The document outlines a Hazard Identification and Risk Assessment for the testing and commissioning of protection panels and AVC for T603, detailing potential hazards, their consequences, and risk mitigation strategies. It includes a risk rating matrix that categorizes risks based on severity and likelihood, with specific control measures for identified hazards. The assessment is approved by relevant personnel and includes a plan for regular reviews and updates.

Uploaded by

ndali99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

RA-Testing Commissioning for Protection PanelAVC

The document outlines a Hazard Identification and Risk Assessment for the testing and commissioning of protection panels and AVC for T603, detailing potential hazards, their consequences, and risk mitigation strategies. It includes a risk rating matrix that categorizes risks based on severity and likelihood, with specific control measures for identified hazards. The assessment is approved by relevant personnel and includes a plan for regular reviews and updates.

Uploaded by

ndali99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

HAZARD IDENTIFICATION AND RISK ASSESSMENT & REGISTER

Risk Assessment (Baseline and full RA)


TASK/ACTIVITY/PROCESS NAME: Testing & Commissioning for peotection panels &AVC for T603 DEPARTMENT/AREA: South
RA Number: RA-23 DATE: 12/5/2025
SEVERITY / CONSEQUENCE (Impact/Hazard Effect) (Where an event has more than one ' Loss Type ', choose the ' Consequence' with the highest rating)
Loss Type Additional "Loss Types" may exist
(1) Insignificant (2) Minor (3) Moderate (4) Major (5) Catastrophic
for an event: Identify & rate accordingly
Medical Treatment Case Single Fatality or Loss of Quality of Life / Irreversible Multiple Fatalities / Impact on health Ultimately
(S/H) Harm to People (Safety/Health) First Aid Case/Exposure to Minor Health Risk Loss Time Injury / Reversible Impact on Health
Exposure to Major Health Risk impact on Health Fatal
Material Environment harm (RST) Serious
(EI) Environmental Impact Minimal environment harm incident with workplace Material Environment harm (RST) Major environmental incident (RLT) Major environmental harm – Incident Irreversible
environmental harm incident (RMT)
(BI/MD) Business Interruption / Material / Fire Brief Disruption to Operation / 10k SR to Less Than Partial Loss of Operation/1M SR Substantial or Total Loss of Operation / 10M SR and
No disruption to operation / 1000 SR to Less than 10k SR Partial Shutdown/100k SR to Less than 1M SR
Damage & Other Consequential Losses 100k SR To Less than10M SR more
LIKELIHOOD Examples (Consider Near-Hits as well as actual events) RISK RATING / PROFILE
(5) ALMOST The unwanted event has occurred frequently : Occurs in order of (1) or more per year & is likely to reoccur within 1
year 11 (M) 16 (H) 20 (H) 23 (Ex) 25 (Ex)
CERTAIN
(4) LIKELY The unwanted event has occurred infrequently : Occurs in order of less than once per year & is likely to reoccur
7 (M) 12 (M) 17 (H) 21 (Ex) 24 (Ex)
within 5 yrs.
(3) POSSIBLE The unwanted event has occurred in the business at some time: or could happen within 10 years.
4 (L) 8 (M) 13 (H) 18 (H) 22 (Ex)
(2) UNLIKELY The unwanted event has occurred in the business at some time: or could happen within 20 years.
2 (L) 5 (L) 9 (M) 14 (H) 19 (H)
(1) RARE The unwanted event has never known to occur in the business or it is highly unlikely to occur within 20 years.
1 (L) 3 (L) 6 (M) 10 (M) 15 (H)
RA TEAM (Names) DESIGNATION SIGNATURE RISK RATING RISK LEVEL GUIDELINES FOR RISK MATRIX
Stop operation and review controls- Eliminate, avoid risk & implement high
1. Mr. Ahmed Sameer Project Manager 21 to 25 (Ex) - Extreme priority action plans
Proactively manage & implement specific controls/action plans-Review after
2. Mr. Mostafa Dief Testing Engineer 13 to 20 (H) - High 7 days
Actively manage & monitor – Additional controls is advised & review after 14
3. Mr. Ihtesham Haider Safety Engineer 6 to 12 (M) - Medium days
Risk acceptable – Monitor & manage as appropriate with frequent review
4. Mr. Mostafa Abohatab Electrical Engineer 1 to 5 (L) - Low
DEPARTMENT / AREA: PDC/ South APPROVED BY / MANAGER or Engr. Ahmed Najmi DATE: 12/5/2025 NEXT REVIEW DATE: 20/4/2026
SUPERVISOR
Identify the hazard on the given task and conduct assessment of the actual site condition, all identified risk should provide with a plan to eliminate or control the risk.

