Bom
Bom
PROJECT OWNER :
PROJECT LOCATION :
IV. Lumber
Plywood
401 1/4" x 4' x 8' (Ordinary) pc
402 !/2" x 4' x 8' (Ordinary) pc
Lumber
403 2" x 2" (Good) bd.ft
404 2" x 3" (Good) bd.ft
V. ROOFING MATERIALS
501 Pre-painted Tilespan 12ft pc
502 Pre-painted Tilespan 9ft pc
503 Pre-painted Spandrel pc
504 Ridge Roll, Union x 8'' pc
505 Valley Roll, Union x 8'' pc
506 Hip Roll, Union x 8'' pc
VI. IRONWORKS
Angle Bar
601 1/4" x 2" x 6 m (5mm) pc
602 3/16 x 1" x 6m (standard) pc
C.Purlins
603 2" x 6" x 1.2 mm pc
604 2"x 4" x 1.2 mm pc
X. Ceiling Accessories
1001 Gypsum Board pc / sheet
1002 Carrying Channel pc / meter
1003 Suspension Rod pc / meter
1004 Gypsum Board Screws pc / box
1005 Drywall Joint tape roll
1006 Joint Compound kg / can
1007 Corner Bead pc / meter
1008 Hanger Wire kg / roll
1009 Edge Molding pc / meter
1010 Rivet Screws / Self-Drilling Screws pc / box
1011 Sealant / Silicone Caulk cartridge (ctg) / tube
1012 Metal Furrings pc / meter
1013 PVC Mouldings pc / meter
1014 Nail or Screw kg / box
1015 Construction Adhesive liter / tube
XI. MISCELLANEOUS
Common Nails
1111 1 1/2" kg
1112 3" kg
Finishing Nails
1113 1 1/2" kg
Concrete Nails
1114 2" kg
1115 3" kg
1116 Tekscrew 1 1/2" pc
1117 Blind Rivets5/32 x 3/4 pc
1118 5/32 drill bit (masonry) pc
1119 Finishing Line #100 pc
1120 Hack saw Blade pc
1121 Welding Rod kg
1122 Cutting Disc 4" pc
1123 Grinding Disc 4" pc
1124 Level Hose m
1125 Chalkstone pc
1126 Sahara bag
BILL OF MATERIALS
SUBTOTAL
50 pcs 400/pcs
50 pcs 400/pcs
50 pcs 400/pcs
150 pcs 400/pcs 60,000
30 kg 80/kg 2,400
SUBTOTAL
10 pcs
8 pcs
6 pcs
15 sets
BILL OF QUANTITY
PROJECT TITLE :
PROJECT OWNER :
PROJECT OWNER : TOTAL AREA = 300 SQ.M