1254
1254
AIR COMPRESSOR , BCU , CLUSTER , NOX SEBSOR , U SOME MATERIAL ARE RECEIVED AS ON DATE -
1 AL BS-6 TIPPER NEW CAMP MN05C 4116 01/04/2025 1391 & 1392 MN/15 DISMANTLED DONE WAITING FOR REMAINIG
BOLT ARE DAMAGE 16-04-2025, FITMENT UNDER PROCESS
8 JCB BS-4 CHECKON SITE MN05C 3982 17/04/2025 1653 MN/135 ENGINE ECU NOT WORKING DISMANTLED DONE PO DONE ATMA & MA - PAYMENT IN PROCESS
J15L4126 / VIB COUPLING M38 , BUSHING & SCREW ARE MATERIAL RECEIVED AS ON DATE - 16-04- DISPATCHED FROM KOLKATA BY SKY KING - 433217055 AS ON
11 TENDAM ROLLER NEW CAMP 01/04/2025 1620 MN/2382 DISMANTLED DONE
4H.3218/1520309 DAMAGE 2025. SOME MATERIAL PENDING DATE- 29-04-2025
NEED TIE ROD END & HOSE PIPE . NOT AVAILABLE AT LOCAL
NEW RECEVINIG MATERIAL FITMENT UNDER
12 PAVER 610605 08/04/2025 1633 MN/10 DRIVE SHAFT & TRACTION MOTOR ARE DAMAGE DISMANTLED DONE MARKET . SAMPLE SEND TO GUWAHATI AS ON DATE - 26-04-
CAMP(NAGALAND) PROCESS
2025
1 AL BS-6 TIPPER
2 AL BS-3 TIPPER
3 AL BS-3 TIPPER
4 AL BS-3 TIPPER
MAHINDRA BS-6
5
CAMPER
KLEEMANN JAW
6
CRUSHER
7 PC-210-08MO
8 JCB BS-4
9 JCB BS-3
10 JCB BS-3
11 PAVER
12 MAHINDRA 10KVA DG
Location Reg No
NEW
610605
CAMP(NAGALAND)
25/04/2025
1658 TO
10/04/2025 MN/197
1663
10/04/2025
06/04/2025
KEYSTONE INFRA PVT LTD.
DAILY BREAKDOWN REPORT AS ON MAY -02-
Reason For BD
ALTERNATOR BURND
TD.
MAY -02-05-2025
Action & Rectification
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLING UNDER PROCESS
DISMANTLED DONE
DISMANTLED DONE
Present Status
1391 & AIR COMPRESSOR , BCU , CLUSTER , NOX PENDING MATERIAL DISPATCHED AS ON DATE - 01-
1 AL BS-6 TIPPER NEW CAMP MN05C 4116 01/04/2025 MN/15 DISMANTLED DONE ENGINE FITMENT UNDER PROCESS 15/05/2025
1392 SEBSOR , U BOLT ARE DAMAGE 05-2025. BY NETWORK - NICCN71930
HILL SITE (NEW LOAD BODY DAMAGE , TYRE , BATTERY , NEW DALA BODY MAKING UNDER
3 AL BS-3 TIPPER NL02Q 8642 25/04/2025 DISMANTLED DONE 17/05/2025
CAMP) DENTING WORK & RUNNING REPAIR PROCESS
KLEEMANN JAW ENGINE FAN & ALTERNATOR BELT ARE QUOTATION SEND TO HO AS ON
6 SEKMAI QUARRY K006.0115 26/04/2025 1693 MN/233 DISMANTLED DONE 07/05/2025 MATERIAL IN GUWAHATI - TO BE DISPATCH
CRUSHER DAMAGE DATE - 27-04-2025
1 AL BS-6 TIPPER
2 AL BS-3 TIPPER
3 AL BS-3 TIPPER
4 AL BS-3 TIPPER
MAHINDRA BS-6
5
CAMPER
KLEEMANN JAW
6
CRUSHER
7 PC-210-08MO
8 JCB BS-4
9 JCB BS-3
MAHINDRA 10KVA
10
DG
Location Reg No
SHOWROOM -
NL0D 7655
HILL SITE
N2A20A24519 &
NEW CAMP
N2A20A24519
Focus Indent
B/D Start Indent No
No
1391 &
### MN/15
1392
###
29-04-2025 006 & 007 MN/276
1618 &
### MN/2394
1619
1658 TO
### MN/197
1663
### 13 MN/310
P
KEYSTONE INFRA P
DAILY BREAKDOWN REPORT AS
Reason For BD
ALTERNATOR BURND
INFRA PVT LTD.
