Material Submittal Air Release Valve
Material Submittal Air Release Valve
FOR
AIR RELEASE VALVE
License Category Dep. of Economic Development دائرة التنمية القتصادية فئة الرخصة
Legal Type Limited Liability Company(LLC) ذات مسئولية محدودة الشكل القانون
Expiry Date 07/02/2026 تاريخ النتهاء Issue Date 08/02/2015 تاريخ الصدار
D&B D-U-N-S ® No الرقم العالمي Main License No. 726596 رقم الرخصة الم
Register No. 2209640 رقم السجل التجارى DCCI No. 246879 عضوية الغرفة
Remarks / الملحظات
Print Date 14/02/2025 19:48 تاريخ الطباعة Receipt No. رقم اليصال
/ )دو6969 أرسل رقم الرخصة إل،يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة
Get FREE access to
.اتصالت( للحصول على اذن الدفع Zoho One for the first
year
Now you can renew your trade license by sending a text message (SMS). Send your trade license . احصل على زوهو ون مجانا
للسنة الولى Zoho.com/det
number to 6969 (Du/ Etisalat) to receive payment voucher.
لمراجعة صحة البيانات الواردة في الرخصة يرجي مسح رمزالستجابة السريعة. وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة القتصاد والسياحة في دبي
This is a certified e-document issued without signature by the department of Economy and Tourism .Kindly scan the QR Code to verify the certificate
2.COMPLIANCE STATEMENT INCLUDING RELATED
DRAWING & STAMPED SPECIFICATION
PROJECT NAME: B02 - THE LINK, MASDAR CITY, ABUDHABI
MAIN CONSULTNAT: STANTEC
MAIN CONTRACTOR: DUTCO CONSTRUCTION COMPANY LLC
Material: Air Release Valve
Compliance sheet
1 328000 Automatic Air Release Valve – Threaded Type : Automatic, single orifice
Irrigation System
2.15
Standard: Body : Cast Iron The specified body
Material: Float : SS304 type is unavailable in
1. Body: Polyoxymethylen Plug : NBR the market. We
2. Float: Polyoxymethylen Seat Ring : Cast Iron propose a cast iron
3. Seal: Elastomer Yoke : Stainless Steel body with SS 304 float
4. orifice: Brass as a more durable and
5. Valve Plug: Brass efficient alternative.
6. Valve seat : Brass Manufacturer/Supplier
confirmation letter is
attached for
compliance.
PN: 6 bar PN : 16 bar
Weight: 0.9kg Weight : 3.200 kg
Page 1 of 2
THE LINK
PLOT B02, MASDAR CITY, ABU DHABI
B. Standard
1. Body: EN-GIS-400-18
2. Bonnet: EN-GIS-400-18
3. Coating: 300 µ
4. Wedge: EN-GIS-400-18
5. Spindle: ST 1.4021
6. Threads: ISO 228
7. Test: EN1074
F. Warranty: 10 years
B. Standard: NA
C. Material:
1. Body: Polyoxymethylen
2. Float: Polyoxymethylen
3. Seal: Elastomer
4. Orifice: Brass
5. Valve Plug Brass
6. Valve Seat: Brass
D. PN: 6 bar
E. Weight: 0.9 kg
F. Warranty: 10 years
A. Valve:
1. Type: Forward flow design
2. Normally: Closed
3. Material:
a. Body: Glass filled nylon
b. Bonnet: Glass filled nylon
c. Diaphragm: EPDM
Q
PIPE TRANSITION POINT ABOVE GRADE MULTI RISERS F AUTOMATIC FILTER CONSULTANTS COMMENTS CONTRACTOR RESPONSE 1 3 5
1.All require calculation to be provide to engineer and approved (Friction losess for calculation already provided
SPRINKLERS FOR LAWN WT WATER TANK main line and latteral line, Pipe dia calculation as per flow rate) with pump submittal Ref.no:
B02-DCC-LG-LX-MT-00020
ONLINE EMITTERS FOR TREE IRRIGATION MAIN LINE: PVC-U CLASS E, PN 15 90
1
2.Missing irrigation elements to be indicated in irrigation main line SD such as Isolation
valve, air valve (Highest Point), Flow sensor, Flow meter, Flush drain valve, QCV, NRV.
