011 DAILY Observation Sheet-REPORT - Baitrani 4

The document is a daily observation report for the 2nd HL bridge project in Odisha, dated May 13, 2025. It highlights safety violations including workers not wearing helmets, poor housekeeping, and lack of proper material stacking and segregation. The report emphasizes the need for corrective actions by the contractor to ensure compliance with safety regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views2 pages

011 DAILY Observation Sheet-REPORT - Baitrani 4

The document is a daily observation report for the 2nd HL bridge project in Odisha, dated May 13, 2025. It highlights safety violations including workers not wearing helmets, poor housekeeping, and lack of proper material stacking and segregation. The report emphasizes the need for corrective actions by the contractor to ensure compliance with safety regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ODISHA BRIDGE & CONSTRUCTION CORPRATION LTD DOC. No.

OBCC/HSE/011

DEVELOPMENT OF VARIOUS PROJECTS IN ODISHA


DAILY UA/UC OBSERVATION SHEET-4
Name of Project : 2nd HL bridge ,Baitrani ,Salapada Anandapur Date: 13.05.2025
Name of the Contractor: Area/ Location
M/s Rajbir Construction Pvt Ltd ,RANCHI ANANDAPUR, KEONJHAR
Target Status
Sl No. Details of Observations Corrective Action(BY Date Open/ Close
CONTRACTOR/AGENCY)
1.

FEW PERSONS WERE FOUND WITHOUT SAFETY HELMET /HARD HAT WHILE AT HEIGHT ON DECK SLAB DURING WORK
PERIOD.. POOR HOUSEKEEPING..STAGING MATERIALS, SHUTTERING BOARDS, PIPES ,PLATES, REBARS ,RAGS , SCRAPS,
etc. CLUTTERED & RANDOMLY KEPT AT WORK AREA CREATING OBSTRUCTED ACCESS & WORK AREA..WORK AREA
WITHOUT PROPER MATERIAL STACKING AT DESIGNATED LOCATION..NO SEGREGATION, PROPER MATERIAL
ARRANGEMENTS & WORK PRACTICES FOLLOWED..NO SOFT BARRICATION/WARNING TAPES & ACCESSWAY CLEARLY
MARKED WITH DIRECTION FOR EMPLOYEES MOVEMENTS...Refer (OB&OCW 2002 rule 40,49,50,115,184,185)
J.DALAI ,
(Lead –HSE expt., pgmc ) Sign of Engineer/Supervisor
ODISHA BRIDGE & CONSTRUCTION CORPRATION LTD DOC. No. OBCC/HSE/011

DEVELOPMENT OF VARIOUS PROJECTS IN ODISHA


DAILY UA/UC OBSERVATION SHEET-4