SAP MM Work Book -II
SAP MM Work Book -II
SAP MM 2020
TABLE OF CONTENT
8. Reservation
8.1. What is Reservation?
8.2. How to reserve a reservation document?
9. Logistic Invoice Verification ……………………………………………..
9.1. IMG settings: LIV …………………………………………………………
9.2. Maintain Number Assignments for Accounting Documents ………………………………
9.3. Maintain Number Range Intervals for Invoice Documents ………………………………
9.4. Tax settings: LIV…………………………………………………………
9.4.1.Check Calculation Procedure …………………………………………………………
9.4.2.Assign Country to Calculation Procedure ………………………………………………
9.4.3.Define Tax Codes for Sales and Purchases ………………………………………
10. Logistic Invoice Verification ……………………………………………
10.1. Check Points …………………………………………………………
10.2. How to do the Invoice verification …………………………………………………………
10.3. Observations …………………………………………………………
Inventory Management
Inventory Management Overview
Goods movement
It is a goods movement, with which the receipt of the goods from vendor or production is posted.
A good receipt leads to an increase in warehouse stock
Stock Transfer
Transfer Posting
• It is a general term for changes in stock type or stock category or stock status of a material
• Transfer posting from material to material
• Release from quality inspection stock
[Note: It is irrelevant whether the posting occurs in connection with Phy. movement or not]
Document concept:
• The account principle of ‘No posting without document” is applies even IT based Inventory
management system
• A document is a proof that a transaction involving stock changes has taken place
• When a good movement is posted, a Material Document is generated as a proof of the
movement.
• If the movement is relevant to the financial accounting (i.e. if it is leads to an update of G/L
accounts) an accounting document will be generated parallel to the material document.
WA – Goods Issue
WE – Gross Goods Receipt
WN – Net Goods Receipt
WI – Physical Inventory Document
WL - Transfer posting
Movement Type
It is meant for
• Goods Receipt
• To display of material document
• Goods Issue
• Releasing of GR Blocked stock
• Place in storage
• Removal from storage
• Cancellation of material document
1. Material documents
a. MB51 – List of Material documents
b. MR51 – List of Accounting documents
2. Stock
MMBE – Stock Overview MB52 -- Warehouse Stock
MB53 – Plant Stock Availability MB5B – Stock between Posting Dates
MB5T – Stock in Transit MBLB – Stock with Subcontract Vendor
ME2o -- Stock provided to the vendor MB50 -- Total Stock all materials
MB5S -- List of GR/IR balances
6. Layouts:
a. ME9F -- PO Printout
b. MB90 -- Output from Goods Movements
c. ME9A -- RFQ Printout
d. ME9E -- Schedule Agreement Printout
7. Reports:
1. Plant Parameters
2. Define Number Assignment for Material and Phys. Inv. Docs (OMBT)
Before GR After GR
In Material Master Record (MM03) In Material Master Record (MM03)
- No new View will be Created - A new View Storage loc. will be Created
No Material and A/c Documents will be created one Material and one A/c Documents will be
created
No Updates in Stock status (MMBE) Updates in Stock status (MMBE)will be done
By increasing the Quantity of the material
In Purchase Order (ME23N) In Purchase Order (ME23N)
- In Header Data – Status tab: - In Header Data – Status tab:
Ordered Qty. – X Nos. Ordered Qty. – X Nos.
Delivered Qty. – 0 Nos. Delivered Qty. – Y Nos.
Still to be delivered Qty. – X Nos.
Still to be delivered Qty. – (X-Y) Nos.
- In Item Details - In Item Details
Delivery Tab Delivery Tab
No check on Deliver completion
indicator check on Deliver completion indicator
- No New Tab: PO History will be created (If the full Qty. received)
- New Tab: PO History will be created with GR
updated details
Goods Movements
Goods Movements are 4 types
A) Goods Receipt:
GR w.r.t PO
1. Goods Receipt - Un-restricted stock type
2. Goods Receipt - QI stock type
3. Goods Receipt - Blocked stock type
4. GR - Partial quantities in to multiple stock types
5. GR – Multiple POs from SAME vendor
6. GR – Multiple POs from Multiple vendors
7. Goods Receipt - Blocked
8. Release of GR-Blocked stock
GR - W/o PO
9. GR - W/o PO - Initial stock entry – Before Go-live
o GR - W/o PO - Initial stock entry – into Un-restricted stock type
o GR - W/o PO - Initial stock entry – QI stock type
o GR - W/o PO - Initial stock entry – Blocked stock type
Steps:
3. Stock Status
Org Unit U/R Stock qty. On order
Plant Increased Decreased
Str. loc. Increased Decreased
Steps:
3. Stock Status
Org Unit QI Stock qty. On order
Plant Increased Decreased
Str. loc. Increased Decreased
Steps:
3. Stock Status
Org Unit Blkd Stk qty. On order
Plant Increased Decreased
Str. loc. Increased Decreased
Steps:
• Use Tcode = MIGO
• Option: Goods Receipt
• Sub Option: Purchase Order
• MVT: 101 (GR w.r.t PO into Stores)
• PO No : xxxxxx.