PORT AS ON MAY -04-05-2025
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
025
Present Status
QUOTATION SEND TO HO AS ON
DATE - 27-04-2025
15/05/2025
20/05/2025
17/05/2025
25/05/2025
10/05/2025
07/05/2025
22/05/2025
10/05/2025
25/05/2025
29/05/2025
REMARKS
1391 & AIR COMPRESSOR , BCU , CLUSTER , NOX MATERILS RECEIVED AT IMPHAL NETWORK - NICCN71930 AND WAITING
1 AL BS-6 TIPPER NEW CAMP MN05C 4116 01/04/2025 MN/15 HO - 77 DISMANTLED DONE ENGINE FITMENT UNDER PROCESS 09/05/2025
1392 SEBSOR , U BOLT ARE DAMAGE FOR ARRIVAL AT NEW CAMP
HILL SITE (NEW LOAD BODY DAMAGE , TYRE , BATTERY , NEW DALA BODY MAKING UNDER WORK PROGRESS SLOW DUE TO WELDER ARE INGAGED TO THE ANOTHER
3 AL BS-3 TIPPER NL02Q 8642 25/04/2025 DISMANTLED DONE 10/05/2025
CAMP) DENTING WORK & RUNNING REPAIR PROCESS WORK
KLEEMANN JAW ENGINE FAN & ALTERNATOR BELT ARE QUOTATION SEND TO HO AS ON MATERILS RECEIVED AT IMPHAL NETWORK BY NETWORK - NICCN07135,
6 SEKMAI QUARRY K006.0115 26/04/2025 1693 MN/233 HO-324 DISMANTLED DONE 06/05/2025
CRUSHER DAMAGE DATE - 27-04-2025 AND WAITING FOR ARRIVAL AT NEW CAMP
PO DONE AT MA & MA - PAYMENT IN MATERIAL DISPATCHED FROM KOLKATA BY SAFE EXPRESS ON 03-05-2025
8 JCB BS-4 CHECKON SITE MN05C 3982 17/04/2025 1653 MN/135 HO-288 ENGINE ECU NOT WORKING DISMANTLED DONE 10/05/2025
PROCESS (501546276832)
Focus Indent
P Fixed Assets Location Reg No B/D Start Indent No Po No Reason For BD Action & Rectification Present Status Expact Date To Be Ready REMARKS
No
HILL SITE (NEW LOAD BODY DAMAGE , TYRE , BATTERY , NEW DALA BODY MAKING UNDER WORK PROGRESS SLOW DUE TO WELDER ARE INGAGED TO THE ANOTHER
3 AL BS-3 TIPPER NL02Q 8642 25/04/2025 DISMANTLED DONE 10/05/2025
CAMP) DENTING WORK & RUNNING REPAIR PROCESS WORK
PO DONE AT MA & MA - PAYMENT IN MATERIAL DISPATCHED FROM KOLKATA BY SAFE EXPRESS ON 03-05-2025
8 JCB BS-4 CHECKON SITE MN05C 3982 17/04/2025 1653 MN/135 HO-288 ENGINE ECU NOT WORKING DISMANTLED DONE 10/05/2025
PROCESS (501546276832)
HILL SITE (NEW LOAD BODY DAMAGE , TYRE , BATTERY , NEW DALA BODY MAKING UNDER
3 AL BS-3 TIPPER NL02Q 8642 25/04/2025 DISMANTLED DONE 10/05/2025
CAMP) DENTING WORK & RUNNING REPAIR PROCESS
HILL SITE (NEW FRONT CBAIN GLASS BROKEN & STEEING PIPE FITTING DONE. DENTING TRANSPORT BILL PAYMENT DONE TOMORROW . MATERIAL PICKUP
6 AL BS-4 TIPPER NL02Q 8755 06/05/2025 DISMANTLED DONE 10/05/2025
CAMP) STEERING PIPE LEKAGE WORK PENDING DUE CRABIDE. TODAY
KING PIN
KING PIN DAMAGE & RADAITOR GIVE TO LATHE FOR SPINDLE BUSH
10 TATA XENON NEW CAMP NL02Q 8628 05/05/2025 DISMANMANTLE 11/05/2025 SPARES RECEIVED FROM LEATH , FITMENT UNDER PROCESS
NOTWORKING FITTING & RAIMINING
DONE
PO DONE AT MA & MA - PAYMENT IN MATERIAL DISPATCHED FROM KOLKATA BY SAFE EXPRESS ON 03-05-
11 JCB BS-4 CHECKON SITE MN05C 3982 17/04/2025 1653 MN/135 HO-288 ENGINE ECU NOT WORKING DISMANTLED DONE 10/05/2025
PROCESS 2025 (501546276832)
HILL SITE (NEW LOAD BODY DAMAGE , TYRE , BATTERY , NEW DALA BODY MAKING UNDER
3 AL BS-3 TIPPER NL02Q 8642 25/04/2025 DISMANTLED DONE 10/05/2025
CAMP) DENTING WORK & RUNNING REPAIR PROCESS
HILL SITE (NEW FRONT CBAIN GLASS BROKEN & STEEING PIPE FITTING DONE. DENTING
6 AL BS-4 TIPPER NL02Q 8755 06/05/2025 DISMANTLED DONE 10/05/2025 MATERIAL RECEIVED , DENTING WORK UNDER PROCESS
CAMP) STEERING PIPE LEKAGE WORK PENDING DUE CRABIDE.
KING PIN
KING PIN DAMAGE & RADAITOR GIVE TO LATHE FOR SPINDLE BUSH
9 TATA XENON NEW CAMP NL02Q 8628 05/05/2025 DISMANMANTLE 11/05/2025 SPARES RECEIVED FROM LEATH , FITMENT UNDER PROCESS
NOTWORKING FITTING & RAIMINING
DONE
PO DONE AT MA & MA - PAYMENT IN MATERIAL DISPATCHED FROM KOLKATA BY SAFE EXPRESS ON 03-05-
10 JCB BS-4 CHECKON SITE MN05C 3982 17/04/2025 1653 MN/135 HO-288 ENGINE ECU NOT WORKING DISMANTLED DONE 10/05/2025
PROCESS 2025 (501546276832)
HO - 77
HO-380
HO-381
HO-2909
HO-288
HO- 234 & HO-
239
KEYSTONE I
DAILY BREAKDOWN REP
Reason For BD
AIR COMPRESSOR , BCU , CLUSTER , NOX SEBSOR , U BOLT ARE
DAMAGE
LOAD BODY DAMAGE , TYRE , BATTERY , DENTING WORK , GEAR
BOX SPARES & RUNNING REPAIR
LOAD BODY DAMAGE , TYRE , BATTERY , DENTING WORK &
RUNNING REPAIR
CYLINDER LINER , HEAD GASKET , PISTON & RING SET , CR
BEARING , VALVE OIL SEAL & ETC ARE DAMAGE
FRONT CBAIN GLASS BROKEN & STEERING PIPE LEKAGE
PICKUP ISSUES & HEAD GASKET , CR BEARING , LINER , PISTON ,
THRUST WASHER , VALVE OIL SEAL & PULLY DEMPER ARE
DAMAGE
ENGINE HEATING ISSUE , PILOT LEVER FUCTION NOT WORKING
PROPERLY
KING PIN DAMAGE & RADAITOR NOTWORKING
ALTERNATOR BURND
ALTERNATOR BURND
BREAKER SEAL KIT , BUSH , CHISEL BUSHING , PLUG , RETAINER
BAR , STOPER PIN ETC ARE DAMAGE
REAR BRAKE PLATE AND LINER ASSY. REPLACEMENT
KEYSTONE INFRA PVT LTD.
