The document provides a detailed price breakdown for a portable security post, including both indirect and direct costs. It lists various materials, labor, and equipment needed for construction, along with their quantities and unit prices. The total costs are summarized at the end, highlighting the overall financial requirements for the project.

Uploaded by

sabeyaios
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1 views

Quotation Form_Portable Security Post

The document provides a detailed price breakdown for a portable security post, including both indirect and direct costs. It lists various materials, labor, and equipment needed for construction, along with their quantities and unit prices. The total costs are summarized at the end, highlighting the overall financial requirements for the project.

Uploaded by

sabeyaios
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

SUMMARY PRICE

PORTABLE SECURITY POST

Quantity
No Description Unit
A

A INDIRECT COST
1 Site Management 1.00 Ls
2 HSE Equipments & Tools (working at operation area) 1.00 Ls
3 Mobilization & Demobilization 1.00 Ls
SUB-TOTAL A

B DIRECT COST
1 Temporary Security Post (1 Unit) + Temporary Toilet (1 Unit) 6.00 Unit
2 Temporary Security Post (1 Unit) 1.00 Unit
3 Strongback For Lifting (1 Unit) 1.00 Unit
SUB-TOTAL B
GRAND TOTAL (A + B)
CE
Y POST

Unit Price Total Price


(Rp) (Rp) Remarks
B C = AxB

- -
- -
- -
-

- -
- -
- -
-
-
PRICE BREAKDOWN
PORTABLE SECURITY POST

Quantity
No Description Unit
A

A INDIRECT COST
1 Site Management 1.00 Ls
2 HSE Equipments & Tools (working at operation area) 1.00 Ls
3 Mobilization & Demobilization 1.00 Ls
SUB-TOTAL A

B DIRECT COST
1 Temporary Security Post (1 Unit) + Temporary Toilet (1 Unit)
1.1 Concreting fc' = 28 Mpa, Slab 10cm THK 3.10 m3
1.2 Wiremesh M6@150 28.24 m2
1.3 Insert plate (carbon steel) including steel painting (white)
a. 40cm x40cm 1.00 pcs
b. 15cm x 15cm 9.00 pcs
c. 25cm x 25cm 1.00 pcs
1.4 Angle L50.50.5 (1 pc = 6m) including steel painting (white) 12.00 pcs
1.5 GRC, 4mm THK 76.80 m2
1.6 Multipleks 15 mm THK 10.24 m2
1.7 Deformed rebar D19 (1pc= 12m) 1.00 pcs
1.8 Roof sheet (aluminium sheet, glass wool & chicken mesh ) 37.27 m2
1.9 Wood Beam 5cm/7cm 36.30 m
1.10 Light truss
a. Wall Vertical 75x35x0.075, L1 90.00 m
b. Wall Horizontal 75x35x0,075, L2 28.00 m
c. Truss 75x35x0.075 67.10 m
d. Trus 40x20x0,75 96.00 m
e. Ceiling hollow 30x30 101.60 m
1.11 Listplank GRC 6mm THK, 30 cm width 8.10 m2
1.12 Gypsum for Ceiling, GRC 4mm THK 31.00 m2
1.13 Aluminium fixed window 1200x1200 (incl glass) 2.00 set
1.14 Aluminium double swing window 1200x1200 (incl glass) 1.00 set
1.15 Aluminium single swing door 900x2100 1.00 set
1.16 Dispencer including gallon 1.00 set
1.17 Wall Fan 1.00 pc
1.18 Bench 1.00 pc
1.19 Chair 2.00 pcs
1.20 Lamp (including cable, and electricity assesories) 5.00 set
1.21 Saklar 2.00 set
1.22 Power electricity (including cable & assesories) 2.00 pcs
1.23 Wall Painting (Dulux)
a. Interior (White) 54.63 m2
b. Exterior (Wheather shield)
i. White 50.39 m2
ii. Blue 8.10 m2
iii. Green 6.40 m2
1.24 Vynil tile 30cmx30cm 10.24 m2
1.25 Portable toilet Asahi type-A (1.5m x 1.2m x 2.65m Height) 1.00 Set
1.26 Assesories (Bolts, screw, dynabolts) 1.00 package
SUB-TOTAL B.1

