0% found this document useful (0 votes)
28 views112 pages

Exam 01 Cmrp

The document is an exam consisting of multiple-choice questions related to maintenance and reliability concepts. It covers topics such as maintenance strategies, performance metrics, and best practices in asset management. Each question includes options with the correct answer indicated.

Uploaded by

Javed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views112 pages

Exam 01 Cmrp

The document is an exam consisting of multiple-choice questions related to maintenance and reliability concepts. It covers topics such as maintenance strategies, performance metrics, and best practices in asset management. Each question includes options with the correct answer indicated.

Uploaded by

Javed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 112

EXAM 01

1 out of 110 Remaining Time | 00:00:00

One of the following is generally true? ( Marks : 1 Mark )

Construction contractors are usually equally skilled at performing all maintenance tasks

Maintenance is often reduced through project designs that provide in- place spares for all rotating equipment
and heat exchangers

Reliability Centered Maintenance can be applied on capital projects in the pre-construction stage to determine
the maintenance plan

Most mechanics can easily alternate between doing capital project work and doing equipment diagnosis and
repair work

Illustration :

The correct answer is (c)

Show Answer Next


2 out of 110 Remaining Time |
00:00:00
What are the three most significant constraints when developing a Maintenance and Reliability organization? ( Marks : 1 Mark )

Culture / People / Resources

Budget / Operations / People

Engineering / Human Resources / Budget

Culture / Engineering / Budget

Illustration :

The correct answer is (a)

Prev. Show Answer Next


3 out of 110 Remaining Time |
00:00:00
Wei bull (life data) analysis is primarily used for: ( Marks : 1 Mark )

Maintainability analysis

Probability of failure determination

Life-cycle cost analysis

On time ratio calculations

Illustration :

The correct answer is (b)

Prev. Show Answer Next


4 out of 110 Remaining Time |
00:00:00
A targe manufacturing company installed some asset monitoring device on some large motors that were deemed critical
equipment. The monitoring devices provide engineering with vibration data, acoustic data, as well as operational performance
data. What asset management strategy has the company selected for the motors? ( Marks : 1 Mark )

OBM (Operational Based Maintenance/CM (Corrective Maintenance)

PM (Preventive Maintenance/OBM Operator Based Maintenance)

CBM (Conditioned Based Maintenance)/PDM (Predictive Maintenance)

CBM (Condition Based Maintenance/CM (Corrective Maintenance)

Illustration :

The correct answer is (C)

Prev. Show Answer Next


5 out of 110 Remaining Time |
00:00:00
If a machine is run for 500 hours and five failures are observed during this period, what is the Mean Time Between Failure? (
Marks : 1 Mark )

500 hours

0.01 hours

2500 hours

100 hours

Illustration :

The correct answer is (b)

Prev. Show Answer Next


6 out of 110 Remaining Time |
00:00:00
Which of the following most effectively makes up the members of a Manufacturing Team? ( Marks : 1 Mark )

Sales/Customer/Production/Supplier/Senior Management

Maintenance/Engineering/Production/Human Resources

Production/Maintenance/Supplier/Engineering

Senior Management/Production/Human Resources

Illustration :

The correct answer is (c)

Prev. Show Answer Next


7 out of 110 Remaining Time |
00:00:00
A skills audit is undertaken to: ( Marks : 1 Mark )

Help an organization understand skills in its industry.

Help an organization understand skills it requires.

Benchmark skills against other companies

Develop employee training plans for the next year.

