BEME for building construction
BEME for building construction
₦
PL/3
BILL NR 2- MAIN BUILDING
Building Works
PRELIMINARIES
AMOUNT
S/N DESCRIPTION QTY UNIT RATE AMOUNT
BILL NO. 2- MAIN BUILDING (BUILDING WORKS)
SUBSTRUCTURE (ALL PROVISIONAL)
1100 m2
A 142 m3
BC 19 m3
D 161 m3
Carried to collections
S/N DESCRIPTION QTY UNIT RATE AMOUNT
RISK OF COLLAPSE
Risk of collapse of excavations to deep excavations
A Sides of trench and hole excavations exceeding 2m deep 316 m2
Compaction of surfaces
G Compaction of ground surface under floors etc including 70 m2
scarifying for a depth of 150mm, breaking down oversize
material, adding suitable material where necessary and
compacting to 90% Mod AASHTO density
SOIL POISONING
Soil insecticide
H Apply 'Dieldrex 20' to under floors etc including forming and 531 m2
posioning shallow furrows against foundation walls etc, filling
in furrows and ramming
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED
SURFACES
10MPa/19mm concrete
J Surface blinding against earth and unblinded sand 19 m3
REINFORCED CONCRETE
25MPa/19mm concrete
K Ground beam 63 m3
L Lift shaft 3 m3
Carried to collections
S/N DESCRIPTION QTY UNIT RATE AMOUNT
FORMWORK
Sawn formwork to sides generally
A Ground beam 422 m2
Carried to collections
COLLECTION
Page/1
Page/2
Page/3
Element No. 1
Subsructure carried to Summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No. 2: FRAME
E05: In situ concrete
25MPa/19mm concrete
A Columns 58 m3
B Beam 125 m3
C Slab 234 m3
D Lift wall 22 m3
E20: Formwork for in situ concrete Formwork and basic finish
Element No. 2
Frame carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No. 3 ROOF AND ROOF COVERING
E05: In situ concrete
25MPa/19mm concrete
A Beams 30 m3
C Copping 2 m3
E20: Formwork for in situ concrete
Formwork and basic finish (Marine plywood)
Carried to collections
S/N DESCRIPTION QTY UNIT RATE AMOUNT
SUNDERIES
150 mm Fulbora cast iron roof outlet complete with grouting
and built into
concrete
A 150mm diameter drain pipes 6 Nr
M10: sand cement screeds
40mm thick Cement-
sand (1:3) one coat screed on concrete work
Carried to collections
COLLECTION
Page/5
Page/6
Element No. 3
Roof covering and Structure carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
AMOUNT
ELEMENT No.4: STAIRCASES
E05: In situ concrete
25MPa/19mm concrete
Staircases
G Bar, 10-16mm diameter 2.55 t
Surface finishes
M20: Plastered/Rendered/ roughcast coatings
Cement-
sand (1:4) one coat external rendering on block or concrete
work
Carried to collections
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.4: STAIRCASES (CONT'D)
M40:Stone/Concrete Quarry/Ceramic tilling/ Mosaic
Porcelain martle floor tiles size 600mm x 300mm laid on cement an
d sand beds in approved pattern
L30:Stairs/Walkways/ Balustrades
G Stair balustrade; made of black pipe 1.2m high fixed complete 94 m
with all accessories including plugging into blockwork or
concrete
Carried to collections
COLLECTION
Page/7
Page/8
Element No. 4
Stairs carried to Summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.5: EXTERNAL AND INTERNAL WALLS
F10: Brick and blockwalling
Vibrated hollow sancrete blocks in cement mortar (1:6) laid in
stretcher bond
C Lintel 2 m3
Element No. 5
External and Internal walls carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
Element No. 6
Window and Doors carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.7: WALL FINISHES
External and Internal
M20: Plastered/Rendered/ roughcast coatings
Cement-
sand (1:4) one coat external rendering on block or concrete work
Element No. 7
Wall finishes carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.8: CEILING FINISHES
M20 12mm thick Gypsum board ceilings
with galvanised steel support, smooth rendering, one coat to
general surfaces complying to Architect' details
Element No. 8
Ceiling finishes carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.9- FLOOR FINISHES
Surface finishes
M10: sand cement screeds
38mm thick Cement-sand (1:3) one coat screed on concrete work
m2
B Open Office, stairhall. Services, Kitchennette and toilets 199
C Skirting 725 m
Element No. 9
Floor finishes carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
A ELEMENT No.10 FITTINGS AND FIXTURES PS
A54: Provisional work
Include a provisional sum for Kitchen cabinets
Element Nr.10
Fittings and fixtures Carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
SUMMARY ,
