Testing and Commissioning Irs Fire and Plumping
Testing and Commissioning Irs Fire and Plumping
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
TESTING & COMMISSIONING REPORT
1 DUTY + 1 STANDBY WATER BOOSETR PUMP SET WITH 100 LTR PRESSURE VESSEL
PROJECT NAME G+6
LOCATION Plot No.2326-1286 at Al Jadaf, Dubai
CLIENT Isa Abdulla Haider Obaid Bin Haider
CONTRACTOR Voltflux Electromechanical Works LLC
DATE OF COMMISSIONING 03/03/2025 MAKE GRUNDFOS
1D + 1S BOOSTER PUMP SET MODEL CM 15-3
MODE OF OPERATION 1 DUTY + 1 STANDBY
PANEL SPECIFICATION Three Phase 1D+1S Control Panel
DRY RUN PROTECTION
CONTROL
OK TESTED
PUMP DETAILS 1 DUTY 1 STANDBY
CUT - IN : 4.0 BAR
CUT - OFF : 5.3 BAR
ELECTRICAL
RATED 380/415V
VOLTAGE
MEASURED 400 V
RATED 8.20 A
CURRENT IN AMPS
MEASURED 7.6 A
POWER IN KW RATED 4.0 KW/5.5 HP
MCB 16A 3 POLE
CONTROL MCB 10A
OVER LOAD RELAY 7.0 - 10.0 A
CONTACTORS OK TESTED
INDICATORS OK TESTED
H-O-A OK TESTED
SELECTOR SWITCH OK TESTED
MECHANICAL
FLANGE/ UNION OK TESTED
GATE VALVE OK TESTED
PRESSURE GUAGE OK TESTED
PUMP ROTATION OK TESTED
PRESSURE VESSEL OK TESTED
Technical Dept.
TESTING & COMMISSIONING REPORT
1 DUTY + 1 STANDBY WATER TRANSFER PUMP SET
PROJECT NAME G+6
LOCATION Plot No.2326-1286 at Al Jadaf, Dubai
CLIENT Isa Abdulla Haider Obaid Bin Haider
CONTRACTOR Voltflux Electromechanical Works LLC
DATE OF COMMISSIONING 03/03/2025 MAKE GRUNDFOS
1D + 1S TRANSFER PUMP SET MODEL CM 25-4
MODE OF OPERATION 1 DUTY + 1 STANDBY
PANEL SPECIFICATION Three Phase 1D+1S Control Panel
DRY RUN PROTECTION
CONTROL
OK TESTED
PUMP DETAILS 1 DUTY 1 STANDBY
ELECTRICAL
RATED 380/415V
VOLTAGE
MEASURED 400 V
RATED 14.8 A
CURRENT IN AMPS
MEASURED 12.0 A
POWER IN KW RATED 7.4 KW/9.92 HP
MCB 16A 3 POLE
CONTROL MCB 10A
OVER LOAD RELAY 12.0 - 16.0 A
CONTACTORS OK TESTED
INDICATORS OK TESTED
H-O-A OK TESTED
SELECTOR SWITCH OK TESTED
MECHANICAL
FLANGE/ UNION OK TESTED
GATE VALVE OK TESTED
PRESSURE GUAGE OK TESTED
PUMP ROTATION OK TESTED
Technical Dept.
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*
PROJECT GROUND +02 PODIUM'S+SIXFLOOR'S+ROOF (OFFICE BUILDING)
Inspection
Activity Location Date* Time
Annexures
1- Sketch showing location
Contractor"s undertaking
I UNDERTAKE FULL RESPONSIBILITY OF EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH LATEST APPROVED DRAWINGS,
SPECIFICATION AND METHOD STATEMENT.
Sub Contractor's name & Stam Contractor's name & Stamp Consultant's receipt
Received
Checked Consultant's Stamp & Sign
*Inspection request must reach the consultant at least 24 hour in advance*