 43.33 43.33 55.51 43.33
As (mm2) 187.64 519.63 16.87 12.85 302.19 114.93
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 64.9 82.8 32.9 16.6 50.9 40.2
v (N/mm2) 0.71 0.90 0.36 0.18 0.56 0.44
vc (N/mm2) 0.55 0.55 0.55 0.55 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 115.3
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 40.18 OK --- 10.87 < 51.97 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16

Bottom Bar 3Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-16

Axis: 6 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B59 L=4425mm 2B60 L=1725mm 2B61 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.162
4.327
3.308 3.652
2.969
0.913
Moment
0.142
(Env.)
-2.087 -1.855 -2.133

Bending (Top Edge) ...


M (kN.m) 5.2 0.1 3.0 0.9 1.2 3.3 4.3 0.1 3.7
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.11 0.00 0.06 0.02 0.02 0.07 0.09 0.00 0.08
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 62.67 1.75 36.04 11.09 14.28 40.16 52.53 1.16 44.33
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 2.1 0.7 1.9 1.1 2.1 0.2
d (mm) 259.0 240.0 240.0 259.0 259.0 240.0
K/K' 0.04 0.02 0.05 0.02 0.05 0.00
x (mm) 28.78 26.67 26.67 28.78 28.78 26.67
As (mm2) 25.34 9.29 24.31 13.32 25.89 2.17
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.7 4.6 2.4 4.9 5.2 5.1
v (N/mm2) 0.10 0.08 0.04 0.08 0.09 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 6.66 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-17

Axis: 7 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B56 L=4425mm 1B57 L=1725mm 1B58 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

62.179
50.357
30.052 37.47
22.354
29.642 14.23
Moment
(Env.)
-38.296
-62.611
Bending (Top Edge) ...
M (kN.m) 22.4 62.2 50.4 39.2 30.8 37.5 14.2
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.19 0.53 0.43 0.34 0.26 0.32 0.12
x (mm) 45.22 93.49 73.93 56.29 45.22 53.70 45.22
As (mm2) 172.69 508.94 402.48 306.44 237.75 292.36 109.93
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 23.0 62.6 1.8 1.9 38.3 14.0
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.22 0.54 0.02 0.02 0.33 0.13
x (mm) 43.33 94.22 43.33 43.33 54.97 43.33
As (mm2) 185.49 512.94 14.62 14.94 299.25 112.62
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 64.5 82.1 32.8 16.5 50.3 40.2
v (N/mm2) 0.70 0.90 0.36 0.18 0.55 0.44
vc (N/mm2) 0.55 0.55 0.55 0.55 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 40.63 OK --- 10.87 < 52.38 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16

Bottom Bar 3Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-18

Axis: 7 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B56 L=4425mm 2B57 L=1725mm 2B58 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.108
3.927 3.812
2.723 3.197
0.814
Moment
(Env.) 0.044
-2.124 -1.912 -2.161

Bending (Top Edge) ...


M (kN.m) 5.1 0.1 2.7 0.8 1.1 3.2 3.9 0.1 3.8
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.11 0.00 0.06 0.02 0.02 0.07 0.08 0.00 0.08
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 62.01 1.72 33.06 9.88 13.01 38.81 47.67 0.88 46.28
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 2.1 0.7 1.9 1.1 0.1 2.2 0.2
d (mm) 259.0 240.0 240.0 259.0 240.0 259.0 240.0
K/K' 0.05 0.02 0.05 0.02 0.00 0.05 0.00
x (mm) 28.78 26.67 26.67 28.78 26.67 28.78 26.67
As (mm2) 25.79 9.43 25.05 13.96 0.84 26.23 2.16
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.7 4.5 2.3 4.9 5.1 5.1
v (N/mm2) 0.10 0.08 0.04 0.08 0.09 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 6.66 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-19

Axis: 8 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B62 L=4425mm 1B63 L=1725mm 1B64 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

63.931 63.738
50.715 51.159
23.308 45.113 23.615
Moment
(Env.)

-65.593 -65.48
Bending (Top Edge) ...
M (kN.m) 23.3 63.9 50.7 46.0 51.2 63.7 23.6
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.20 0.55 0.44 0.40 0.44 0.55 0.20
x (mm) 45.22 96.48 74.51 66.90 75.23 96.15 45.22
As (mm2) 180.06 525.22 405.62 364.19 409.52 523.42 182.43
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 23.7 65.6 2.3 2.3 65.5 23.8
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.22 0.56 0.02 0.02 0.56 0.22
x (mm) 43.33 99.34 43.33 43.33 99.15 43.33
As (mm2) 190.91 540.79 18.34 18.46 539.73 191.50
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 66.6 84.7 28.3 28.4 84.6 66.7
v (N/mm2) 0.73 0.92 0.31 0.31 0.92 0.73
vc (N/mm2) 0.55 0.55 0.55 0.55 0.48 0.55 0.55 0.55 0.55
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 121.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 38.8 OK --- 10.87 < 38.87 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 603.19 603.19 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 1Y16 1Y16

Bottom Bar 3Y16 2Y16 3Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-20

Axis: 8 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B62 L=4425mm 2B63 L=1725mm 2B64 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.204 5.249
3.258 3.276
1.997 2.028
Moment -0.807
(Env.) -1.322 -1.29
-1.907 -1.906

Bending (Top Edge) ...


M (kN.m) 5.2 0.3 3.3 2.0 0.4 2.0 3.3 0.3 5.2
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.11 0.01 0.07 0.04 0.01 0.04 0.07 0.01 0.11
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 63.17 3.52 39.55 24.25 4.84 24.62 39.77 3.84 63.72
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 1.9 0.3 1.3 1.1 1.3 0.5 1.9
d (mm) 259.0 240.0 240.0 259.0 240.0 240.0 259.0
K/K' 0.04 0.01 0.03 0.02 0.03 0.01 0.04
x (mm) 28.78 26.67 26.67 28.78 26.67 26.67 28.78
As (mm2) 23.15 3.96 17.32 12.83 16.90 7.07 23.14
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.6 4.6 3.9 3.9 4.6 5.6
v (N/mm2) 0.10 0.08 0.07 0.07 0.08 0.10
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 6.66 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-21

Axis: 9 Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B33 L=4425mm 1B34 L=1725mm 1B35 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

35.668 35.384
28.575 28.633
13.049 24.46 13.344
Moment
(Env.)

-35.495 -35.38
Bending (Top Edge) ...
M (kN.m) 13.0 35.7 28.6 25.1 28.6 35.4 13.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.11 0.31 0.25 0.22 0.25 0.30 0.11
x (mm) 45.22 50.96 45.22 45.22 45.22 50.53 45.22
As (mm2) 100.81 277.40 220.75 193.60 221.20 275.05 103.09
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 13.7 35.5 1.6 1.7 35.4 13.5
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.13 0.31 0.02 0.02 0.30 0.13
x (mm) 43.33 50.69 43.33 43.33 50.52 43.33
As (mm2) 110.57 275.97 13.17 13.33 275.02 108.87
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 38.2 48.2 16.7 17.0 48.0 38.2
v (N/mm2) 0.42 0.53 0.18 0.19 0.52 0.42
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 55.81 OK --- 10.87 < 55.96 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-22

Axis: 9 Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B33 L=4425mm 2B34 L=1725mm 2B35 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

3.683 3.548 3.442 3.662


1.994 2.019

Moment 0.511
(Env.)
-2.336 -2.333

Bending (Top Edge) ...


M (kN.m) 3.7 0.0 3.5 2.0 0.9 2.0 3.4 0.0 3.7
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.08 0.00 0.08 0.04 0.02 0.04 0.07 0.00 0.08
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 44.71 0.34 43.08 24.21 10.71 24.51 41.79 0.36 44.46
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.1 2.3 0.1 0.2 2.3 0.1
d (mm) 240.0 259.0 240.0 240.0 259.0 240.0
K/K' 0.00 0.05 0.00 0.01 0.05 0.00
x (mm) 26.67 28.78 26.67 26.67 28.78 26.67
As (mm2) 1.55 28.36 1.34 3.17 28.33 1.83
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.2 5.1 2.9 2.9 5.0 5.2
v (N/mm2) 0.09 0.09 0.05 0.05 0.09 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK --- 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-23

Axis: A Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B4 L=4425mm 1B5 L=5475mm 1B6 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

74.804 72.421 75.817


63.957 69.195

12.788
Moment
(Env.)
-36.169 -43.855
-53.011

Bending (Top Edge) ...