SUBSTRUCTURE
FRAME
ROOF COVERING AND STRUCTURE
STAIRCASE
INTERNAL AND EXTERNAL WALLS
WINDOWS AND DOORS
WALL FINISHES
CEILINGS FINISHES
FLOOR FINISHES
FITTING AND FIXTURES
A 17 m3
B 17 m3
Carried to collections
S/N DESCRIPTION QTY UNIT RATE AMOUNT
RISK OF COLLAPSE
Risk of collapse of excavations to deep excavations
A Sides of trench and hole excavations exceeding 2m deep 55 m2
B Keeping excavations free of water Item
Keeping excavations free of water
Compaction of surfaces
F Compaction of ground surface under floors etc including 24 m2
scarifying for a depth of 150mm, breaking down oversize
material, adding suitable material where necessary and
compacting to 90% Mod AASHTO density
SOIL POISONING
Soil insecticide
G Apply 'Dieldrex 20' to under floors etc including forming and 77 m2
posioning shallow furrows against foundation walls etc, filling
in furrows and ramming
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED
SURFACES
10MPa/19mm concrete
H Surface blinding against earth and unblinded sand 1 m3
REINFORCED CONCRETE
25MPa/19mm concrete
J Ground beam 8 m3
Carried to collections
S/N DESCRIPTION QTY UNIT RATE AMOUNT
FORMWORK
Sawn formwork to sides generally
A Ground beam 21 m2
BRC mesh
C Brc wire mesh 32 m2
Reinforcement bars; B.S. 4449, hot rolled ribbed, high yield ste
el; straight,bent and curved
Carried to collections
COLLECTION
Page/1
Page/2
Page/3
Element No. 1
Subsructure carried to Summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No. 2: FRAME
E05: In situ concrete
25MPa/19mm concrete
A Columns 3 m3
B Beam 1 m3
E20: Formwork for in situ concrete Formwork and basic finish
C To sides of column 36 m2
Element No. 2
Frame carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No. 3 ROOF AND ROOF COVERING
E05: In situ concrete
25MPa/19mm concrete
A Roof slab 6 m3
E20: Formwork for in situ concrete
Formwork and basic finish (Marine plywood)
SUNDERIES
150 mm Fulbora cast iron roof outlet complete with grouting
and built into
concrete
D 150mm diameter drain pipes 2 Nr
M10: sand cement screeds
40mm thick Cement-
sand (1:3) one coat screed on concrete work
Element No. 3
Roof covering and Structure carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.4: EXTERNAL AND INTERNAL WALLS
F10: Brick and blockwalling
Vibrated hollow sancrete blocks in cement mortar (1:6) laid in
stretcher bond
B Lintel 1 m3
Element No. 5
External and Internal walls carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.5 : WINDOWS AND DOORS
"White Epoxy" powder coated aluminum coated outward five(5) ba
y
wndow with 3 fixed panels complete with aluminium lever handles,
double glazing in 6mm grey tinted glass, 12mm void filled with
Argon gas & 2-
layers of 3mm clear glass with 0.37PVB ; complying
to Architect details
A Ditto size 450mm x 1200mm high 1 Nr
D 1165mm x 2100mm 1 Nr
E 1145mm x 2100mm 1 Nr
2345mm x 2100mm
F L20: Timber Doors 1 Nr
Supply and fix; Interior quality; single panel single swing
Isreali Security door with high fire
resistance complete with architraves and
ironmongeries in accordance to architect's details to fit openin
g size.
Element No. 6
Window and Doors carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.6: WALL FINISHES
External and Internal
M20: Plastered/Rendered/ roughcast coatings
Cement-
sand (1:4) one coat external rendering on block or concrete work
Element No. 7
Wall finishes carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.7: CEILING FINISHES
M20: Plastered/Rendered/ roughcast coatings
Cement-sand (1:4) one coat fair finishes to soffit of slab in ground
floor
Element No. 8
Ceiling finishes carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT No.8- FLOOR FINISHES
Surface finishes
M10: sand cement screeds
38mm thick Cement-sand (1:3) one coat screed on concrete work
Element No. 9
Floor finishes carried to summary
S/N DESCRIPTION QTY UNIT RATE AMOUNT
SUMMARY ,
SUBSTRUCTURE
FRAME
ROOF COVERING AND STRUCTURE
INTERNAL AND EXTERNAL WALLS
WINDOWS AND DOORS
WALL FINISHES
CEILINGS FINISHES
FLOOR FINISHES
Preliminaries
GENERATORS
Supply, install, test and commission a Prime Rated
250KVA, 415V, 50HZ, 1500 RPM, ACOUSTIC
2 GENERATING SET 1 No.
complete with all necessary accessories.
PERKINS OR APPROVED EQUAL
3 Allow for earthing with heavy duty copper earth rods, 1 lot
earth cables, earth bar and other accessories for the
LV PANEL and GENERATORS to obtain Earth
Resiatance (R<1).