Steps:
• Use Tcode = MIGO Observations:
• Option: Goods Receipt 1. One Material document will be created
• Sub Option: Purchase Order 2. One A/c document will create
• MVT: 101 (GR w.r.t PO into Stores) and trigger the following G/L accounts
• PO No : xxxxxx. G/L account Description
Steps:
• Use Tcode = MIGO Check ‘OK’ check box
• Option: Goods Receipt Click ‘check’ button on application to bar
• Sub Option: Purchase Order System validate your entries
• MVT: 101 (GR w.r.t PO into Stores) System display an ERROR
• PO No : xxxxxx. “Enter Vendor XXX (same) vendor Only
System Display PO details of one vendor System DONOT allow you to post
Again enter one more PO details of other vendor multiple POs of Multiple vendors
System appends 2nd PO details in a single GR (MIGO)
Select the Line items which you wish to receive
7. Goods Receipt - Blocked: Due to administrative reasons sometimes company will receive
the material inside the premises, however not taken into the str. loc
Steps:
• Use Tcode = MIGO
• Option: Goods Receipt
• Sub Option: Purchase Order
• MVT: 103 (GR w.r.t PO into Blocked NOT
Into the Str.Loc.)
• PO No : xxxxxx
• System Display PO details in to MIGO
8. Releasing of GR Blocked
1st Method
Tcode = MIGO
Option: Goods Receipt
Sub Option: Purchase Order
MVT: 105 Releasing of GR Blocked
Enter PO No: XXXXXX
(Same PO through which we blocked the
Stock earlier)
Sys Display the PO Details
2nd Method
Tcode = MIGO
Option: Release of GR Blocked
Sub Option: Material Document (Through which we blocked the stock earlier)
Enter Material Document No: XXXXXX
Sys Display the Material Document Details Observations:
Mat OK Qty Str loc MVT S typ Plant 1. One Material doc will be created
Xxx xx S11 105 U/R XPL1 2. One A/c document will be created
Check OK Check Box It triggers the following GL accounts
Enter Str. Loc GL A/c no Description
30000 Inv. Raw of Material
+ve
Click Check button on application tool bar 191100 GR/IR Clearing A/c
-ve
If No error 3. Stock Status:
Sys display ‘Doc OK’ Org Unit U/R GR blocked On
order
Click Post Plant
Str. Loc
GR without PO or GR Others
Again GR others are Two Types
a. Before Go-Live (GR – w/o PO as Initial Stock entries)
b. After Go-Live (GR – w/o PO as Auction Stock entries)
Click Check
Click Post
Observations
Observations
B Stock transfer
Transferring of Stock from one organizational unit to other organizational unit can be called as Stock
Transfer
1. Stock Transfer are two types
a. Intra Company Stock transfer ( With in the Co_cd )
i. Str. loc - to – Str. loc
1. One step method
2. Two step method
a. Rem. from str. loc.
b. Placing into str. loc.
ii. Plant - to - Plant
1. One step method
2. Two step method
a. Rem. from str. loc.
3. Placing into str. loc.
b. Inter Company Stock transfer ( Between Co_cd )
i. Co_cd - to Co_cd
1. W/o SD w/o billing
2. With SD w/o billing
3. With SD with billing
a. Stock transfer (Intra company Stock Transfer)
Steps
Use Tcode = MIGO
Option: Transfer Posting
Sub Option: Others
MVT: 311 – Transfer posting str 2 Str
one step
Steps
Use TCode = MIGO
Option: Transfer Posting
Sub Option: Remove from Str Loc
MVT: 313 – Transfer posting str 2 str –
- Remove form str loc.
Steps
Use Tcode = MIGO
Option: Transfer Posting
Sub Option: Place into Str Loc
MVT: 315 – Transfer posting str 2 str –
- Place into str loc.
Steps
Use Tcode = MIGO
Option: Transfer Posting
Sub Option: Others
MVT: 301 – Transfer posting
plant 2 plant one step
Steps
Use Tcode = MIGO
Option: Transfer Posting
Sub Option: Remove from Str Loc
MVT: 303 – Transfer posting plant 2 plant–
- Remove form str loc.
