proj_appl
proj_appl
1. The original college request letter is issued by the institute is attached and the college is AICTE/UGC/AIU approved.
2. The student has attached 3 passport size photographs, and a copy of student’s college ID proof. The student must carry the
original college ID during training.
3. The student will not claim for refund of fees paid to BHEL and I will be responsible for any issue that arises.
4. I shall be held responsible for proper conduct of the student during the training in BHEL.
5. BHEL shall not pay stipend and do not provide Boarding / Lodging / Transport facility to the students.
I have read and understood all the above 5-point guidelines for the project work and I ensure the student shall abide by them.
(SIGNATURE OF EMPLOYEE)
1. I will not visit unauthorized area / workplace and any kind of deviation will lead to the TERMINATION of training.
2. I agree to come in formal dress, safety helmet and shoes inside the Factory and follow the prescribed safety rules. BHEL will
not be responsible for payment of any compensation for any injury that may arise out of the training.
3. I understand the property of BHEL including drawings/documents/tools shall not be used/taken or copied by me without the
permission of the guide. I will keep all the information collected by me as confidential & will use for academic purpose only.
4. I understand being vacation trainee, BHEL doesn’t entitle the trainee to have any kind of preference / weightage for any
recruitment in the company and on completion of training; I must return the CISF gate pass.
5. I understand that the training period can’t be extended and I will not be absent, during the period of training.
6. I understand fee once paid will not be refunded and I ensure all the stationary required in connection with the project work
shall be arranged by me.
I have read and understood all the above 6-point guidelines for the project work and I shall abide by them.
(SIGNATURE OF STUDENT)
For fee waiver of BHEL, R.C. Puram Employee (Regular / Retired / VRS) / BLCCS / GVSS / LWC / Contract Labour / CISF’s
dependent, the certification from HR Department is MUST.
HR CELL
Paid Dependent
HEAD /
Recommended Not recommended
PROJECT TRAINING IN-CHARGE HRDC
NOTE: For further details please visit HRDC intranet portal. (Please do not print back to back for correctness of processing.)
FORM-B
PT Regn. No E/M
Date: / /
To be filled by Student
From:
To:
Name of Regular Employee Staff No. Department Phone No.
and having College Roll No ______________________ has completed project training from
_____/_____/_________ to _____/____/_________ . He/she was absent for a period of ____ days. The title
NOTE: Before signing Project Training Completion Report, the guide must ensure that the student
returns all the journals, documents, books, tools, drawings etc. Guide has to necessarily ensure that
date findings/ study is in the interest of the organization and any kind of information, which is
detrimental to company’s business, is not shared at all. The guide must not sign the Project Training
Completion Report before the due date of completion.
FORM-C
(Signature of Student)