Illustration :

The correct answer is (b)

Prev. Show Answer Next


8 out of 110 Remaining Time |
00:00:00
Of the following, what is the best method for measuring employee skills and training? : ( Marks : 1 Mark )

Maintain a skills inventory and tracking database

Ask employees to keep a training notebook

Keep records of all forma! training courses taken

Have employees complete annual self- evaluations

Illustration :

The correct answer is (a)

Prev. Show Answer Next


9 out of 110 Remaining Time |
00:00:00
When training maintenance workers, it is best to first: ( Marks : 1 Mark )

List all the tasks the workers need to perform

Check the budget to set how much to spend per worker

Review the list of classes already taken by the workers

Give classes to all workers on basic skills

Illustration :

The correct answer is (a)

Prev. Show Answer Next


10 out of 110 Remaining Time |
00:00:00
What relationship should Maintenance and Reliability Teams have with customers and suppliers for optimum effectiveness? (
Marks : 1 Mark )

Purchasing should be the only communicators with suppliers

Management should be the only communicators with customers and suppliers

Team members should be involved in communicating with customers and suppliers

Sales should be the only department communicating with customers

Illustration :

The correct answer is (c)

Prev. Show Answer Next


11 out of 110 Remaining Time |
00:00:00
Which of the following metrics definitions is not accurate? ( Marks : 1 Mark )

Uptime - % of time you run producing quality product at design rate

Schedule compliance - how often mechanics are pulled off their current work to another task

MTBF - a measure or indicator of equipment life expectancy

Backlog - how long it takes to fix broken equipment

Illustration :

The correct answer is (d)

Prev. Show Answer Next


12 out of 110 Remaining Time |
00:00:00
Which of the following does not support people development? ( Marks : 1 Mark )

Providing feedback only when asked

Defining result areas, goals, and measurements

Coaching, feedback, and encouragement

Defining training and skills goals

Illustration :

The correct answer is (a)

Prev. Show Answer Next


13 out of 110 Remaining Time |
00:00:00
From the following list, which is not a critical structural element of a strategic plan for maintenance and reliability? ( Marks : 1
Mark )

Current levels of performance

Benefits available through implementation

Historical direction of the business

Vision of the future state

Illustration :

The correct answer is (c)

Prev. Show Answer Next


14 out of 110 Remaining Time |
00:00:00
Which performance result best shows a maintenance and reliability manager that the scheduled maintenance activities being
implemented are effective? ( Marks : 1 Mark )

Hours spent on unscheduled maintenance have decreased

Maintenance cost per unit of production has decreased

Total annual maintenance cost has decreased

Production rate has increased

Illustration :

The correct answer is (a)

Prev. Show Answer Next


15 out of 110 Remaining Time |
00:00:00
When the time period between the testing which detects a failure, for failures with significant economic consequences, and
when life expectancy is highly variable, a good approach is ( Marks : 1 Mark )

More frequent periodic predictive testing

Structured preventive maintenance

On-line condition monitoring

Time based rebuild or change out

Illustration :

The correct answer is (c)

Prev. Show Answer Next


16 out of 110 Remaining Time |
00:00:00
Best Practices are practices that are defined and applied by an organization. They may or may not be proven, but results are
found to be acceptable. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


17 out of 110 Remaining Time |
00:00:00
Maintainability is measured by PM schedule compliance. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


18 out of 110 Remaining Time |
00:00:00
All maintenance personnel's time is covered by work orders, ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


19 out of 110 Remaining Time |
00:00:00
Operations and Maintenance work as a team to achieve Improved OEE , ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


20 out of 110 Remaining Time |
00:00:00
Best practices would indicate that 90 % or more of all maintenance work is planned , ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


21 out of 110 Remaining Time |
00:00:00
100% of PM and PdM tasks should be developed using FMEA/RCM methodology , ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


22 out of 110 Remaining Time |
00:00:00
Utilization of Assets in a world-class facility should be above 93%, ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


23 out of 110 Remaining Time |
00:00:00
100% of maintenance personnel's (craft) time should be scheduled. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


24 out of 110 Remaining Time |
00:00:00
Time-based PMs should be less than 20% of all PMs. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


25 out of 110 Remaining Time |
00:00:00
The 10% rule of PM is applied on critical assets, ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


26 out of 110 Remaining Time |
00:00:00
Most emergency work orders should be written by production , ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


27 out of 110 Remaining Time |
00:00:00
It is a common practice for Operators to perform PMs. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


28 out of 110 Remaining Time |
00:00:00
P-F interval can be applied to visual inspections. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