AKDOWN REPORT AS ON MAY -09-05-2025
Action & Rectification
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
KING PIN DISMANMANTLE
DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
DISMANTLED DONE
-09-05-2025
Present Status
12/05/2025
10/05/2025
10/05/2025
11/05/2025
10/05/2025
11/05/2025
REMARKS
WORK IN PROGRESS
AIR COMPRESSOR ,
1391 DISMA
AL BS-6 NEW MN05C HO - BCU , CLUSTER , NOX ENGINE FITMENT
1 01/04/2025 & MN/15 NTLED 14/05/2025 WORK IN PROGRESS
TIPPER CAMP 4116 77 SEBSOR , U BOLT ARE UNDER PROCESS
1392 DONE
DAMAGE
LOAD BODY DAMAGE , C CHANNEL , MS PLAIN
HILL AUTO SPARES PO DONE AT
004& MN/276 TYRE , BATTERY , DISMA SHEET , MS SQUARE PIPE
AL BS-3 SITE NL02Q HO- KSAR EARTHMOVERS , &
2 11/04/2025 005 DENTING WORK , GEAR NTLED - MATERIAL
TIPPER (NEW 8726 380 FEBRICATION MATERIAL
008 MN282 BOX SPARES & DONE REQUIREMENTS INDENT
CAMP) PO UNDER PROCESS
RUNNING REPAIR RISED
HILL LOAD BODY DAMAGE ,
DISMA NEW DALA BODY
AL BS-3 SITE NL02Q TYRE , BATTERY ,
3 25/04/2025 NTLED MAKING UNDER 12/05/2025
TIPPER (NEW 8642 DENTING WORK &
DONE PROCESS
CAMP) RUNNING REPAIR
HILL
FRONT CBAIN GLASS DISMA
AL BS-4 SITE NL02Q
6 06/05/2025 BROKEN & STEERING NTLED WORK UNDER PROGRESS 10/05/2025 WORK IN PROGRESS
TIPPER (NEW 8755
PIPE LEKAGE DONE
CAMP)
AIR COMPRESSOR ,
1391 DISMA
AL BS-6 NEW MN05C HO - BCU , CLUSTER , NOX ENGINE FITMENT
1 01/04/2025 & MN/15 NTLED 14/05/2025 WORK IN PROGRESS
TIPPER CAMP 4116 77 SEBSOR , U BOLT ARE UNDER PROCESS
1392 DONE
DAMAGE
AIR COMPRESSOR ,
1391 DISMA
AL BS-6 NEW MN05C HO - BCU , CLUSTER , NOX ENGINE FITMENT
1 01/04/2025 & MN/15 NTLED 14/05/2025 WORK IN PROGRESS
TIPPER CAMP 4116 77 SEBSOR , U BOLT ARE UNDER PROCESS
1392 DONE
DAMAGE
114
DG Set NEW
15 000000 12/05/2025 ENGINE HEATING ISSUE UNDER OBSERVATION
62.5kva CAMP
00677
KEYSTONE INFRA PVT LTD.
DAILY BREAKDOWN REPORT AS ON MAY -13-05-2025
Action
Focus
SL Fixed Locatio Inden Po & Expact Date
Reg No B/D Start Indent Reason For BD Present Status REMARKS
NO Assets n t No No Rectifi To Be Ready
No
cation
AIR COMPRESSOR ,
1391 DISMA
AL BS-6 NEW MN05C HO - BCU , CLUSTER , NOX ENGINE FITMENT
1 01/04/2025 & MN/15 NTLED 14/05/2025 WORK IN PROGRESS
TIPPER CAMP 4116 77 SEBSOR , U BOLT ARE UNDER PROCESS
1392 DONE
DAMAGE
AUTO SPARES PO
DONE AT KSAR
EARTHMOVERS SOME
C CHANNEL , MS
PARTS DISPATCHED
LOAD BODY DAMAGE , PLAIN SHEET , MS
FROM GHY TO IMPHAL
AL BS-3 HILL SITE 004& 005 MN/276 TYRE , BATTERY , DENTING DISMANTLE SQUARE PIPE -
2 NL02Q 8726 11/04/2025 HO-380 ON 12-05-2025,
TIPPER (NEW CAMP) 008 MN282 WORK , GEAR BOX SPARES DONE MATERIAL
NETWORK
& RUNNING REPAIR REQUIREMENTS
(NICCN72252), &
INDENT RISED
FEBRICATION
MATERIAL PO UNDER
PROCESS
PO DONE TO MAX DG
MAHINDR
N2A20A245 DISMANTLE GUWAHATI - MATERIALS TO BE
12 A 10KVA NEW CAMP 06/04/2025 13 MN/310 HO-389 ALTERNATOR BURND
19 DONE MATERIAL DISPATCH DISPATCHED
DG
SOON
PO DONE TO MAX DG
MAHINDR
N2P21A176 DISMANTLE GUWAHATI - MATERIALS TO BE
13 A 10KVA NEW CAMP 06/04/2025 13 MN/310 HO-389 ALTERNATOR BURND
96 DONE MATERIAL DISPATCH DISPATCHED
DG
SOON
PO DONE TO KSAR 3 ITEMS DISPATCHED
BREAKER SEAL KIT , BUSH ,
KOMATSU HO- ERATHMOVERS & (PO - HO 234)
1364 & CHISEL BUSHING , PLUG , DISMANTLE
14 BREAKER NEW CAMP JH 350 01/05/2025 MN/2185 234 & INDUSTRIAL SPARES &
1365 RETAINER BAR , STOPER DONE
PC-300 HO-239 & I EQUIP PO - HO 239 ITEMS
PIN ETC ARE DAMAGE
CORPORATION NOT DISPATCHED
CYL HEAD GASKET, LOCAL PURCHASE
114 CORE PLUG, ROCKER DONE FROM KSAR,
DG Set
15 NEW CAMP 0000000067 12/05/2025 ENGINE HEATING ISSUE COVER GASKET, INVOICE YET NOT
62.5kva
7 INTAKE MANIFOLD RECEIVED, TO BE
GASKET, TURBO DISPATCHED VIA AIR
KEYSTONE INFRA PVT LTD.
