The document provides a detailed breakdown of costs for various construction works including plastering, painting, and plumbing. The total cost for plaster work and floor finishing is Rs. 330,255.57, painting work totals Rs. 244,237.50, and plumbing and drainage work amounts to Rs. 189,750.00. The overall summary of costs is essential for budgeting and project management.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views2 pages

chamodi - py

The document provides a detailed breakdown of costs for various construction works including plastering, painting, and plumbing. The total cost for plaster work and floor finishing is Rs. 330,255.57, painting work totals Rs. 244,237.50, and plumbing and drainage work amounts to Rs. 189,750.00. The overall summary of costs is essential for budgeting and project management.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Srl Rate Amount

Description Unit Qty


No Rs. Cts. Rs. Cts.
A - PLASTER WORK & OTHER FLOOR FINISHING

1 DPC 3/4" tk in 1:3 cement sand finished 2 coats of hot


Sqr 4.06 5,400.00 21,924.00
tar & blinded with sand.

2 Plinth plaster 5/8" tk in 1:3 cement sand finished smooth


Sqr 4 3,500.00 14,000.00
with neat cement.

3 External plaster 5/8" tk in 1:1:5 lime cement & sand


finished semi rough with wood float including reveals in Sqr 7 3,350.00 24,589.00
ground floor.

4 Internal plaster 5/8" tk in 1:1:5 lime cement & sand


finished smooth with lime putty including reveals in Sqr 18.40 3,886.00 71,502.40
ground floor.

5 3/8" tk plastring to soffits & vertical side of beam,


column, slab, staircase in 1:3 cement sand finished Sqr 11.05 3,917.00 43,282.85
smooth with lime putty.

6 Rendering floor 3/4" tk in 1:3 cement sand finished


smooth with neat colour cement in ground floor including Sqr 18.23 4,440.00 80,932.32
staircase.

7 4" height skirting in 1:3 cement sand project to walls


finished smooth with neat colour cement including Lft 400 85.00 34,000.00
forming groove in ground floor

8 8" x 6" colour ceramic wall tiles lining to walls in bath


room area to a height of 6' - 0" from floor set in cement Sqr 1.25 19,000.00 23,750.00
sand 1:3 & 1/2" tk in ground floor.

9 12" x 8" colour ceramic non skide floor tiles paving to


bath room floor in 1:3 cement sand mortar beding 1/2" tk Sqr 0.93 17,500.00 16,275.00
in ground floor.

Total Carried To Summary 330,255.57

B - PAINTING WORK

1 Prepair & apply 2 coats of emulsion weathershield paint


and primer under coat in external wall surfaces in ground Sqr 15 2,900.00 43,500.00
floor.

2 Prepair & apply 2 coats of emulsion paint & primer under


Sqr 60.00 2,300.00 138,000.00
coat in internal wall surfaces in ground floor.

3 Prepair & apply 2 coats of emulsion paint & primer under


Sqr 20.13 2,650.00 53,331.25
coat in ground floor soffits of slab .

4 Prepair & apply 2 coats of polishing work in door &


Sqr 4.38 2,150.00 9,406.25
window surface in ground floor

Total Carried To Summary 244,237.50

Page 1
Srl Rate Amount
Description Unit Qty
No Rs. Cts. Rs. Cts.
C - PLUMBING & DRAIN LAYER

1 Supply & fix colour ceramic commode with low level


cistern flush pipe double plastic sheet cover 1/2" dia stop No 1 25,000.00 25,000.00
cock & trap etc. All complete to working order.

2 Supply & fix bidet shower with necessary specials No 1 1,000.00 1,000.00

3 Supply & fix 22" x 16" ceramic wash basin with 1/2" dia
chromium plated pillar tap 1 1/4" dia rubber plug and No 1 8,500.00 8,500.00
chromium plated waste chain & stay (pedestal type)

4 Supply & fix Al/ kitchen sink single bowle, chromium


plated swaneck tap 1 1/4" dia rubber plug and chromium No 1 6,800.00 6,800.00
plated waste chain & stay.

5 Supply & fix chromium plated 1/2"dia bib tap Nos 2 550.00 1,100.00

6 Supply & fix chromium plated 1/2"dia stop tap No 1 550.00 550.00

7 Supply & fix chromium plated 1/2"dia angle valve No 1 500.00 500.00

8 Supply & fix with 1/2", 1' - 6" long flexible hose with
Nos 3 550.00 1,650.00
necessary accessories

9 Supply & fix 3/4" dia brass gate valve No 1 550.00 550.00

10 Supply & fix chromium plated towel rail No 1 750.00 750.00

11 Supply & fix chromium plated soap tray No 1 650.00 650.00

12 Supply & fix 12" x 18" size bath room mirror No 1 3,100.00 3,100.00

13 Supply & fix 1/2" dia type 1000 PVC pipe line for internal
water services including all necessary special Lft 95.00 65.00 6,175.00

14 Supply & fix 3/4" dia type 1000 PVC pipe line for internal
Lft 50.00 95.00 4,750.00
water services including all necessary special

15 Supply & fix 1 1/4" dia type 600 PVC pipe line for waste
Lft 10.00 90.00 900.00
water line including all necessary special

16 Supply & fix 2" dia type 600 PVC pipe line for waste
water, catch pit up to main waste water line, including all Lft 20.00 400.00 8,000.00
necessary special

17 Supply & fix 4" dia type 600 PVC soil pipe with necessary
inspection bend, sewer main line from 1st floor up to
Lft 57.00 575.00 32,775.00
ground floor, sewer line connect to existing man hole.

18 Supply & fix 6" x 6" PVC catch pit in toilet & bathroom
Nos 1 2,000.00 2,000.00
floor area

19 Construction of 4' - 0" dia soakge pit all as per detail. Rate
to include 9" tk brick work, concrete work. Item Allow Sum 85,000.00

Total Carried To Summary 189,750.00