Project resource_plan & Capacity Plan

The document outlines the manpower, machine, tool, raw material, facility, and other resource requirements for a project involving the production of parts, specifically focusing on the outer sleeve. It details the availability of resources, including operators and machines, and highlights gaps in tool availability for certain operations. Additionally, a capacity analysis is provided, indicating the utilization and balance capacity of various machines in relation to the new project.

Uploaded by

Vikas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views5 pages

Project resource_plan & Capacity Plan

The document outlines the manpower, machine, tool, raw material, facility, and other resource requirements for a project involving the production of parts, specifically focusing on the outer sleeve. It details the availability of resources, including operators and machines, and highlights gaps in tool availability for certain operations. Additionally, a capacity analysis is provided, indicating the utilization and balance capacity of various machines in relation to the new project.

Uploaded by

Vikas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Doc.no.

:
Rev.no./date
Customer
Customer Requirment / Year
(pcs) + 20%

Part Name PROJECT RESOURCE PLAN Customer


Requirment / Day
(pcs)

Part No. Date

MANPOWER REQUIREMENT
Available/Not Available ( 2 Shift Basis)
Op.
S. No. Description/Skill required Resource required Operator Line Period Required Comments
No. Supervisor
(Day+Night) Inspector

1 10 Raw Material Receipt 1 Available ---

2 20 Raw Material inspection 1 Available ---

3 30 Raw Material Storage 1 Available ---

4 40 Parting 1 Available ---

5 50 Flaring 1 Available ---

6 60 Final Inspection 1 Available ---

7 70 PDI 1 Available ---

NEW MACHINE AND MANUFACTURING EQUIPMENT REQUIREMENT


Op. Available/Not Available
S. No. Description/Skill required Resource required Quantity Comments
No. (Description)

1 10 Raw Material Receipt N/A N/A ---

2 20 Raw Material inspection N/A N/A ---

3 30 Raw Material Storage N/A N/A ---

4 40 Parting 1 Available ---

5 50 Flaring 1 Available ---

6 60 Final Inspection N/A N/A ---

7 70 PDI N/A N/A ---

NEW TOOLS/INSERTS/GAUGES REQUIREMENT


Op. Available/Not Available
S. No. Description/Skill required Resource required Quantity Comments
No. (Description)

1 10 Raw Material Receipt N/A N/A 0

2 20 Raw Material inspection N/A N/A 0

3 30 Raw Material Storage N/A N/A 0

4 40 Parting 2 Available 2
PARTING &CHAMFER T

5 50 Flaring 1 Not Available 1 Flarting tool

6 60 Final Inspection 2 Not Available 1


Length Gauge ,Snap G

7 70 PDI 2 Available 1
Length Gauge ,Snap G

1 of 5
Doc.no.:
Rev.no./date
Customer
Customer Requirment / Year
(pcs) + 20%

Part Name PROJECT RESOURCE PLAN Customer


Requirment / Day
(pcs)

Part No. Date

RAW MATERIAL REQUIREMENT


Available/Not Available
S. No. Description/Skill required Resource required Quantity Comments
(Description)
1 CEW -1 As per IS 3074 _____ Available _____
2
3
4

FACILITY REQUIRED
Available/Not Available
S. No. Description/Skill required Resource required Quantity Comments
(Description)
1 Final Inspection Table 0 Available 0 Parts Will check at Existin
2
3
4

OTHER RESOURCES REQUIRED


Available/Not Available
S. No. Description/Skill required Resource required Quantity Comments
(Description)
1 _____ _____ ---- ---- NO
2
3
4
Doc. No.:-PALI/QP11/F006A Rev. No.:-00 Rev. Date.:-01.12.2019

Prepared by Engg. (signature) Approved by(signature)

2 of 5
Doc.no.:
Rev.no./date: 00

240000

800 nos

2/4/2022

Comments

Comments

Comments

PARTING &CHAMFER TOOL

Flarting tool

Length Gauge ,Snap Gauge

Length Gauge ,Snap Gauge

3 of 5
Doc.no.:
Rev.no./date: 00

240000

800 nos

2/4/2022

Comments

Comments

Parts Will check at Existing Facility

Comments

NO

4 of 5
Doc.no.:

Capacity Analysis at the time of New project Rev.no./date: 00


Part name OUTER SLEEVE
Part Number CC-CB 2025-210
Date 4/4/2022

Capacity Analysis at the time of New project


Total Avaialble
No. of working Capacity Utilization against Balance capacity before
S.No. Machine Station time per day OEE New project Utilized Capacity I % Balance capacity after (days)
days standard monthly schedule (days)
( hrs)
1 Press M/c 1 25 24 85% 50% 35% 10% 25%
2 Parting (Traub) m/c 4 25 96 85% 60% 25% 8% 17%
3 Chemfer m/c 2 25 48 85% 60% 25% 5% 20%