0% found this document useful (0 votes)
0 views

Cookgramam Boq Base

The document outlines detailed specifications and quantities for various civil works, including flooring, walls, roofing, metal fabrication, and carpentry for a construction project. It includes sections for both ground and first floors, detailing materials and construction methods for areas such as dining, kitchen, and service areas. Additionally, it notes the requirement for cross-checking areas by the site team and specifies material quality standards.

Uploaded by

Venkatesh Tayi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views

Cookgramam Boq Base

The document outlines detailed specifications and quantities for various civil works, including flooring, walls, roofing, metal fabrication, and carpentry for a construction project. It includes sections for both ground and first floors, detailing materials and construction methods for areas such as dining, kitchen, and service areas. Additionally, it notes the requirement for cross-checking areas by the site team and specifies material quality standards.

Uploaded by

Venkatesh Tayi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

S.

No DESCRIPTION SPECIFICATIONS QUANTITY UNIT UNIT RATE (rs) TOTAL REMARKS


CIVIL WORKS
GROUND FLOOR
DINING AREA
i) FLOORING
Ground floor - for flooring tile/pavers Existing flooring chipping, Debris Removal, Msand filling,
1 1933 sq.ft 0 0
laying purpose 40mm blue metal filling , mortar filling works
Ground floor - Entrance Pathway and
2 40 mm th Pavers block to be laid (material cost included) 1530 sq.ft 0 0
parking area Pavers laying

STONE FLOORING tile laying will be laid on floor


Ground floor - Outdoor dining stone
3 wherever applicable with cement mortar (material cost 620 sq.ft 0 0
tile laying
included)

4 Ground Floor - staff toilet tile laying Wall tile laying + material cost 23 sq.ft 0 0 as per selection
Floor tile laying + material cost 180 sq.ft 0 0 as per selection
5 Fountain tile laying Floor tile laying + material cost 35 sq.ft 0 0 as per selection
ii) WALLS/CIVIL TO BE CONSTRUCTED

1.CLAY BREEZE BLOCK to be fixed by proper cement


mortar ratio mix and adhesive using 4mm spacer.
3.Using MS Square Tube in
6 Ground floor - Clay Breeze Block Walls at every 8' vertically &For Horizontal MS square tube 1153 sq.ft 0 0
using partially in height of the wall for support
4. Necessary Excavation for support of the wall to be
done

Ground floor- Staff Toilet (near Car Constructing walls in Brickwork for staff toilet
7 190 sq.ft 0 0
Park)
Ground Floor - Screen Wall + horse Refer design for details
8 1 LS 0 0
sculpture feature
Fixed seating at 1'6" from FFL in civil works. Can use Brick
9 Ground Floor - Bench Seating 65 sq.ft 0 0
debris from site as well
iii) ROOFING- DINING AREA

Mangalore tile roofing sloping towards the Parking area


10 Roofing - for outdoor Dining 850 sq.ft 0 0
Clear height to be 10'6" can slope down to 8'6"

Roofing for outdoor Dining - Laser cut


Decorative metal strips used to cover the purlins below
11 metal profile panels along the roof 95 R.ft 0 0
the roof on the edges
edge

Providing 50mm puff panel MS roofing with vertical


column support in MS square tube with rafter & purlin
12 PUF Panel Roofing - for staff toilet support at horizontal in roof 30 sq.ft 0 0
1.every 10' using ms tubes
2.MS square tube excavation & concrete work depth2'
iv) METAL FABRICATION
13 MS gate fixing Mangalore tile roofing sloping towards the Parking area 1 LS 0 0
v) TEXTURE PAINT/Polished LIME PLASTER FINISHES
Live counter and Screen wall - Rough Textured finish on the fascia as per design and
14 250 sq.ft 0 0
Mud/plaster texture finish selection
Fixed bench seating - smooth tecture
15 130 sq.ft 0 0
paint finish
vi) STONE COUNTER FIXING
16 Sone counter in the Handwash Area Granite stone counter as per selection 10 sq.ft 0 0
KITCHEN/SERVICE AREA (SETBACK)
i) FLOORING
Ground floor -Tile laying in the Service laying of cheap tiles (around 50/sqft)
17 1320 sq.ft 0 0
area in the setback
ii) WALLS/CIVIL TO BE CONSTRUCTED
Constructing walls in the service area with Bison boards
Ground floor- GI Sheet with Bison
18 with necessary support 980 sq.ft 0 0
Board
iii) ROOFING- SERVICE AREA
Providing 50mm puff panel MS roofing with vertical
column support in MS square tube with rafter & purlin
19 PUF Panel Roofing - for service area support at horizontal in roof 1530 sq.ft 0 0
1.every 10' using ms tubes
2.MS square tube excavation & concrete work depth2'
iv) METAL FABRICATION
20 MS Service Staircase 1 LS 0 0
v) STONE COUNTER FIXING
21 Sone counter in the Wash area Granite stone counter as per selection 35 sq.ft 0 0
FIRST FLOOR
i) FLOORING
22 First Floor - Sunken filling works using AAC blocks and 2" concrete 230 sq.ft 0 0
First Floor - Polished cement/tile
23 flooring to be done as per design and selection 600 sq.ft 0 0
flooring
24 First Floor - Athangudi tile laying In floor and a few half height walls as per design 520 sq.ft 0 0
25 First Floor - Athangudi tile laying Material Cost 520 sq.ft 0 0 as per selection
ii) WALLS/CIVIL TO BE CONSTRUCTED
26 First Floor - AAC blocks walls All walls on First floor to be built with 4" AAC block 1200 sq.ft 0 0
Fixed seating at 1'6" from FFL in civil works. Can use Brick
27 First Floor - Raised fixed seating 102 sq.ft 0 0
debris from site as well
28 First Floor - Internal Walls plastering 1200 sq.ft 0 0
29 First Floor - External Walls plastering 1200 sq.ft 0 0
iii) ROOFING- DINING AREA
Providing 50mm puff panel MS roofing with vertical
column support in MS square tube with rafter & purlin
30 First Floor - PUF panel roofing support at horizontal in roof 1162 sq.ft 0 0
1.every 10' using ms tubes
2.MS square tube excavation & concrete work depth2'

