0% found this document useful (0 votes)
4 views

Project Proposal

The document outlines a proposal for implementing smart energy meters with load control at the Federal Polytechnic Ilaro, Nigeria, to address energy monitoring and management challenges. Key features include real-time data transmission, automated load regulation, and a user-friendly interface for monitoring. The estimated cost for the project is NGN 257,500, with a planned execution period of six weeks.

Uploaded by

vademola640
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Project Proposal

The document outlines a proposal for implementing smart energy meters with load control at the Federal Polytechnic Ilaro, Nigeria, to address energy monitoring and management challenges. Key features include real-time data transmission, automated load regulation, and a user-friendly interface for monitoring. The estimated cost for the project is NGN 257,500, with a planned execution period of six weeks.

Uploaded by

vademola640
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

IMPLEMENTATION OF

SMART ENERGY
METER WITH LOAD
CONTROL

Submitted by:
AKINWUMI OLUMIDE ABDULHAMID
Matric Number:
2430521080
Date:
MAY 2025
1. Client Requirements
The Federal Polytechnic Ilaro, Nigeria, is experiencing challenges in energy monitoring and
control within its academic and administrative facilities. These challenges include energy
wastage, inability to track usage in real-time, and lack of automated load regulation during
peak hours or non-operational periods.

To address these issues, the institution has expressed the following requirements:
- Implementation of smart energy meters for different buildings.
- Integration of load control mechanisms to automatically switch off or regulate non-
essential loads.
- Real-time energy monitoring and data logging for analysis and future planning.
- Scalable system design for possible expansion across other facilities within the institution.
- User-friendly interface accessible via computer or mobile device.

2. Specification
The proposed system will include the following features:

2.1 Smart Energy Meter


- Measures voltage, current, power factor, energy consumed.
- Microcontroller-based (e.g., Arduino or ESP32).
- Real-time data transmission using Wi-Fi or GSM module.
- LCD display for local reading.

2.2 Load Control System


- Automated control of non-critical loads (e.g., lighting, air conditioning).
- Integration with relay switches.
- Programmable thresholds based on time or usage.

2.3 Data Monitoring and Interface


- Remote dashboard access through web or mobile app.
- Real-time charts and logging.
- Alert notifications via SMS or email when thresholds are crossed.

2.4 Safety and Compliance


- Surge protection.
- Circuit isolation and relay protection.
- Enclosure designed for safety and environmental protection.

2.5 Scalability
- Modular design that supports additional units.
- Cloud-based data storage and management for multiple locations.
3. Proposal Drawing
Block Diagram:

+-----------------------+ +----------------------+ +------------------------+


| Electrical Load |<---->| Smart Energy Meter |<---->| Load Control System |
+-----------------------+ +----------------------+ +------------------------+
|
|
+--------------------------+
| Web/Mobile Monitoring UI |
+--------------------------+

System Flow:
1. Energy meter measures load parameters.
2. Sends data to controller and remote server.
3. Controller triggers relay to regulate power based on predefined conditions.
4. Data displayed on monitoring interface.

4. Cost Estimation
S/N Item Qty Unit Cost (NGN) Total (NGN)
Description

1 Smart Energy 5 15,000 75,000


Meter Module

2 Microcontroller 5 8,000 40,000


(ESP32)

3 Relay Switch 5 5,000 25,000


(4-channel)

4 GSM/Wi-Fi 5 6,000 30,000


Module

5 Display (LCD 5 2,500 12,500


16x2)

6 Enclosures 5 3,000 15,000

7 Power Supply 5 2,000 10,000


Adapter

8 Wiring and 1 10,000 10,000


Connectors
9 Software and UI 1 20,000 20,000
Development

10 Installation and 1 20,000 20,000


Testing

**TOTAL **257,500**
ESTIMATED
COST**

*Note: Cost is subject to variation based on market changes and sourcing.*

5. Execution Period
The implementation of this project is estimated to span 6 weeks, broken down as follows:

Week Activity Description

1 Procurement of materials and components

2 Assembly of energy meter modules and


control units

3 Programming of microcontrollers and load


logic

4 Development of monitoring interface and


testing

5 Field installation and initial calibration

6 Final testing, training of technical staff,


handover

Conclusion

This project aims to improve energy management within the Federal Polytechnic Ilaro
through the deployment of smart, automated, and scalable energy meters with load control.
The successful implementation will result in better energy usage visibility, reduced wastage,
and improved operational efficiency across the campus facilities.