The document outlines various aspects of a construction project, including a building layout, organizational charts for construction and manufacturing companies, and a business plan. It details an accident report involving a workshop incident, material lists for construction and furniture projects, and step-by-step procedures for construction and redesign tasks. The document serves as a comprehensive guide for building technology assessments and project management.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Print Building FINALE

The document outlines various aspects of a construction project, including a building layout, organizational charts for construction and manufacturing companies, and a business plan. It details an accident report involving a workshop incident, material lists for construction and furniture projects, and step-by-step procedures for construction and redesign tasks. The document serves as a comprehensive guide for building technology assessments and project management.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Building Layout

Task: Laying out a building, size 10 x 10


Organizational Chart for Construction
Company
Emcor Group Inc.
Norwalk, Jersey, United States of America
BUSINESS PLAN
Organizational Chart for Manufacturing
Company
Johnson & Johnson
Johnson & Johnson Plaza, New Jersey, 08933, United States of America
BUILDING TECHNOLOGY SCHOOL BASED
ASSESSMENT

Subject: Building Technology

School: Maranatha Academy

Centre No: 180006

Candidate Number: 1800060464

Candidate Name: Melliesha Saint Jean

Year of Exam: 2025

Territory: Turks and Caicos Islands

ACCIDENT REPORT
TO: Mr. Gilbert
FROM: Melliesha Saint Jean
DATE: 25/12/23
SUBJECT: Accident in the Workshop

On December 20, 2023, at about 2 p.m., Jacob Higgs age 25 of a Kew Town
address was using the circular saw in the Building Tech Lab at the Camero
Academy High to cut a few boards for his bedside table. Jacob Higgs failed to
abide by the safety rule which is to avoid being engaged in horseplay and as a
result his entire right arm was severed. Brenique Wells, age 32, of a Five Cays
address was present and saw the entire scene and exactly what had happened.
Brenique ran to the assistance of Jacob, and she used a towel to tie around the
wound to aid in ceasing further bleeding. She then took the arm, put it in a plastic
bag and placed the bag in a bowl filled with ice water. Jacob was rushed to the
nearby hospital where he was treated by a doctor who did surgical operations on
his arm and stitched it back on. Jacob was then released the following day.

Submitted By

Material List for Construction Project


No. Of Name of Size in mm Unit Material Unit Cost
pieces parts TxWxL Measurmt. Cost

4 Legs 50x150x740 22.2m Pitch $5 $111


Pine
4 Top 50x150x1800 54m Pitch $5 $270
Boards Pine
4 Seats 50x150x1800 54m Pitch $5 $270
Pine
2 Top Rails 50x150x740 22.2m Pitch $5 $111
Pine
2 Bottom 50x150x1600 24m Pitch $5 $120
Rails Pine
36 75mm Bolts $5 $5
25 Screws $5 $5

3 Sanding $5 $5
Belt

2 Litres Paint $5 $10


Total $907
Cost

Steps of Procedure for Construction Project


Steps of Procedure Tools and Materials
Select Board Board
Measure and cut top rail Compound saw, Pencil, Framing Square,
Measuring Tape
Sand Top Rail Belt Sander
Measure and cut legs Compound saw, Pencil, Framing Square,
Measuring Tape
Sand Legs Belt Sander
Attach and Glue top rail to legs Wood Glue, G-Clamp, Screws, Cordless
Drill, Bolt, Washer, Adjusting wrench
Measure and cut bottom rails Compound saw, Pencil, Framing Square,
Measuring Tape
Sand Bottom Rails Belt Sander
Attach and Glue bottom rail to the legs Screws, Bolts, Washer, Adjusting Wrench,
Cordless Drill, Wood Glue, G-Clamp
Measure and cut seats Compound saw, Pencil, Framing Square,
Measuring Tape
Sand seats Belt Sander
Attach and Glue seats to the bottom rail Wood Glue, G-Clamp, Screws, Cordless
Drill, Bolt, Washer, Adjusting wrench
Measure and Cut tabletop Compound saw, Pencil, Framing Square,
Measuring Tape