29 out of 110 Remaining Time |
00:00:00
Understanding of a P-F curve should help in optimizing PM frequency. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


30 out of 110 Remaining Time |
00:00:00
The best method of measuring the Reliability of an asset is by counting downtime events. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


31 out of 110 Remaining Time |
00:00:00
The primary purpose of scheduling is to coordinate maintenance jobs for greatest utilization of the maintenance resources . (
Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


32 out of 110 Remaining Time |
00:00:00
What percentage of your assets should be ranked critical based on the risk to business? . ( Marks : 1 Mark )

Less than 20%

20-50 %

over 50%

Illustration :

The correct answer is (a)

Prev. Show Answer Next


33 out of 110 Remaining Time |
00:00:00
Vibration monitoring can detect uniform impeller wear. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


34 out of 110 Remaining Time |
00:00:00
Understanding the known and likely causes of failures can help design a maintenance strategy for an asset to prevent or predict
failure. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


35 out of 110 Remaining Time |
00:00:00
Reliability can be improved easily after a maintenance plan has been put into operation . ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


36 out of 110 Remaining Time |
00:00:00
What percentage of maintenance work should be proactive? ( Marks : 1 Mark )

85% or more

0.5

Illustration :

The correct answer is (b)

Prev. Show Answer Next


37 out of 110 Remaining Time |
00:00:00
MTBF is measured by operating time divided by the number of failures of an asset . ( Marks : 1 Mark )

True

False

Prev. Show Answer Next


38 out of 110 Remaining Time |
00:00:00
Maintenance cost will decrease as reliability increases. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


39 out of 110 Remaining Time |
00:00:00
The 'F" on the P-F Interval indicates that equipment is still functioning . ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


40 out of 110 Remaining Time |
00:00:00
A rule of thumb is that on average, an experienced planner can plan work for how many craft people? ( Marks : 1 Mark )

10

15

20 or more

Illustration :

The correct answer is (b)

Prev. Show Answer Next


41 out of 110 Remaining Time |
00:00:00
Which of the following is not a primary objective for implementing Planning and Scheduling? ( Marks : 1 Mark )

Reduce reactive work

Prevent delays during the maintenance process

Mesh the production schedule and the maintenance schedule

Illustration :

The correct answer is (c)

Prev. Show Answer Next


42 out of 110 Remaining Time |
00:00:00
The best method of measuring the reliability of an asset is by ( Marks : 1 Mark )

MTTR

MTBF

Both

Illustration :

The correct answer is (b)

Prev. Show Answer Next


43 out of 110 Remaining Time |
00:00:00
With the exception of emergency work orders,P&5 will benefit all maintenance work : ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


44 out of 110 Remaining Time |
00:00:00
Leading KPIs predict results : ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


45 out of 110 Remaining Time |
00:00:00
The 6th 5 in the 6 5 (also called 5 S plus) process stands for safety. : ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


46 out of 110 Remaining Time |
00:00:00
RCM stands for : ( Marks : 1 Mark )

Regimented Centers of Maintenance

Reliability Centered Maintenance

Reliable Centers of Maintenance (uses best practices)

Illustration :

The correct answer is (b)

Prev. Show Answer Next


47 out of 110 Remaining Time |
00:00:00
The objective of RCM is to preserve functions, ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


48 out of 110 Remaining Time |
00:00:00
An MRO storeroom shouldn't be stocking parts for emergencies. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


49 out of 110 Remaining Time |
00:00:00
The inventory turnover ratio for MRO store should be ( Marks : 1 Mark )

Less than 2

Between 4-6

Over 6

Illustration :

The correct answer is (a)

Prev. Show Answer Next


50 out of 110 Remaining Time |
00:00:00
PM compliance is a lagging kPI, ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


51 out of 110 Remaining Time |
00:00:00
Quality is one key component of OEE. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


52 out of 110 Remaining Time |
00:00:00
Reliability and Maintainability can only be designed in ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


53 out of 110 Remaining Time |
00:00:00
Creating a reliability culture from a reactive mode can be accomplished in a short period of time if enough resources are made
available ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