DAILY BREAKDOWN REPORT AS ON MAY -15-05-2025
Action &
SL Fixed Locatio Focus Expact Date
Reg No B/D Start Indent No Po No Reason For BD Rectificat Present Status REMARKS
NO Assets n Indent No To Be Ready
ion
AIR COMPRESSOR , BCU ,
AL BS-6 NEW MN05C 1391 & DISMANT ENGINE FITMENT
1 01/04/2025 MN/15 HO - 77 CLUSTER , NOX SEBSOR , U 20/05/2025 WORK IS IN PROGRESS
TIPPER CAMP 4116 1392 LE DONE UNDER PROCESS
BOLT ARE DAMAGE
HILL
LOAD BODY DAMAGE , TYRE , NEW DALA BODY
AL BS-3 SITE NL02Q DISMANT
3 25/04/2025 BATTERY , DENTING WORK & MAKING UNDER 19/05/2025 WORK IS IN PROGRESS
TIPPER (NEW 8642 LE DONE
RUNNING REPAIR PROCESS
CAMP)
KING PIN
GAVE AT LATHE SHOP
TATA NEW NL02Q KING PIN DAMAGE & DISMANM
9 05/05/2025 FOR SPINDLE BUSH 16/05/2025 FITMENT UNDER PROCESS
XENON CAMP 8628 RADAITOR NOTWORKING ANTLE
FITTING & RAIMINING
DONE
C CHANNEL , MS
LOAD BODY DAMAGE ,
HILL PLAIN SHEET , MS
004& TYRE , BATTERY ,
AL BS-3 SITE MN/276 HO-380 & DISMANT SQUARE PIPE -
2 NL02Q 8726 11/04/2025 005 DENTING WORK , GEAR
TIPPER (NEW MN282 HO-365 LE DONE MATERIAL
008 BOX SPARES & RUNNING
CAMP) REQUIREMENTS
REPAIR
INDENT RISED
PO DONE TO MA &
CHECKO ENGINE ECU NOT DISMANT
8 JCB BS-4 MN05C 3982 17/04/2025 1653 MN/135 HO-288 MA - PAYMENT IN
N SITE WORKING LE DONE
PROCESS
SOME HYDRAULIC HOSE
PIPE LEAKAGE , PICK UP PO DONE TO KSAR
1658
NEW ISSUE , BREAK SYSTEM DISMANT EARTH MOVERS -
9 JCB BS-3 MN01 9722 10/04/2025 TO MN/197 HO-406
CAMP NOT WORKING LE DONE PAYMENT IN
1663
PROPERLY & KING PIN PROCESS
ARE DAMAGE
PO DONE TO MAX DG
MAHINDRA NEW DISMANT GUWAHATI -
10 N2A20A24519 06/04/2025 13 MN/310 HO-389 ALTERNATOR BURND
10KVA DG CAMP LE DONE MATERIAL DISPATCH
SOON
PO DONE TO MAX DG
MAHINDRA NEW DISMANT GUWAHATI -
11 N2P21A17696 06/04/2025 13 MN/310 HO-389 ALTERNATOR BURND
10KVA DG CAMP LE DONE MATERIAL DISPATCH
SOON
WORK IS IN PROGRESS
WORK IS IN PROGRESS
PARTS DISPATCHED
THROUGH NATIONAL
CARRIYING CORP.
(RLY/00184)
FITMENT UNDER PROCESS
MATERIALS TO BE
DISPATCHED
MATERIALS TO BE
DISPATCHED
MATERIALS TO BE
DISPATCHED
SOME HYDRAULIC
HOSE PIPE
LEAKAGE , PICK UP PO DONE TO KSAR
1658 TO ISSUE , BREAK DISMANTLE EARTH MOVERS - MATERIALS TO BE
6 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 MN/197 HO-406
1663 SYSTEM NOT DONE PAYMENT IN DISPATCHED
WORKING PROCESS
PROPERLY & KING
PIN ARE DAMAGE
AIR COMPRESSOR ,
AL BS-6 MN05C 1391 & BCU , CLUSTER , DISMANTLE ENGINE FITMENT ALMOST COMPLETE,
7 NEW CAMP 01/04/2025 MN/15 HO - 77 20/05/2025
TIPPER 4116 1392 NOX SEBSOR , U DONE UNDER PROCESS UNDER TRIAL
BOLT ARE DAMAGE
LOAD BODY
DAMAGE , TYRE , NEW DALA BODY
AL BS-3 HILL SITE NL02Q DISMANTLE
11 25/04/2025 BATTERY , MAKING UNDER 20/05/2025 WORK IS IN PROGRESS
TIPPER (NEW CAMP) 8642 DONE
DENTING WORK & PROCESS
RUNNING REPAIR
CYLINDER LINER ,
HEAD GASKET ,
PO DONE TO SOME PARTS RECEIVED
AL BS-3 HILL SITE NL02Q PISTON & RING SET DISMANTLE
12 29-04-2025 006 & 007 MN/277 HO-381 NARAYANI ON 18-05-2025 (INVOICE
TIPPER (NEW CAMP) 8721 , CR BEARING , DONE
TRADING COMPANY NO. - 278)
VALVE OIL SEAL &
ETC ARE DAMAGE
PO DONE TO MAX
MAHINDRA N2A20A245 ALTERNATOR DISMANTLE DG GUWAHATI - MATERIALS TO BE
14 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 19 BURND DONE MATERIAL DISPATCHED
DISPATCH SOON
PO DONE TO MAX
MAHINDRA N2P21A176 ALTERNATOR DISMANTLE DG GUWAHATI - MATERIALS TO BE
15 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 96 BURND DONE MATERIAL DISPATCHED
DISPATCH SOON
ENGINE HEATING
PO DONE TO PARTS DISPATCHED
ISSUE , PILOT
PC-210- N710361 - DISMANTLE SHANTHI TRADING THROUGH NATIONAL
1 NEW CAMP 16/04/2025 1695 MN/283 HO-392 LEVER FUCTION
08MO 19 DONE - PAYMENT IN CARRIYING CORP.
