Module 2
Module 2
(NBCx)
Module 2
CBCP® 2
CBCP_v2023.10 1
New Building Commissioning (Cx)
Scope of Commissioning
CBCP® 3
NBCx Process
Pre-Design Commissioning
Ongoing Commissioning
CBCP® 4
CBCP_v2023.10 2
Pre-design Phase
Occupancy/ Ongoing
Pre-Design Design Construction
Operations Cx
Cx Team
Deliverables:
OPR
Cx Plan
Issues Log
CBCP® 6
CBCP_v2023.10 3
Pre-Design
Pre-Design Phase
Define Cx Team
Develop initial
Cx Plan
Acceptance
Design Phase
CBCP®
CBCP® 7
Cx Team
Who Deliverables:
• Owner of a new facility to be
Creates
built OPR
it?
Cx Plan
CBCP® 8
CBCP_v2023.10 4
Request for Proposal (RFP) cont’d
Pre-Design
Cx Team
Deliverables:
Who
• Potential Cx Agents OPR
Answers?
Cx Plan
CBCP® 9
Pre-Design
Select? • Combination
• Contract negotiations
Then
• Final contract approval
What?
• Notice of Intent
CBCP® 10
10
CBCP_v2023.10 5
Cx Team: Who’s involved? Pre-Design
Pre-Design
Cx Team
11
Cx Team: Owner
Pre-Design
Cx Team
• Facility owner OR
Who? • Representative designated by Deliverables:
owner
OPR
12
CBCP_v2023.10 6
Cx Team: Commissioning
Pre-Design
Authority Cx Team
• Independent, 3rd
party Deliverables:
contractor
• Direct contract with owner OPR
Who? • Knowledge of building systems, Cx Plan
O&M procedures, equipment
testing, and design and Issues Log
construction procedures
CBCP® 13
13
Cx Team
Cx Plan
• Review designs
• Provide input to OPR Issues Log
CBCP® 14
14
CBCP_v2023.10 7
Cx Team: Design/Build Team
Pre-Design
Cx Team
• A/E firms
Deliverables:
Who? • Contractors and Sub-
contractors OPR
CBCP® 15
15
Cx Team: Org-Chart
Pre-Design
Cx Team
Deliverables:
Owner OPR
Cx Plan
Sub-
Contractors
CBCP® 16
16
CBCP_v2023.10 8
Pre-Design
Deliverables
OPR
Requirements (OPR)
Deliverables Issues Log
• Cx Plan
• Issues Log Outline
CBCP® 17
17
(OPR) Cx Team
Deliverables:
OPR
CBCP® 18
18
CBCP_v2023.10 9
OPR Criteria Pre-Design
Issues Log
Operators Tenants
Community
Managers
Reps
OPR
Owner Criteria Designers
Input
CBCP® 19
19
Cx Team
CBCP® 20
20
CBCP_v2023.10 10
OPR: Sample Outline
Pre-Design
Cx Team
Introduction
Deliverables
• Overview of project
• Why Cx? OPR
• What’s the process?
Cx Plan
Key Project Requirements
• Key requirements critical to project success Issues Log
• Requirements and goals for facility design and
performance
Objectives
• Main goals of Cx process
CBCP® 21
21
Cx Team
Budget Considerations
Issues Log
Performance Criteria
CBCP® 22
22
CBCP_v2023.10 11
Pre-Design
Deliverables
OPR
Purpose:
Cx Plan
CBCP® 23
23
Pre-Design
Deliverables
Process: OPR
Cx Plan
• Outlined in Pre-Design Phase
Issues Log
• Input from CxA, Owner, Design Team, and O&M Staff
CBCP® 24
24
CBCP_v2023.10 12
Cx Plan: Pre-Design Phase
Pre-Design
Cx Plan
CBCP® 25
25
Cx Team
Deliverables
• Design Cx Plan
• Installation
Issues Log
• Performance Issues
• Measures not in line with OPR
• Maintains record of all open and resolved issues
with necessary details
CBCP® 26
26
CBCP_v2023.10 13
Pre-Design
CBCP® 27
27
Pre-Design
CBCP® 28
28
CBCP_v2023.10 14
Issues Report
Pre-Design
Cx Team
CBCP® 29
29
Pre-Design
CBCP® 30
30
CBCP_v2023.10 15
New Building Cx Phases
Occupancy/ Ongoing
Pre-Design Design
Design Construction Operations Cx
Cx Team BoD
Cx Process
OPR Requirements
Construction
Cx Plan Checklists
Systems Manual
Outline
Issues Log
Training
Requirements
DesignSbmittals
Design Submittals
Acceptance
CBCP® 31
31
Design
Design Phase
Cx Plan Update
Acceptance
Construction
Phase
CBCP® 32
32
CBCP_v2023.10 16
Basis of Design (BoD)
Design
BoD
Update Cx Plan
Cx Process
Reqs
Acceptance
CBCP® 33
33
BoD
Design
BoD
• Developed and updated throughout Design
Update Cx Plan
Phase Cx Process
Reqs
• Submitted with each design submission Construction
Checklists
• Narrates the reasoning and decisions made Systems
Manual Outline
during each design to meet OPR
Training
Reqs
• Documents any OPR criterion not met and its Design
Submittals
impact to the OPR
Acceptance
CBCP® 34
34
CBCP_v2023.10 17
BoD: What’s Included?