54 out of 110 Remaining Time |
00:00:00
Karl Fischer's Coulometric Titration Method is an effective technique to determine the metallic content (in PPM) in an oil
sample. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


55 out of 110 Remaining Time |
00:00:00
An IR thermography window is an effective method to satisfy NFPA 70E arc Nash requirements ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


56 out of 110 Remaining Time |
00:00:00
FMEA is applicable only to assets currently in use. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


57 out of 110 Remaining Time |
00:00:00
RCM methodology can't be used effectively on new systems being designed. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


58 out of 110 Remaining Time |
00:00:00
Properly training the M&R workforce can increase asset and plant availability. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


59 out of 110 Remaining Time |
00:00:00
TPM is a type of maintenance performed by the operators. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


60 out of 110 Remaining Time |
00:00:00
Lagging KPIs are the results of a process. ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


61 out of 110 Remaining Time |
00:00:00
EOQ improves the inventory turn ratio ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


62 out of 110 Remaining Time |
00:00:00
New incoming oil from the supplier is always clean and ready to be used ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (b)

Prev. Show Answer Next


63 out of 110 Remaining Time |
00:00:00
Which phase of asset life cycle has the highest cost? ( Marks : 1 Mark )

Design

Acquisition

0&M

Illustration :

The correct answer is (c)

Prev. Show Answer Next


64 out of 110 Remaining Time |
00:00:00
Most of the maintenance costs are fixed ( Marks : 1 Mark )

After installation

During operations

During design

Illustration :

The correct answer is (c)

Prev. Show Answer Next


65 out of 110 Remaining Time |
00:00:00
RCM provides best results when used ( Marks : 1 Mark )

During Operation /Production

During Design / development

After asset has failed or keeps failing

Illustration :

The correct answer is (b)

Prev. Show Answer Next


66 out of 110 Remaining Time |
00:00:00
How soon we can restore an asset is measured by (Marks : 1 Mark)

MTBF

MTTR

MTBMA

None of the above

Illustration :

The correct answer is (b)

Prev. Show Answer Next


67 out of 110 Remaining Time |
00:00:00
Availability is a function of ( Marks : 1 Mark )

MTBF

MTTR

Uptime

Uptime and downtime

Illustration :

The correct answer is (b)

Prev. Show Answer Next


68 out of 110 Remaining Time |
00:00:00
The failure rate of a component / asset can be calculated by knowing ( Marks : 1 Mark )

Number of failures

MTBF

MTTR

Uptime

Illustration :

The correct answer is (b)

Prev. Show Answer Next


69 out of 110 Remaining Time |
00:00:00
Most benefit of a Failure Mode and Effect Analysis occurs during ( Marks : 1 Mark )

Operations phase

Maintenance phase

Design phase

None of the above

Illustration :

The correct answer is (c)

Prev. Show Answer Next


70 out of 110 Remaining Time |
00:00:00
PM schedule compliance should be equal or greater than 95% ( Marks : 1 Mark )

True

False

Illustration :

The correct answer is (a)

Prev. Show Answer Next


71 out of 110 Remaining Time |
00:00:00
Condition-based maintenance (CBM) is a superior method of equipment maintenance used to prioritize and optimize
maintenance resources and strategies using: ( Marks : 1 Mark )

Real-time data

Oil analysis

Project schedules

Optimizes strategies

Illustration :

The correct answer is (a)

Prev. Show Answer Next


72 out of 110 Remaining Time |
00:00:00
Progressive discipline is a disciplinary system that applies : ( Marks : 1 Mark )

Penalties

System discipline dispute

Feedback from coworker

Two-way between management and subordinate

Illustration :

The correct answer is (d)

Prev. Show Answer Next


73 out of 110 Remaining Time |
00:00:00
The technique which the Shop floor supply work when they get the work order request when needed, : ( Marks : 1 Mark )

Push

Pull

Feedback

management

Illustration :

The correct answer is (b)

Prev. Show Answer Next


74 out of 110 Remaining Time |
00:00:00
If a machine is running for 1000 hours and five failures are observed during this period what is the Mean Time Between
Failure?: ( Marks : 1 Mark )

