The document outlines the architectural and structural details for a proposed commercial development in Buwanuka, Kakiri District, including specifications for septic tanks, drainage systems, and building materials. It emphasizes the need for compliance with local regulations, reinforced concrete work, and specific construction practices. Additionally, it includes notes on dimensions, materials, and responsibilities of the architect and contractors involved in the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

ARCH DWG

The document outlines the architectural and structural details for a proposed commercial development in Buwanuka, Kakiri District, including specifications for septic tanks, drainage systems, and building materials. It emphasizes the need for compliance with local regulations, reinforced concrete work, and specific construction practices. Additionally, it includes notes on dimensions, materials, and responsibilities of the architect and contractors involved in the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Half round A

600 x 450 mm cast iron cover C


channel 100mm dia cast iron inlet /
Notes:-
TO SOAK PIT & 600 x 450mm cast
outlet pipes PERCOLATION iron covers complete
L TRENCHES with frames

15,240
IN
1. All dimensions to be checked on site, written dimensions
Conc. to fdn. (mix B OUT
100mm dia. to be followed in preference to scaled dimensions.
1:3:6) to be at inlet / outlet L
D
thickness specified
B
cast iron pipe 2. All walls less than 200mm thick to be reinforced with
650 hoop iron at every alternate course.
A C

880
SECTION A - A 100mm thick R.C cover
3. All reinforced concrete work is to be in accordance with
PLAN (Scale 1:75)
(Scale 1:75) slab. structural engineer's details.
PLAN AT TOP (Scale 1:75) 4. All sanitary work to be in accordance with M.O.H rules
690 and regulations.
5. Where drain passes under building or driveway area,
pipe to be of cast iron or encased in 150mm concrete.
Selected filling well
6. All waste pipes and soil pipes are to be in ducts and the
compacted and bends to have all cleaning eyes accessible from outside.
consolidated. 600 x 450 mm cast iron
cover
Selected filling in six layers well 7. All windows and external glazed doors on ground floor to
rammed and consolidated into
place. have burglar proofing to Architect's detail.
9. Stair case and lobby doors to be self closing and 1/2
Second hand G.C.I
sheet or roofing hour fire resistant.
Inlet pipe felt
10. All internal plaster to be two coats steel float finished.
MH MH Benching rendered 12mm 11. All manholes within building area, driveway and
Selected stone thick, finished smooth with 100mm dia
profile. steel float agricultural pipes parking to have heavy duty air tight covers and double
laid with open SELECTED STONE 150 DOWN sealed.
joints, minimum TO 20mm
SECTION C - C (Scale 1:50) fall 1:10. 12. Provide G.I. 125 x 100 rainwater down pipes and
125 x 100 G.I.box gutter with brackets etc. where shown.
GROUND
LEVEL 13. All painting to be 3 coats.
LONGITUDINAL SECTION THROUGH 14. Lay 1 layer of paving slabs 600 x 600 on sand along the
PERCOLATION TRENCH perimeter of building.
SECTION THROUGH SOAK PIT
Invert 15. Samples of fittings, materials etc. to be produced &
Selected 600 x 450 mm 100mm th. reinforced
level
stone concrete cover slab 600 x 450 mm approved before commencing work.
cast iron
(mix. 1:2:4) cast iron cover
cover GROUND 16. All office windows to have P.C. cills, built in P.V.
30,480

30,480
LEVEL
Pelmet boxes & timber internal window cills & Skirtings.
100mm dia half round 17. Steel trusses/portal frames & purlins to be painted with
SECTION-DRAIN PIPE TRENCH Benching
No. OF CAPACITY IN PERCOLATION.
channel L B D LITRES 2 coats of oil paint.
(Scale 1:50) USERS TRENCHES

