Inpection Test Plan (ITP) MV Switchgear Schneider Rev.01
Inpection Test Plan (ITP) MV Switchgear Schneider Rev.01
A
P
P
R
O
V
A
L
APPROVAL DOES NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY
FOR ERROR OR DEVIATIONS FROM CONTRACT REQUIREMENTS
PIU
PT. PLN (Persero) UIP SULAWESI BAGIAN UTARA
DOCUMENT NO
CONTRACTOR :
DOC. NO.
DATE 09-08-2019 SCALE N/A NO. SHEETS: 7
PLN-GIS-SARIOTELING-2018-ITP-03
TABULATION OF REVISED PAGES
ATTACHMENTS
REVISIONS
PAGE REMARKS REVISIONS REMARKS
ATT. PAGES
00 01 02 03 04 00 01 02 03 04
1 X X Cover 7 X X
2 X X TOC 7 X X
3 X X Tech Spec 7 X X
4 X X
REVISIONS REMARKS
EXHI PAGES
REFERENCE DOCUMENTS
REV DOC. NUMBER DOCUMENT TITLE
INSPECTION and TEST PLAN
Doc. No: WI-QP/FQC MV/111 rev. A
1 VISUAL INSPECTION
General arrangement - Follow approved
1.01 Dimensions: h x w x d CS-QP FQC MV 059 V W W
drawing approved GA drawing
- Follow approved
1.02 Rating Plate / Cubicle Designation Refer to approved drawing CS-QP FQC MV 059 V W W
SLD drawing
- Follow approved
1.03 Phisical fitness and completness Refer to approved drawing Drawing V W W
SLD drawing
- No scratch
- Refer to approved
1.04 Painting Color CS-QP FQC MV 059 - As per V W W
drawing
Specification
Follow IEC62271-1 sub- - Follow approved
1.05 Specification panel check Drawing V W W
clause 5,13 and 7,5 drawing
2 BUSBAR
QF M03 088;
2.01 Tightness of the busbar fixings WI-QP/FQC MV/110 As per torque table V SW SW
QF M03 089
Refer to Approved
2.02 Appearance of busbar Mark on SLD drawing Approval Drawing V SW SW
Drawing
4 MECHANICAL OPERATIONS
4.01 Panel Mechanical operations As per Product Catalogue CS-QP FQC MV 059 Smooth operation V W W
INSPECTION and TEST PLAN
Doc. No: WI-QP/FQC MV/111 rev. A
10 ACCESSORIES
10.01 Main bar Refer to accessories list Accessories list Complete material V SW SW
Available as per
10.02 Cubicle accessories Refer to accessories list Accessories list V SW SW
Accessories list
Signature
& Name
Date :