Cookgramam Boq Base
Cookgramam Boq Base
4 Ground Floor - staff toilet tile laying Wall tile laying + material cost 23 sq.ft 0 0 as per selection
Floor tile laying + material cost 180 sq.ft 0 0 as per selection
5 Fountain tile laying Floor tile laying + material cost 35 sq.ft 0 0 as per selection
ii) WALLS/CIVIL TO BE CONSTRUCTED
Ground floor- Staff Toilet (near Car Constructing walls in Brickwork for staff toilet
7 190 sq.ft 0 0
Park)
Ground Floor - Screen Wall + horse Refer design for details
8 1 LS 0 0
sculpture feature
Fixed seating at 1'6" from FFL in civil works. Can use Brick
9 Ground Floor - Bench Seating 65 sq.ft 0 0
debris from site as well
iii) ROOFING- DINING AREA