Steps
Use Tcode = MIGO
Option: Transfer Posting
Sub Option: Place into Str Loc
MVT: 305 – Transfer posting plant 2 plant –
- Place in to str loc.
In Item details
√𝑇𝑟𝑎𝑛𝑠𝑓𝑒𝑟 𝑃𝑜𝑠𝑡𝑖𝑛𝑔 1. A material document will be created
Destination From 2. No accounting doc will be created
Mat: xxxxx Mat: xxxxx
Plant: XPL1 Plant: XPL1 3. Stock Status:
Str Loc : S12 Org Unit U/R Stk in Trn
(strloc)
Qty: XX Nos Plant No change
Observations:
S11 Decreased
S12 Increased Decreased
Transfer posting
Stock Types
Stock Types
When we receive the material, we have to apply a status for the material is called
Stock type or stock category, i.e. the materials available in stores must be a stock
status
There are 3 stock types that indicate a material’s usability.
Unrestricted Stock type
Quality Inspection Stock type
Blocked Stock type
Transfer posting
Cost Center
It is an expenditure category
In a company normally the following departments are available
Sales
Production
Project
Service
Administration
R&D
In order to post the respective expenditures in the respective departments these cost center
will be created like
Sales Cost Center
Production Cost Center
Project Cost Center
Service Cost Center
Administration Cost Center
R & D Cost Center
Goods Issue
Physical Inventory
What is Physical Inventory?
• Periodic Inventory
• Continuous inventory
• Cycle counting
• Inventory sampling
Periodic Inventory:
• In periodic Inventory all stocks of the company are physically counted on the balance
sheet key date.
• Every material must be counted
• During counting, the warehouse must be blocked for material movements.
Continuous Inventory:
• With the continuous Inventory procedure, stocks are counted continuous during the
entire fiscal year.
• In this case, it is important to ensure that every material is physically counted at least
once during the year.
Cycle Counting:
Inventory Sampling:
• In inventory Sampling, randomly selected stock of the company are physically counted
on the balance sheet key date.
• If the variance between the result of the count and the book inventory balance are
small enough, it is presumed that the book inventory balances for the other stock are
correct.
Independent of the Physical inventory procedure, the physical inventory process can be
divided into three phases:
o The stocks in the warehouse are counted and the count results are entered in
the count list.
o These are then transferred from the count list to the system in the step “Enter
Physical inventory count”
o Using the list of inventory differences, you can check variances in the stocks.
o You should check whether the transferred count result is correct (change
count) or whether you want to initiate a recount.
o If the difference is accepted, it is posted and stock is corrected.
Steps:
Steps:
Steps:
Steps:
Reservations
IMG Settings:
SPRO → MM → Inv. Mgmt. and Phy. Inv. → Plant parameters
Steps in Reservation
1. Create a material with General plant data/storage 2 view
2. Create Reservation for the above material (MB21)
• Note: Enter MVT = 201, plant, material no, qty. and str. loc details
3. System generates a Reservation doc.
4. Note down the reservation doc no.
5. Now check the stock status (MMBE) for the above material
6. System reserves the above material qty. under reservation category
7. Make a PO and GR for the above material
8. Check the stock status (MMBE) for the above material
• Note: The Material Qty in U/r stock type will be increased and another reservation qty
will also appear
9. Make a Goods Issue (MB1A) w.r.t above reservation (MVT 201)
10. Check the stock status: (MMBE)
• It is observed that both U/r Qty and reserved qty. will be reduced
Steps:
• In this module system verify the vendor Invoices for its content and price
• Tcode for Invoice verification = MIRO
• Pre requisites are:
o You should have a PO for which GR has to be made
Or
o You can have a Scheduling Agreement and its GR
Check Points:
Steps:
• Use Tcode = MIRO
• In initial screen
• Check the above 4 check points
• Enter the PO no = XXXX
• Enter the Amount as Balance amount
• No errors will be appeared
• green light indicates to proceed for post by clicking save button
• Click Save to post the document
• Note down the document No
Observations:
• System will create an invoice document as a proof of entering the incoming invoice
• How to view this Invoice document?
• Use Tcode = MIR4 (display of Invoice doc)
• Enter the document No and year
• Press enter
• system will display the invoice doc
• To view an a/c if any created during this process
• Click 'follow-on document' button
• System will display the a/c doc which is attached to this invoice doc
• The Following a/c will trigger during the invoice verification
G/L A/cs Description
400000 JK Tyres Limited -ve
191100 Goods Rcvd/Invoice R +ve
154000 Input tax +ve