Construction contractors are usually equally skilled at performing all maintenance tasks
Maintenance is often reduced through project designs that provide in- place spares for all rotating equipment
and heat exchangers
Reliability Centered Maintenance can be applied on capital projects in the pre-construction stage to determine
the maintenance plan
Most mechanics can easily alternate between doing capital project work and doing equipment diagnosis and
repair work
Illustration :
Illustration :
Maintainability analysis
Illustration :
Illustration :
500 hours
0.01 hours
2500 hours
100 hours
Illustration :
Sales/Customer/Production/Supplier/Senior Management
Maintenance/Engineering/Production/Human Resources
Production/Maintenance/Supplier/Engineering
Illustration :
Illustration :
Illustration :
Illustration :
Illustration :
Schedule compliance - how often mechanics are pulled off their current work to another task
Illustration :
Illustration :
Illustration :
Illustration :
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
20-50 %
over 50%
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
85% or more
0.5
Illustration :
True
False
True
False
Illustration :
True
False
Illustration :
10
15
20 or more
Illustration :
Illustration :
MTTR
MTBF
Both
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
Illustration :
True
False
Illustration :
True
False
Illustration :
Less than 2
Between 4-6
Over 6
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
True
False
Illustration :
Design
Acquisition
0&M
Illustration :
After installation
During operations
During design
Illustration :
Illustration :
MTBF
MTTR
MTBMA
Illustration :
MTBF
MTTR
Uptime
Illustration :
Number of failures
MTBF
MTTR
Uptime
Illustration :
Operations phase
Maintenance phase
Design phase
Illustration :
True
False
Illustration :
Real-time data
Oil analysis
Project schedules
Optimizes strategies
Illustration :
Penalties
Illustration :
Push
Pull
Feedback
management
Illustration :
2500 hours
200 hours
0.005 hours
5000 hours
Illustration :
decrease
increase
remains constant
Is undefined
Illustration :
None of these
Illustration :
Ishikawa Diagram
Weibull Chart
Pareto Diagram
Illustration :
Illustration :
Inclusion
Paraphrasing
Gatekeeping
Compartmentation
Illustration :
None of these
Illustration :
Recordable injury
First aid
No injury
Lost time
Illustration :
Control Charts
Risk analysis
Failure analysis
Illustration :
The maintainer
The user
The management
The operator
Illustration :
Illustration :
Cost
Maintenance Procedures
Salary
Frequent Rework
Illustration :
Illustration :
0.9835
0.9767
0.9311
0.9001
Illustration :
Illustration :
Insufficient attention
Management disengagement
Illustration :
Fishbone Diagram
Illustration :
Illustration :
0.999999991
0.9314
0.9409
Illustration :
Improve planning and scheduling to increase wrench time (tool turning time}
Inform management that four hours wrench time (tool turning time) per day is considered good
investigate the barriers causing loss of wrench time (tool turning time)
Illustration :
Illustration :
Increasing the quantity and quality of maintenance cannot improve system reliability beyond the designed
standard
A reliable system can be designed from unreliable components if enough redundancy is built in
Highly accelerated stress screening without design changes can improve reliability of systems
Illustration :
0.6
0.15
0.3
0.8
Illustration :
Operating cost
Illustration :
Illustration :
Illustration :
Illustration :
The operations manager failed to notify the maintenance manager about the issue of bearing noise
Maintenance technician failed to notice and diagnose the bearing noise due to lack of skills
The planning department was not informed to create a work order to address the bearing noise
Operations were mounting too much pressure so there was no time to complete the work
Illustration :
Illustration :
700
1200
350
600
Illustration :
Forming
Norming
Storming
Performing
Illustration :
Dissolve the reliability team and rehire more experienced maintenance and reliability engineers or specialists
making sure they follow the company rules and regulations to avoid conflicts
Step back and allow team members to go through the steep learning curve. Avoid resolving any conflicts until
members officially report to HR ,
Delegate tasks and projects to the team members who are problematic to keep them busy. Ensure that they are
given stretched targets that will boost their morale and cause them to cooperate with other team members
Establish process and structures for the team, building trust and good relationship between team members.
Ensuring that conflicts are resolved swiftly
Illustration :
The Production Department has added a third production shift to meet increased sales. The new shift will be
staffed mostly of new employees whose training consists of two weeks working with the dayshift. Adding the
third shift also increases equipment operating hours by 50%
The Maintenance Department has assumed responsibility for the maintenance of the equipment in a small
production line acquired after the buyout of a smaller competitor. The competitor uses equipment that is
different from the company's existing equipment
A custom-made production machine, critical to meeting production requirements, has failed for the third time
in six months , The Maintenance Department has carefully inspected the machine after each failure, and each
failure has been attributed to a loss of lubrication of the machine's bearing
Corporate downsizing has reduced the staff of the Maintenance Department to two reliability technicians and
two supervisors for each craft (trade). These foremen will now manage contracted maintenance crews for all
plant (facility) maintenance activities
Illustration :
Make organizational meeting to plan, train far; and implement change mandatory, but make participation
voluntary to avoid alienating employees who dislike change
Issue a directive on the revised process or program, start it and require compliance by a specific date, then
begin training as soon as possible thereafter
Announce the new process or program, issue a draft directive for review and comment. Then issue the final
with a specific compliance date, and employee review comments and recommendations incorporated to the
maximum extent possible to get a buy-in
Involve key personnel in the planning and development of the new process or program directives, train affected
personnel, and then implement before a specified compliance date
Illustration :
Illustration :
Warming/Swarming/Absorbing/Norming
Forming/Storming/Norming/performing
Forming/Absorbing/Storming/Performing
Warming/Absorbing/Performing/Norming
Illustration :
The maintenance manager made a unilateral decision that it was time to do the outage
The maintenance manager did not know if the production manager had communicated the plan to the shift
leader
The maintenance manager did not know if the production manager received his email communication
The maintenance manager did not know if the production schedule allowed for the planned downtime
Illustration :