HAZARD IDENTIFICATION CONTROL RISK ASSESSMENT RISK REDUCTION ACTION PLAN


Risk Ranking /

Risk Ranking /
Consequence

Consequence
Risks Issue
Likelihood

Likelihood
Item Work Activity
Profile

Profile
(Possible incident) Improve existing controls Follow up by Whom Controls Implemented
(Process, Equipment, Hazards [What can go wrong] Existing Controls / implement new controls Yes/No
# Materials) (Accident / ill health to persons, fire
(name) & By When (date)

or property loss)

# CLASSIFICATION: Internal (Confidential)


1 Obtain Permit to Work • Unathorized work to be • Accident resulting serious injury or • Permit to Work shall be obtained as a pre- Supervisory Control
3 3 9 3 1 3
performed within a defined death to worker requisite to perform work
location and boundary • Significant property and • Work shall not be started until duly approved
• Uncontrolled personnel appurtenances damage Permit to Work is available at site and that Safety
entering a restricted location • Loss of production Toolbox meeting was conducted
• Unidentified hazards with • Significant cost due to damages • A safe work practice shall be implemented to
unplanned safety mitigating • Governmental violation reduce the possibilities of accident / incident
measures • Environmental complaint • Permit Receiver and Permit Issuer shall visit
• Inadequate coordination and together at the site to ensure that workplace
area control protocol hazards are adequately identified and mitigating
measure shall be established
• Permit to Work shall be displayed at the
worksite Site Engineer Safety Engineer
Yes
• Permit Receiver shall not leave the area for the LOA Holder
whole duration of work
• Work shall not proceed without the presence of
approved Permit to Work with the Permit
Receiver overseeing the activity
• Permit Receiver shall account all workers under
his Permit to Work before the start of work

2 Preparation of tools, • Contact with sharp edges • Sharp edges if not identified and • Valid permit to work should be obtained. Inspections
3 2 6 3 1 3
materials and • Improper use of personal isolated causes skin laceration and • Tool box talk should be conducted prior the
equipment protective equipment cuts work commence.
• Working in awkward • Wearing inadequate PPE may cause • Appropriate personal protective equipment
position physical injuries should be available like coverall, safety shoes,
• Not observing proper posture could hand gloves, eye protection, and etc.
cause muscle spasm and body pain • Observe proper posture and natural working
position
• Tools and equipment shall inspected by Site Engineer Safety Engineer
Yes
competent person LOA Holder
• Tools that will be used for the Test and Pre-
commissioning shall be calibrated and certified
by third party as required

# CLASSIFICATION: Internal (Confidential)


3 • Exposure to live electrical • Electric shock • All conductors in the reach zone of workers are •Replacing aluminum stairs with fiber
3 2 6 3 1 3
equipment( Not ioslated / Not isolated •. glass ones •Replacing aluminum stairs
discharged) All non-electrical metallic parts of equipment are with fiber glass ones
properly ground. Proper •Periodically check for all personal
authorization and work permits are required protective equipment
before working on any grid equipment •The disposal of all defective personal
•Safe work procedures for all hazardous tasks on protective equipment
electrical equipment should be available •Supervision and follow
•The coalification of all technicians and -up to make sure all workers are in
contractors to receive work permits compliance with all safe work
•Ensure that the lighting is suitable for the work •procedures and waring PPE
site Training, instructions and information
•Safety meeting before starting work should be available for all employees
•Defining the work area
•Implementing safety locks
/tags
•Ensure that the electrical circuits in drawings are
Site Engineer Safety Engineer
same in actual Yes
LOA Holder
•All PPE
(electrical gloves and safety shoes
) should be available to prevent electrical shock

•All PPE should be in accordance with


international specifications and suitable for uses.