First Floor - PUF panel UPVC Water


31 Using UPVC WATER GUTTER and 4"PVC pipe for drain 500 R.ft 0 0
gutter
PUF Panel roofing - Laser cut metal
Decorative metal strips used to cover the purlins below
32 profile panels along the roof edge on 36 R.ft 0 0
the roof on the edges
the front side
iv) METAL FABRICATION
33 MS Grill for arch windows window size - 3'6" x 6'6" 2 nos 0 0
v) TEXTURE PAINT/POLISHED PLASTER FINISHES
Fixed bench seating - Booth and Floor
34 200 sq.ft 0 0
seating seating area
Indoor dining walls in Texture
35 480 sq.ft 0 0
paint/Polished plaster finish
ELECTRICAL
GROUND FLOOR
36 Electrical works All electrical works as per requirement 1 sq.ft 0 0
FIRST FLOOR
37 Electrical works All electrical works as per requirement 1 sq.ft 0 0
PLUMBING
PLUMBING DRAINAGE WATER 6" PIPE
38 WORK(NORTH,EAST&SOUTH TO ROAD 150 sq.ft 0 0
DRAINAGE
Fixing of all the sanitary Fixtures as per
39 sink 4 nos, Wash basins 5 nos, WC 1 nos, urinal 1 nos 1 LS 0 0
drawing
40 Water Fountain fixing of water fountain in ground floor 6'x5' 30 sq.ft 0 0
CARPENTRY
GROUND FLOOR
41 Wooden tables with Yellow tile top 2' x 2'6" size 9 nos 0 0
42 Wooden tables with Yellow tile top 2' x 6' size 2 nos 0 0
43 Wooden tables with Yellow tile top 2' x 4' size 2 nos 0 0
44 Chairs for outdoor dining 18 nos 0 0
45 Cane bench seating 4 nos 0 0
FIRST FLOOR
46 Wooden tables 2' x 4' size 4 nos 0 0
47 Wooden tables 2' x 6' size 3 nos 0 0
48 Booth Seating - Wooden tables 2 nos 0 0
49 Wooden bench seating 5'x 1'6" 1 nos 0 0
50 Wooden carved Panel in Booth seating 1 nos 0 0

Wooden Carved Doors for Indoor


51 door size 6'6" x 8' 1 nos 0 0
dining Entrance
Wooden Service Back Door for Indoor
52 door size 3'x 7' 1 nos 0 0
dining Entrance
53 Wooden carved arch windows 2 nos 0 0
Wooden and metal railing for main
54 as per design 30 R.ft 0 0
staircase
FALSE CEILING
First Floor - Plywood flase ceiling with
55 wooden rafters and rope details as per 850 sq.ft 0 0
design
First Floor - Plywood flase ceiling with
56 130 sq.ft 0 0
Clay pots detail as per design
FIXED GLASS
57 Fixed glass with metal frame work first floor walls 300 sq.ft 0 0
ITEMS TO BE SOURCED
Wooden Chettinad columns - Ground
58 These columns will be fixed on the thinnai - Height of 7' 5 nos 0 0
floor Thinnai bench seating
Wooden Chettinad columns - Ground These columns will be fixed on the Stone pavers - Height
59 2 nos 0 0
floor Dining area of 10'
Wooden Chettinad columns -First floor These columns will be fixed on the Stone pavers - Height
60 2 nos 0 0
Dining area Booth seating 1 of 8'
Wooden Chettinad columns -First floor These columns will be fixed on the Stone pavers - Height
61 2 nos 0 0
Dining area Booth seating 2 of 9'
Wooden Chettinad columns -First floor These columns will be fixed on the Stone pavers - Height
62 2 nos 0 0
Dining area of 10'
63 Face masks for mask wall first floor -Lobby area feature wall 1 nos 0 0
64 Pots for false ceiling 1 nos 0 0
65 Rope for False ceiling 1 nos 0 0
66 Art for Art wall - First floor 1 nos 0 0
67 Signage - As per requirement 1 nos 0 0
68 Air conditioners as per requirements 1 Ls 0 0
EXEC. TOTAL 0 WITHOUT GST

NOTE: All areas to be crosschecked by site team

NOTE - All areas to be crosschecked by site team


All plywood used for carpentry must be of BWR grade
All laminates to be merino or similar make
Veneer and laminate selection to be done by architect