NOT WORKING
PROCESS (RLY/00184)
PROPERLY
3 ITEMS DISPATCHED 09-
BREAKER SEAL
PO DONE TO KSAR 05-2025 & 2 ITEMS
KIT , BUSH , CHISEL
KOMATSU HO- 234 ERATHMOVERS & DISPATCHED 13-05-
1364 & BUSHING , PLUG , DISMANTLE
2 BREAKER PC- NEW CAMP JH 350 01/05/2025 MN/2185 & HO- INDUSTRIAL 2025(PO - HO 234)
1365 RETAINER BAR , DONE
300 239 SPARES & I EQUIP & PO - HO
STOPER PIN ETC
CORPORATION 239 ITEMS NOT
ARE DAMAGE
DISPATCHED
Mitsubishi ARTICULATE CYL. SEAL KIT, KING PIN,
MOTOR NEW MN 01 9723 16/05/2025 33 MN/444 LEAK, KING PIN KING PIN BEARING PO NOT PREPARED YET
3
GRADER CHECKON DAMAGE REQUIRED
PO DONE TO MA &
CHECKON MN05C ENGINE ECU NOT DISMANTLE PARTS PICKUP WILL BE
5 JCB BS-4 17/04/2025 1653 MN/135 HO-288 MA - PAYMENT IN
SITE 3982 WORKING DONE DONE TODAY
PROCESS
SOME HYDRAULIC
HOSE PIPE
LEAKAGE , PICK UP PO DONE TO KSAR
1658 TO ISSUE , BREAK DISMANTLE EARTH MOVERS - MATERIALS TO BE
6 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 MN/197 HO-406
1663 SYSTEM NOT DONE PAYMENT IN DISPATCHED
WORKING PROCESS
PROPERLY & KING
PIN ARE DAMAGE
AIR COMPRESSOR ,
AL BS-6 MN05C 1391 & BCU , CLUSTER , DISMANTLE ENGINE FITMENT ENGINE OIL PIPE AND
7 NEW CAMP 01/04/2025 MN/15 HO - 77 22/05/2025
TIPPER 4116 1392 NOX SEBSOR , U DONE UNDER PROCESS GAUGE PENDING
BOLT ARE DAMAGE
LOAD BODY
DAMAGE , TYRE , NEW DALA BODY
AL BS-3 HILL SITE NL02Q DISMANTLE
11 25/04/2025 BATTERY , MAKING UNDER 22/05/2025 WORK IS IN PROGRESS
TIPPER (NEW CAMP) 8642 DONE
DENTING WORK & PROCESS
RUNNING REPAIR
CYLINDER LINER ,
HEAD GASKET ,
PO DONE TO SOME PARTS RECEIVED
AL BS-3 HILL SITE NL02Q PISTON & RING SET DISMANTLE
12 29-04-2025 006 & 007 MN/277 HO-381 NARAYANI ON 18-05-2025 (INVOICE
TIPPER (NEW CAMP) 8721 , CR BEARING , DONE
TRADING COMPANY NO. - 278)
VALVE OIL SEAL &
ETC ARE DAMAGE
PO DONE TO MAX
MAHINDRA N2A20A24 ALTERNATOR DISMANTLE DG GUWAHATI - MATERIALS TO BE
14 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 519 BURND DONE MATERIAL DISPATCHED
DISPATCH SOON
PO DONE TO MAX
MAHINDRA N2P21A17 ALTERNATOR DISMANTLE DG GUWAHATI - MATERIALS TO BE
15 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 696 BURND DONE MATERIAL DISPATCHED
DISPATCH SOON
ENGINE
HEATING
ISSUE ,
PILOT
PC-210- N710361 - DISMANTLE
1 NEW CAMP 16/04/2025 1695 MN/283 HO-392 LEVER
08MO 19 DONE
FUCTION
NOT
WORKING
PROPERLY
BREAKER
SEAL KIT ,
BUSH ,
CHISEL
KOMATSU BUSHING ,
1364 & HO- 234 & DISMANTLE
2 BREAKER NEW CAMP JH 350 01/05/2025 MN/2185 PLUG ,
1365 HO-239 DONE
PC-300 RETAINER
BAR ,
STOPER PIN
ETC ARE
DAMAGE
ARTICULATE
Mitsubishi
NEW CYL. LEAK,
3 MOTOR MN 01 9723 16/05/2025 33 MN/444
CHECKON KING PIN
GRADER
DAMAGE
INPUT
Apollo
SHAFT AND DISMANTLE
4 Sensor TOP DUSARA 610605 17/05/2025 46 MN/440
SPUR GEAR DONE
Paver
DAMAGE
CONE
Kleeman
BREAKDOW
Mobile SEKMAI
5 K0720048 21/05/2025 N, PULLEY,
Crusher - CRUSHER
BELT AND
Cone
TENSIONER
ENGINE
CHECKON MN05C DISMANTLE
6 JCB BS-4 17/04/2025 1653 MN/135 ECU NOT
SITE 3982 DONE
WORKING