Checking and testing Lifting testing equipment Employees should take a periodically medical Transporting equipment should be
3 3 9 3 1 3
ferules for differential check for joints and muscles available to facilitate the transfer of
protection Handling of testing equipment should be testing equipment
performed by more than one person
.There is a Periodically check for Human Factors
Engineering to make sure that all hazards
.connected to the handling of testing equipment
are being controlled
Mechanical Site Engineer Safety Engineer
Yes
-transporting equipment should be available to LOA Holder
facilitate the transfer of testing equipment

long Taking a sufficient rest period while doing work


-standing or long
Health Issues
.
3 3 9 3
Damage to the muscles and
sitting while testing vertebrae of the back Employees should take a periodically medical
protection equipment check for joints and muscles
.
There is a Periodically check for Human Factors
Engineering to make sure that all hazards
.
connected to the handling of testing equipment
are being controlled Site Engineer Safety Engineer
Considering the proper number of employees to Yes
LOA Holder
perform a task when planning maintenance
.
programs and working force

# CLASSIFICATION: Internal (Confidential)


4 Testing, Connecting Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are • Measuring isolated circuits to ensure
3 2 6 3 1 3
and isolating equipment isolated there is no current while the equipment
terminals of CT (not isolated • All non-electrical metallic parts of equipment is in service
or not discharged) are properly grounded .
• Applying of Caution and guidance tags on • Verifying the calibration certificate for
hazardous electrical equipment the testing device
• Proper authorization and work permits are .•
required before working on any grid equipment .All PPE should be in accordance with
• Safe work procedures for all hazardous tasks on international specifications and suitable
electrical equipment should be available • for use
.The coalification of all technicians and •
contractors to receive work permits .Replacing aluminum stairs with fiber
• Ensure that the lighting is suitable for the work glass ones
site •
. .Periodically check for all personal
• Safety meeting before starting work protective equipment
. • The disposal of all defective personal
Site Engineer Safety Engineer
• Defining the work area protective equipment Yes
LOA Holder
• Implementing safety locks •Supervision and follow
/tags -up to make sure all workers are in
. compliance with all safe work
• Ensuring the drawings match all circuits. procedures and waring PPE
• Handle with caution and care when measuring , • Training, instructions and information
connecting or isolating circuits while the should be available for all employees
equipment is in service

Lifting ‫ا‬ Health Issues Employees should take a periodically medical .Periodically check for all personal
3 3 9 3
testing equipment Damage to the muscles and check for joints and muscles protective equipment
vertebrae of the back .
Handling of testing equipment should be
performed by more than one person
.
There is a Periodically check for Human Factors
Engineering to make sure that all hazards
.
connected to the handling of testing equipment
are being controlled
Mechanical
-transporting equipment should be available to
facilitate the transfer of testing
.
equipmen
Site Engineer Safety Engineer
Yes
LOA Holder

# CLASSIFICATION: Internal (Confidential)


Exposure to live ekectrical Electric shock • All conductors in the reach zone of workers are
3 3 9 2 1 2
equipment isolated .The disposal of all defective personal
(not isolated • All non electrical metallic parts of equipment protective equipment
or not discharged) are properly grounded •
• Applying of Caution and guidance tags on .Supervision and follow
hazardous electrical equipment -up to make sure all workers are in
• Working on live electricity is forbidden while compliance with all safe work
the equipment de procedures and waring PPE
-energization • employees all for available be should
.Safe work procedures for all hazardous tasks on informed
electrical equipment should be available

