Key steps for execution 21-5-2025
Key steps for execution 21-5-2025
3 Mechanical System
10
Electrical System
11
12
13
14
Extra Low Voltage System
Extra Low Voltage System
15
SUB SYSTEMS FIRST FIX
HVAC.
Public Health.
1). Material inspection
2).Markings
Fire Fighting.
3).Hanging supports.
4). Ductwork.
VTS. 5). Piping.
IBMS.
UPS
IP Surveillance (CCTV)
WIFI
PABX
SECOND FIX THIRD FIX