2500 hours

200 hours

0.005 hours

5000 hours

Illustration :

The correct answer is (b)

Prev. Show Answer Next


75 out of 110 Remaining Time |
00:00:00
With series systems, reliability …………………….. as the number of components increase. ( Marks : 1 Mark )

decrease

increase

remains constant

Is undefined

Illustration :

The correct answer is (a)

Prev. Show Answer Next


76 out of 110 Remaining Time |
00:00:00
A system with parallel structure have built inredundancy. Components are backed up, and the system will work even if some of
the components fail to function. Which of the following statement^) is correct? ( Marks : 1 Mark )

True for parallel systems only

False for all parallel and series systems

True for all parallel and series systems

None of these

Illustration :

The correct answer is (a)

Prev. Show Answer Next


77 out of 110 Remaining Time |
00:00:00
What does the picture represent? ( Marks : 1 Mark )

What does the picture represent?

Ishikawa Diagram

Weibull Chart

Pareto Diagram

Illustration :

The correct answer is (b)

Prev. Show Answer Next


78 out of 110 Remaining Time |
00:00:00
FMEA & RCFA, which statement is false ( Marks : 1 Mark )

FMEA is a broader view than RCFA

Both determine the way of failure

FMEA is before failure and RCFA is after failure

FMEA has no value or connection to RCFA

Illustration :

The correct answer is (d)

Prev. Show Answer Next


79 out of 110 Remaining Time |
00:00:00
Which on of the following is considered as an Effective communication feedback: ( Marks : 1 Mark )

Inclusion

Paraphrasing

Gatekeeping

Compartmentation

Illustration :

The correct answer is (b)

Prev. Show Answer Next


80 out of 110 Remaining Time |
00:00:00
Which on of the following is considered as an Effective communication feedback: ( Marks : 1 Mark )

Return an asset to an operating condition by predicting failure before it happens.

Return an asset to an operating condition by predicting failure before it happens.

Predict failure according to maintenance experience

None of these

Illustration :

The correct answer is (a)

Prev. Show Answer Next


81 out of 110 Remaining Time |
00:00:00
What safety metric is usually overlooked ‫ تغاضى‬: ( Marks : 1 Mark )

Recordable injury

First aid

No injury

Lost time

Illustration :

The correct answer is (c)

Prev. Show Answer Next


82 out of 110 Remaining Time |
00:00:00
to improve and monitoring the manufacturing performance ( Marks : 1 Mark )

Control Charts

Risk analysis

Failure analysis

Non of the above

Illustration :

The correct answer is (a)

Prev. Show Answer Next


83 out of 110 Remaining Time |
00:00:00
Who is the person responsible for looking for the equipment and failure ( Marks : 1 Mark )

The maintainer

The user

The management

The operator

Illustration :

The correct answer is (a)

Prev. Show Answer Next


84 out of 110 Remaining Time |
00:00:00
What relationship should Maintenance and Reliability Teams have with customers and suppliers for optimum effectiveness? (
Marks : 1 Mark )

Sales should be the only department communicating with customers

Team members should be involved in communicating with customers and suppliers

Purchasing should be the only communicators with suppliers

Management should be the only communicators with customers and suppliers

Illustration :

The correct answer is (b)

Prev. Show Answer Next


85 out of 110 Remaining Time |
00:00:00
What is an ineffective training program indicator for Maintenance craft: ( Marks : 1 Mark )

Cost

Maintenance Procedures

Salary

Frequent Rework

Illustration :

The correct answer is (d)

Prev. Show Answer Next


86 out of 110 Remaining Time |
00:00:00
Appraisal can be used to in a job performance to ( Marks : 1 Mark )

Evaluate current and future performance

Management tool for employees

Evaluate training effectiveness

Determine and evaluate compensation

Illustration :

The correct answer is (a)

