OYALO KALAVASAL

The document outlines various construction and renovation works, including glass installation, ACP sheet work, kitchen tiles, paint work, MS work, civil work, carpentry, and lump sum tasks. It provides detailed descriptions, measurements, and quantities for each task, along with associated costs and totals. The final section summarizes the total amounts, including additional charges and GST, leading to a comprehensive financial overview of the project.

Uploaded by

infodreamcarve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views8 pages

OYALO KALAVASAL

The document outlines various construction and renovation works, including glass installation, ACP sheet work, kitchen tiles, paint work, MS work, civil work, carpentry, and lump sum tasks. It provides detailed descriptions, measurements, and quantities for each task, along with associated costs and totals. The final section summarizes the total amounts, including additional charges and GST, leading to a comprehensive financial overview of the project.

Uploaded by

infodreamcarve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

SI.

NO DESCREPTION OF WORK NOS MEASUREMENT


1 GLAS FRONT EXTENSION FLOOR L B H
A DOOR GLASS 1 1'0" 0 7'6"
B OUTER GLASS 1 14'0" 0 7'0"

2 FRONT ACP SHEET WORK


A LEFT SIDE PILLAR 1 8'0" 0 2'0"
B L-SIDE PILLAR BOTTOM 1 6'0" 0 2'0"
C L-SIDE TOP BOARD 1 8'0" 0 2'0"
TOTAL

D MS WORK 1 KG KG KG

3 KITCHEN TILES WORK


NOTE AFTER DEMOLETION OF REPLACING
TILES LAYING WORK
A WALL -1 CUBBOARD 1 9'0" 0 7'0"
B WALL-2 OVEN BOX 1 2'0" 0 4'0"
C WALL-3 FOR STABILISOR WIREWORK 1 2'0" 0 1'0"
FLOOR-CUBBOARD BOTTOM 1 4'0" 0 1'6"
TOTAL SQ.FT

MATERIAL-FROM BILL WITHOUT GST

4 PAINT WORK
1 OUTSIDE BATHROOM
A CEILING 1 24'0" 3'0" 0
B WALL 1 37'0" 0 9'6"
DEDUCTION
1 EB BOX 1 4'0" 0 4'0"
2 DP BOX 1 5'6" 0 2'0"

A EXTENSION FLOOR WALL 1 14'0" 0 3'0"


B GENERATOR 1 12'9" 0 1'6"
TOTAL

2 KITCHEN ROOM ROLLER PAINT WORK 0 0 0 0


(CEILING WITH WALL).

5 MS WORK
1 MS STAND (BATTERY) 1 KG KG KG
2 MS PLATFORM EXTENSION FLOOR 1 KG KG KG
TOTAL KG
3 TRANSPORTION&FITTINGS LABOUR

4 FRONT EXTENSION FLOOR ROOF MS


PIPE WELDING FOR GLASS WORK .
5 GENERATOR SHED WORK
A MS PIPE(2 1/2" X1 1/2") KG KG KG
B ROOF SHEET WORK 4 12'0" 3'0" 0
6 NET FRAME WORK MATERILAS WITH
LABOUR.
7 BACK SIDE ROOF SHED WORK
MATERILAL.
8 MS PIPE MUTTY PAINT
9 MS PIPE (2 1/2 X 1 1/2) FROM BILL
WITHOUT GST . 34 KG KG KG
10 MATERIAL ROOFING SHEET 4 KG KG KG

6 CIVIL WORK
1 KITCHEN DEMOLETION WITH
PLASTERING .
2 BUILDING OUTSIDE WALL TOUCHUP
WORK .
3 MATERIALS
A CEMENT 2
B M-SAND 10
4 ELECTRICALS WORK IN KITCHEN
A WIRING WITH SWITCHS BOX
B STABILISER WIRING WORK .
5 EARTHING PIT EXCAVATION WORK
WITH CONCRETE/ELECTRICAL.EARTH 1 4'0" 4'0" 4'0"
PIT TO GENERATOR CONNECTION.

7 CARPENTER
A TV BACK SIDE PLYWOOD WORK 1 8' 0 1'6"
B KITCHEN IN WOODEN PLANKS 1 3'6" 0 1'0"
C OUTSIDE BATHROOM CUBBOARD 3 2'0" 0 4'0"
E KITCHEN WALL CUBBOARD 2
F WASH BASIN TABLE FIXING TOP WORK 1 2'6" 0 7'0"

MATERIAL
1 PLYWOOD 5
2 MICA 4
3 HARDWARE

8 LUMPSUM
1 EXCHAUSTER FAN HOLE BY CORE CUTTER 2 0 0 8"
2 KITCHEN LUVOUR WINDOW FIXING 1 0 0 0
3 OUTSIDE BATHROOM ALUMINIUM 1
WINDOW WITH GLASS
4 OUTSIDE WASHG BASIN FIXED DOOR 1
5 WASH BASIN MIRROR FIXING WITH
FITTING
6 OUTSIDE BATHROOM PVC DOOR 1
7 WASH BASIN TABLE TOP GRANITE WITH
LABOUR.
8 FRONT GENERATOR POSITION CHANGE
9 FRONT ACP WORK WITH SCOFFOLDING
SHIFTING WORK 1
10 AC TRAY WORK WITH MATERIALS 1 10'0" 0'6" 0
11 NAGA FURNITURE PARCEL WITH
TRANSPORTION CHARGES
TOTAL QTY RATE PER TOTAL AMOUNT

7'6" 7.5
7'0" 98
SQ.FT 105.5 50,000
ADD 15% 7,500
57,500
GST 18% 10,350
TOATL 67,850

16
12
16
44 250 11000

40 160 6400

ADD 15% 2610


20010
GST 185 36012
TOTAL 23612

63
8
2
6
79 25 1975

2800
4775
ADD15% 716
5491
GST18% 988
TOTAL 6479

72
351.5
16
11

42
19.12
457 13 5941

398 10 3890
TOTAL 9831
ADD 15% 1475
11306
GST 18% 2035
13341

21
5
26 125 3250
LUMPSUM 1750

2000

498 50 24900
144 50 7200

4500

3900
700

498 32797
144 5800
86797
ADD 15% 13020
99817
GST18% 17967
117784

4200
2100

250
30 800

2000

4'0' 64 5000

ADD 15% 2115


16215
GST18% 2918
TOTAL 19133

12
3.5
24 18000

17.5

2000 10000
1500 6000
10000
44000
ADD15% 6600
50600
GST18% 9108
TOTAL 59708

0 1300 2600
0 4000

4000
1500
2500

2000
2500
60

740