complied 2 4 6
PIPE SLEEVE: PVC-U CLASS C, PN 9
AREA TO RECEIVE DRIPLINE 3.Main line profile to be provide as per approved trench depth and section details. Ref.dwg no:B02-GDS-PW-PW-
PR:15 MM/H - B02 LX-SD-20503-001
Valve Type & Number 4.Provide typical section details for main line connection with irrigation tank and all valves Ref.dwg no:B02-GDS-PW-PW-
AREA TO RECEIVE DRIPLINE
PR:10 MM/H - GRT AND OS-53 Controller Name
chamber. LX-SD-20503-001 7 8 9
DV A 5.Contractor to be using the LPS (Litter per second) unit for water flow. noted
25 10
Flow rate(gpm) 6.Corrdinate point to be indicated in layout drawing for Elbow, Tee, Riase. complied
POC
GRAY WATER SOURCE TOPPED WITH POTABLE - B02
Size of Valve (mm) 7.Detactable Warrning tape for main line and irrigation cables to be indiacted in Ref.dwg no:B02-GDS-PW-
section details. PW-LX-SD-20503-001
POC 2 TSE WATER SOURCE
8.Subject to full Coordination with all underground services, Roads, Landscape. noted NOTE:-
1- ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS ARE IN METERS, UNLESS STATED
POC 2 TSE WATER SOURCE 9.Subject to full coordination with the secondary irrigation network. noted OTHERWISE
2- ALL DOORS & WINDOWS FIXING CLEARANCE WIDTH(10+10=20MM) HEIGHT=10MM.
3- DOOR'S & WINDOW'S DETAILS KINDLY REFER TO SPECIALIST SUBCONTRACTOR DRAWINGS
4- ALL THE EXTERNAL LEVELS TO BE COORDINATE WITH EXISTING STR.
10.Any clearance less than 30cm between IRR pipes and any other underground noted 5- ALL STAIRCASES DETAILS WILL BE SUBMITTED SEPARATELY.
C IRRIGATION CONTROLLER services, Contractor must provide concrete encasement. 6- FIRE RATED BLOCKWORK AS PER CIVIL DEFENSE REQUIREMENT.
7- ALL MEP SERVICES ARE SHOWN INDICATIVE ONLY, REFER MEP DRAWINGS FOR LEVELS &
SIZES OF PIPES. 8- DO NOT SCALE THE DRAWING.
SOLENOID VALVE 11.Contractor must provide concrete encasement and Thrust block to be provided at any noted
change of direction and at the Tee's as per ADQCC.
FS FLOW SENSOR
12.Contractor shall follow the approved Material submittals and Method Statement. noted PIPE LEVEL FROM +4.900M
PS BOOSTER PUMP SET (DUTY/ASSIST) 13.Bedding material shall be used as per the approved typical detail. noted
14.Concrete encasement and Sleeves shall be provided under the roads. complied
B A' C D E F G H J K L M N
Approved
A No re-submittal required .Proceed with the
manufacture and / or Construction
Approved as Noted
B Manufacturer and / or Construction may
proceed incorporating comments provided
Revise and re-submit
C Do not proceed with Manufacture and /or
Construction
15 D Rejected
31/12/2024
Signed: ................................ Date:.......................
All "B" Status shall be upgraded to Status "A" prior to the Testing and
Commissioning Commencement.
Correction or comments provided on the shop drawing during review do not
relieve the contractor from compliance with the requirements of the drawings and
specification.This review is a check only for general conformance with the design
25
concept and intent of the project and general compliance. The contractor is
responsible for conforming and correcting all quantities and dimensions, selecting
fabrication process, techniques of construction.
16
drawing, and this approval does not relieve the contractor of their contractual obligations.
CABLE CONDUIT
BOP -0.363 m CONCRETE ENCASEMENT Spare Duct to be provide
QCV location to be 7-Irrigation water demand 2L/Sqm daily as per Estidama requirement and ADDC/TAQA regulations.
before solenoied valve 8-Provide coordinate points table for all type of providing valves and solenoid valves calculation
PULL BOX 9-The invert level shall be indicated on the drawing along the irrigation main line corridor. DESIGN CONSULTANT:
DV-02 A
50mm 10.144
N 2704460.110
E 258428.612
PROJECT MANAGEMENT:
QUICK COUPLING VALVE
90 mmø
SUPERVISION CONSULTANT:
PULL BOX
BOP -0.363 m DV1 A
AIR RELEASE VALVE BOP -0.363 m N 2704423.841 QUICK COUPLING VALVE N 2704402.348
50mm 34.71
N 2704408.364 E 258483.666
STANTEC INTERNATIONAL INC.