Prev. Show Answer Next


87 out of 110 Remaining Time |
00:00:00
A simple computer consists of a processor, a bus and a memory. The computer will work only if all three are functioning
correctly. The probability that the processor is functioning is 0.99, that the bus is functioning0.95, and that the memory is
functioning is 0.99. What is the reliability of the computer? ( Marks : 1 Mark )

0.9835

0.9767

0.9311

0.9001

Illustration :

The correct answer is (c)

Prev. Show Answer Next


88 out of 110 Remaining Time |
00:00:00
A skills audit is undertaken to ( Marks : 1 Mark )

Help an organization understand skills in its industry

Develop employee training plans for the next year

Benchmark skills against other companies

Help an organization understand skills it requires

Illustration :

The correct answer is (d)

Prev. Show Answer Next


89 out of 110 Remaining Time |
00:00:00
Which statement is not true as an asset management barrier ( Marks : 1 Mark )

M&R treated as partners in production

Insufficient attention

Management disengagement

Focus on short cost reduction

Illustration :

The correct answer is (a)

Prev. Show Answer Next


90 out of 110 Remaining Time |
00:00:00
Another name for Ishikawa diagram is? ( Marks : 1 Mark )

Root Cause Analysis Diagram

Fault Tree Analysis Diagram

Fishbone Diagram

Crow AMSAA Diagram

Illustration :

The correct answer is (c)

Prev. Show Answer Next


91 out of 110 Remaining Time |
00:00:00
What is the statistical mode and the median of the following data obtained from life achieved on a component in years {3.0,
12.0, 9.0, 4.0, 2.0, 4.0, 4.0) ( Marks : 1 Mark )

Mode = 4.0, Median = 8.0

Mode = 3.0, Median = 9.0

Mode = 4.0, Median = 4.5

Mode = 4.0, Median = 4.0

Illustration :

The correct answer is (d)

Prev. Show Answer Next


92 out of 110 Remaining Time |
00:00:00
A farmer in a rural area had problems with his tractor tires. He called a maintenance personnel to replace two front tires that
had gone fiat overnight with two used ones he had in storage. He had determined that the two rear tires had been recently
replaced with new ones. If the reliability of the front tires were 0.97 each and that of the rear tires were 0.99 each. What is the
reliability of the system of tractor tires? ( Marks : 1 Mark )
0.9222

0.999999991

0.9314

0.9409

Illustration :

The correct answer is (a)

Prev. Show Answer Next


93 out of 110 Remaining Time |
00:00:00
As the maintenance manager for a manufacturing company, you have conducted a study that reveals that the mechanics, on
average, spend four hours per ten hours shift on wrench time (tool turning time}. Your first action should be ( Marks : 1 Mark )

Improve planning and scheduling to increase wrench time (tool turning time}

Encourage your planners to develop more aggressive job estimates

Inform management that four hours wrench time (tool turning time) per day is considered good

investigate the barriers causing loss of wrench time (tool turning time)

Illustration :

The correct answer is (d)

Prev. Show Answer Next


94 out of 110 Remaining Time |
00:00:00
What is the recommended methodology to reduce or increase the frequency of a PM inspection? ( Marks : 1 Mark )

Use best practices from other industries

Use Risk Based inspection (RBI)

Use American Petroleum institute (API) standards

use American National Standards institute (ANSI)

Illustration :

The correct answer is (b)

Prev. Show Answer Next


95 out of 110 Remaining Time |
00:00:00
Which of the following statements about reliability is true? ( Marks : 1 Mark )

Increasing the quantity and quality of maintenance cannot improve system reliability beyond the designed
standard

Reliability of a system or equipment can be improved as a result government legislation

A reliable system can be designed from unreliable components if enough redundancy is built in

Highly accelerated stress screening without design changes can improve reliability of systems

Illustration :

The correct answer is (a)

Prev. Show Answer Next


96 out of 110 Remaining Time |
00:00:00
What is the approximate percentage of failures in a rotating equipment can be found using predictive technologies? ( Marks : 1
Mark )

0.6

0.15

0.3

0.8

Illustration :

The correct answer is (d)