.The coalification of all technicians and
contractors to receive work permits
• Ensure that the lighting is suitable for the work
site
.
Site Engineer Safety Engineer
• Safety meeting before starting work Yes
LOA Holder
.
• Defining the work area
• Implementing safety locks
/tags
.
• Ensuring the drawings match all circuits.
• Handle with caution and care when measuring
, connecting or isolating circuits while the
equipment is in service
• Measuring isolated circuits to ensure there is
no voltage while the equipment is in service
• Verifying the calibration certificate for the
testing device
• All PPE
(electrical gloves and safety shoes
) should be available to prevent electrical shock
• All PPE should be in accordance with
Lifting ‫ا‬ Employees should take a periodically medical
3 3 9 2 1 2
testing equipment check for joints and muscles
.
Handling of testing equipment should be
performed by more than one person
.
There is a Periodically check for Human Factors
Engineering to make sure that all hazards
.
connected to the handling of testing equipment
are being controlled
Mechanical Site Engineer Safety Engineer
Yes
LOA Holder
,Testing
5 connecting and isolating
terminals of VT

Health Issues
Damage to the muscles and
vertebrae of the back

# CLASSIFICATION: Internal (Confidential)


Health Issues
Damage to the muscles and
vertebrae of the back

Long Taking a sufficient rest period while doing work


3 3 9 2 1 2
-standing or long .
- Employees should take a periodically medical
sitting while testing check for joints and muscles
protection equipment .
There is a Periodically check for Human Factors
Engineering to make sure that all hazards
.
connected to the handling of testing equipment
are being controlled Site Engineer Safety Engineer
Considering the proper number of employees to Yes
LOA Holder
perform a task when planning maintenance
.
programs and working force

(Health risks) Long standing or wrong sitting when .Take adequate breaks while doing work
3 3 9 2 1 2
Damage to the muscles and doing tests on protective devices
vertebrae

Site Engineer Safety Engineer


Yes
LOA Holder

6 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are Verifying the calibration certificate for
3 3 9 2 1 2
equipment isolated the testing device
(not isolated All non All PPE
or not discharged) -electrical metallic parts of equipment are (electrical gloves and safety shoes
properly groundedWorking on live electricity is ) should be available to prevent
forbidden electrical shock

Proper authorization and work permits are All PPE should be in accordance with
required before working on any grid equipment international specifications and suitable
Safe work procedures for all hazardous tasks on for use
electrical equipment should be available Replacing aluminum stairs with fiber
glass ones
The coalification of all technicians and Periodically check for all personal
contractors to receive work permits protective equipment
.Ensure that the lighting is suitable for the work The disposal of all defective personal
site protective equipment
. Safety meeting before starting work
Site Engineer Safety Engineer
Yes
LOA Holder
Defining the work area
.Implementing safety locks
/tags
. Ensuring the drawings match all circuits

.Verifying the calibration certificate for the


testing device
All PPE
(electrical gloves and safety shoes
) should be available to prevent electrical shock

Stability test
for transformers, bus
bars or
lines

# CLASSIFICATION: Internal (Confidential)


Stability test
for transformers, bus
bars or Lifting ‫ا‬ Employees should take a periodically medical Ensuring the drawings match all circuits
lines
3 3 9 2 1 2
testing equipment check for joints and muscles
.Handling of testing equipment should be .Verifying the calibration certificate for
performed by more than one person the testing device
.There is a Periodically check for Human Factors
Engineering to make sure that all hazards
connected to the handling of testing equipment
are being controlled
.Mechanical
-transporting equipment should be available to
facilitate the transfer of testing
equipment

Site Engineer Safety Engineer Site Engineer Safety Engineer


LOA Holder LOA Holder

Health Issues
Damage to the muscles and
vertebrae of the back

Long Taking a sufficient rest period while doing work .Considering the proper number of
3 3 9 2 1 2
-standing or long .Employees should take a periodically medical employees to perform a task when
- check for joints and muscles planning maintenance
sitting while testing .There is a Periodically check for Human Factors
protection equipment Engineering to make sure that all hazards
connected to the handling of testing equipment
are being controlled

