Method Statement for Backfilling
Method Statement for Backfilling
Revision No. :
Issued
IMPORTANT
The information contained herein is the proprietary property of Maga Engineering (Pvt) Ltd. It shall
not be reproduced, copied, revealed, published, or distributed in whole or part without the authority
from Maga Engineering (Pvt) Ltd.
TABLE OF CONTENTS
1.0 INTRODUCTION 02
2.0 SCOPE OF WORK 02
3.0 MANPOWER,MATERIALS,MACHINERY & EQUIPMENTS 03
4.0 EXECUTION OF WORK AND SEQUENCE OF WORK 04
5.0 HEALTH AND SAFETY 04
6.0 ENVIRONMENT AND SOCIAL SAFEGUARD CONCERN 09
7.0 SUPERVISION OF THE WORK 11
8.0 ATTACHMENTS 11
-1-
METHOD STATEMENT
Revision No. :
Issued
1.0 INTRODUCTION
1.3 Engineer :
-2-
METHOD STATEMENT
Revision No. :
Issued
3.2 MACHINERY
1.Back-hoe loader
2.Excavator
3.Excavator
4.Eight Tones Roller
4.Wacker compactors.
5.Breaker
6.Dump trucks as required.
3.3 EQUIPMENTS
1.Sand cone Apparatus
2.Scale
3.Gas burner.
4,Mammoties
5.Shovel
3.4 MATERIALS
Site excavated soil blended with quarry sand prepared according to approved method statement.
o Prior to any demolition or backfilling works, Meda Ela will be diverted to ensure a
safe working environment.
-3-
METHOD STATEMENT
Revision No. :
Issued
-4-
METHOD STATEMENT
Revision No. :
Issued
1. Use of machinery.
2. Use of hand held power tools.
3. Electricity.
4. Work under ground.
5. Noise.
6. Air quality
The following hazards and risks are evaluated for the activities of pile cap construction.
5.2.1 Risks with heavy machinery / Equipment
Accident due to failure of machine
Accident due to moving machineries.
Accident due to wrong operations.
Failure of lifting equipments.
Risk Control Methods (The best hierarchy methods)
Availability of fitness certificates for Machinery.
Availability of licence for operator.
Availability of fitness certificate for Operator.
Guideline for machinery operations.
Availability of helper for machinery operator.
Periodical check and maintanace of machineries and equipments.
Periodical check on lifting belts and equipments.
Educate all personnel involved in the work to keep away from lifting area.
-5-
METHOD STATEMENT
Revision No. :
Issued
Cut injuries
Eye injuries due to the flying particles
Slips and twist of tools.
Electrocution.
Electrical Burns
Electrical Fires
Electrocution
Failure of shoring.
Bad air quality.
Material falling from height.
-6-
METHOD STATEMENT
Revision No. :
Issued
Hearing damage.
Physicological stress.
Loss of concentration.
Third party complains.
-7-
METHOD STATEMENT
Revision No. :
Issued
Loss of concentration.
-8-
METHOD STATEMENT
Revision No. :
Issued
Dust Control
Dust generation from earth will be controlled by wetting.
Spread of dust generated by power tool operations will be controlled by dust covers.
Tyre washing bays for vehicles and machineries depart from site.
Proper house keeping.
-9-
METHOD STATEMENT
Revision No. :
Issued
Designation Responsibility
Deputy Project Manager Provide required instructions and
communicate with relevant parties.
- 10 -
METHOD STATEMENT
Revision No. :
Issued
8.0 ATTACHMENTS
- 11 -