Design
BoD
Systems
• Calculations and • Owner’s guidelines Manual Outline
analytical procedures • Specific descriptions of Training
Reqs
• Environmental factors systems & assemblies Design
Submittals
• Narratives • Consultant, Acceptance
engineering, and
architectural strategies
CBCP® 35
35
BoD
Systems & Assemblies to be
Tested and Verified Update Cx Plan
Cx Process
Schedule of Construction and Reqs
Occupancy Phase Activities Construction
Checklists
What’s Systems
New Responsibilities of Cx Manual Outline
Changed? Team Members
Training
Reqs
New/Updated Required Design
Documentation and Submittals
Communication Acceptance
CBCP® 36
36
CBCP_v2023.10 18
Cx Process Requirements in the
Design
Update Cx Plan
Cx Process
Reqs
CxA is responsible for verifying that the Construction
Checklists
commissioning scope of work for the Systems
contractors, vendors, specialty Manual Outline
associated costs.
CBCP® 37
37
Design
Construction Checklists
BoD
Cx Process
• Documents and verifies: Reqs
Construction
Checklists
• Correct installation
Systems
Manual Outline
• Integration with systems
Training
Reqs
• Safe and ready to operate Design
Submittals
against OPR
CBCP® 38
38
CBCP_v2023.10 19
Construction Checklists: What’s
Design
Included BoD
Acceptance
Negative Response
• Space to record any issues and corrective actions
CBCP® 39
39
Design
CBCP® 40
40
CBCP_v2023.10 20
Design
BoD
Update Cx Plan
Cx Process
Systems
Manual Outline
Training
Reqs
Design
Submittals
Acceptance
CBCP® 41
41
Design
BoD
Update Cx Plan
Cx Process
Reqs
Construction
Checklists
Systems
Manual Outline
Training
Reqs
Design
Submittals
Acceptance
CBCP® 42
42
CBCP_v2023.10 21
Design
BoD
Update Cx Plan
Cx Process
Reqs
Construction
Checklists
Systems
Manual Outline
Training
Reqs
Design
Submittals
Acceptance
CBCP® 43
43
Design
BoD
Update Cx Plan
Cx Process
Reqs
Construction
Checklists
Systems
Manual Outline
Training
Reqs
Design
Submittals
Acceptance
CBCP® 44
44
CBCP_v2023.10 22
Design
BoD
Update Cx Plan
Cx Process
Reqs
Construction
Checklists
Systems
Manual Outline
Training
Reqs
Design
Submittals
Acceptance
CBCP® 45
45
Design
BoD
Update Cx Plan
Cx Process
Reqs
Construction
Checklists
Systems
Manual Outline
Training
Reqs
Design
Submittals
Acceptance
CBCP® 46
46
CBCP_v2023.10 23
Systems Manual
Design
BoD
Cx Process
• Continually updated throughout the project Reqs
Construction
Checklists
Systems
Compilation of all documentation Manual Outline
CBCP® 47
47
Design
Systems
documents, specs, and • Cx Process Reports Manual Outline
logs, etc.