M (kN.m) 12.8 13.6 64.0 69.2 3.3 74.8 72.4 13.1 75.8
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 405.0
K/K' 0.11 0.12 0.55 0.60 0.03 0.64 0.62 0.11 0.66
x (mm) 45.22 45.22 96.53 105.62 45.22 115.63 111.34 45.22 118.25
As (mm2) 98.79 105.12 525.47 574.98 25.60 629.47 606.13 100.96 643.76
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 14.2 36.2 0.6 1.6 53.0 2.3 1.9 43.9 1.3
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.13 0.31 0.01 0.02 0.46 0.02 0.02 0.38 0.01
x (mm) 43.33 51.72 43.33 43.33 78.23 43.33 43.33 63.59 43.33
As (mm2) 114.50 281.54 4.44 12.91 425.89 18.47 15.03 346.20 10.26
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 38.4 57.4 67.3 68.3 80.5 81.6
v (N/mm2) 0.42 0.63 0.73 0.75 0.88 0.90
vc (N/mm2) 0.48 0.48 0.55 0.55 0.55 0.61 0.58 0.48 0.58
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 121.7 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 54.96 OK 13.45 < 47.24 OK 10.87 < 46.25 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 804.25 804.25 402.12 716.28
Bottom Edge 402.12 402.12 402.12 603.19 603.19 603.19 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16 2Y16 2Y16 1Y20

Bottom Bar 2Y16 3Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-24

Axis: A Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B7 L=5700mm 1B8 L=4425mm 1B9 L=2850mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

79.12 82.524 78.932


43.986
33.184
15.527
Moment 13.048
(Env.)
-46.988
-56.977

Bending (Top Edge) ...


M (kN.m) 79.1 2.8 82.5 78.9 11.4 44.0 33.2 23.8 15.5
d (mm) 405.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.69 0.02 0.71 0.68 0.10 0.38 0.29 0.20 0.13
x (mm) 124.38 45.22 129.92 123.19 45.22 63.80 47.20 45.22 45.22
As (mm2) 677.12 21.52 707.24 670.63 88.13 347.32 256.95 183.49 119.95
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 3.0 57.0 0.7 0.7 47.0 7.7
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.03 0.49 0.01 0.01 0.40 0.07
x (mm) 43.33 84.76 43.33 43.33 68.54 43.33
As (mm2) 24.26 461.40 5.47 5.28 373.13 61.80
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 71.3 72.9 84.6 72.3 15.7 9.3
v (N/mm2) 0.78 0.80 0.92 0.79 0.17 0.10
vc (N/mm2) 0.58 0.55 0.61 0.58 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 14.0 < 44.36 OK 10.87 < 43.13 OK ---
Provided Steel Areas (mm2)
Top Edge 716.28 402.12 804.25 804.25 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y20 2Y16 2Y16

Bottom Bar 3Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-25

Axis: A Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B10 L=3975mm 1B11 L=3300mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---

20.611 29.939 27.555


5.945
Moment
(Env.) -25.508 -15.723

Bending (Top Edge) ...


M (kN.m) 20.6 0.4 29.9 27.6 5.5 5.9
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.18 0.00 0.26 0.24 0.05 0.05
x (mm) 45.22 45.22 45.22 45.22 45.22 45.22
As (mm2) 159.23 3.14 231.29 212.87 42.33 45.93
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 5.1 25.5 1.1 15.7 6.9
d (mm) 390.0 407.0 390.0 407.0 390.0
K/K' 0.05 0.22 0.01 0.14 0.06
x (mm) 43.33 45.22 43.33 45.22 43.33
As (mm2) 41.45 197.06 8.76 121.47 55.39
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 36.3 40.6 33.9 22.5
v (N/mm2) 0.40 0.44 0.37 0.25
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 9.77 < 58.64 OK 8.11 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-26

Axis: A Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B4 L=4425mm 2B5 L=5475mm 2B6 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.757 5.724
4.411 4.311 4.734
3.319

Moment
(Env.) -1.423
-2.103
-3.197

Bending (Top Edge) ...


M (kN.m) 3.3 0.1 4.4 5.8 0.1 5.7 4.3 0.3 4.7
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.07 0.00 0.09 0.12 0.00 0.12 0.09 0.01 0.10
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 40.29 1.21 53.54 69.88 0.96 69.49 52.33 3.11 57.47
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.4 2.1 0.3 3.2 0.2 1.4
d (mm) 240.0 259.0 240.0 259.0 240.0 259.0
K/K' 0.01 0.04 0.01 0.07 0.01 0.03
x (mm) 26.67 28.78 26.67 28.78 26.67 28.78
As (mm2) 5.86 25.53 3.52 38.81 3.01 17.28
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 4.9 5.3 6.4 6.3 5.1 5.3
v (N/mm2) 0.08 0.09 0.11 0.11 0.09 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 21.14 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-27

Axis: A Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B7 L=5700mm 2B8 L=4425mm 2B9 L=2850mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

6.243 5.894
4.618
3.78
1.844 2.503

Moment
(Env.) -1.749
-0.894
-3.567

Bending (Top Edge) ...


M (kN.m) 6.2 0.1 5.9 4.6 0.1 3.8 1.8 0.4 2.5
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.13 0.00 0.13 0.10 0.00 0.08 0.04 0.01 0.05
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 75.79 1.09 71.55 56.06 1.46 45.89 22.39 4.61 30.39
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.3 3.6 1.7 0.5 0.9
d (mm) 240.0 259.0 259.0 240.0 259.0
K/K' 0.01 0.08 0.04 0.01 0.02
x (mm) 26.67 28.78 28.78 26.67 28.78
As (mm2) 3.44 43.30 21.23 6.90 10.85
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 6.6 6.5 5.3 5.0 3.3 3.9
v (N/mm2) 0.11 0.11 0.09 0.09 0.06 0.07
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 22.01 < 57.96 OK 17.08 < 57.96 OK 11.0 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-28

Axis: A Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B10 L=3975mm 2B11 L=3300mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---

3.712
2.448 1.748 1.83
Moment
(Env.) -1.698 -1.424

Bending (Top Edge) ...


M (kN.m) 3.7 0.2 2.4 1.7 0.0 1.8
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.08 0.00 0.05 0.04 0.00 0.04
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 45.07 2.85 29.72 21.22 0.06 22.21
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 1.7 0.3 0.4 1.4 0.3
d (mm) 259.0 240.0 240.0 259.0 240.0
K/K' 0.04 0.01 0.01 0.03 0.01
x (mm) 28.78 26.67 26.67 28.78 26.67
As (mm2) 20.62 4.10 4.93 17.29 3.45
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 4.9 4.3 3.7 3.8
v (N/mm2) 0.08 0.07 0.06 0.07
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 15.35 < 57.96 OK 12.74 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-29

Axis: B Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B44 L=4425mm 1B45 L=5475mm 1B46 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

90.876 98.209 89.629 79.704 86.898

17.736
Moment 11.775
(Env.)
-35.54
-49.902
-73.699

Bending (Top Edge) ...


M (kN.m) 17.7 19.4 90.9 98.2 2.0 89.6 79.7 25.5 86.9
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.15 0.17 0.78 0.84 0.02 0.77 0.69 0.22 0.75
x (mm) 45.22 45.22 146.12 161.09 45.22 143.65 124.63 45.22 138.30
As (mm2) 137.02 149.74 795.46 876.96 15.49 782.00 678.44 197.08 752.88
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 20.1 49.9 2.1 73.7 3.4 0.4 35.5
d (mm) 390.0 407.0 390.0 407.0 390.0 390.0 407.0
K/K' 0.19 0.43 0.02 0.63 0.03 0.00 0.31
x (mm) 43.33 73.20 43.33 113.63 43.33 43.33 50.76
As (mm2) 162.20 398.49 16.66 618.61 27.03 3.24 276.34
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 54.3 81.9 95.3 91.7 71.5 74.5
v (N/mm2) 0.59 0.89 1.04 1.00 0.78 0.81
vc (N/mm2) 0.48 0.48 0.65 0.65 0.61 0.66 0.61 0.48 0.65
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 126.8 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 40.42 OK 13.45 < 39.87 OK 10.87 < 55.75 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1005.31 1005.31 402.12 804.25 804.25 402.12 1005.31
Bottom Edge 402.12 402.12 402.12 804.25 804.25 804.25 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 3Y16 3Y16 2Y16 2Y16 3Y16

Bottom Bar 2Y16 4Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-30

Axis: B Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B47 L=5700mm 1B48 L=4425mm 1B49 L=2850mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

98.268 102.997 91.304

40.732 32.637 28.669


Moment 15.93
(Env.) -3.805
-40.777
-80.672

Bending (Top Edge) ...