Site Engineer Safety Engineer Site Engineer Safety Engineer


LOA Holder LOA Holder

# CLASSIFICATION: Internal (Confidential)


7 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are Verifying the calibration certificate for
3 3 9 2 1 2
equipment isolated the testing device
(not isolated All non All PPE
or not discharged) -electrical metallic parts of equipment are (electrical gloves and safety shoes
properly groundedWorking on live electricity is ) should be available to prevent
forbidden electrical shock

Proper authorization and work permits are All PPE should be in accordance with
required before working on any grid equipment international specifications and suitable
Safe work procedures for all hazardous tasks on for use
electrical equipment should be available Replacing aluminum stairs with fiber
glass ones
The coalification of all technicians and Periodically check for all personal
contractors to receive work permits protective equipment
.Ensure that the lighting is suitable for the work The disposal of all defective personal
site protective equipment
. Safety meeting before starting work
Site Engineer Safety Engineer Site Engineer Safety Engineer
LOA Holder LOA Holder
Defining the work area
.Implementing safety locks
/tags
. Ensuring the drawings match all circuits

.Verifying the calibration certificate for the


testing device
All PPE
(electrical gloves and safety shoes
) should be available to prevent electrical shock

Measuring of secondary
current and voltage
circuit
Lifting ‫ا‬ Employees should take a periodically medical
3 3 9 2 1 2
testing equipment check for joints and muscles
.Handling of testing equipment should be
performed by more than one person
.There is a Periodically check for Human Factors
Engineering to make sure that all hazards
connected to the handling of testing equipment
are being controlled
.Mechanical
-transporting equipment should be available to Site Engineer Safety Engineer Site Engineer Safety Engineer
facilitate the transfer of testing LOA Holder LOA Holder
equipment

Health Issues
Damage to the muscles and
vertebrae of the back

Long Taking a sufficient rest period while doing work


-standing or long .Employees should take a periodically medical
3 3 9 2 1 2
- check for joints and muscles
sitting while testing .There is a Periodically check for Human Factors
protection equipment Engineering to make sure that all hazards
connected to the handling of testing equipment Site Engineer Safety Engineer Site Engineer Safety Engineer
are being controlled LOA Holder LOA Holder

7 3 3 9 2 1 2

# CLASSIFICATION: Internal (Confidential)


8 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
3 3 9 2 1 2
equipment isolated
(not isolated All non
or not discharged) -electrical metallic parts of equipment are
Maitaining all protection properly groundedWorking on live electricity is
Site Engineer Safety Engineer Site Engineer Safety Engineer
devices (Alram forbidden
LOA Holder LOA Holder
&indication testing)
Proper authorization and work permits are
required before working on any grid equipment
Safe work procedures for all hazardous tasks on
electrical equipment should be available
Lifting ‫ا‬ Employees should take a periodically medical
3 3 9 2 1 2
testing equipment check for joints and muscles
.Handling of testing equipment should be
performed by more than one person
.There is a Periodically check for Human Factors
Engineering to make sure that all hazards
Site Engineer Safety Engineer Site Engineer Safety Engineer
connected to the handling of testing equipment
LOA Holder LOA Holder
are being controlled
.Mechanical
-transporting equipment should be available to
facilitate the transfer of testing
equipment

Long Taking a sufficient rest period while doing work


-standing or long .Employees should take a periodically medical
3 3 9 2 1 2
- check for joints and muscles
sitting while testing .There is a Periodically check for Human Factors
protection equipment Engineering to make sure that all hazards
connected to the handling of testing equipment
Health Issues are being controlled
Damage to the muscles and
vertebrae of the back

Site Engineer Safety Engineer


Yes
LOA Holder

9 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
equipment isolated
3 3 9 2 1 2
(not isolated All non
or not discharged) -electrical metallic parts of equipment are
properly groundedWorking on live electricity is
forbidden

Proper authorization and work permits are Site Engineer Safety Engineer Site Engineer Safety Engineer
required before working on any grid equipment LOA Holder LOA Holder
Safe work procedures for all hazardous tasks on
electrical equipment should be available

