0% found this document useful (0 votes)
12 views5 pages

R02 I16c31 Sad Itp Me 0004 (C1)

Uploaded by

msajjad619
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views5 pages

R02 I16c31 Sad Itp Me 0004 (C1)

Uploaded by

msajjad619
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Document Transmittal Form

RSG-DC-FRM-0001

RED SEA PROJECT


General Information
To The Red Sea Development Company (RSG) Transmittal No.

Name Date 13/3/2025

Firm M/s. RSG From Saad Ali AlEssa Group


Address & Tel. NO Project/Department “MRO” Facility Works - Program 2 –
Airport
Email Rev. C1

The following is being transmitted:

☐ Drawings ☐ Specifications ☐ Vendor Invoices ☐ Copy of Letter


☐ Plans ☐ Change Order ☐ Shop Drawings ☐ Samples
☒ Others (Please specify)

Copies Document No. Description


1 R02-I16C31-SAD-ITP-ME-0004 Inspection & Test Plan for Fan Coil Unit (FCU) Installation and Testing

Transmitted via
☐ Hand Delivery ☒ Registered Mail ☐ Courier
Status
☒ For Approval ☐ For Information ☐ Returned for Corrections
☐ For Your Use ☐ Approved as Submitted ☐ Returned Corrected Prints
☐ For Review and Comment ☐ Approved as Noted Others (Please specify):

☐ As Requested ☐ Resubmit Copies for Approval

Remarks

Acknowledgement

Name Signature Date

RSG-DC-FRM-0001
Document No.

Document Submittal R02-I16C31-SAD-ITP-ME-0004

Status IFR
Rev. C1 Contract: R02I16C31 Page 1 of 7

PROJECT:

Maintenance, Repair & Overhauling (MRO) Facility Work

CLIENT:

RED SEA DEVELOPMENT COMPANY


Kingdom of Saudi Arabia

CONTRACTOR:
SAAD ALI AL ESSA GROUP
P.O Box 126, Abqaiq 31992, KSA
Tel: (013)5662858, Fax: (013)5662622

Inspection & Test Plan for Fan Coil Unit


(FCU) Installation and Testing

PREPARED BY: REVIEWED BY: APPROVED BY:


Mohammed Irfan Ahmed Hamouda Beshoy Nabil

QA/QC Engineer Mechanical Engineer MEP Manager

DATE DOCUMENT NO. REV.

13/3/2025 R02-I16C31-SAD-ITP-ME-0004 C1
Document No.

Document Submittal R02-I16C31-SAD-ITP-ME-0004

Status IFR
Rev. C1 Contract: R02I16C31 Page 2 of 7

Revision Record
Version Date Section Page Description of Modification & Basis

CO 26/1/2025 All All First submission

C1 13/3/2025 All All Revised as per the comments


INSPECTION & TEST PLAN FOR FAN COIL UNIT (FCU) INSTALLATION AND TESTING

CLIENT RED SEA DEVELOPMENT COMPANY ITP NO: R02-I16C31-SAD-ITP-ME-0004 REV NO: C1

CONTRACT R02I16C31 DISCIPLINE ME DATE: PAGE NO:

Maintenance, Repair & Overhauling


PROJECT PACKAGE C31
(MRO) Facility Work 3/13/2025 1 of 2
LOCATION RED SEA AIRPORT

Inspection & Test


Type of Code Verifying
Activity No: Project Phase / Task / Activity Description of Inspection / Test Acceptance Criteria FREQ
Control Documents
AL-ESSA RSG

1 Document / Submittals

R02-I16C31-SAD-MR-GF-SDW-ME-10101 R02-
IFC/Design
1.1 Shop Drawing Approval Approval of Mechanical shop drawings I16C31-SAD-MR-M1-SDW-ME-10101 R02- Once, Prior to Start H R SDW
Drawings
I16C31-SAD-MR-RF-SDW-ME-10101.
R02-I16D01-WSU-SPC-CS-0001-PDF[04] Division
23 (SECTION 238219)
Approved
1.2 Material Submittal Approval Approval of FCU Materials. and approved vendor Once, Prior to Start H R MAT
Submittal
List ( HVA-139 LG (SouthKorea))
R02-I16C31-SAD-MAT-ME-0014
R02-I16D01-WSU-SPC-CS-0001-PDF[04] Division
Approval of FCU installation Method of Project
1.3 Method of statment Approval 23 (SECTION 238219), Once, Prior to Start H R MTS
statment/Testing procedures. Specifications
R02-I16C31-SAD-MTS-ME-0006

2 Materials Receiving, Storage and Delivery

R02-I16D01-WSU-SPC-CS-0001-PDF[04] Division
Material Receiving, Storage and Approval of Material received, deliver to storge Approved
2.1 23 (SECTION 238219) and For each delivery H H MIR,DN
delivery and site Submittal
R02-I16C31-SAD-MIR-ME-0001

3 Installation

Visual inspection of FCU as per


R02-I16C31-SAD-MTS-ME-0006 and
approved shop drawings and project Once, Prior to
3.1 Pre-Installation of FCU Surveillance Relevant Approved Shop H S Checklist
specifications - R02-I16D01-WSU-SPC-CS-0001- Installation
Drawing
PDF[04] Division 23 (SECTION 238219)