M (kN.m) 98.3 1.5 103.0 91.3 23.2 40.7 32.6 19.5 28.7
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.85 0.01 0.89 0.79 0.20 0.35 0.28 0.17 0.25
x (mm) 161.22 45.22 171.30 146.98 45.22 58.73 46.38 45.22 45.22
As (mm2) 877.64 11.90 932.52 800.11 179.26 319.70 252.47 150.73 221.47
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 2.7 80.7 3.2 40.8 9.5 3.8
d (mm) 390.0 405.0 390.0 407.0 390.0 407.0
K/K' 0.02 0.70 0.03 0.35 0.09 0.03
x (mm) 43.33 127.30 43.33 58.80 43.33 45.22
As (mm2) 21.47 693.00 25.76 320.08 76.80 29.40
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 97.3 99.5 78.8 60.3 26.2 26.2
v (N/mm2) 1.06 1.09 0.86 0.66 0.29 0.29
vc (N/mm2) 0.65 0.64 0.65 0.66 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 129.2 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 14.07 < 38.97 OK 10.87 < 49.54 OK 7.0 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 1005.31 402.12 1005.31 1005.31 402.12 402.12 402.12 402.12 402.12
Bottom Edge 942.48 942.48 942.48 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 3Y16 3Y16 3Y16

Bottom Bar 3Y20 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-31

Axis: B Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B50 L=3975mm 1B51 L=3300mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---

34.313 42.587 39.716


7.799
Moment
(Env.) -23.945
-34.861

Bending (Top Edge) ...


M (kN.m) 34.3 0.6 42.6 39.7 7.3 7.8
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.30 0.01 0.37 0.34 0.06 0.07
x (mm) 48.90 45.22 61.61 57.15 45.22 45.22
As (mm2) 266.23 4.65 335.40 311.14 56.49 60.25
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 5.4 34.9 2.0 0.5 23.9 10.5
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.05 0.30 0.02 0.00 0.21 0.10
x (mm) 43.33 49.73 43.33 43.33 45.22 43.33
As (mm2) 43.61 270.73 15.78 3.79 184.98 84.30
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 54.0 57.7 49.9 33.7
v (N/mm2) 0.59 0.63 0.54 0.37
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 9.77 < 56.62 OK 8.11 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-32

Axis: B Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B44 L=4425mm 2B45 L=5475mm 2B46 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

6.669
5.692
4.145 4.021 4.243 4.364

Moment
(Env.) -2.084 -2.026
-2.91

Bending (Top Edge) ...


M (kN.m) 4.1 0.1 4.0 5.7 0.2 6.7 4.2 0.1 4.4
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.09 0.00 0.09 0.12 0.00 0.14 0.09 0.00 0.09
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 50.32 1.07 48.81 69.10 2.07 80.96 51.50 1.16 52.97
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.2 2.1 0.3 0.1 2.9 0.1 2.0
d (mm) 240.0 259.0 240.0 240.0 259.0 240.0 259.0
K/K' 0.00 0.04 0.01 0.00 0.06 0.00 0.04
x (mm) 26.67 28.78 26.67 26.67 28.78 26.67 28.78
As (mm2) 2.06 25.29 4.42 0.96 35.33 1.11 24.59
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.2 5.0 6.2 6.6 5.2 5.3
v (N/mm2) 0.09 0.09 0.11 0.11 0.09 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 21.14 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-33

Axis: B Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B47 L=5700mm 2B48 L=4425mm 2B49 L=2850mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

6.84 6.16
3.859 4.366
2.623 2.273
Moment
(Env.) -0.5420.011
-2.071
-3.148

Bending (Top Edge) ...


M (kN.m) 6.8 0.2 6.2 3.9 0.1 4.4 2.6 0.5 2.3
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.15 0.00 0.13 0.08 0.00 0.09 0.06 0.01 0.05
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 83.04 2.03 74.78 46.85 1.01 53.01 31.84 6.55 27.59
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 3.1 0.0 0.5 2.1 0.5
d (mm) 259.0 240.0 240.0 259.0 259.0
K/K' 0.07 0.00 0.01 0.04 0.01
x (mm) 28.78 26.67 26.67 28.78 28.78
As (mm2) 38.22 0.30 6.93 25.14 6.58
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 6.7 6.5 5.1 5.4 3.7 3.6
v (N/mm2) 0.11 0.11 0.09 0.09 0.06 0.06
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 22.01 < 57.96 OK 17.08 < 57.96 OK 11.0 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-34

Axis: B Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B50 L=3975mm 2B51 L=3300mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---

3.506
2.473 2.375
1.563
Moment
(Env.) -1.763 -1.365

Bending (Top Edge) ...


M (kN.m) 3.5 0.1 2.5 1.6 0.0 2.4
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.07 0.00 0.05 0.03 0.00 0.05
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 42.57 0.91 30.02 18.97 0.29 28.83
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 1.8 0.5 0.5 1.4 0.0
d (mm) 259.0 240.0 240.0 259.0 240.0
K/K' 0.04 0.01 0.01 0.03 0.00
x (mm) 28.78 26.67 26.67 28.78 26.67
As (mm2) 21.41 7.07 6.57 16.58 0.15
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 4.9 4.4 3.5 4.1
v (N/mm2) 0.08 0.08 0.06 0.07
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 15.35 < 57.96 OK 12.74 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-35

Axis: C Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B26 L=4425mm 1B24 L=2850mm 1B25 L=2625mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

56.655 47.296
34.761
19.341 14.456 12.986
Moment
2.841 5.843
(Env.) -11.392 -6.43
-54.039

Bending (Top Edge) ...


M (kN.m) 19.3 0.3 56.7 47.3 19.8 14.5 13.0 18.7 34.8
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.17 0.00 0.49 0.41 0.17 0.12 0.11 0.16 0.30
x (mm) 45.22 45.22 84.22 69.03 45.22 45.22 45.22 45.22 49.58
As (mm2) 149.42 2.21 458.49 375.79 153.27 111.67 100.32 144.44 269.91
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 20.4 54.0 0.3 11.4 5.8 2.4 6.4
d (mm) 390.0 407.0 390.0 407.0 390.0 390.0 407.0
K/K' 0.19 0.46 0.00 0.10 0.05 0.02 0.06
x (mm) 43.33 79.91 43.33 45.22 43.33 43.33 45.22
As (mm2) 164.07 435.04 2.63 88.01 46.88 19.47 49.67
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 57.1 73.1 46.0 31.9 22.9 30.4
v (N/mm2) 0.62 0.80 0.50 0.35 0.25 0.33
vc (N/mm2) 0.55 0.55 0.55 0.55 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 46.47 OK 7.0 < 58.64 OK 6.45 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 1Y16 1Y16

Bottom Bar 3Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-36

Axis: C Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B27 L=4425mm 1B28 L=5700mm 1B29 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

89.621 100.047 100.97 90.237

42.049 43.934

Moment
(Env.)
-39.926 -40.266
-78.29

Bending (Top Edge) ...