2 Temporary Security Post (1 Unit)


2.1 Concreting fc' = 28 Mpa, Slab 10cm THK 2.50 m3
2.2 Wiremesh M6@150 25.00 m2
2.3 Insert plate (carbon steel) including steel painting (white)
a. 40cm x40cm 1.00 pcs
b. 15cm x 15cm 9.00 pcs
c. 25cm x 25cm 1.00 pcs
2.4 Angle L50.50.5 (1 pc = 6m) including steel painting (white) 12.00 pcs
2.5 GRC, 4mm THK 76.80 m2
2.6 Multipleks 15 mm THK 10.24 m2
2.7 Deformed rebar D19 (1pc= 12m) 1.00 pcs
2.8 Roof sheet (aluminium sheet, glass wool & chicken mesh ) 29.68 m2
2.9 Wood Beam 5cm/7cm 36.30 m
2.10 Light truss
a. Wall Vertical 75x35x0.075, L1 45.50 m
b. Wall Horizontal 75x35x0,075, L2 28.00 m
c. Truss 75x35x0.075 62.60 m
d. Trus 40x20x0,75 96.00 m
e. Ceiling hollow 30x30 72.60 m
2.11 Listplank GRC 6mm THK, 30 cm width 6.00 m2
2.12 Gypsum for Ceiling, GRC 4mm THK 25.00 m2
2.13 Aluminium fixed window 1200x1200 (incl glass) 2.00 set
2.14 Aluminium double swing window 1200x1200 (incl glass) 1.00 set
2.15 Aluminium single swing door 900x2100 1.00 set
2.16 Dispencer including gallon 1.00 set
2.17 Wall Fan 1.00 pc
2.18 Bench 1.00 pc
2.19 Chair 2.00 pcs
2.20 Lamp (including cable, and electricity assesories) 5.00 set
2.21 Saklar 2.00 set
2.22 Power electricity (including cable & assesories) 2.00 pcs
2.23 Wall Painting (Dulux)
a. Interior (White) 54.63 m2
b. Exterior (Wheather shield)
i. White 44.39 m2
ii. Blue 6.00 m2
iii. Green 6.40 m2
2.24 Vynil tile 30cmx30cm 10.24 m2
2.25 Assesories (Bolts, screw, dynabolts) 1.00 package
SUB-TOTAL B.2

3 Strongback For Lifting (1 Unit)


3.1 WF 150x75x5x7 9.20 m
3.2 L 100x100x10 12.80 m
3.3 Steel Plate 10 mm THK 0.60 m2
3.4 Bow Shackles with screw collar pin, WLL 1 Ton 18.00 nos
3.5 Standard eye & thimble sling 1/4 ", (1 nos = 3m length) 6.00 nos
3.6 Standard eye & thimble sling 1/4 ", (1 nos = 1.5m length) 6.00 nos
3.7 Steel Plate 12 mm THK 5.12 m2
3.8 Painting for steel structure (Grey) 13.83 m2
3.9 Bolts Dia 16mm 20.00 pcs
3.10 Bolts Dia 12mm 10.00 pcs
3.11 Fire retardant blanket for covering during welding activities 10.00 m
SUB-TOTAL B.3
SUB-TOTAL B (B.1 + B.2 + B.3)
GRAND TOTAL (A + B)
PRICE BREAKDOWN
PORTABLE SECURITY POST

Unit Price (Rp)


Total Price
Material Labor Equipment Total (Rp) Remarks
B C D E = B+C+D F = AxE

- -
- -
- -
-

- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
-

- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
-

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
-
harga toilet fiber 18,000,000.00