09 FINAL_Module 3_ NiE_DRRM-H-NiE Translatng - Integrating - Implementing

The document outlines the Disaster Risk Reduction and Management in Health - Nutrition in Emergencies (DRRM-H-NiE) planning cycle, detailing phases from preparation to evaluation. It emphasizes the importance of aligning and integrating the DRRM-H-NiE plan with various national and local development plans to ensure effective implementation and funding. Key steps include data gathering, developing SMART objectives, and ensuring stakeholder engagement throughout the planning and execution process.

Uploaded by

Nutri San Pablo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

09 FINAL_Module 3_ NiE_DRRM-H-NiE Translatng - Integrating - Implementing

The document outlines the Disaster Risk Reduction and Management in Health - Nutrition in Emergencies (DRRM-H-NiE) planning cycle, detailing phases from preparation to evaluation. It emphasizes the importance of aligning and integrating the DRRM-H-NiE plan with various national and local development plans to ensure effective implementation and funding. Key steps include data gathering, developing SMART objectives, and ensuring stakeholder engagement throughout the planning and execution process.

Uploaded by

Nutri San Pablo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

MODULE 3

DISASTER RISK REDUCTION AND MANAGEMENT –


HEALTH – NUTRITION IN EMERGENCIES
(DRRM-H-NiE)
DRRM-H-NiE PLANNING CYCLE
3.2.1. Preparing to plan
3.2.2. Data gathering and analysis
Phase 1 3.2.3. Developing/Updating the DRRM-H-
NiE Plan
Planning 3.2.4. Translating and integrating the
DRRM-H-NiE Plan

Phase 2
Phase 4
Implementation of
Re-Planning
DRMM-H-NiE Plan

Phase 3 3.3.5. Implementing the DRRM-H-NiE Plan

Monitoring and 3.3.6. Monitoring and Evaluating the


Evaluation DRRM-H-NiE Plan
STEPS IN DRRM-H-NiE PLANNING:
3.2.4 Translating and Integrating the DRRM-H-NiE Plan

Aligning Institutionalizing Mainstreaming

• Philippine Development • Policies and structures • Comprehensive Local


Plan (PDP) • Coordination Development Plan (CLDP)
• Philippine Plan of Action mechanisms and • Local Nutrition Action
for Nutrition (PPAN) programs Plan (LNAP)
• DRRM Plan • Budget appropriation • Local Disaster Risk
• DRRM-H Plan from national down to Reduction Management
• Climate Change Action local levels Plan (LDRRMP)
Plan (CCAP) • Local Investment Plan for
• Gender and Health (LIPH)
Development Plan
(GAD)

Figure 3.6 Mainstreaming the DRRM-H-NiE Plan


2023-2025 PPAN Programs
STEPS IN DRRM-H-NiE PLANNING:
3.2.4 Translating and Integrating the DRRM-H-NiE Plan

DRRM-H-NiE Plan

Figure 3.7 Harmonizing the DRRM-H-NiE in the Local Nutrition Program


Management and Overall Local Development System
STEPS IN DRRM-H-NiE PLANNING:
3.2.4 Translating and Integrating the DRRM-H-NiE Plan

Figure 3.8 Integration of DRRM-H-NiE in the


LNAP and DRRM-H Plan
STEPS IN DRRM-H-NiE PLANNING:
3.2.5 Implementing the DRRM-H-NiE Plan
• Implementation of the DRRM-H-NiE plan shall commence upon
approval of the plan.
• Since the activities are integrated in different plans, the role of
NAO is to ensure smooth execution of the targeted activities and
proper utilization of funds.
• Shall be done through close monitoring and management of
implementation gaps and guided by the indicators.
STEPS IN DRRM-H-NiE PLANNING:
3.2.5 Implementing the DRRM-H-NiE Plan
Step-by-step Procedure

Orient the LCEs and other Utilize appropriate


Ensure that resources are
stakeholders on the resources per type of
available
approved plan activity

Evaluate appropriateness
Communicate to the
Implement activities of the response plan and
stakeholders and decision-
based on timeline consider contingency
makers the results
measures
Key Messages
• The DRMM-H-NiE is done based on the 4 thematic areas.
• Data gathering and analysis are conducted using various IM tools
and lessons learned from previous emergencies and disasters.
• The DRMM-H-NiE plan is composed of a set of SMART objectives
and activities.
Key Messages
• Developing and updating the DRRM-H-NiE work plan entails the
preparation of the Prevention and Mitigation Plan, Preparedness Plan,
Response Plan, and the Recovery and Rehabilitation Plan.
• Funds are obtained from both monetary and non-monetary sources.
• The DRMM-H-NiE plan needs to be aligned, institutionalized, and
mainstreamed to secure appropriate funding.
Thank You!