CBCP® 48
48
CBCP_v2023.10 24
System Manual: Outline
Design
BoD
Introduction
Update Cx Plan
• Summarize key parts of manual
• Facility description Cx Process
Reqs
Facility Design Construction
• OPR Checklists
• BoD Systems
• Building designs, schematics, and as-builts, etc Manual Outline
Training
Information for Commissioned Systems and Equipment Reqs
• Equipment specifications Design
• Approved submittals including final controls sequences of Submittals
operation (SOO)
Acceptance
• Manufacturer’s operation and maintenance (O&M) data
• Warranties
• Contractors & suppliers listing and contact information
CBCP® 49
49
Design
CBCP® 50
50
CBCP_v2023.10 25
Training Requirements
Design
BoD
Acceptance
CBCP® 51
51
BoD
personnel. Reqs
Design
• The number and type of training sessions. Submittals
Acceptance
• Describe specific skills and knowledge that
the participant is expected to master.
CBCP® 52
52
CBCP_v2023.10 26
Training Requirements cont’d
Design
BoD
Update Cx Plan
Systems
Manual Outline
Troubleshooting Maintenance and Repair
inspection Training
procedures procedures procedures Reqs
Design
Submittals
CBCP® 53
53
Design
Review of Submittals
BoD
Update Cx Plan
• CxA is responsible for review of Cx Process
construction design submittals Reqs
Construction
• Understand purpose of submittal Checklists
CBCP® 54
54
CBCP_v2023.10 27
Design
Update Cx Plan
Cx Process
Reqs
Select Provide Construction
Request Review Checklists
Sample Comment
Submittals Submittals
Group Report Systems
Manual Outline
Training
Reqs
Design
Submittals
Acceptance
CBCP® 55
55
Review of Submittals
Design
BoD
Update Cx Plan
Request Submittals
teams, and A/E Checklists
Acceptance
Select Provide
Review
Request Submittals Sample Comment
Submittals
Group Report
CBCP® 56
56
CBCP_v2023.10 28
Review of Submittals
Design
BoD
Acceptance
Select Provide
Review
Request Submittals Sample Comment
Submittals
Group Report
CBCP® 57
57
Review of Submittals
Design
BoD
Update Cx Plan
• Is the documentation
Cx Process
complete? Reqs
Acceptance
Select Provide
Review
Request Submittals Sample Comment
Submittals
Group Report
CBCP® 58
58
CBCP_v2023.10 29
Review of Submittals
Design
BoD
Acceptance
Select Provide
Review
Request Submittals Sample Comment
Submittals
Group Report
CBCP® 59
59
Cx Process
• The Cx Process should include the formal Reqs
acceptance by the Owner of the BoD and the Construction
Checklists
updated OPR during the Design Phase,
following review and comment by the CxA. Systems
Manual Outline
Training
Documentation Requirements Reqs
Design
• Construction document commissioning Submittals
CBCP® 60
60
CBCP_v2023.10 30
Deliverables: Design Phase
Design
CBCP® 61
61
Cx Process
Verify Submittals
OPR Requirements
Construction
Test Procedures
Cx Plan Checklists
Systems Manual
Verify Systems
Outline
Issues Log
Training
Systems Manual
Requirements
DesignSbmittals
Design Submittals Verify Training
Acceptance Acceptance
CBCP® 62
62
CBCP_v2023.10 31
Construction
Phase Construction
Kick-off Meeting
Complete
Construction Develop FPTs Perform Training
Checklists
Update Cx Plan
Acceptance
Occupancy
Phase
CBCP® 63
63
Update OPR
Construction
Update OPR
CBCP® 64
64
CBCP_v2023.10 32
Update Cx Plan
Construction
CBCP® 65
65
Construction
Update Cx Plan
Systems
• Discuss roles & responsibilities Manual
Verify
Training
• Review schedule
Acceptance
CBCP® 66
66
CBCP_v2023.10 33
Construction
Update Cx Plan
Test
• Tasks are time consuming Procedures
Verify Systems
Acceptance
CBCP® 67
67
Systems to be Commissioned
Construction
Update OPR
Phase Verify
Submittals
Acceptance
CBCP® 68
68
CBCP_v2023.10 34
Systems: What’s Included?