SOME
HYDRAULIC
HOSE PIPE
LEAKAGE ,
PICK UP
ISSUE ,
1658 TO BREAK DISMANTLE
7 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 MN/197 HO-406
1663 SYSTEM DONE
NOT
WORKING
PROPERLY
& KING PIN
ARE
DAMAGE
AIR
COMPRESS
OR , BCU ,
AL BS-6 MN05C 1391 & CLUSTER , DISMANTLE
8 NEW CAMP 01/04/2025 MN/15 HO - 77
TIPPER 4116 1392 NOX DONE
SEBSOR , U
BOLT ARE
DAMAGE
AL BS-6 DISMANTLE
10 NEW CAMP MN05C 3749 17/05/2025 ACCIDENT
DONE
TIPPER
LOAD BODY
DAMAGE ,
TYRE ,
BATTERY ,
HILL SITE
AL BS-3 NL02Q 004& 005 MN/276 HO-380 & DENTING DISMANTLE
11 (NEW 11/04/2025
TIPPER 8726 008 MN282 HO-365 WORK , DONE
CAMP)
GEAR BOX
SPARES &
RUNNING
REPAIR
LOAD BODY
DAMAGE ,
TYRE ,
HILL SITE
AL BS-3 NL02Q BATTERY , DISMANTLE
12 (NEW 25/04/2025
TIPPER 8642 DENTING DONE
CAMP)
WORK &
RUNNING
REPAIR
CYLINDER
LINER ,
HEAD
GASKET ,
PISTON &
HILL SITE
AL BS-3 NL02Q RING SET , DISMANTLE
13 (NEW 29-04-2025 006 & 007 MN/277 HO-381
TIPPER 8721 CR DONE
CAMP)
BEARING ,
VALVE OIL
SEAL & ETC
ARE
DAMAGE
114 ENGINE
DG Set
14 NEW CAMP 000000006 12/05/2025 HEATING
62.5kva
77 ISSUE
PICKUP
ISSUES &
HEAD
GASKET ,
CR
BEARING ,
LINER ,
MAHINDRA SHOWROO
1618 & PISTON , DISMANTLE
17 BS-6 M - HILL NL0D 7655 31/03/2025 MN/2394 HO-2909
1619 THRUST DONE
CAMPER SITE
WASHER ,
VALVE OIL
SEAL &
PULLY
DEMPER
ARE
DAMAGE
KING PIN
DAMAGE & KING PIN
TATA NL02Q
18 NEW CAMP 05/05/2025 RADAITOR DISMANMA
XENON 8628
NOTWORKI NTLE DONE
NG
5
PARTS
DISPATCHE
PO DONE
D
TO
THROUGH
SHANTHI
NATIONAL
TRADING -
CARRIYING
PAYMENT
CORP.
IN PROCESS
(RLY/0018
4)
3 ITEMS
DISPATCHE
D 09-05-
PO DONE 2025 & 2
TO KSAR ITEMS
ERATHMOV DISPATCHE
ERS & D 13-05-
INDUSTRIA 2025(PO -
L SPARES & HO 234)
I EQUIP
CORPORATI &
ON PO - HO 239
ITEMS NOT
DISPATCHE
D
SEAL KIT,
KING PIN, PO NOT
KING PIN PREPARED
BEARING YET
REQUIRED
WAITING PO NOT
FOR NEW PREPARED
PARTS YET
PREPARING
THE INDENT
PART
PO DONE
RECEIVED,
TO MA &
FITMENT
MA - 22/05/2025
WILL BE
PAYMENT
DONE
IN PROCESS
TODAY
PO DONE
TO KSAR MATERIALS
EARTH TO BE
MOVERS - DISPATCHE
PAYMENT D
IN PROCESS
SYNCRO
RING AND PO NOT
OTHER PREPARED
PARTS YET
ORDERED
RADIATOR
AND
COOLER
RADIATOR LOCAL
AND REPAIR
22/05/2025
COOLER DONE,
DAMAGED WAITING
FOR PICKUP
AND
FITMENT
NEW DALA
BODY
WORK IS IN
MAKING 22/05/2025
PROGRESS
UNDER
PROCESS
SOME
PO DONE
PARTS
TO
RECEIVED
NARAYANI
& FITMENT
TRADING
PROCESS
COMPANY
STARTED
CYL HEAD
GASKET, RADIATOR
CORE PLUG, LOCAL
ROCKER REPAIR
COVER DONE,
22/05/2025 WAITING
GASKET,
INTAKE FOR PICKUP
AND
MANIFOLD FITMENT
GASKET,
TURBO
PO DONE
TO MAX DG MATERIALS
GUWAHATI TO BE
- MATERIAL DISPATCHE
DISPATCH D
SOON
PO DONE
TO MAX DG MATERIALS
GUWAHATI TO BE
- MATERIAL DISPATCHE
DISPATCH D
SOON
PO DONE
TO JAIN
FINAL
SALES
WORDS
AGENCY ,
NOT
PO NO - HO-
SHARED
54 .
YET
PAYMENT
IN PROCESS
ENGINE HEATING
PO DONE TO PARTS DISPATCHED
ISSUE , PILOT
PC-210- N710361 - DISMANTLE SHANTHI TRADING THROUGH NATIONAL
2 NEW CAMP 16/04/2025 1695 MN/283 HO-392 LEVER FUCTION
08MO 19 DONE - PAYMENT IN CARRIYING CORP.