IN WORKING OUT 18. Fire fighting equipment to be provided and installed by


125mm thick concrete base (mix. LEVEL 6 1800 675 900 1112.5 7.5m
MH
1:3:6). Depth to invert level not more gl. support bracket built into
10 2250 675 900 1417.5 12.2m
Building Fire Consultants.
230mm thick block wall
than 1500mm D
15 2500 675 900 1561.5 14.4m 19. The ARCHITECT shall not accept any LIABILITY for works
L
Concrete to foundation 25mm th. cement screed 20 2800 675 900 1800.0 18.3m which he has not been expressly instructed in WRITING
(mix 1:3:6) to be at finished smooth with
thickness specified steel float. 25 3300 675 900 2083.5 30.5m [&has accepted to proceed in writing ] to SUPERVISE,or for
SECTION L-L (Scale 1:50)
any ommissions or deviations from his Drawings/Technical
Specifications. Nor Shall he take responsibilty for works
handled by other nominated Consultants / Contractors.
20. These architectural drawings shall be read in

SEPTIC TANK DETAILS


conjunction with the structural drawings,Electrical-
Mechanical drawings, Bills of Quantities & Technical
Specifications.
Any discrepancy shall be reported immediately to the
SEPTIC TANK

SCALE: 1:100 Architect.


Storm water drainage

SOAK PLOT
PIT

No. Revision/Issue Date

Client:
3,550

Signature:
Telephone:

15,240 Architect's Stamp and Signature

5.0M WIDE ACCESS


5.0M WIDE ACCESS
ROAD
ROAD Architect :

SITE LAYOUT PLAN


SCALE 1:125 Reg. no. P.C. no.

Project Name and Address:


PROPOSED COMMERCIAL DEVELOPMENT
IN BUWANUKA - KAKIRI DISTRICT

Drawing Title Sheet


SITE LAYOUT, LOCATION PLAN & SEPTIC
TANK DETAILS 1/2
Scale Date Drawn
AS SHOWN 11-05-25 AA
LOCATION PLAN
SCALE: NTS
13,900
150 6,750 150 6,700 150

Notes:-
150

150
+3,600

2,004
250

50 500 50
200 1 Story 1. All dimensions to be checked on site, written dimensions
to be followed in preference to scaled dimensions.
SHOP 11 SHOP 12
3,500

3,500
Ceramic tile f.f Ceramic tile f.f 2. All walls less than 200mm thick to be reinforced with
hoop iron at every alternate course.
3. All reinforced concrete work is to be in accordance with
200 250
structural engineer's details.

2,700
400 300

150
1,700
4. All sanitary work to be in accordance with M.O.H rules
150

D1 D1
100

and regulations.

1,100
D4

W4
SHOP 10 GENTS 5. Where drain passes under building or driveway area,
±0
2,200

50
D2

Ceramic tile f.f

100
pipe to be of cast iron or encased in 150mm concrete.
0 Ground Floor
6. All waste pipes and soil pipes are to be in ducts and the

1,000
W4

300
200
D3
100

bends to have all cleaning eyes accessible from outside.

100
D4
E-04 7. All windows and external glazed doors on ground floor to
150

1,600
150

LADIES

1,050
ELEVATION E-02
have burglar proofing to Architect's detail.

W4
1,200
2,900

SHOP 9 9. Stair case and lobby doors to be self closing and 1/2

100
2,300

D3
D2

Ceramic tile f.f


hour fire resistant.
SCALE 1:75

1,200
10. All internal plaster to be two coats steel float finished.

50
11. All manholes within building area, driveway and
150
150

200

150

150
parking to have heavy duty air tight covers and double
sealed.
12. Provide G.I. 125 x 100 rainwater down pipes and
SHOP 8 SHOP 4
2,950

2,950
3,000

3,000
125 x 100 G.I.box gutter with brackets etc. where shown.
D1

D1
Ceramic tile f.f Ceramic tile f.f
13. All painting to be 3 coats.
14. Lay 1 layer of paving slabs 600 x 600 on sand along the
+3,600 perimeter of building.
1 Story 15. Samples of fittings, materials etc. to be produced &
150

200

200

150
approved before commencing work.
16. All office windows to have P.C. cills, built in P.V.
26,000

26,000
E-03

SHOP 7 SHOP 3 Pelmet boxes & timber internal window cills & Skirtings.
3,000

3,000

3,000

3,000
D1

D1

Ceramic tile f.f Ceramic tile f.f


17. Steel trusses/portal frames & purlins to be painted with
E-02

2 coats of oil paint.