Construction
Update OPR
• Lighting Test
Procedures
• Lighting controls (scheduling, sensors, and Verify Systems
daylighting, etc)
Systems
• Building envelope/Enclosure Manual
Verify
• Refrigeration Training
transfer switches
• Uninterruptible power supply systems (UPS)
CBCP® 69
69
• Electrical Test
Procedures
• Security Acceptance
• Irrigation
CBCP® 70
70
CBCP_v2023.10 35
Construction
Update Cx Plan
Verify
• Sample 5% to 10% of the Submittals
submittal Test
Procedures
• If deviations are substantial, Verify Systems
Key review an additional 5% to
Systems
Points 10% Manual
CBCP® 71
71
Update Cx Plan
Verify
• Cx Team member reviews Submittals
Systems
Points • Review the systems manual Manual
CBCP® 72
72
CBCP_v2023.10 36
Functional Performance Tests Construction
Systems
Manual
Who’s Responsible? Verify
Training
• Developed and managed by CxA Acceptance
CBCP® 73
73
FPTs: Development
Construction
CBCP® 74
74
CBCP_v2023.10 37
FPTs: Ready to Test?
Construction
Update OPR
Update Cx Plan
Verify Systems
CBCP® 75
75
Test
• CxA checks for proper testing and form Procedures
Systems
Manual
Tip: Walk through FPTs and Checklists with Verify
Acceptance
are clear on all tests and know to distribute
sections to appropriate sub-contractors
if necessary.
CBCP® 76
76
CBCP_v2023.10 38
FPTs: Test Results
Construction
Update OPR
Test
under different conditions? Procedures
Verify Systems
• Document results Systems
• Consider reason for failure Manual
Verify
correction
• Re-test until corrected
CBCP® 77
77
FPTs: Sampling
Construction
Update OPR
scope Systems
Manual
CBCP® 78
78
CBCP_v2023.10 39
FPTs: Sampling Construction
Recommendations
Update OPR
CBCP® 79
79
Test
Procedures
Population
4 8 12 16 20 25 30 35 40 45 50 60 70 90 100 125
Size Verify Systems
Sample Systems
4 6 8 9 10 11 11 12 12 13 13 14 14 15 15 16
Size, n Manual
Verify
Training
Acceptance
CBCP® 80
80
CBCP_v2023.10 40
Construction
Update OPR
Update Cx Plan
Verify Systems
Systems
Manual
Verify
Training
Acceptance
CBCP® 81
81
Construction
BINARY INPUTS
DESCRIPTION POINT NAME AS FOUND ON/OPEN OFF/CLOSED PASS/FAIL INITIALS DATE NOTES
Supply Fan Status OFF
OFF
ANALOG OUTPUTS
DESCRIPTION POINT NAME FAIL STATE 0% CMD 50% CMD 100% CMD PASS/FAIL DATE NOTES
Outside Air Damper Position 0%
Return Air Damper Position 100%
HW Valve Position 0%
CHW Valve Position 0%
CBCP® 82
82
CBCP_v2023.10 41
Construction
ANALOG INPUTS
DESCRIPTION POINT NAME BAS VALUE MEASURED UNITS TOLERANCE ERROR CALIBRATE PASS/FAIL DATE NOTES
Discharge Air Temperature °F
Return Air Temperature °F
Mixed Air Temperature °F
Space Temperature °F
CBCP® 83
83
Construction
CBCP® 84
84
CBCP_v2023.10 42
Verify Systems & Assemblies Construction
• Document identified
installation problems • Update the Issues and
Resolution Log
CBCP® 85
85
Update OPR
Test Procedures and test data records
Update Cx Plan
Training plans
Verify
Training records Submittals
CBCP® 86
86
CBCP_v2023.10 43
Training Construction
Verify
Efficient Submittals
Operation Test
Procedures
Reduced Verify Systems
Energy Cost
Systems
& Longer Manual
Equipment Verify
Training
Life!