M (kN.m) 42.0 22.3 89.6 100.0 1.5 101.0 90.2 22.6 43.9
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.36 0.19 0.77 0.86 0.01 0.87 0.78 0.19 0.38
x (mm) 60.77 45.22 143.63 164.97 45.22 166.93 144.85 45.22 63.72
As (mm2) 330.83 172.30 781.91 898.06 11.73 908.76 788.54 174.38 346.87
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 6.2 39.9 0.7 78.3 3.5 40.3 9.5
d (mm) 390.0 407.0 390.0 407.0 390.0 407.0 390.0
K/K' 0.06 0.34 0.01 0.67 0.03 0.35 0.09
x (mm) 43.33 57.48 43.33 122.00 43.33 58.00 43.33
As (mm2) 49.86 312.91 5.89 664.17 28.25 315.77 76.34
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 60.9 77.9 97.8 98.0 78.3 61.4
v (N/mm2) 0.66 0.85 1.07 1.07 0.86 0.67
vc (N/mm2) 0.48 0.48 0.66 0.65 0.61 0.65 0.66 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 126.8 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 50.49 OK 14.0 < 37.71 OK 10.87 < 50.11 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1005.31 1005.31 402.12 1005.31 1005.31 402.12 402.12
Bottom Edge 402.12 402.12 402.12 804.25 804.25 804.25 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 3Y16 3Y16 3Y16 3Y16

Bottom Bar 2Y16 4Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-37

Axis: C Storey: 1 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B30 L=2850mm 1B31 L=3975mm 1B32 L=3300mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

37.04 32.844 36.843 42.712 39.798


8.096
Moment 11.705
(Env.) -11.889 -23.862
-34.224

Bending (Top Edge) ...


M (kN.m) 37.0 17.1 32.8 36.8 0.7 42.7 39.8 7.6 8.1
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.32 0.15 0.28 0.32 0.01 0.37 0.34 0.07 0.07
x (mm) 53.05 45.22 46.69 52.75 45.22 61.81 57.28 45.22 45.22
As (mm2) 288.78 131.98 254.17 287.14 5.10 336.46 311.83 58.78 62.55
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 1.8 11.9 5.3 34.2 1.5 23.9 10.2
d (mm) 390.0 407.0 390.0 407.0 390.0 407.0 390.0
K/K' 0.02 0.10 0.05 0.29 0.01 0.21 0.10
x (mm) 43.33 45.22 43.33 48.77 43.33 45.22 43.33
As (mm2) 14.17 91.85 42.89 265.49 12.07 184.34 82.04
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 39.1 38.9 54.7 57.5 49.9 33.9
v (N/mm2) 0.43 0.43 0.60 0.63 0.55 0.37
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 7.0 < 58.64 OK 9.77 < 57.45 OK 8.11 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-38

Axis: C Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B26 L=4425mm 2B24 L=2850mm 2B25 L=2625mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

4.66
3.616 3.078
2.72 2.242
0.727
Moment 0.461
(Env.) -1.25
-0.256
-2.124

Bending (Top Edge) ...


M (kN.m) 4.7 0.1 2.7 0.7 1.0 3.6 3.1 1.0 2.2
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.10 0.00 0.06 0.02 0.02 0.08 0.07 0.02 0.05
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 56.57 1.25 33.02 8.83 12.03 43.89 37.37 11.99 27.22
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 2.1 0.6 1.2 1.2 0.3 0.1
d (mm) 259.0 240.0 240.0 259.0 259.0 240.0
K/K' 0.05 0.01 0.03 0.03 0.01 0.00
x (mm) 28.78 26.67 26.67 28.78 28.78 26.67
As (mm2) 25.79 7.73 15.22 15.17 3.11 0.85
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.5 4.6 2.7 4.7 3.9 3.2
v (N/mm2) 0.10 0.08 0.05 0.08 0.07 0.06
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 11.0 < 57.96 OK 10.14 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-39

Axis: C Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B27 L=4425mm 2B28 L=5700mm 2B29 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

6.173 6.353
3.651 4.292 4.27 3.848

Moment
(Env.)
-2.169 -2.009
-3.215

Bending (Top Edge) ...


M (kN.m) 3.7 0.1 4.3 6.2 0.1 6.4 4.3 0.1 3.8
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.08 0.00 0.09 0.13 0.00 0.13 0.09 0.00 0.08
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 44.32 0.99 52.10 74.94 1.39 77.12 51.83 1.05 46.71
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.2 2.2 0.2 0.1 3.2 0.3 2.0
d (mm) 240.0 259.0 240.0 240.0 259.0 240.0 259.0
K/K' 0.01 0.05 0.01 0.00 0.07 0.01 0.04
x (mm) 26.67 28.78 26.67 26.67 28.78 26.67 28.78
As (mm2) 3.13 26.33 2.78 1.56 39.03 3.36 24.38
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.1 5.3 6.5 6.6 5.3 5.2
v (N/mm2) 0.09 0.09 0.11 0.11 0.09 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 22.01 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-40

Axis: C Storey: 2 ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B30 L=2850mm 2B31 L=3975mm 2B32 L=3300mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

2.694 3.189 2.843


2.282 1.688 2.374
Moment
(Env.) -0.599
-1.825 -1.291

Bending (Top Edge) ...


M (kN.m) 2.7 0.5 2.3 3.2 0.0 2.8 1.7 0.0 2.4
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.06 0.01 0.05 0.07 0.00 0.06 0.04 0.00 0.05
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 32.71 5.83 27.70 38.72 0.46 34.51 20.50 0.31 28.82
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.6 0.1 1.8 0.2 0.4 1.3 0.1
d (mm) 259.0 240.0 259.0 240.0 240.0 259.0 240.0
K/K' 0.01 0.00 0.04 0.01 0.01 0.03 0.00
x (mm) 28.78 26.67 28.78 26.67 26.67 28.78 26.67
As (mm2) 7.27 0.80 22.16 2.94 5.02 15.67 1.44
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 3.8 3.6 4.7 4.6 3.6 4.0
v (N/mm2) 0.06 0.06 0.08 0.08 0.06 0.07
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 11.0 < 57.96 OK 15.35 < 57.96 OK 12.74 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-41

Axis: D Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B21 L=4425mm 1B22 L=2850mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---

40.21
33.278

13.378
3.861
Moment
0.594
(Env.) -7.634

-38.498
Bending (Top Edge) ...
M (kN.m) 13.4 0.3 40.2 33.3 14.1 3.9
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.12 0.00 0.35 0.29 0.12 0.03
x (mm) 45.22 45.22 57.92 47.34 45.22 45.22
As (mm2) 103.35 1.95 315.30 257.72 109.09 29.83
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 14.1 38.5 0.0 7.6 4.5
d (mm) 390.0 407.0 390.0 407.0 390.0
K/K' 0.13 0.33 0.00 0.07 0.04
x (mm) 43.33 55.28 43.33 45.22 43.33
As (mm2) 113.90 300.93 0.11 58.98 36.18
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 39.9 51.4 31.9 14.8
v (N/mm2) 0.44 0.56 0.35 0.16
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3
Td (kN.m) 0.0 0.1
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 52.14 OK 7.0 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-42

Axis: D Storey: 1 (/ 2) Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B52 L=4425mm 1B36 L=5700mm 1B37 L=4425mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

82.989 83.73 80.437 77.452


48.328
19.522
Moment
(Env.)
-55.523 -54.855 -46.765

Bending (Top Edge) ...


M (kN.m) 19.5 10.5 83.0 83.7 5.1 80.4 77.5 10.9 48.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.17 0.09 0.71 0.72 0.04 0.69 0.67 0.09 0.42
x (mm) 45.22 45.22 130.80 132.21 45.22 125.99 120.46 45.22 70.68
As (mm2) 150.81 80.77 712.03 719.70 39.27 685.88 655.77 83.85 384.75
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 21.9 55.5 0.6 54.9 0.6 1.4 46.8 8.6
d (mm) 390.0 407.0 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.21 0.48 0.01 0.47 0.01 0.01 0.40 0.08
x (mm) 43.33 82.35 43.33 81.25 43.33 43.33 68.19 43.33
As (mm2) 176.96 448.31 5.11 442.32 4.98 11.26 371.20 69.69
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 58.6 89.3 72.4 71.5 83.9 73.9
v (N/mm2) 0.64 0.98 0.79 0.78 0.92 0.81
vc (N/mm2) 0.55 0.55 0.61 0.61 0.55 0.61 0.61 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 121.7 121.7 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 10.87 < 45.39 OK 14.0 < 45.88 OK 10.87 < 43.35 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 804.25 804.25 402.12 804.25 804.25 402.12 402.12
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 2Y16 2Y16 2Y16 2Y16

Bottom Bar 3Y16 3Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-43

Axis: D Storey: 1 (/ 2) ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B38 L=2850mm 1B39 L=3975mm 1B40 L=3300mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---

38.621 29.465 27.103


21.067 24.122
6.099
Moment 12.038
(Env.) -4.721
-24.799 -15.86

Bending (Top Edge) ...