HT Supply & Transformer 1 No.
Supply and Install 200KVA 11/0.415kV 50Hz OIL
Immersed ONAN type step down
transformer,complete with metering unit (Installation
cost to include cost for terminations,earthing etc to
PHCN standard and in accordance with Statutory
Regulations
ABB/SCHNEIDER
Sub-Total A To Collection
AMOUNT N
AMOUNT N
-
ITEM DESCRIPTION QTY UNIT RATE SUPPLY RATE FIXED N
N
SITE)
1core 240mm² PVC/PVC copper cable for NEAREST
PHCN SUPPLY - LV PANEL (3P+N)
1 75 m
1core 120mm² PVC Earth cable. 75 m
1core 240mm² PVC/PVC copper cable for GEN SET - LV
2 PANEL (3P+N) 90 m
1 25 No.
2 Earth rod couplings 15 No.
1
INDELEC Preventron 3 S6.60 1 No.
2 Earth copper rods 1.22m x 15mm dia. 5 No.
D LIGHTING FITTINGS
H LIGHTNING PROTECTION
I SECURITY/CCTV SYSTEM
J FIRE DETECTION AND ALARM SYSTEM
SUBTOTAL (Carried forward to Collection)
COLLECTION
SUB-TOTAL
BILL NR 5- ELV INSTALLATIONS
AMOUNT N
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ITEM BILL No. 5 - ELV INSTALLATIONS QTY UNIT BASIC FIXED
DESCRIPTION RATE RATE
1 ELV SUPPLY AND INSTALLATION
Supply, Installation, testing and commissioning of
30kVA
-
ITEM Section 1 - SANITARY APPLIANCES QTY UNIT BASIC FIXED
DESCRIPTION RATE RATE
1 BILLNO. 6 - PLUMBING INSTALLATIONS
Supply and install the following:
TOTAL TO Collection
TOTAL COST
-
Section 3- SOIL, DRAINAGE & RAINWATER
BASIC FIXED
ITEM SERVICES QTY UNIT
DESCRIPTION RATE RATE
Supply and install the following:
(Pipework shall be UPVC Fit for abover and Under
ground use Except indicated otherwise)
1 Pipes
i. 50mm 38 m
iii 100mm 38 m
iv 150mm 52 m
2 Elbows 88.5 deg
i. 50mm 10 Nos
iii 100mm 8 Nos
iv 150mm 10 Nos
4 Tees 88.5 deg branch
i. 50mm 5 Nos
iv 100mm 4 Nos
v 150 x 100mm 3 Nos
5 Tees 45 deg branch
i. 50mm 5 Nos
ii 100 x 50mm 10 Nos
6 Reducers
i. 100 x 50mm 6 Nos
ii 150 x 100mm 24 Nos
8 Floor Clean Out
i 100mm Access pipe 12 Nos
ii Weather Cap for pipes e.g. Vent cowls Lot
TO Collection
TOTAL
COST
-
COLLECTION
Section 1 - Sanitary Appliances (Installation only)
Section 2 - Water Services
Section 3 - Drainage Services
-
ITEM BILL No. 7 - HVAC INSTALLATIONS QTY UNIT BASIC FIXED
DESCRIPTION RATE RATE
1 AIR CONDITIONING SYSTEMS SUPPLY AND 3 Nr
AB INSTALLATION 1 Nr
CD Daikin, Panasonic or equal and approved 5 Nr
EF Airconditioning Unit including sales, testing and 9 Nr
G commissioning 12 Nr
H CEILING MOUNTED DUCTED-TYPE SPLIT AIR 15 Nr
J CONDITIONING UNITS 1 Lot
K Equipment: Daikin, Panasonic or other approved 1 Lot
L equal, 1 Lot
M 1 Lot
Single split air conditioning system complete with all 18 Nr
accessories necessary for installation 1 Lot
OUTDOOR UNIT
84 kw cooling capacity fresh air unit
22.4 kw cooling capacity fresh air unit
CASSETTE-TYPE VRF INDOOR UNITS
4.5 kw cooling capacity - Diffuser (Windfree 4way)
2.2 kw cooling capacity - Indoor wall mounted
MSP DUCT TYPE AIR CONDITIONING SYSTEM
9.0 kw cooling capacity
12.80 kw cooling capacity
REFRIGERANT LINE ACCESSORIES
Supply, install, test and charge the following copper
pipe refrigerant lines for the air conditioning units
above with all necessary fittings as recommended by
manufacturer.
CONDENSATE DRAIN LINE
Supply, install and test the UPVC pipe with insulation
to connect to drain as shown in drawing.
ELECTRICAL CABLING
Communication cable interconnecting all the indoor
units and their corresponding outdoor unit and
controllers serving individual indoor AC units
CONSUMABLES
Allow for Duct-tapes, Gasket, Thread tape, Brazing
Rod, Adhesive Gum, Sealant, Tangit Gum, Unistrut,
Beam Clamp and other necessary materials for
complete installation.