Visual inspection of Hangers and


supports for FCU as per approved R02-I16C31-SAD-MTS-ME-0006 and
Once after
3.2 Installation of Hangers and supports for FCU. shop drawings and project Surveillance Relevant Approved Shop W S Checklist
completion
specifications- R02-I16D01-WSU-SPC-CS-0001- Drawing
PDF[04] Division 23 (SECTION 238219)

Inspection for installation of FCU as


R02-I16C31-SAD-MTS-ME-0006 and
per approved shop drawings. project Inspection Once after
3.3 Installation of FCU Relevant Approved Shop H H WIR
specifications- R02-I16D01-WSU-SPC-CS-0001- Request completion
Drawing
PDF[04] Division 23 (SECTION 238219)

Inspection for installation of Drain


Pipes for FCU as per approved shop drawings. R02-I16C31-SAD-MTS-ME-0006 and
Inspection Once, Prior to
3.4 Installation of Condensate Drain Pipes for FCU Project Relevant Approved Shop H H WIR
Request Completion
specifications- R02-I16D01-WSU-SPC-CS-0001- Drawing
PDF[04] Division 23(SECTION 238129/16)

Inspection for Insulation of Drain Pipes for FCU


R02-I16C31-SAD-MTS-ME-0006 and
as per approved shop drawings. project Once, After
3.5 Insulation of Condensate Drain Pipes for FCU Inspection Request Relevant Approved Shop H H WIR
specifications- R02-I16D01-WSU-SPC-CS-0001- completion
Drawing
PDF[04] Division 23(SECTION 238129/16)

4 Testing

Testing and commissioning of FCU


as per recommended in CIBSE TM43. & R02-I16C31-SAD-MTS-ME-0006 and
Inspection Once after
4.1 Testing and commissioning of FCU approved Method statement. project Relevant Approved Shop H W WIR
Request completion
specifications- R02-I16D01-WSU-SPC-CS-0001- Drawing
PDF[04] Division 23 (SECTION 238219)

General Notes

Employer: An authorized employee who represents RSG and is empowered to take action in the activity. This role can be filled by a Quality Supervisor, Quality Manager, Technical Engineer, or Construction Engineer as defined in the
1
Method Statement and PQP.

2 Review Point: Employer shall review the task results before moving on.

3 Surveillance Point: Monitoring work in progress, which does not require a written notification. A surveillance report may be issued to document the activity.

4 Witness Point: The Employer shall be notified in advance, in writing, about the timing of inspections or tests. However, if there is no written approval or presence from the Employer, the inspection or test shall proceed as scheduled.

5 Hold Point: The Employer shall be notified in advance, in writing, about the timing of inspections or tests. Subsequent activities should not be carried out without written approval from the Employer.

LEGEND
Surveillance
H Hold Point W Witness Point S R Review Point
Point

I Inspection

SAAD ALI AL-ESSA RSG


Prepared By Reviewed By Approved By Approved By
Position QA/QC Engineer Mechanical Engineer MEP Manger Quality Lead

Name Mohammed Irfan Ahmed Hamouda Beshoy Nabil

Signature
Date 3/13/2025 3/13/2025 3/13/2025
Document No

R02-I16C31-SAD-ITP-ME-0004

Document Submittal STATUS IFR

REV C1

PAGE

CHECKLIST FOR FAN COIL UNIT (FCU) INSTALLATION AND TESTING

Department Mechanical WIR No:

Description

Drawing No.

Location

Sl. No Description Accepted Rejected Remarks

section 1 Preparation
1.1 Shop drawing for Duct Network is approved.

1.2 Method Statement for installation of FCU is approved.

1.3 Material which is used for installation of FCU is approved.


Inspection area is free of any violations against house keeping,HSE and
1.4
environmental rules and regulations.

section 2 Installation

2.1 Installation of Hangers and supports for FCU as per approved shop drawings.

FCUs are installed in correct location as per approved shop drawings, equipment
2.2
schedule and manufacturers recommendations.

FCUs are installed with approved vibration isolation from the structure on which they
2.3
are mounted and with approved isolation from the duct work connected to it.

2.4 Fire dampers installed, tested, and under control.

2.5 Coil piping & valves installed & labeled.

Condensate pipe installation & insulation done as per approved shop drawing,methed
2.6
statement & project Specifications

At the Condensate discharge points right drains shall be installed as per approved shop
2.7
drawing.

Check the Condensate pipework slope towards drain, proper trap management as per
2.8
approved shop drawing and specification.
Ensure Gravity condense pipework shall be laid to fall at a gradient of not less than 1 in
2.9
100

2.1 Electrical connections completed properly as per manufacturers recommendations.

section 3 Testing and commissioning

3.1 Installation of FCU is approved as per shop drawings.

3.2 Functional Test is done for operation as per approved shop drawings.

Note:

AL-ESSA CONTRACTING AL-ESSA QC RSG

ISSUED BY

NAME

DESIGNATION

SIGNATURE

DATE