M (kN.m) 38.6 21.2 21.1 24.1 0.4 29.5 27.1 5.4 6.1
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.33 0.18 0.18 0.21 0.00 0.25 0.23 0.05 0.05
x (mm) 55.47 45.22 45.22 45.22 45.22 45.22 45.22 45.22 45.22
As (mm2) 301.96 163.63 162.75 186.35 3.40 227.63 209.38 41.64 47.11
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 4.7 1.1 4.7 24.8 0.8 0.3 15.9 6.8
d (mm) 407.0 390.0 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.04 0.01 0.04 0.21 0.01 0.00 0.14 0.06
x (mm) 45.22 43.33 43.33 45.22 43.33 43.33 45.22 43.33
As (mm2) 36.47 9.25 38.23 191.58 6.63 2.71 122.53 54.58
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 31.6 23.3 37.3 40.1 33.7 22.7
v (N/mm2) 0.35 0.25 0.41 0.44 0.37 0.25
vc (N/mm2) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 115.3 115.3 115.3
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 7.0 < 58.64 OK 9.77 < 58.64 OK 8.11 < 58.64 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-44

Axis: D Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B21 L=4425mm 2B22 L=2850mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---

3.533 3.483

1.514 1.593

Moment
(Env.)
-1.125
-2.221

Bending (Top Edge) ...


M (kN.m) 3.5 0.0 3.5 1.5 0.0 1.6
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.08 0.00 0.07 0.03 0.00 0.03
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 42.89 0.27 42.29 18.38 0.06 19.34
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.2 2.2 0.1 0.4 1.1 0.3
d (mm) 240.0 259.0 240.0 240.0 259.0 240.0
K/K' 0.00 0.05 0.00 0.01 0.02 0.01
x (mm) 26.67 28.78 26.67 26.67 28.78 26.67
As (mm2) 2.51 26.97 0.91 5.86 13.66 3.30
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.1 5.1 3.3 3.5
v (N/mm2) 0.09 0.09 0.06 0.06
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 11.0 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-45

Axis: D Storey: 2 (/ 2) Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B52 L=4425mm 2B36 L=5700mm 2B37 L=4425mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

5.883 6.17
4.718 4.99
4.156 3.439

Moment
(Env.) -1.493 -1.73
-3.707

Bending (Top Edge) ...


M (kN.m) 4.2 0.3 4.7 5.9 0.1 6.2 5.0 0.2 3.4
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.09 0.01 0.10 0.12 0.00 0.13 0.11 0.00 0.07
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 50.45 3.43 57.28 71.42 0.84 74.90 60.58 2.14 41.75
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.1 1.5 0.4 3.7 1.7 0.1
d (mm) 240.0 259.0 240.0 259.0 259.0 240.0
K/K' 0.00 0.03 0.01 0.08 0.04 0.00
x (mm) 26.67 28.78 26.67 28.78 28.78 26.67
As (mm2) 1.73 18.12 4.90 45.01 21.00 1.67
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 5.0 5.2 6.5 6.7 5.5 4.8
v (N/mm2) 0.09 0.09 0.11 0.11 0.09 0.08
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 17.08 < 57.96 OK 22.01 < 57.96 OK 17.08 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-46

Axis: D Storey: 2 (/ 2) ... Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B38 L=2850mm 2B39 L=3975mm 2B40 L=3300mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---

2.68 3.293 2.768


1.809 1.925 1.934
Moment
(Env.) -0.934
-1.751 -1.357

Bending (Top Edge) ...


M (kN.m) 1.8 0.3 2.7 3.3 0.1 2.8 1.9 0.0 1.9
d (mm) 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0 259.0
K/K' 0.04 0.01 0.06 0.07 0.00 0.06 0.04 0.00 0.04
x (mm) 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78 28.78
As (mm2) 21.96 4.11 32.53 39.98 0.72 33.60 23.37 0.09 23.48
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.6 0.9 1.8 0.0 0.2 1.4 0.2
d (mm) 240.0 259.0 259.0 240.0 240.0 259.0 240.0
K/K' 0.02 0.02 0.04 0.00 0.01 0.03 0.01
x (mm) 26.67 28.78 28.78 26.67 26.67 28.78 26.67
As (mm2) 8.13 11.34 21.26 0.46 3.14 16.47 2.73
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 3.2 4.0 4.7 4.5 3.8 3.8
v (N/mm2) 0.06 0.07 0.08 0.08 0.07 0.07
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58 3.58 3.58 3.58 3.58
Vnom (kN) 107.8 107.8 107.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 11.0 < 57.96 OK 15.35 < 57.96 OK 12.74 < 57.96 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12 2Y12 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12 2Y12 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-47

Axis: E Storey: 1 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
1B42 L=2625mm
BwxH (mm) 225 x 450
Flange BfxHf ---

3.326
2.403

Moment
(Env.) -2.066

-2.518 -2.118

Bending (Top Edge) ...


M (kN.m) 2.4 0.0 3.3
d (mm) 407.0 407.0 407.0
K/K' 0.02 0.00 0.03
x (mm) 45.22 45.22 45.22
As (mm2) 18.56 0.10 25.70
As' (mm2) 0.00 0.00 0.00
As-min 182.86 182.86 182.86
Bending (Bottom Edge) ...
M (kN.m) 2.5 2.5 1.9
d (mm) 390.0 407.0 390.0
K/K' 0.02 0.02 0.02
x (mm) 43.33 45.22 43.33
As (mm2) 20.13 19.45 15.39
As' (mm2) 0.00 0.00 0.00
As-min 182.86 182.86 182.86
Shear and Torsion Design ...
Vd (kN) 5.1 5.8
v (N/mm2) 0.06 0.06
vc (N/mm2) 0.48 0.48 0.48
v-max (N/mm2) 3.58 3.58
Vnom (kN) 115.3
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y10-300 Y10-300 Y10-300
Deflection Check ...
L/d 6.45 < 45.11 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-48

Axis: E Storey: 2 Material: C16/20 / Grade 385 (Type 2) (Links: Grade 385 (Type 2))
2B42 L=2625mm
BwxH (mm) 225 x 300
Flange BfxHf ---

0.997
0.634

Moment
(Env.)

-1.341
Bending (Top Edge) ...
M (kN.m) 0.6 1.0
d (mm) 259.0 259.0
K/K' 0.01 0.02
x (mm) 28.78 28.78
As (mm2) 7.70 12.10
As' (mm2) 0.00 0.00
As-min 121.91 121.91 121.91
Bending (Bottom Edge) ...
M (kN.m) 0.8 1.3 0.5
d (mm) 240.0 259.0 240.0
K/K' 0.02 0.03 0.01
x (mm) 26.67 28.78 26.67
As (mm2) 9.86 16.28 6.77
As' (mm2) 0.00 0.00 0.00
As-min 121.91 121.91 121.91
Shear and Torsion Design ...
Vd (kN) 2.8 3.2
v (N/mm2) 0.05 0.05
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 3.58 3.58
Vnom (kN) 107.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y10-175 Y10-175 Y10-175
Deflection Check ...
L/d 10.14 < 44.58 OK
Provided Steel Areas (mm2)
Top Edge 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19
Steel Bars ...
Hanger Bars 2Y12
Top Bar
Top SupBar

Bottom Bar 2Y12


Bottom Bar
Bot SupBar

Side Bars

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-49

Project: SIMARACHILDRENCANCERFOUNDATION
Column
Analysis and
Design
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1

1C1 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 78.9 - 78.9
M1 (kN.m) 4.1 0.9 0.0
M2 (kN.m) -7.4 -0.9 -11.1 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.078 Le1/b1 = 8.7 < 15.0
Beta = 0.91 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.4 / 4.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.85 / 0.85 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.10 N/mm2
Links = Y10-175

2C1 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 15.0 - 15.0
M1 (kN.m) -6.4 -0.2 0.0
M2 (kN.m) 7.0 0.2 13.4 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 9.0 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.2 / 3.5 kN As (Required): %0.89 449.40 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.09 N/mm2
Links = Y10-175

1C2 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 193.5 - 193.5
M1 (kN.m) 5.4 2.2 0.0
M2 (kN.m) -12.2 -2.2 -16.5 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.191 Le1/b1 = 8.6 < 15.0
Beta = 0.78 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 6.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.97 / 0.95 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.15 N/mm2
Links = Y10-175