WALL MOUNTED FAN (TOILET BATH) - EF-05
Model:XPELAIR DX100 or approved equivalent
MISCELLANEOUS
Allow for leakage test
-
ITEM BILL No. 8 - LIFT SYSTEM QTY UNIT BASIC FIXED
DESCRIPTION RATE RATE
A Otis or Kone elevator including sales, testing 1 No
and commissioning for 650kg 4stops
-
RKS
S/N DESCRIPTION QTY UNIT RATE
A
B BILL NO. 9 - EXTERNAL WORKS
125mm thick x 225mm high precast concrete kerbs with fair faced
finish; bedded and fixed on in-situ concrete foundation and haunching 86 m
(measured altogether)
PAVING (internal) 546 m2
Installation of interlocking paving on site and Provide insitu cast
Stamped concrete floor to external parking, all according to architect
design
Kerbs / Paving
carried to External Works summary
S/N DESCRIPTION QTY UNIT RATE
A FENCE WORK
B EXCAVATION, FILLING, ETC OTHER THAN BULK
C
D Excavation in compacted earth maximum depth not exceeding 2m dee
E p inclusive
F of Working space allowance to excavation not exceeding 2.0m deep; in
G cluding
H additional earthwork support, disposal and backfilling with selected exc
J avated
material compacted
Ground beam to 95% Mod AASHTO density 600mm away from fa
excavation 80 m3
CARTING AWAY
RISK OF COLLAPSE
COMPACTION
Compaction of surfaces
Compaction of ground surface under floors etc including scarifying for a 35 m2
depth of 150mm, breaking down oversize material, adding suitable
material where necessary and compacting to 90% Mod AASHTO density
SOIL POISONING
Soil insecticide
Apply 'Dieldrex 20' to under floors etc including forming and posioning 307 m2
shallow furrows against foundation walls etc, filling in furrows and
ramming
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
10MPa/19mm concrete
Surface blinding against earth and unblinded sand 2 m3
REINFORCED CONCRETE
25MPa/19mm concrete
Footing 35 m3
Carried to Collection
AMOUNT
AMOUNT
AMOUNT
S/N DESCRIPTION QTY UNIT RATE
BLOCKWORK
Sandcrete hollow blockwork, bedded and jointed in cement and sand m
ortar (1:6) in 4.5 Mpa min.
A Walls; 230 thick; stretcher bond 354 m2
B DAMP PROOF COURSE m
One layer of 1000 micron waterproof sheeting sealed at laps with Press
ure Sensitive Tape
Plain areas, horizontal; laid loose including sealing edges to concrete
SECURITY GATE
C Supply and fix complete fully finished aluminum double swing gate at 1 nr
3m high, fully finished to architect specification. Size 4.000mm wide x
3.000m high
D Single folding security steel gate at 120mm high, fully finished to 1 nr
architect specification. Size 4.000mm wide x 3.000m high
External and Internal
M20: Plastered/Rendered/ roughcast coatings
Cement-sand (1:4) one coat external rendering on block or concrete work
Carried to Collection
Collecton
Page/2
Page/3
Allow a provisional sum for generator plinth size 4.2m x 3.0m. This cost PS
includes
excavation, concrete work, blocckwork and all associated electrical
works
SEPTIC TANK AND SOAK AWAY
Allow for a provisional sum for 2.8m x 3m septic tank and soakaway 1 No
pit, this cost includes excavation, concrete work, reinforcement and
associated blockwork.
Borehole and water treatment 1 No
Other External Works
carried to External Works summary
AMOUNT
S/N DESCRIPTION QTY UNIT RATE
EXTERNAL WORKS SUMMARY
PAVING
FENCING
OTHER EXTERNAL WORKS
CARRIED TO SUMMARY
GENERAL SUMMARY
AMOUNT
PROPOSED NSIB OFFICE COMPLEX BUILDING
MURTALA MUHAMMED INTERNATIONAL AIRPORT, IKEJA, LAGOS STATE
For:
NIGERIAN SAFETY INVESTIGATION BUREAU (NSIB)
A GENERAL SUMMARY -
B PRELIMINARIES -
C MAIN BUILDING (Building Works) -
D SECURITY AND GENERATOR HOUSE -
D ELECTRICAL INSTALLATIONS -
E ELV INSTALLATIONS -
F MECHANICAL - PLUMBING -
G MECHANICAL - HVAC -
H MECHANICAL - LIFT -
EXTERNAL WORKS
ADD: CONTINGENCY
ADD: VALUE ADDED TAX
-
-
-
-
PS
5.0%
7.5%
ESTIMATED CONSTRUCTION COST -