2,400
18. Fire fighting equipment to be provided and installed by
Building Fire Consultants.
150

150
200

200

19. The ARCHITECT shall not accept any LIABILITY for works
250

±0
which he has not been expressly instructed in WRITING
0 Ground Floor [&has accepted to proceed in writing ] to SUPERVISE,or for
SHOP 6 SHOP 2
3,000

3,000
3,000

3,000

any ommissions or deviations from his Drawings/Technical


D1

D1

Ceramic tile f.f Ceramic tile f.f


Specifications. Nor Shall he take responsibilty for works
ELEVATION E-03 handled by other nominated Consultants / Contractors.
250

20. These architectural drawings shall be read in


SCALE 1:75 conjunction with the structural drawings,Electrical-
150

150
400

200

200

-0.050 S-01 S-01 Mechanical drawings, Bills of Quantities & Technical


±0.000 Specifications.
Any discrepancy shall be reported immediately to the
3,000

3,000
D1

D1

50 Architect.

50
SHOP 5 -0.20 SHOP 1 ROOF CONSTRUCTION DETAILS
Ceramic tile f.f Ceramic tile f.f
Roof pitch angle 10° +3,600
6,500

6,500
700

IT4 Roofing Sheets on


200

200

1 Story

500 25
50mm x 100mm purlins 1200mm C/C on
-0.050 ±0.000
100mm x 50mm rafters max. 2000mm C/C on
100mm x 50mm struts & ties on

68
No. Revision/Issue Date

50
150mm x 75mm tie beam on
D1

D1

75mm x 100mm wall plate


4,300

Client:
4,500

To be fixed with hoop irons.

2,750
225mm x 25mm fascia and
400
150

150

barge boards
Signature:
D1 D1
Telephone:
1,150

1,150

±0
0 Ground Floor

50
400

300
400
150

150

150

400
Concrete Lintel 50X50 ceiling joists
at 600mm C/C
150 3,500 150 1,500 150 3,000
13,900
150 1,500 150 3,500 150 1:2:4 mix
Architect's Stamp and Signature

ELEVATION E-01
E-01 SCALE 1:75
GROUND FLOOR PLAN
3,350

SCALE 1:75 Architect :

DOOR AND WINDOW SCHEDULE


DOOR ID D1 D2 D3 D4 W4

Top hung double +3.60 Reg. no. P.C. no.


Metal casement door
DOOR NAME Steel Roll up Door Steel Roll up Door Wooden door window with frosted
with glass glazing PVO
glasss
1 Story

Quantity 14 2 2 2 3
Project Name and Address:
W x H Size 2,500×2,400 2,000×2,400 800×2,400 800×2,100 600×600
Sill height 0 0 0 0 1,900 PROPOSED COMMERCIAL DEVELOPMENT
Head height 2,400 2,400 2,400 2,100 2,500
IN BUWANUKA - KAKIRI DISTRICT
2D Symbol 2,730 2,230 600
800 800

- 25mm thick screed on - 230mm exterior masonry wall


±0.00 Drawing Title Sheet
2/2
- 100mm thick mix 1:3:6 slab on - 230mm Plinth wall
- Damp proof membrane - 690mm x 230mm strip footing on 0 Ground Floor GROUND FLOOR PLAN, ELEVATIONS,
2,100
2,710

2,710

600

3D Back View - 30mm thick sand blinding on - well compacted earth SECTION, DOOR & WINDOW SCHEDULE
600
- 250mm thick hardcore on Scale Date Drawn
ELEVATION E-04
- well compacted earth
AA
800
AS SHOWN 11-05-25
2,730 2,230
SECTION S - 01
SCALE 1:50 SCALE 1:75