2C2 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 20.8 - 20.8
M1 (kN.m) -5.4 -0.2 0.0
M2 (kN.m) 12.1 0.2 17.4 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 5.9 kN As (Required): %1.20 605.19 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.14 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2

1C3 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 194.9 - 194.9
M1 (kN.m) -5.7 -2.2 0.0
M2 (kN.m) -12.1 -2.2 -16.6 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.192 Le1/b1 = 8.6 < 15.0
Beta = 0.78 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.8 / 6.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.97 / 0.97 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.15 N/mm2
Links = Y10-175

2C3 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 20.7 - 20.7
M1 (kN.m) 5.9 0.2 0.0
M2 (kN.m) 11.8 0.2 17.5 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.7 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.9 / 5.9 kN As (Required): %1.21 610.14 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.14 N/mm2
Links = Y10-175

1C4 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 200.5 - 200.5
M1 (kN.m) 6.4 2.3 0.0
M2 (kN.m) -12.2 -2.3 -17.2 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.198 Le1/b1 = 8.6 < 15.0
Beta = 0.77 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.2 / 6.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.98 / 0.97 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.15 N/mm2
Links = Y10-175

2C4 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 20.8 - 20.8
M1 (kN.m) -6.5 -0.2 0.0
M2 (kN.m) 11.8 0.2 18.1 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.3 / 5.8 kN As (Required): %1.26 637.85 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.14 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3

1C5 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 212.5 - 212.5
M1 (kN.m) -5.1 -2.4 0.0
M2 (kN.m) -12.3 -2.4 -16.2 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.210 Le1/b1 = 8.6 < 15.0
Beta = 0.76 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.5 / 6.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.99 / 0.98 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.15 N/mm2
Links = Y10-175

2C5 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 20.6 - 20.6
M1 (kN.m) 5.4 0.2 0.0
M2 (kN.m) 12.0 0.2 17.2 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.7 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.8 / 5.8 kN As (Required): %1.18 599.24 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.14 N/mm2
Links = Y10-175

1C6 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 115.3 - 115.3
M1 (kN.m) -6.3 -1.3 -11.1
M2 (kN.m) -5.6 -1.3 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.114 Le1/b1 = 8.6 < 15.0
Beta = 0.86 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.5 / 3.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.90 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.09 / 0.08 N/mm2
Links = Y10-175

2C6 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 16.5 - 16.5
M1 (kN.m) 6.0 0.2 0.0
M2 (kN.m) 7.1 0.2 12.9 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.016 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.0 / 3.6 kN As (Required): %0.84 425.81 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.09 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4

1C7 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 80.7 - 80.7
M1 (kN.m) 4.5 0.9 0.0
M2 (kN.m) -5.8 -0.9 -9.9 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.080 Le1/b1 = 8.6 < 15.0
Beta = 0.90 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 3.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.86 / 0.84 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.08 N/mm2
Links = Y10-175

2C7 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 17.9 - 17.9
M1 (kN.m) -3.2 -0.2 0.0
M2 (kN.m) 7.1 0.2 10.3 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.6 / 3.7 kN As (Required): %0.61 309.28 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.09 N/mm2
Links = Y10-175

1C8 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 148.0 - 148.0
M1 (kN.m) -2.3 -1.7 0.0
M2 (kN.m) -11.9 -1.7 -13.8 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.146 Le1/b1 = 8.6 < 15.0
Beta = 0.83 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 6.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.90 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.15 N/mm2
Links = Y10-175

2C8 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 17.4 - 17.4
M1 (kN.m) 2.2 0.2 0.0
M2 (kN.m) 11.4 0.2 13.6 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.2 / 5.6 kN As (Required): %0.90 454.58 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.14 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5

1C9 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 65.2 - 65.2
M1 (kN.m) -1.8 -0.7 0.0
M2 (kN.m) -7.4 -0.7 -9.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.064 Le1/b1 = 8.7 < 15.0
Beta = 0.92 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.3 / 4.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.84 / 0.84 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.10 N/mm2
Links = Y10-175

2C9 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 14.0 - 14.0
M1 (kN.m) 2.7 0.2 0.0
M2 (kN.m) 6.7 0.2 9.3 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.014 Le1/b1 = 8.8 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.3 / 3.5 kN As (Required): %0.55 280.64 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.08 N/mm2
Links = Y10-175

1C10 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 108.1 - 108.1
M1 (kN.m) -3.3 -1.2 -6.2
M2 (kN.m) 3.3 1.2 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.107 Le1/b1 = 8.7 < 15.0
Beta = 0.87 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.77 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y10-175

2C10 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 15.5 - 15.5
M1 (kN.m) 3.9 0.2 7.6
M2 (kN.m) -3.8 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.1 / 2.1 kN As (Required): %0.41 206.78 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6

1C11 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 65.3 - 65.3
M1 (kN.m) -1.9 -0.7 0.0
M2 (kN.m) 7.0 0.7 8.8 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.064 Le1/b1 = 8.7 < 15.0
Beta = 0.92 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 3.8 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.85 / 0.84 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.09 N/mm2
Links = Y10-175

2C11 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:10 - ((G+Q)P51 *F)
Min Design
N (kN) 14.1 - 14.1
M1 (kN.m) 2.8 0.2 0.0
M2 (kN.m) -6.7 -0.2 -9.5 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.014 Le1/b1 = 8.8 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.6 / 3.5 kN As (Required): %0.57 288.36 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.08 N/mm2
Links = Y10-175

1C12 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 108.0 - 108.0
M1 (kN.m) -3.3 -1.2 0.0
M2 (kN.m) -3.7 -1.2 -6.6 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.107 Le1/b1 = 8.7 < 15.0
Beta = 0.87 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.78 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y10-175

2C12 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 15.4 - 15.4
M1 (kN.m) 4.0 0.2 7.8
M2 (kN.m) 3.8 0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.1 / 2.2 kN As (Required): %0.42 213.21 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7

1C13 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 227.8 - 227.8
M1 (kN.m) -1.5 -2.6 0.0
M2 (kN.m) -6.6 -2.6 -8.5 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.225 Le1/b1 = 8.6 < 15.0
Beta = 0.74 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 4.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.92 / 0.98 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.10 N/mm2
Links = Y10-175

2C13 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 18.3 - 18.3
M1 (kN.m) 2.9 0.2 0.0
M2 (kN.m) 6.4 0.2 9.3 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.5 / 3.4 kN As (Required): %0.53 266.18 mm2 4Y16
vc'(1/2)= 0.79 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.08 N/mm2
Links = Y10-175

1C14 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 228.3 - 228.3
M1 (kN.m) -1.5 -2.6 0.0
M2 (kN.m) 6.3 2.6 8.2 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.225 Le1/b1 = 8.6 < 15.0
Beta = 0.74 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 4.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.95 / 0.98 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.10 N/mm2
Links = Y10-175

2C14 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 18.0 - 18.0
M1 (kN.m) 3.0 0.2 0.0
M2 (kN.m) -6.3 -0.2 -9.3 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.5 / 3.4 kN As (Required): %0.53 266.54 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.08 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8

1C15 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 147.4 - 147.4
M1 (kN.m) -2.4 -1.7 0.0
M2 (kN.m) 11.6 1.7 13.6 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.146 Le1/b1 = 8.6 < 15.0
Beta = 0.83 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 6.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.15 N/mm2
Links = Y10-175

2C15 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 17.5 - 17.5
M1 (kN.m) 2.4 0.2 0.0
M2 (kN.m) -11.3 -0.2 -13.6 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.3 / 5.6 kN As (Required): %0.90 453.46 mm2 4Y16
vc'(1/2)= 0.79 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.14 N/mm2
Links = Y10-175

1C16 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:8 - ((G+Q)P41 *F)
Min Design
N (kN) 127.7 - 127.7
M1 (kN.m) 2.5 1.4 0.0
M2 (kN.m) 11.3 1.4 13.4 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.126 Le1/b1 = 8.6 < 15.0
Beta = 0.85 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 5.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.14 N/mm2
Links = Y10-175

2C16 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:8 - ((G+Q)P41 *F)
Min Design
N (kN) 18.2 - 18.2
M1 (kN.m) -2.7 -0.2 0.0
M2 (kN.m) -11.0 -0.2 -13.6 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.3 / 5.4 kN As (Required): %0.89 451.68 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.13 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9