Prev. Show Answer Next


97 out of 110 Remaining Time |
00:00:00
Key performance indicators can be classified as leading or lagging indicators. All the following are examples of lagging indicators
for manufacturing plant except? ( Marks : 1 Mark )

Mean Time Between Stoppages (MTTS)

% work orders completed during the scheduled period (schedule compliance)

Mean Time to Repair (MTTR )

Operating cost

Illustration :

The correct answer is (b)

Prev. Show Answer Next


98 out of 110 Remaining Time |
00:00:00
The primary purpose of operations involvement in the maintenance program is to ( Marks : 1 Mark )

Improve plant (facility) housekeeping and decrease contractors

Increase stakeholder contributions to the asset maintenance

Reduce maintenance workforce staffing and maintenance cost

Improve the skill levels of operations people

Illustration :

The correct answer is (b)

Prev. Show Answer Next


99 out of 110 Remaining Time |
00:00:00
What is the statistical average and the population standard deviation of the following reliability data (3.0, 12.0, 9.0, 4.0, 2.0) (
Marks : 1 Mark )

Mean = 5.9, Standard deviation = 3.847

Mean = 4.0, Standard deviation = 3.487

Mean = 6,0, Standard deviation = 3 ,847

Mean = 30.0, Standard deviation = 5.847

Illustration :

The correct answer is (c)

Prev. Show Answer Next


100 out of Remaining Time |
110 00:00:00
When measuring the temperature of an object using a radiometric imager, which two parameters have the greatest effect on
the accuracy of the temperature reading on the instrument? ( Marks : 1 Mark )

Emissivity and background temperature

Relative humidity and ambient air temperature

Aperture and brightness

Range and span

Illustration :

The correct answer is (b)

Prev. Show Answer Next


101 out of Remaining Time |
110 00:00:00
Operations notified the maintenance department about an unusual bearing noise when a process water pump runs for more
than 6 hours continuously. After a regular PM was completed and production had started, it was noticed that bearing noise was
not fixed. Amongst the following, which one is the most credible reason for this occurrence? ( Marks : 1 Mark )

The operations manager failed to notify the maintenance manager about the issue of bearing noise

Maintenance technician failed to notice and diagnose the bearing noise due to lack of skills

The planning department was not informed to create a work order to address the bearing noise

Operations were mounting too much pressure so there was no time to complete the work

Illustration :

The correct answer is (c)

Prev. Show Answer Next


102 out of Remaining Time |
110 00:00:00
Out of the choices below, which is the best way to evaluate the effectiveness of a safety program? ( Marks : 1 Mark )

Measure the number of safety slogans and bulletins posted

Periodic safety audits of work processes in the field

Review health and safety performance as required

Solicit feedback about safety performance from employees

Illustration :

The correct answer is (b)

Prev. Show Answer Next


103 out of Remaining Time |
110 00:00:00
The maintenance manager of a pump seal manufacturer has asked you to calculate the re-order point of a spare part item. He
has provided you with the following information to facilitate your calculations. The cost of the spare parts is $100.00. The cost
of earning inventory is 20% of the cost of the part. The cost of placing an order is $40.00 for which the annual demand is 5,200
units. The average lead-time for replenishment is two weeks and the buffer stock of 500 units is desired. The average inventory
is 100 units per week, what is the re-order point in units for this spare part? ( Marks : 1 Mark )

700

1200

350

600

Illustration :

The correct answer is (a)

Prev. Show Answer Next


104 out of Remaining Time |
110 00:00:00
The maintenance manager of a mining company recently formed a reliability team to improve equipment performance. The
team members don't seem to get along well. Team members stick to their style of working and challenge authority whenever
they get the opportunity. Some team members are even questioning the team’s goats. What developmental stage is the
reliability team? ( Marks : 1 Mark )

Forming

Norming

Storming

Performing

Illustration :

The correct answer is (c)

Prev. Show Answer Next


105 out of Remaining Time |
110 00:00:00
The maintenance manager of a mining company recently formed a reliability team to improve equipment performance. The
team members don't seem to get along well. Team members stick to their own style of working and challenge authority
whenever they get the opportunity. Some team members are even questioning the team’s goals. What should the manager do?
( Marks : 1 Mark )