Sand tabletop Belt Sander


Router Top boards Router
Attach and glue top boards to bench Screws, Bolts, Washer, Adjusting Wrench,
Cordless Drill, Wood Glue, G-Clamp
Fill in holes Chisel, Wood filler
Finished Sanding Sandpaper
Apply Finish Paint and Paintbrush

Steps of Procedure for Redesign


Steps of procedure Tools and Materials
Remove old roof Pry bar, Hammer
Measure and cut wall plates Circular saw, measuring tape, pencil, framing
square
Install wall plates Measuring tape, Spirit Level, Hammer, Nails

Measure and cut ridge board Circular saw, measuring tape, pencil, framing
square

Install ridge board Measuring tape, Spirit Level, Hammer, Nails

Measure and cut rafters Circular saw, measuring tape, pencil, framing
square
Install rafters Measuring tape, Spirit level, Hammer, Nails

Apply Roof Covering Hammer, Nails, Pencil, Measuring Tape,


Utility Knife
Measure and cut drip edge Circular saw, measuring tape, pencil

Install drip edge Measuring tape, Hammer, Nails

Measure and cut roofing felt Circular saw, measuring tape, pencil

Install roofing felt Measuring tape, Hammer, Nails

Measure and cut sheathing Circular saw, measuring tape, pencil

Install sheathing Measuring tape, Spirit Level, Hammer, Nails

Material List for Redesign

No. of Name of Size in mm Unit Material Unit Cost Cost


pieces parts TxWxL measurmt.
20 Common 50150x2500 375m Pitch Pine $5 $1875
rafters
1 Ridge 50x150x3600 27m Pitch Pine $5 $135
Board
4 Wall 50x150x150 4.5m Pitch Pine $5 $22.50
plates
8 Eaves 25x150x750 22.5m Pitch Pine $5 $112.50
Board
4 Facia 25x250x3600 90m Pitch Pine $5 $450
Board
10 boxes Roof $25 $25
Shingles
1 box 200mm Shingle $15 $15
Nails
Total Cost $2635

Material List for Furniture Project


Name of Number Size in mm Unit Materia Unit cost Cost
parts of pieces TxWxL Measur l
mt
Legs 4 50x50x76 8m Cedar $3 $24
2 wood
Top rails 4 26x77x30 3m Cedar $2 $6
5 wood

Bottom 4 26x77x30 3m Cedar $2 $6


rails 5 wood
Tabletop 4 26x432x4 20m Cedar $3 $60
32 wood
Laminate 1 12x305x3 1m Cerami $2 $2
d 18 c
plywood
8 75 mm Screws $5 $5

1 litre Glue $10 $10


1 litre Lacque $12 $12
r
1 litre Paint $9 $9
Thinner
16 oz Wood $10 $10
Filler
Total $144
Cost

Steps of Procedure for Furniture Project


STEPS OF PROCEDURE TOOLS and MATERIALS
Measure and mark legs Pencil, measuring tape, try square
Cut legs Compound saw
Measure and mark, top and bottom Pencil, measuring tape, try square
rails
Cut top and bottom rails Compound saw
Straighten the best side of each rail Jointer
Sand legs and rails Belt sander
Mark and layout mortise joints on all Pencil, combination square
legs
Dig mortise joints on all legs Mallet, Chisel
Mark tenon joints on each rail Pencil, combination square
Cut tenon joints Table Saw
Glue and fit mortise and tenon joints Glue, clamp stand
Square legs Measuring tape, framing square
Measure and mark tabletop pieces Pencil, measuring tape, try square
Sand Tabletop pieces Belt sander
Mark Mitre joint on corner of Pencil, combination square
tabletop
Cut mitre joint Table saw
Assemble tabletop Wood Glue, string
Attach tabletop to the top of the legs Screws, Cordless drill
Sand tabletop to level it Belt sander
Measure the inside part of the measuring tape
tabletop
Use the measurement to mark and Pencil, measuring tape, tri square,
cut out a piece of laminated table saw
plyboard
Fit and glue laminated board in the Wood Glue
center of the tabletop
Fill in holes Wood Filler, Chisel
Finished sanding Sandpaper
Apply Finish Paint brush, lacquer, Paint Thinner

You might also like