SPM(7-8th)Dec2021

The document outlines the exam structure for the B.Tech. (CSE) Software Project Management course, including instructions for three sections with varying question formats and marks. Section-A consists of ten compulsory questions worth two marks each, Section-B has five questions worth five marks each with four to be attempted, and Section-C contains three questions worth ten marks each with two to be attempted. Topics covered include contract management, risk management, cost estimation, and software configuration management.

Uploaded by

hsofficial8907
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views2 pages

SPM(7-8th)Dec2021

The document outlines the exam structure for the B.Tech. (CSE) Software Project Management course, including instructions for three sections with varying question formats and marks. Section-A consists of ten compulsory questions worth two marks each, Section-B has five questions worth five marks each with four to be attempted, and Section-C contains three questions worth ten marks each with two to be attempted. Topics covered include contract management, risk management, cost estimation, and software configuration management.

Uploaded by

hsofficial8907
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Roll No. Total No.

of Pages : 02
Total No. of Questions : 18
B.Tech. (CSE) (2012 to 2017 E-II) (Sem.–7)
SOFTWARE PROJECT MANAGEMENT
Subject Code : BTCS-907
M.Code : 71899
Time : 3 Hrs. Max. Marks : 60

INST RUCT IONS T O CANDIDAT ES :


1. SECTION-A is COMPULSORY cons is ting of TEN questions carrying TWO marks
each.
2. SECTION-B c ontains FIVE questions c arrying FIVE marks eac h and s tudents
have to atte mpt any FOUR ques tions.
3. SECTION-C contains THREE questions carrying TEN marks e ach and s tudents
have to atte mpt any TWO questions.

m
SECTION-A

o
Write briefly :

1. Contract Management
r . c
pe m
2. Risk Management

p a c o
3. Test Automation
r r .
4. b
Cash flow forecasting
p e
5. Change control
p a
6. Visualizing Process
b r
7. Earned Value

8. Hazard Analysis

9. CMMI

10. Project Scheduling

1|M -71899 (S2)-596

hts:/w.udycom
SECTION-B

11. What is cost estimation? What are different factors that affect the cost?

12. Explain Oldman-Hackman job characteristic model. Elaborate with example.

13. Explain Contract Management in detail. Also give details about its types.

14. How Risk Management is important in software project management? Explain its nature
and types.

15. What is the role of organization and team structures in quality assurance of software?
Explain.

SECTION-C

control of any software project?


o m
16. What are various parameters in Earned Value Analysis? How it helps in monitoring and

r . c
17. a) What are the various activities involved in software project management? Explain.

e
b) Discuss in detail about team structure.
p m
a c o
18. How Software Configuration Management helps in Change management? What are the

p
r
various processes of Software configuration management?
r .
b p e
p a
b r

2|M -71899 (S2)-596

hts:/w.udycom

You might also like