E 258456.091
CABLE CONDUIT CABLE CONDUIT BOP -0.363 m CABLE CONDUIT TAMOUH TOWER - BUILDING 12 , OFFICE 1304 MARIANA
SQUARE AL REEM ISLAND P.O.BOX-54191,ABU DHABI,UAE
90 mmø E 258476.410
90 mmø
90 mmø N 2704399.766 COST CONSULTANT:
N 2704407.406 E 258485.958
N 2704450.324 E 258476.164
E 258421.021
90 mmø
N 2704423.437
90 mmø E 258455.554 SV-02 A SV-01 A
50mm 24.20 PULL BOX 50mm 37.03 OFFICE NO.3 7th FLOOR EAST TOWER,
ABU DHABI TRADE CENTER BUILDING,
PULL BOX Section to be provide for irrigation main line, PO BOX-36788,TOURIST CLUB AREA,
ABU DHABI , UAE
BOP -0.363 m
showing the connection with pump set. MAIN CONTRACTOR:
DRAWING TITLE:
1 IRRIGATION MAIN LINE- GROUND (G) c Dutco Construction Co. Abu Dhabi Branch - LLC 2023
THE COPYRIGHT IN THIS DRAWING OR PLAN (TOGETHER WITH ALL CONFIDENTIAL INFORMATION CONTAINED IN IT) IS
SCALE - 1 : 200 THE PROPERTY OF Dutco Construction Co.Abu Dhabi Branch-LLC AND MAY ONLY BE COPIED WHEN USED BY
THE COMPANY OR PERSON FOR WHOM IT WAS PREPARED AND ONLY FOR THE PURPOSE FOR WHICH IT WAS
PREPARED. DISCLOSURE TO ANY OTHER PERSON IS NOT PERMITED WITHOUT PRIOR WRITTEN CONSENT.
3. SCHEDULE OF MATERIALS / COO
4.TECHNICAL DATA SHEET
5. MATERIAL SAFETY DATA SHEET
6.MATERIAL / LAB TEST CERTIFICATE
7.SUSTAINABILITY/ ENVIRONMENTAL
REQUIREMENTS
8. SAMPLES
9. WARRANTY CERTIFICATES
10. PREVIOUS PROJECT APPROVALS
11. COMPANY PROFILE
COMPANY PROFILE
Established in 2015, Flomax Unlike other pump companies in Middle east, We, Flomax
Pump Trading LLC specializes serve all major renowned brands in Water Pumping Industry,
in the engineering, packaging Electrical & Mechanical Solutions with varied and reputable
and trading of water and partnerships like Grundfos, Ebara, Xylem-
waste water pumping Lowara/Goulds/Bell&Goset to name a few. We represent
systems, water treatment world’s leading brands of pumps, valves, engines, motors,
equipment like Oil separator, pressure vessels.
Engines, Valves related to the
building services industry With in-house design and service teams in place, It has been
our legacy to be in the fore front to provide innovative, cost
At Flomax Pump Trading, we effective solution to all our clients addressing their needs of
are focused on our planning, customization and implementation.
specialization, we have
ensured that we supply the Flomax is established to provide efficient, quality cost
world’s best manufacturers to effective products in the field of MEP in Building and
the market. Since the very infrastructure industry.
beginning, we have been
persistent in serving the We are proud to be recognized by our customers throughout
building services industry with in our industry as their preferred choice for rendering
dedication and commitment. complete integrated solutions under one roof, fully backed-
up with pre and after sales services.
We are constantly working on
improving our services and Extensive product and application knowledge in HVAC
expanding our line of systems, Plumbing and drainage systems and a client- centric
products to ensure a approach defines us.
comprehensive coverage of
the building services industry. We welcome you to our evolving world of innovation and
technology and invite you to learn more about our rich
heritage and massive network varied business interests.
PRODUCT PORTFOLIO
PUMPING SOLUTIONS
APPLICATIONS
Water Transfer Pump Set
Water Booster Pump Set.
Hot Water Circulation Pumps
Filtration Pump sets
Chilled Water Pumps
Cooling Tower Make up Water Pump set
Pressurization Unit
Submersible Pump Set
Sewage Pump Set
Irrigation Pump Sets
Storm water Pump Sets
Lifting Stations
APPLICATIONS
ter Transfer Pump Set
Water Booster Pump Set.
Hot Water Circulation Pumps
Filtration Pump sets
Chilled Water Pumps
Cooling Tower Make up Water Pump set
Pressurization Unit
Submersible Pump Set
Sewage Pump Set
Irrigation Pump Sets
We Associate with
MAJOR PROJECT
REFERENCES
REFERENCES
REFERENCES
AUDI WORKSHOP
Al Naboodah/ NEB
AL THOWIMA TOWER
MERAAS / Dewan
AL RAYYAN COMPLEX
JMS/ Halcrow
B+G+13+R AT JADDAF
Injazzat / Golden Square
CLIENTS
CONSULTANTS
www.flomaxpumps.com