The coalification of all technicians and


contractors to receive work permits
.Ensure that the lighting is suitable for the work
site

installation and
dismantle of
protection devices

# CLASSIFICATION: Internal (Confidential)


Lifting ‫ا‬ Employees should take a periodically medical
3 3 9 2 1 2
testing equipment check for joints and muscles
.Handling of testing equipment should be
performed by more than one person
.There is a Periodically check for Human Factors
Engineering to make sure that all hazards
installation and connected to the handling of testing equipment
dismantle of are being controlled
protection devices .Mechanical Site Engineer Safety Engineer Site Engineer Safety Engineer
-transporting equipment should be available to LOA Holder LOA Holder
facilitate the transfer of testing
equipment

Health Issues
Damage to the muscles and
vertebrae of the back

Long Taking a sufficient rest period while doing work


3 3 9 2 1 2
-standing or long .Employees should take a periodically medical
- check for joints and muscles
sitting while testing .There is a Periodically check for Human Factors
protection equipment Engineering to make sure that all hazards
connected to the handling of testing equipment Site Engineer Safety Engineer
are being controlled Yes
LOA Holder

10 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
equipment isolated
3 3 9 2 1 2
(not isolated All non
or not discharged) -electrical metallic parts of equipment are Site Engineer Safety Engineer Site Engineer Safety Engineer
properly groundedWorking on live electricity is LOA Holder LOA Holder
forbidden

Proper authorization and work permits are


Lifting ‫ا‬ Employees should take a periodically medical
testing equipment check for joints and muscles
3 3 9 2 1 2
.Handling of testing equipment should be
performed by more than one person Site Engineer Safety Engineer Site Engineer Safety Engineer
.There is a Periodically check for Human Factors LOA Holder LOA Holder
Engineering to make sure that all hazards
connected to the handling of testing equipment
are being controlled
Long Taking a sufficient.Mechanical
rest period while doing work
Wirring works
-standing or long .Employees should take a periodically medical
3 3 9 2 1 2
- check for joints and muscles
sitting while testing Health Issues .There is a Periodically check for Human Factors
protection equipment Damage to the muscles and Engineering to make sure that all hazards
vertebrae of the back connected to the handling of testing equipment
are being controlled

Site Engineer Safety Engineer


Yes
LOA Holder

11 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
equipment isolated
3 3 9 2 1 2
(not isolated All non
or not discharged) -electrical metallic parts of equipment are Site Engineer Safety Engineer Site Engineer Safety Engineer
properly groundedWorking on live electricity is LOA Holder LOA Holder
forbidden

Proper authorization and work permits are

Testing of

13.8 /132
circuit breakers
# CLASSIFICATION: Internal (Confidential)
11

Lifting ‫ا‬ Employees should take a periodically medical


3 3 9 2 1 2
testing equipment check for joints and muscles
.Handling of testing equipment should be Site Engineer Safety Engineer Site Engineer Safety Engineer
performed by more than one person LOA Holder LOA Holder
.There is a Periodically check for Human Factors
Testing of Engineering to make sure that all hazards
Long Taking a sufficient rest period while doing work
3 3 9 2 1 2
13.8 /132 -standing or long .Employees should take a periodically medical
circuit breakers - check for joints and muscles
sitting while testing .There is a Periodically check for Human Factors
Health Issues
protection equipment Engineering to make sure that all hazards
Damage to the muscles and
connected to the handling of testing equipment
vertebrae of the back
are being controlled
Site Engineer Safety Engineer
Yes
LOA Holder

12 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
equipment isolated
3 3 9 2 1 2
Site Engineer Safety Engineer Site Engineer Safety Engineer
(not isolated All non LOA Holder LOA Holder
or not discharged) -electrical metallic parts of equipment are
properly groundedWorking on live electricity is
Lifting ‫ا‬ Employees should take a periodically medical
testing equipment check for joints and muscles
3 3 9 2 1 2
.Handling of testing equipment should be
Site Engineer Safety Engineer Site Engineer Safety Engineer
performed by more than one person
LOA Holder LOA Holder
.There is a Periodically check for Human Factors
Engineering to make sure that all hazards
Signals checking
connected to the handling of testing equipment
Long Health Issues are being
Taking a sufficient controlled
rest period while doing work
-standing or long Damage to the muscles and .Employees should take a periodically medical
3 3 9 2 1 2
- vertebrae of the back check for joints and muscles
sitting while testing .There is a Periodically check for Human Factors
protection equipment Engineering to make sure that all hazards Site Engineer Safety Engineer
Yes
connected to the handling of testing equipment LOA Holder
are being controlled