Acceptance
Proper
Maintenance
CBCP® 87
87
Training: Tips
Construction
Update OPR
CBCP® 88
88
CBCP_v2023.10 44
Training: Documentation Construction
Update OPR
Acceptance
CBCP® 89
89
Acceptance
CBCP® 90
90
CBCP_v2023.10 45
Construction
CBCP® 91
91
cont’d
CBCP® 92
92
CBCP_v2023.10 46
New Building Cx Phases
Occupancy/
Occupancy/ Ongoing
Pre-Design Design Construction
Operations
Operations Cx
Acceptance Acceptance
CBCP® 93
93
Occupancy
Phase
Update
Issues Log
Final
Cx Plan
Final
Systems Manual
Acceptance
Ongoing
Commissioning
CBCP® 94
94
CBCP_v2023.10 47
Deferred and Seasonal Testing
Occupancy/
Operations
Deferred
Testing
System
Lessons Learned
loading or outdoor conditions not
available during the Construction Phase Final Cx Report
Final Systems
testing
• Other tests not able to be completed
during the Construction Phase
CBCP® 95
95
Deferred
Testing
System
Optimization
Final Cx Report
• May require contractor callbacks
Final Systems
Manual
• Update Issues Log
CBCP® 96
96
CBCP_v2023.10 48
System Optimization Occupancy/
Operations
Deferred
Testing
CBCP® 97
97
Deferred
Testing
CBCP® 98
98
CBCP_v2023.10 49
Cx Report: Occupancy Phase
Occupancy/
Operations
Deferred
Testing
System
Final Optimization
Cx Process Plan
Lessons Learned
Summary of
Optimization Efforts
Plan for
Ongoing Commissioning
CBCP® 99
99
Deferred
Introduction Testing
System
• General Building Information Optimization
Lessons Learned
Overview
Final Cx Report
Management Plan
CBCP® 100
100
CBCP_v2023.10 50
Final Cx Report: Outline cont’d Occupancy/
Operations
Deferred
Testing
Lessons Learned
• Scoping meeting (OPR)
• Project schedule Final Cx Report
CBCP® 101
101
Deferred
Testing
System
• Updated and Delivered during Optimization
Final Cx Report
• Include deferred testing results Final Systems
Manual
• Include additional training provided
• Update with changes to building
functions/operations
CBCP® 102
102
CBCP_v2023.10 51
Occupancy/
Design Teams,
Final Owner,
CxA Contractors,
Systems Manual O&M Staff
O&M Staff
CBCP® 103
103
Occupancy/ Ongoing
Ongoing
Pre-Design Design Construction Operations Cx
Cx
CBCP® 104
104
CBCP_v2023.10 52
Ongoing Commissioning Ongoing
Cx
CBCP® 105
105
• Training of staff
• New staff members
• New equipment or operating schedules
• Updates to Systems Manual
• Change in occupancy schedules
• New installation/replacement of equipment
• Change in facility use
• Benchmarking of facility energy performance
• Compared to similar buildings
• Compared to prior performance
CBCP® 106
106
CBCP_v2023.10 53
Appendix M2.1: Definitions
Acceptance
Architect/Engineer (A/E)
CBCP® 107
107
• Standards and goals developed to compare the building’s energy use and
performance with similar buildings.
Commissioning Authority/Agent
Commissioning Plan
CBCP® 108
108
CBCP_v2023.10 54
Appendix M2.1: Definitions cont’d
Commissioning Team
• The team is consisted of CxA, Owner, A/E, Construction
Manager/General Contractor, Sub-Contractors, Maintenance and
Operations Personnel as well as Occupants.
Construction Checklists
• Contractor and CxA use this form to confirm that appropriate components are
on-site, ready for installation, correctly installed, set up, calibrated and functional.
CBCP® 109
109
Issues Log
• Formal and on-going record of problems or concerns and resolutions raised by
members of the commissioning team during the course of the commissioning
process.
CBCP® 110
110
CBCP_v2023.10 55
Appendix M2.1: Definitions cont’d
• Contracting and managing authority for the Owner, who supervises the
design and/or construction of the project.
Systems Manual
CBCP® 111
111
CBCP® 112
112
CBCP_v2023.10 56
Appendix M2.2: Industry Guidelines,
cont.
• PECI (Portland Energy Conservation Institute)
www.peci.org
• NEBB (National Environmental Balancing Bureau)
www.nebb.org
• Energy Star
www.energystar.gov
https://www.ashrae.org/technical-resources/bookstore/commissioning-essentials
CBCP® 113
113
End