Dissolve the reliability team and rehire more experienced maintenance and reliability engineers or specialists
making sure they follow the company rules and regulations to avoid conflicts

Step back and allow team members to go through the steep learning curve. Avoid resolving any conflicts until
members officially report to HR ,

Delegate tasks and projects to the team members who are problematic to keep them busy. Ensure that they are
given stretched targets that will boost their morale and cause them to cooperate with other team members

Establish process and structures for the team, building trust and good relationship between team members.
Ensuring that conflicts are resolved swiftly

Illustration :

The correct answer is (d)

Prev. Show Answer Next


106 out of Remaining Time |
110 00:00:00
Which of the scenarios below justifies the use of Failure Modes and Effects Analysis (FMEA) ( Marks : 1 Mark )

The Production Department has added a third production shift to meet increased sales. The new shift will be
staffed mostly of new employees whose training consists of two weeks working with the dayshift. Adding the
third shift also increases equipment operating hours by 50%

The Maintenance Department has assumed responsibility for the maintenance of the equipment in a small
production line acquired after the buyout of a smaller competitor. The competitor uses equipment that is
different from the company's existing equipment
A custom-made production machine, critical to meeting production requirements, has failed for the third time
in six months , The Maintenance Department has carefully inspected the machine after each failure, and each
failure has been attributed to a loss of lubrication of the machine's bearing

Corporate downsizing has reduced the staff of the Maintenance Department to two reliability technicians and
two supervisors for each craft (trade). These foremen will now manage contracted maintenance crews for all
plant (facility) maintenance activities

Illustration :

The correct answer is ( )

Prev. Show Answer Next


107 out of Remaining Time |
110 00:00:00
When initiating change to an existing process or program, the best practice is to : ( Marks : 1 Mark )

Make organizational meeting to plan, train far; and implement change mandatory, but make participation
voluntary to avoid alienating employees who dislike change

Issue a directive on the revised process or program, start it and require compliance by a specific date, then
begin training as soon as possible thereafter

Announce the new process or program, issue a draft directive for review and comment. Then issue the final
with a specific compliance date, and employee review comments and recommendations incorporated to the
maximum extent possible to get a buy-in

Involve key personnel in the planning and development of the new process or program directives, train affected
personnel, and then implement before a specified compliance date

Illustration :

The correct answer is ( )

Prev. Show Answer Next


108 out of Remaining Time |
110 00:00:00
The common root cause of bearing failure on hydraulic systems can be attributed to all the following except : ( Marks : 1 Mark )

Particle contamination during periodic maintenance

Wrong bearing design For the application

Misalignment during installation

Water contamination of hydraulic oil

Illustration :

The correct answer is (b)

Prev. Show Answer Next


109 out of Remaining Time |
110 00:00:00
When forming teams to address reliability issues, forestages of team development should be recognized and manageably the
reliability professional. These stages in order are: : ( Marks : 1 Mark )

Warming/Swarming/Absorbing/Norming

Forming/Storming/Norming/performing

Forming/Absorbing/Storming/Performing

Warming/Absorbing/Performing/Norming

Illustration :

The correct answer is (b)

Prev. Show Answer Next


110 out of Remaining Time |
110 00:00:00
On Monday, the maintenance manager sent an e-mail memo to the production manager saying that the date and time of the
next planned outage would be on the third shift of the coming Friday, when the maintenance manager arrived at the unit on
Friday third shift, the equipment was still operating at full capacity. The operator said he knew nothing of a planned
outage, and he had to make up production on this shift. Which of the following is the most Likely reason for the equipment still
running? ( Marks : 1 Mark )

The maintenance manager made a unilateral decision that it was time to do the outage

The maintenance manager did not know if the production manager had communicated the plan to the shift
leader

The maintenance manager did not know if the production manager received his email communication

The maintenance manager did not know if the production schedule allowed for the planned downtime

Illustration :

The correct answer is (a)

Prev. Show Answer Next