13 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
equipment isolated
3 3 9 2 1 2
(not isolated All non Site Engineer Safety Engineer Site Engineer Safety Engineer
or not discharged) -electrical metallic parts of equipment are LOA Holder LOA Holder
properly groundedWorking on live electricity is
forbidden
Lifting ‫ا‬ Employees should take a periodically medical
3 3 9 2 1 2
testing equipment check for joints and muscles
.Handling of testing equipment should be Site Engineer Safety Engineer Site Engineer Safety Engineer
performed by more than one person LOA Holder LOA Holder
maintaining and .There is a Periodically check for Human Factors
calibrating AMR Engineering to make sure that all hazards
Long connected to the handling
Taking a sufficient of testing
rest period equipment
while doing work
-standing or long
Health Issues
.Employees should take a periodically medical
3 3 9 2 1 2
Damage to the muscles and
- vertebrae of the back check for joints and muscles
sitting while testing .There is a Periodically check for Human Factors
protection equipment Engineering to make sure that all hazards Site Engineer Safety Engineer
Yes
connected to the handling of testing equipment LOA Holder
are being controlled

14 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
equipment isolated
3 3 9 2 1 2
(not isolated All non
or not discharged) -electrical metallic parts of equipment are
properly groundedWorking on live electricity is Site Engineer Safety Engineer Site Engineer Safety Engineer
forbidden LOA Holder LOA Holder

Proper authorization and work permits are


required before working on any grid equipment
Safe work procedures for all hazardous tasks on
Retrieving fault record electrical equipment should be available

# CLASSIFICATION: Internal (Confidential)


Retrieving fault record
Lifting ‫ا‬ Employees should take a periodically medical
3 3 9 2 1 2 Site Engineer Safety Engineer Site Engineer Safety Engineer
testing equipment check for joints and muscles
.Handling of testing equipment should be LOA Holder LOA Holder
Health Issues performed by more than one person
Long Taking a sufficient rest period while doing work
Damage to the muscles and 3 3 9 2 1 2
-standing or long vertebrae of the back .Employees should take a periodically medical
- check for joints and muscles Site Engineer Safety Engineer
Yes
sitting while testing .There is a Periodically check for Human Factors LOA Holder
protection equipment Engineering to make sure that all hazards
connected to the handling of testing equipment
15 Exposure to live ekectrical Electric shock All conductors in the reach zone of workers are
equipment isolated
3 3 9 2 1 2
(not isolated All non Site Engineer Safety Engineer Site Engineer Safety Engineer
or not discharged) -electrical metallic parts of equipment are LOA Holder LOA Holder
properly groundedWorking on live electricity is
forbidden
Lifting ‫ا‬ Employees should take a periodically medical
3 3 9 2 1 2
testing equipment check for joints and muscles
.Handling of testing equipment should be Site Engineer Safety Engineer Site Engineer Safety Engineer
Testing- STATIC performed by more than one person LOA Holder LOA Holder
SYNCHRONOUS .There is a Periodically check for Human Factors
COMPENSATOR Health Issues Engineering to make sure that all hazards
Damage to the muscles and connected to the handling of testing equipment
Long Taking a sufficient rest period while doing work
-standing or long
vertebrae of the back
.Employees should take a periodically medical
3 3 9 2 1 2
- check for joints and muscles Site Engineer Safety Engineer Site Engineer Safety Engineer
sitting while testing .There is a Periodically check for Human Factors LOA Holder LOA Holder
protection equipment Engineering to make sure that all hazards
connected to the handling of testing equipment
are being controlled

# CLASSIFICATION: Internal (Confidential)

You might also like