NOT WORKING
PROCESS (RLY/00184)
PROPERLY
3 ITEMS DISPATCHED 09-
BREAKER SEAL
PO DONE TO KSAR 05-2025 & 2 ITEMS
KIT , BUSH , CHISEL
KOMATSU HO- 234 ERATHMOVERS & DISPATCHED 13-05-
1364 & BUSHING , PLUG , DISMANTLE
3 BREAKER PC- NEW CAMP JH 350 01/05/2025 MN/2185 & HO- INDUSTRIAL 2025(PO - HO 234)
1365 RETAINER BAR , DONE
300 239 SPARES & I EQUIP & PO - HO
STOPER PIN ETC
CORPORATION 239 ITEMS NOT
ARE DAMAGE
DISPATCHED
Mitsubishi ARTICULATE CYL. SEAL KIT, KING PIN,
MOTOR NEW MN 01 9723 16/05/2025 33 MN/444 LEAK, KING PIN KING PIN BEARING PO NOT PREPARED YET
4
GRADER CHECKON DAMAGE REQUIRED
SERVICE CHARGE
CHECKON MN05C ENGINE ECU NOT DISMANTLE FITMENT TO BE
7 JCB BS-4 17/04/2025 QUOTATION FOR WORK
SITE 3982 WORKING DONE DONE BY MA & MA
ORDER SUBMITTED
SOME HYDRAULIC
HOSE PIPE
LEAKAGE , PICK UP PO DONE TO KSAR
1658 TO ISSUE , BREAK DISMANTLE EARTH MOVERS - MATERIALS TO BE
8 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 MN/197 HO-406
1663 SYSTEM NOT DONE PAYMENT IN DISPATCHED
WORKING PROCESS
PROPERLY & KING
PIN ARE DAMAGE
CYLINDER LINER ,
HEAD GASKET ,
PO DONE TO SOME PARTS RECEIVED &
AL BS-3 HILL SITE NL02Q PISTON & RING SET DISMANTLE
13 29-04-2025 006 & 007 MN/277 HO-381 NARAYANI FITMENT PROCESS
TIPPER (NEW CAMP) 8721 , CR BEARING , DONE
TRADING COMPANY STARTED
VALVE OIL SEAL &
ETC ARE DAMAGE
PO DONE TO MAX
MAHINDRA N2A20A24 ALTERNATOR DISMANTLE DG GUWAHATI - PART DISPATCHED
15 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 519 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
PO DONE TO MAX
MAHINDRA N2P21A17 ALTERNATOR DISMANTLE DG GUWAHATI - PART DISPATCHED
16 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 696 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
Kleeman
CONE BREAKDOWN,
Mobile SEKMAI
1 K0720048 21/05/2025 60 - 62 MN/659 PULLEY, BELT AND WAITING FOR PO
Crusher - CRUSHER
TENSIONER
Cone
SOME HYDRAULIC
HOSE PIPE LEAKAGE ,
PO DONE TO KSAR
1658 PICK UP ISSUE , PARTS DISPATCHED ON 20-
DISMANTLE EARTH MOVERS -
6 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 TO MN/197 HO-406 BREAK SYSTEM NOT 05-2025 (BHAWANI
DONE PAYMENT IN
1663 WORKING PROPERLY ROADLINES)
PROCESS
& KING PIN ARE
DAMAGE
C CHANNEL , MS
LOAD BODY DAMAGE
PLAIN SHEET , MS
004& HO-380 , TYRE , BATTERY , GEAR BOX FITMENT DONE &
AL BS-3 HILL SITE NL02Q MN/276 DISMANTLE SQUARE PIPE - FEBRICATION MATERIAL PO
8 11/04/2025 005 & HO- DENTING WORK ,
TIPPER (NEW CAMP) 8726 MN282 DONE MATERIAL UNDER PROCESS
008 365 GEAR BOX SPARES &
REQUIREMENTS
RUNNING REPAIR
INDENT RISED
AL BS-6 MN05C GEAR BOX NOISY ON DISMANTLE GEARBOX PREPARING THE INDENT
11 NEW CAMP 23/05/2025 66-69
TIPPER 3745 APPLYING GEARS DONE DISMANTLED LIST
PO DONE TO MAX DG
MAHINDRA N2A20A24 ALTERNATOR DISMANTLE GUWAHATI - PART DISPATCHED
12 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 519 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
PO DONE TO MAX DG
MAHINDRA N2P21A17 ALTERNATOR DISMANTLE GUWAHATI - PART DISPATCHED
13 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 696 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
Kleeman
CONE BREAKDOWN,
Mobile SEKMAI
1 K0720048 21/05/2025 60 - 62 MN/659 PULLEY, BELT AND WAITING FOR PO
Crusher - CRUSHER
TENSIONER
Cone
SOME HYDRAULIC
HOSE PIPE LEAKAGE ,
PO DONE TO KSAR
1658 PICK UP ISSUE , PARTS DISPATCHED ON 20-
DISMANTLE EARTH MOVERS -
6 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 TO MN/197 HO-406 BREAK SYSTEM NOT 05-2025 (BHAWANI
DONE PAYMENT IN
1663 WORKING PROPERLY ROADLINES)
PROCESS
& KING PIN ARE
DAMAGE
C CHANNEL , MS
LOAD BODY DAMAGE
PLAIN SHEET , MS
HILL SITE 004& HO-380 , TYRE , BATTERY , GEAR BOX FITMENT DONE &
AL BS-3 NL02Q MN/276 DISMANTLE SQUARE PIPE - FEBRICATION MATERIAL PO
8 (NEW 11/04/2025 005 & HO- DENTING WORK ,
TIPPER 8726 MN282 DONE MATERIAL UNDER PROCESS
CAMP) 008 365 GEAR BOX SPARES &
REQUIREMENTS
RUNNING REPAIR
INDENT RISED
AL BS-6 MN05C GEAR BOX NOISY ON DISMANTLE GEARBOX PREPARING THE INDENT
11 NEW CAMP 23/05/2025 66-69
TIPPER 3745 APPLYING GEARS DONE DISMANTLED LIST
PO DONE TO MAX DG
MAHINDRA N2A20A24 ALTERNATOR DISMANTLE GUWAHATI - PART DISPATCHED
12 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 519 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
