The document is an inquiry form for a project named ORC-2 involving the construction of a building at Mouza Kund Plant in Balochistan. It includes detailed specifications regarding building materials, dimensions, structural design, and features such as insulation and crane provisions. The form is addressed to a specific individual and requires customer information to proceed with the project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
16 views2 pages
ORC-2
The document is an inquiry form for a project named ORC-2 involving the construction of a building at Mouza Kund Plant in Balochistan. It includes detailed specifications regarding building materials, dimensions, structural design, and features such as insulation and crane provisions. The form is addressed to a specific individual and requires customer information to proceed with the project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
Inquiry Form
PROJECT NAME: ORC-2-(for two Gensets))
Company Name: Attention: Imran sb CUSTOMER Position: INFORMATION Cell No.: Email: Date: BUILDING USAGE: BUILDING LOCATION: Mouza Kund Plant (MKP) Hub, Balochistan. No. of identical Building 1
COVERED AREA:(SFT)
. BUILDING DESCRIPTION
1 Grade of Steel-ASTM A-50/ A-36 A-36
2 Building Shape:(Gable/Mono Slope /Multi Gable) Gable 3 Frame Type:(Clear Span/ MS-I/MS-II) CS 4 Width (feet):Out to Out/Center to Center W = 16.45 m 5 Length (feet):Out to Out/Center to Center L = 23.625 m 6 Bay Spacing As per design 7 Post Spacing as per design 8 Height : From FFL Engine Hall hieght-13 M and crane runway beam at 11 M 9 Eave Height(m) As per design 10 Ridge Top Height As per design 11 Lower Eave Height 12 Heigher Eave Height 13 Roof Slope (V : H) 1/10/15/20 As per design 14 F.F.L (m) 0.000 15 Brick Wall Height -From FFL 15 Columns Base Condition:(Pinned Base /Fixed Base) As per design 16 Drainage System:(Eave/valley Gutter and Downspouts) 17 Columns: (Tapered/Straight) End Wall Condition:
•Left End Wall:Rigid Frame with Posts (Half BayLoaded)
18 / Post and Beam As per design
•Right End Wall:Rigid Frame with Posts (Half Bay Loaded)
/ Post and Beam LEW As per design 19 Post Spacing (m) REW As per design 20 Width Module Walls Grits Type:(By - Pass/Flushed) 21 •Side Walls By-pass •End Walls 22 Purlin:1.5/2mm-(Z275) 23 Girt:1.5/2mm-(Z275) Bracing Type (X-Bracing (Rods or Angles)) •Near Side Wall •Far Side Wall 23 •Intermediate Wall As per design •Left End Wall •Right End Wall 24 Sheeting-PPGI/PPGAL.5/.6mm 25 Sheeting: At wall 26 Sheeting: At Roof Internal Roof & Wall Panel (Liner):0.5 mm(Nominal) 27 •At Roof •At Walls 28 Insulation 25/50 mm External Roof & Wall Panel (Sandwich Panels) Density:(~38-40 kg/m3) Double-skin sandwich panels(ensuring an external noise 29 •At Roof level of no more than 75 dB.) •At Walls 30 Crane Provsion yes-7 tons 31 Crane System nil 32 Solar Provsion Load Consider inside the building Fans and Light 33 CAT / VISITOR WALK WAYS nil 34 ROOF PLATFORMS nil Translucent fiberglass roof panels at designated intervals to allow natural 35 Sky lihghts (W x L=1000 x 3300) daylight during the daytime. Translucent fiberglass roof panels at designated intervals to allow natural 36 Wall Lights (W x L=1000 x 1650) daylight during the daytime. 37 Doors: (L X W) 38 Window Openings Louver yes 39 Windows nil 40 Ridge Vents (3000 x 300) nil 41 Power Vents (Dia. 1000) nil 42 Doors 43 Canopies Roof Monitor: •Throat width (m): 0.8/1.00 / 1.20 / 1.50 / •Length (m): •Height (m): Half Throat Width/Other (m): 44 •Overall width (m): As per design nil •Eave Condition:Curved Eave Panel/Eave Trim •Wall Condition:Fully Open •Bird mesh at sidewalls:Yes/No (By others) 45 Mezzanine nil 46 Partitions nil Stairs •Stair treads are checkered plates/MS pipes) 47 •Handrails are made of MS pipes. •Stairs main frame will be of MS type. Surface preparation:(Enamel/Epoxy/pu) •Surface:sand blasting/short/sweep/power •Surface preparation, sandblasting, to SAE 2.5 upto the satisfaction of clients Permier: representative Top coat: Primer 2 coats (DFT 200 micron) Finish coat (DFT 50 micron)
DTU, Department of Energy Engineering H in (KJ/KG) - V in (M 3/kg) - P in (Bar) M.J. Skovrup & H.J.H Knudsen. 18-01-10 Ref:D.P.Wilson & R.S.Basu, ASHRAE Transactions 1988, Vol. 94 Part 2