1C17 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 211.5 - 211.5
M1 (kN.m) 2.1 2.4 0.0
M2 (kN.m) -6.1 -2.4 -7.9 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.209 Le1/b1 = 8.6 < 15.0
Beta = 0.76 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 4.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.89 / 0.97 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.10 N/mm2
Links = Y10-175

2C17 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 16.4 - 16.4
M1 (kN.m) -3.7 -0.2 0.0
M2 (kN.m) 6.4 0.2 10.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.016 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.8 / 3.5 kN As (Required): %0.60 302.10 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.09 N/mm2
Links = Y10-175

1C18 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 213.7 - 213.7
M1 (kN.m) -2.7 -2.4 0.0
M2 (kN.m) -6.2 -2.4 -8.2 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.211 Le1/b1 = 8.6 < 15.0
Beta = 0.76 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 4.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.97 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.10 N/mm2
Links = Y10-175

2C18 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 15.9 - 15.9
M1 (kN.m) 4.4 0.2 0.0
M2 (kN.m) 6.6 0.2 11.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.016 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.3 / 3.6 kN As (Required): %0.68 345.64 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.09 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10

1C19 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 177.0 - 177.0
M1 (kN.m) -5.7 -2.0 0.0
M2 (kN.m) 11.1 2.0 15.6 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.175 Le1/b1 = 8.6 < 15.0
Beta = 0.80 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 5.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.85 / 0.90 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.14 N/mm2
Links = Y10-175

2C19 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 16.8 - 16.8
M1 (kN.m) 5.6 0.2 0.0
M2 (kN.m) -10.6 -0.2 -16.1 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.9 / 5.4 kN As (Required): %1.11 563.16 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.13 N/mm2
Links = Y10-175

1C20 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 209.2 - 209.2
M1 (kN.m) -5.0 -2.4 0.0
M2 (kN.m) 12.2 2.4 16.1 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.207 Le1/b1 = 8.6 < 15.0
Beta = 0.76 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.5 / 6.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.99 / 0.98 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.15 N/mm2
Links = Y10-175

2C20 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 20.7 - 20.7
M1 (kN.m) 5.2 0.2 0.0
M2 (kN.m) -11.7 -0.2 -16.7 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 5.8 kN As (Required): %1.14 577.23 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.14 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11

1C21 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 266.0 - 266.0
M1 (kN.m) -9.1 -3.0 -13.8
M2 (kN.m) -6.8 -3.0 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.263 Le1/b1 = 8.6 < 15.0
Beta = 0.69 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.7 / 1.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.94 / 0.97 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.03 N/mm2
Links = Y10-175

2C21 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 21.0 - 21.0
M1 (kN.m) 8.9 0.2 15.5
M2 (kN.m) 6.8 0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.7 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.4 / 3.6 kN As (Required): %1.04 524.58 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.09 N/mm2
Links = Y10-175

1C22 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 299.6 - 299.6
M1 (kN.m) 4.7 3.4 0.0
M2 (kN.m) -6.7 -3.4 -9.8 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.296 Le1/b1 = 8.6 < 15.0
Beta = 0.65 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 1.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.90 / 0.96 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.03 N/mm2
Links = Y10-175

2C22 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 20.9 - 20.9
M1 (kN.m) -8.5 -0.2 -15.0
M2 (kN.m) 6.7 0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.2 / 3.6 kN As (Required): %1.00 505.05 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.10 / 0.09 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12

1C23 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 213.6 - 213.6
M1 (kN.m) -5.2 -2.4 0.0
M2 (kN.m) 12.4 2.4 16.4 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.211 Le1/b1 = 8.6 < 15.0
Beta = 0.76 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 6.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.77 / 0.99 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.15 N/mm2
Links = Y10-175

2C23 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 20.3 - 20.3
M1 (kN.m) 4.5 0.2 0.0
M2 (kN.m) -12.0 -0.2 -16.4 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.7 < 15.0
Beta = 0.98 Le2/b2 = 9.0 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.5 / 5.8 kN As (Required): %1.12 565.45 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.14 N/mm2
Links = Y10-175

1C24 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 114.2 - 114.2
M1 (kN.m) 6.9 1.3 11.2
M2 (kN.m) 5.0 1.3 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.113 Le1/b1 = 8.7 < 15.0
Beta = 0.87 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.2 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.10 / 0.00 N/mm2
Links = Y10-175

2C24 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:10 - ((G+Q)P51 *F)
Min Design
N (kN) 15.3 - 15.3
M1 (kN.m) -9.6 -0.2 -13.6
M2 (kN.m) -4.1 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 9.0 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.6 / 2.3 kN As (Required): %0.90 457.48 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.06 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13

1C25 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 152.2 - 152.2
M1 (kN.m) 2.6 1.7 0.0
M2 (kN.m) -2.7 -1.7 -4.9 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.150 Le1/b1 = 8.6 < 15.0
Beta = 0.82 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.85 / 0.85 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y10-175

2C25 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 22.3 - 22.3
M1 (kN.m) -4.5 -0.3 -7.0
M2 (kN.m) 2.5 0.3 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.022 Le1/b1 = 8.6 < 15.0
Beta = 0.97 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 1.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.03 N/mm2
Links = Y10-175

1C26 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 95.6 - 95.6
M1 (kN.m) -0.8 -1.1 0.0
M2 (kN.m) -5.7 -1.1 -6.7 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.094 Le1/b1 = 8.6 < 15.0
Beta = 0.89 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 3.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.09 N/mm2
Links = Y10-175

2C26 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 17.1 - 17.1
M1 (kN.m) 1.7 0.2 0.0
M2 (kN.m) 6.0 0.2 7.7 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.9 / 3.1 kN As (Required): %0.40 203.90 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.08 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14

1C27 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 238.8 - 238.8
M1 (kN.m) -4.7 -2.7 0.0
M2 (kN.m) -5.6 -2.7 -9.1 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.236 Le1/b1 = 8.6 < 15.0
Beta = 0.73 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.8 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.89 / 0.90 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.02 N/mm2
Links = Y10-175

2C27 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 18.3 - 18.3
M1 (kN.m) 5.9 0.2 11.6
M2 (kN.m) 5.8 0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.0 / 2.9 kN As (Required): %0.72 362.87 mm2 4Y16
vc'(1/2)= 0.79 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.07 N/mm2
Links = Y10-175

1C28 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 158.9 - 158.9
M1 (kN.m) -4.1 -1.8 0.0
M2 (kN.m) 11.7 1.8 15.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.157 Le1/b1 = 8.6 < 15.0
Beta = 0.82 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 5.8 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.77 / 0.91 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.14 N/mm2
Links = Y10-175

2C28 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:10 - ((G+Q)P51 *F)
Min Design
N (kN) 17.7 - 17.7
M1 (kN.m) 4.4 0.2 0.0
M2 (kN.m) -11.1 -0.2 -15.4 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.3 / 5.4 kN As (Required): %1.05 529.57 mm2 4Y16
vc'(1/2)= 0.79 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.13 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15

1C29 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 92.9 - 92.9
M1 (kN.m) -0.8 -1.0 0.0
M2 (kN.m) 3.5 1.0 4.5 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.092 Le1/b1 = 8.6 < 15.0
Beta = 0.89 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.84 / 0.77 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.00 N/mm2
Links = Y10-175

2C29 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 14.7 - 14.7
M1 (kN.m) 1.5 0.2 0.0
M2 (kN.m) -4.0 -0.2 -5.5 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.8 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.0 / 2.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.05 N/mm2
Links = Y10-175

1C30 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
MinDesign
N (kN) 8.4 - 8.4
M1 (kN.m) 0.2 0.1 0.3
M2 (kN.m) -0.1 -0.1 0.0 225
N-max (kN) 0.0
Concrete Cover25.0
= mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.008 Le1/b1 = 8.6 < 15.0
Beta = 0.99 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.4 / 1.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.77 / 0.77 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.03 N/mm2
Links = Y10-175

2C30 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 10.3 - 10.3
M1 (kN.m) 0.4 0.1 0.0
M2 (kN.m) 0.9 0.1 1.3 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.010 Le1/b1 = 8.8 < 15.0 225
Beta = 0.99 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.77 / 0.77 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16

1C31 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 16.6 - 16.6
M1 (kN.m) -0.5 -0.2 -1.0
M2 (kN.m) 0.5 0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.016 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.6 / 1.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.04 N/mm2
Links = Y10-175