PO DONE TO MAX DG
MAHINDRA N2P21A17 ALTERNATOR DISMANTLE GUWAHATI - PART DISPATCHED
13 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 696 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
Kleeman
CONE BREAKDOWN,
Mobile SEKMAI
1 K0720048 21/05/2025 60 - 62 MN/659 PULLEY, BELT AND WAITING FOR PO
Crusher - CRUSHER
TENSIONER
Cone
SOME HYDRAULIC
HOSE PIPE LEAKAGE ,
PO DONE TO KSAR
1658 PICK UP ISSUE , PARTS DISPATCHED ON 20-
DISMANTLE EARTH MOVERS -
6 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 TO MN/197 HO-406 BREAK SYSTEM NOT 05-2025 (BHAWANI
DONE PAYMENT IN
1663 WORKING PROPERLY ROADLINES)
PROCESS
& KING PIN ARE
DAMAGE
C CHANNEL , MS
LOAD BODY DAMAGE
PLAIN SHEET , MS
HILL SITE 004& HO-380 , TYRE , BATTERY , GEAR BOX FITMENT DONE &
AL BS-3 NL02Q MN/276 DISMANTLE SQUARE PIPE - FEBRICATION MATERIAL PO
8 (NEW 11/04/2025 005 & HO- DENTING WORK ,
TIPPER 8726 MN282 DONE MATERIAL UNDER PROCESS
CAMP) 008 365 GEAR BOX SPARES &
REQUIREMENTS
RUNNING REPAIR
INDENT RISED
AL BS-6 MN05C GEAR BOX NOISY ON DISMANTLE GEARBOX PREPARING THE INDENT
11 NEW CAMP 23/05/2025 66-69
TIPPER 3745 APPLYING GEARS DONE DISMANTLED LIST
PO DONE TO MAX DG
MAHINDRA N2A20A24 ALTERNATOR DISMANTLE GUWAHATI - PART DISPATCHED
12 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 519 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
PO DONE TO MAX DG
MAHINDRA N2P21A17 ALTERNATOR DISMANTLE GUWAHATI - PART DISPATCHED
13 NEW CAMP 06/04/2025 13 MN/310 HO-389
10KVA DG 696 BURND DONE MATERIAL (NETWORK - NICCN07655)
DISPATCH SOON
114
DG Set NOZZLE ABNORMAL
14 NEW CAMP 000000006 12/05/2025 STARTING ISSUE SENT TO LOCAR REPAIR
62.5kva SPRAY
77
Kleeman
CONE BREAKDOWN,
Mobile SEKMAI
1 K0720048 21/05/2025 60 - 62 MN/659 PULLEY, BELT AND WAITING FOR PO
Crusher - CRUSHER
TENSIONER
Cone
CHECKON MN05C ENGINE ECU NOT DISMANTLE FITMENT TO BE DONE BY SERVICE CHARGE QUOTATION
5 JCB BS-4 17/04/2025 FOR WORK ORDER SUBMITTED
SITE 3982 WORKING DONE MA & MA
SOME HYDRAULIC
HOSE PIPE LEAKAGE ,
1658 PO DONE TO KSAR
PICK UP ISSUE , BREAK DISMANTLE PARTS DISPATCHED ON 20-05-
6 JCB BS-3 NEW CAMP MN01 9722 10/04/2025 TO MN/197 HO-406 EARTH MOVERS -
SYSTEM NOT WORKING DONE 2025 (BHAWANI ROADLINES)
1663 PAYMENT IN PROCESS
PROPERLY & KING PIN
ARE DAMAGE
PO DONE TO MAX DG
MAHINDRA N2A20A24 DISMANTLE PART DISPATCHED (NETWORK
12 NEW CAMP 06/04/2025 13 MN/310 HO-389 ALTERNATOR BURND GUWAHATI - MATERIAL
10KVA DG 519 DONE - NICCN07655)
DISPATCH SOON
PO DONE TO MAX DG
MAHINDRA N2P21A17 DISMANTLE PART DISPATCHED (NETWORK
13 NEW CAMP 06/04/2025 13 MN/310 HO-389 ALTERNATOR BURND GUWAHATI - MATERIAL
10KVA DG 696 DONE - NICCN07655)
DISPATCH SOON
114
DG Set NOZZLE ABNORMAL SPRAY SENT TO LOCAR REPAIR
14 NEW CAMP 000000006 12/05/2025 STARTING ISSUE
62.5kva
77
Mitsubishi
NEW ARTICULATE CYL. LEAK, SEAL KIT, KING PIN, KING
4 MOTOR MN 01 9723 16/05/2025 33 MN/444 WAITING FOR PO
CHECKON KING PIN DAMAGE PIN BEARING REQUIRED
GRADER
CHECKON MN05C ENGINE ECU NOT DISMANTLE FITMENT TO BE DONE BY SERVICE CHARGE QUOTATION
5 JCB BS-4 17/04/2025
SITE 3982 WORKING DONE MA & MA FOR WORK ORDER SUBMITTED
BREAKER SEAL KIT , BUSH , CHISEL PO DONE TO KSAR CHISEL, ISOLATOR STOPPER
KOMATSU 1364 & HO- 234 & DISMANTLE RECEIVED (PO - 234)
3 NEW CAMP JTHB 350 01/05/2025 MN/2185 BUSHING , PLUG , RETAINER BAR , ERATHMOVERS & INDUSTRIAL
BREAKER PC-300 1365 HO-239 DONE & PO - HO 239 ITEMS
STOPER PIN ETC ARE DAMAGE SPARES & I EQUIP CORPORATION
NOT DISPATCHED
PO DONE TO KSAR
MITSUBISHI ARTICULATE CYL. LEAK, KING PIN
4 NEW CHECKON MN 01 9723 16/05/2025 33 MN/444 HO-589 ERATHMOVERS & INDUSTRIAL MATERIALS TO BE DISPATCHED
MOTOR GRADER DAMAGE
SPARES
LOAD BODY DAMAGE , TYRE , C CHANNEL , MS PLAIN SHEET , MS GEAR BOX FITMENT DONE &
HILL SITE (NEW 004& 005 MN/276 DISMANTLE
8 AL BS-3 TIPPER NL02Q 8726 11/04/2025 HO-507 BATTERY , DENTING WORK , GEAR SQUARE PIPE -PO DONE TO STEEL FEBRICATION MATERIAL PO
CAMP) 008 MN282 DONE HOUSE
BOX SPARES & RUNNING REPAIR UNDER PROCESS
DISMANTLE
12 AL BS-6 TIPPER SEKMAI CRUSHER MN05C 4110 27/05/2025 FRONT CROWN PINION NOISY UNDER PROCESS CHECKING UNDER PROGRESS INDENT TO BE RAISED