Quality Assurance Plan
Quality Assurance Plan
a) MTC Verification
a) Chemical Property a) R a) MTC
Purlin and Panel b) MTC a) 100% b) 100%
1.3 b)Mechanical Property c) IS277:2018 b) R b) MTC
Coil Verifiction c) Actuail Checked
Dimention c) I c)Inespection
c)Measurement
2.BROUGHT ITEMS
a) MTC Verification
a) Chemical Property a) R a) MTC
Nut, Bolts And b) MTC a) 100% b) 100%
2.1 b)Mechanical Property c) IS-1367 CLASS 8.8-Ed.2002 b) R b) MTC
Wisher Verifiction c) Actuail Checked
Dimention c) I c)Inespection
c)Measurement
3.FABRICATION PROCESS
Fabrication of
3.1 Dimention Measurment 50% Fabrication As Per Drawings a) I Inspection Report
Primery Struture
a) Inspection Report
a) Visual Defects a)Visual b) a) I
Welding a) 100% b) 50% b)Inspection
4.2 b)Weld Size Measurement AWS D1.1:2010 b) I
Inspection c) 1 Joint per day Report
c) Surface Defects c) DP Test c) I
c)Inspection Report
6
6.1 Inspection By FI QC TPI QC Client QC
6.2 Name