0% found this document useful (0 votes)
20 views1 page

Quality Assurance Plan

The document outlines a Quality Assurance Plan for a Pre-Engineered Building project, detailing the inspection and verification processes for raw materials, fabrication, welding, and surface cleaning. It specifies the acceptance criteria, extent of checks, and formats for records, ensuring compliance with relevant standards. The plan includes roles for various quality control personnel and documentation requirements for each stage of the project.

Uploaded by

Fahadali Sayyed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views1 page

Quality Assurance Plan

The document outlines a Quality Assurance Plan for a Pre-Engineered Building project, detailing the inspection and verification processes for raw materials, fabrication, welding, and surface cleaning. It specifies the acceptance criteria, extent of checks, and formats for records, ensuring compliance with relevant standards. The plan includes roles for various quality control personnel and documentation requirements for each stage of the project.

Uploaded by

Fahadali Sayyed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

QUALITY ASSURANCE PLAN DOCUMENT NO

Pre-Engineered Building / Steel Structure REVISION NO


NAME COSTMORE-Godrej , Khapoli PROJECT CODE-073 DATE
SPE. CODE AND STANDARDS FOR INSPECTION BY
SR.NO DESCRIPTION CHRACTERISTIC TYPE OF CHECK EXTENT OF CHECK FROMATE OF RECORDS REMARK
ACCEPTANCE CRITERIA FI CLIENT
1.RAW MATERIAL
a) MTC Verification
a) Chemical Property a) R a) MTC
b) MTC a) 100% b) 100%
1.1 Steel Plate b)Mechanical Property c) IS2062:2011 E350A E350BR,E350C b) R b) MTC
Verifiction c) Actuail Checked
Dimention c) I c)Inespection
c)Measurement
a) MTC Verification
a) Chemical Property a) R a) MTC
Hot Rolled And b) MTC a) 100% b) 100%
1.2 b)Mechanical Property c) IS 2062 b) R b) MTC
Hollow Section Verifiction c) Actuail Checked
Dimention c) I c)Inespection
c)Measurement

a) MTC Verification
a) Chemical Property a) R a) MTC
Purlin and Panel b) MTC a) 100% b) 100%
1.3 b)Mechanical Property c) IS277:2018 b) R b) MTC
Coil Verifiction c) Actuail Checked
Dimention c) I c)Inespection
c)Measurement
2.BROUGHT ITEMS
a) MTC Verification
a) Chemical Property a) R a) MTC
Nut, Bolts And b) MTC a) 100% b) 100%
2.1 b)Mechanical Property c) IS-1367 CLASS 8.8-Ed.2002 b) R b) MTC
Wisher Verifiction c) Actuail Checked
Dimention c) I c)Inespection
c)Measurement
3.FABRICATION PROCESS

Fabrication of
3.1 Dimention Measurment 50% Fabrication As Per Drawings a) I Inspection Report
Primery Struture

Final Inspection a)Dimention b)Part a)Measurment a) 100% b) 100%


3.2 Fabrication As Per Drawings a) I Inspection Report
Befor Painting Indentification b)Verification

4. WELDING PROCEDURE AND NDT


a) Welding Procedure a) R
a)Verification a) WPS
Welding b)Procedure Qualification a) 100% b) 100% b) R
4.1 b) Verification AWS D1.1:2010 b) PQR
Procedure c) Welder c) 100% c)
c) Verification c)WQR
Qualification R

a) Inspection Report
a) Visual Defects a)Visual b) a) I
Welding a) 100% b) 50% b)Inspection
4.2 b)Weld Size Measurement AWS D1.1:2010 b) I
Inspection c) 1 Joint per day Report
c) Surface Defects c) DP Test c) I
c)Inspection Report

5.SURFACE CLEANING AND PAINTING


a) 100% b)100%
a) Surface Prepararion a)Sand Balsting and
Surface Cleaning
b)One coate Primer And Two Visualy b) a) I a) Inspection Report
5.1 And Painting As Per Client Requirement
coat Final Paint Measurement /DFT
Process

6
6.1 Inspection By FI QC TPI QC Client QC
6.2 Name

6.3 FI Date Sign TPI Date Sign Amcor Date Sign


Sign And Date