2C31 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 11.4 - 11.4
M1 (kN.m) -0.8 -0.1 0.0
M2 (kN.m) 1.4 0.1 2.2 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.8 < 15.0
Beta = 0.99 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 0.9 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.77 / 0.77 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.02 N/mm2
Links = Y10-175

1C32 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 84.1 - 84.1
M1 (kN.m) 5.4 0.9 0.0
M2 (kN.m) 7.9 0.9 12.8 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.083 Le1/b1 = 8.7 < 15.0
Beta = 0.90 Le2/b2 = 8.7 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.9 / 4.4 kN As (Required): %0.44 221.30 mm2 4Y16
vc'(1/2)= 0.86 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.10 / 0.11 N/mm2
Links = Y10-175

2C32 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:10 - ((G+Q)P51 *F)
Min Design
N (kN) 15.3 - 15.3
M1 (kN.m) -6.7 -0.2 0.0
M2 (kN.m) -7.1 -0.2 -13.7 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 9.0 < 15.0 225
Beta = 0.98 Le2/b2 = 9.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.4 / 3.6 kN As (Required): %0.91 461.31 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.09 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17

1C33 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 113.6 - 113.6
M1 (kN.m) 7.8 1.3 12.2
M2 (kN.m) -5.1 -1.3 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.112 Le1/b1 = 8.7 < 15.0
Beta = 0.87 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.6 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.80 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.00 N/mm2
Links = Y10-175

2C33 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:7 - ((G+Q)P32 *F)
Min Design
N (kN) 16.3 - 16.3
M1 (kN.m) -9.5 -0.2 -13.6
M2 (kN.m) 4.2 0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.016 Le1/b1 = 9.0 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.7 / 2.3 kN As (Required): %0.90 457.22 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.12 / 0.06 N/mm2
Links = Y10-175

1C34 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 136.0 - 136.0
M1 (kN.m) 8.9 1.5 12.4
M2 (kN.m) 4.1 1.5 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.134 Le1/b1 = 8.7 < 15.0
Beta = 0.84 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.4 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.86 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.01 N/mm2
Links = Y10-175

2C34 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 17.1 - 17.1
M1 (kN.m) -8.8 -0.2 -12.6
M2 (kN.m) -3.9 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 9.0 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.3 / 2.2 kN As (Required): %0.82 412.66 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.05 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18

1C35 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 148.7 - 148.7
M1 (kN.m) 3.0 1.7 0.0
M2 (kN.m) 3.6 1.7 6.1 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.147 Le1/b1 = 8.6 < 15.0
Beta = 0.83 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.83 / 0.77 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.00 N/mm2
Links = Y10-175

2C35 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 21.0 - 21.0
M1 (kN.m) -4.0 -0.2 -7.4
M2 (kN.m) -3.5 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.6 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 2.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y10-175

1C36 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 150.4 - 150.4
M1 (kN.m) -3.5 -1.7 0.0
M2 (kN.m) 3.8 1.7 6.6 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.148 Le1/b1 = 8.6 < 15.0
Beta = 0.83 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.77 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y10-175

2C36 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 20.6 - 20.6
M1 (kN.m) 5.1 0.2 8.8
M2 (kN.m) -3.8 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 2.1 kN As (Required): %0.48 240.88 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.05 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19

1C37 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 268.2 - 268.2
M1 (kN.m) -9.1 -3.0 -13.9
M2 (kN.m) 6.9 3.0 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.265 Le1/b1 = 8.6 < 15.0
Beta = 0.69 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 1.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.95 / 0.97 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.03 N/mm2
Links = Y10-175

2C37 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 20.5 - 20.5
M1 (kN.m) 9.0 0.2 15.6
M2 (kN.m) -6.8 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.7 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.4 / 3.6 kN As (Required): %1.04 528.83 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.09 N/mm2
Links = Y10-175

1C38 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 253.9 - 253.9
M1 (kN.m) 10.6 2.9 15.5
M2 (kN.m) 6.9 2.9 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.251 Le1/b1 = 8.6 < 15.0
Beta = 0.71 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.3 / 3.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 1.03 / 1.01 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.13 / 0.08 N/mm2
Links = Y10-175

2C38 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 21.5 - 21.5
M1 (kN.m) -10.3 -0.2 -16.9
M2 (kN.m) -6.8 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.7 < 15.0 225
Beta = 0.97 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.0 / 3.5 kN As (Required): %1.15 583.28 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.12 / 0.09 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
BOA (*1JY-TUGZ-C7Z2-RZKM)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20

1C39 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 256.9 - 256.9
M1 (kN.m) -9.7 -2.9 -14.5
M2 (kN.m) 6.8 2.9 0.0 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.254 Le1/b1 = 8.6 < 15.0
Beta = 0.71 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 1.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 1.04 / 0.97 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.12 / 0.04 N/mm2
Links = Y10-175

2C39 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 17.8 - 17.8
M1 (kN.m) 9.4 0.2 16.5
M2 (kN.m) -7.2 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.7 < 15.0
Beta = 0.98 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.6 / 4.2 kN As (Required): %1.14 576.81 mm2 4Y16
vc'(1/2)= 0.78 / 0.78 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.10 N/mm2
Links = Y10-175

1C40 Storey: 1 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 298.7 - 298.7
M1 (kN.m) 3.0 3.4 0.0
M2 (kN.m) 7.3 3.4 9.5 225
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.295 Le1/b1 = 8.6 < 15.0
Beta = 0.66 Le2/b2 = 8.6 < 15.0 225
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 1.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.89 / 0.98 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.04 N/mm2
Links = Y10-175

2C40 Storey: 2 (Con.:C16/20 / Steel:Grade 385 (Type 2))


Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 19.3 - 19.3
M1 (kN.m) -7.5 -0.2 -14.5
M2 (kN.m) -7.2 -0.2 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.019 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.7 / 3.8 kN As (Required): %0.96 484.67 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.09 / 0.09 N/mm2
Links = Y10-175

Project: SIMARACHILDRENCANCERFOUNDATION
Stairs
Analysis and
Design
STAIRCASE

TYPE 1

Flight 1

Riser = 150 mm
Thread = 300 mm

Slope Factor = 1.118

Take waist thickness = 150 mm

LOADINGS TO FLIGHT

Dead Load

Waist
Self weight (kN/sq.m) = 4.02

Steps
(kN/sq.m) = 0.00
Finishes (kN/sq.m) = 1.34

Gk = 5.37 kN/sq.m

Live Load

Residence Purposes Adopt


Qk = 2.00 kN/sq.m

Design Load
1.4Gk + 1.6Qk = 10.72
say 14.00 kN/sq.m

Landing Design Load = 9.920 kN/sq.m


say 10.00 kN/sq.m

Service Load (kN/sq.m.) = 7.368


ELEMENT DESIGN to BS 8110:1997
SOLID SLABS
Originated from RCC11.xls v1.2 © 2000 BCA for RCC

INPUT Location FLIGHT 1 & 2


Design moment, M 27.0 kNm/m fcu 21 N/mm² gc = 1.50
ßb 1.00 fy 385 N/mm² gs = 1.05
span 4000 mm
Height, h 150 mm Section location SIMPLY SUPPORTED SPAN
Bar Ø 12 mm
cover 20 mm to this reinforcement

OUTPUT FLIGHT 1 & 2 Compression steel = None


d = 150 - 20 - 12/2 = 124.0 mm .
(3.4.4.4) K' = 0.156 > K = 0.084 ok .
(3.4.4.4) z = 124.0 [0.5 + (0.25 - 0.084 /0.893)]^½ = 111.1 > 0.95d = 117.8 mm
(3.4.4.1) As = 27.01E6 /385 /111.0 x 1.05 = 663 > min As = 360 mm²/m
PROVIDE R12 @ 75 = 1508 mm²/m As increased by 85.8% for deflection
(Eqn 8) fs = 2/3 x 385 x 663 /1508 /1.00 = 112.9 N/mm²
(Eqn 7) Tens mod factor = 0.55 + (477 - 112.9) /120 /(0.9 + 1.757) = 1.692
(3.4.6.3) Permissible L/d = 20.0 x 1.692 = 33.841
. Actual L/d = 4000 /124.0 = 32.258 ok .
. .