7-Transport & Communication
7-Transport & Communication
1 General Schemes 16 1051.430 0.000 1051.430 14 912.875 0.000 912.875 30 1964.305 0.000 1964.305 0.000 1964.305
2 Improvement 152 1954.867 0.000 1954.867 41 339.600 0.000 339.600 193 2294.467 0.000 2294.467 0.000 2294.467
3 Construction 189 2533.803 0.000 2533.803 166 966.800 0.000 966.800 355 3500.603 0.000 3500.603 0.000 3500.603
4 Bridges 3 87.900 0.000 87.900 3 152.725 0.000 152.725 6 240.625 0.000 240.625 0.000 240.625
5 Foreign Aided Projects 2 1000.000 0.000 1000.000 0 0.000 0.000 0.000 2 1000.000 0.000 1000.000 3100.000 3100.000
Total Transport and Communication 362 6628.000 0.000 6628.000 224 2372.000 0.000 2372.000 586 9000.000 0.000 9000.000 3100.000 12100.000
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
General Schemes
(On-Going Schemes)
534 Block Scheme for construction and improvement of Sindh Approved 1231.800 5.000 100.000 105.000 150.000 150.000 9% 21%
Provincial Road in Sindh.
535 Block Allocation for completion of missing on-going T.A.Yar Approved 116.231 91.275 24.956 116.231 0.100 0.100 100% 100%
schemes of past years (Construction of Tando
Allahyar Bypass Road mile 0/0-3/7).
536 Reconstruction of damaged Bridges. Sindh Approved 100.250 94.685 12.748 107.433 5.000 5.000 107% 112%
537 Construction of Social Sector Roads / Rural Access Sindh Approved 800.000 701.652 98.771 800.423 50.000 50.000 100% 106%
Road by the Province.
538 Block Allocation for Land Compensation. Sindh Approved 81.305 26.000 24.546 50.546 20.000 20.000 62% 87%
539 Skill Development Internship Programme for Sindh Approved 40.000 12.085 12.085 15.830 15.830 30% 70%
Unemployment Engineer to prepare them for private
sector.
540 Construction of Rural Access Roads in Upper Sindh Upper Sindh Approved 401.520 286.725 56.250 342.975 50.000 50.000 85% 98%
100 Kms.
541 Construction of Rural Access Roads in Lower Lower Sindh Approved 493.000 370.256 96.250 466.506 40.000 40.000 95% 103%
Sindh 100 Kms.
542 Feasibility Study Construction of Road from Super Jamshoro Approved 4.550 1.900 2.650 4.550 0.500 0.500 100% 111%
Highway Karachi to Sehwan along Sui Gas Line
152.0 Kms.
543 Block Allocation of Construction of Road network Upper Sindh Approved 1088.268 10.000 192.750 202.750 150.000 150.000 19% 32%
for better Rural Access by Provincial Government in
Upper Sindh 250.0 Kms.
544 Construction of Road network for better Rural Lower Sindh Approved 1305.395 10.000 180.000 190.000 150.000 150.000 15% 26%
access by Provincial Government in Lower Sindh
250.0 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
545 Construction of Road from Tando Bagho to Badin Approved 122.130 1.000 25.000 26.000 20.000 20.000 21% 38%
Khairpur Gambo via Olya Khan Shah Road 30
Kms (Missing Scheme)
546 Construction of road in Pangrio of Nukot via Rahim Umerkot Approved 99.490 1.000 20.750 21.750 20.000 20.000 22% 42%
Khan Notkhani (17 Kms) Missing link
547 Block Schme for Construction of Rural Access Lower Sindh Approved 1462.220 25.000 25.000 140.000 140.000 2% 11%
Road in Lower Sindh 260 Kms.
548 Block Scheme for Construction of Rural Access Upper Sindh Approved 1312.050 25.000 25.000 140.000 140.000 2% 13%
Road in Upper Sindh 260 Kms.
549 Block Schme for improvement of Various Roads in Sindh Approved 336.720 25.000 25.000 100.000 100.000 7% 37%
Sindh 100 Kms.
Total General Schemes (On-Going Schemes) 8994.929 0 1599.493 0 921.756 0 2521.249 0 1051.430 0 1051.430 0
General Schemes
(New Schemes)
550 Improvement / Re-alignment of curves of existing Sindh Unapproved 500.000 20.000 20.000 0% 4%
roads (Phase-II)
553 Construction / Improvement of Provincial roads in Sukkur Un-Approved 600.000 40.000 40.000 0% 7%
Sukkur & Shikarpur 80.00 Km
554 Construction / Improvement of Provincial roads in Larkana Un-Approved 520.000 40.000 40.000 0% 8%
District Larkana. (80 Kms).
555 Construction / Improvement of Provincial roads in Badin Un-Approved 325.000 40.000 40.000 0% 12%
Badin & Thatta Districts (50 Kms.)
556 Construction/Improvement of Provincial Roads in Dadu/ Un-Approved 390.000 40.000 40.000 0% 10%
District Dadu & Jamshoro (60.00 Km)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
557 Construction/Improvement of Provincial roads in Upper Sindh Un-Approved 1200.000 85.000 85.000 0% 7%
Sindh(Upper Sindh) 200Kms.
558 Construction/Improvement of Provincial roads in Lower Sindh Un-Approved 1200.000 150.000 150.000 0% 13%
Sindh(Lower Sindh) 200Kms.
559 Emergent restoration of damaged raods & bridges in Sindh Un-Approved 200.000 33.875 33.875 0% 17%
Sindh.
560 Construction of Rural Access Road for newly Kamber Un-Approved 700.000 90.000 90.000 0% 13%
created District Kamber Shahdadkot 100 Kms. Shahdadkot
561 Construction / Improvement of various roads under Sindh Un-Approved 690.000 150.000 150.000 0% 0.28%
CM Directive
562 Construction of various roads under CM Directive Sindh Un-Approved 700.000 84.000 84.000 0% 0.21%
(100 Kms)
563 Improvement of existing roads for newly created Kamber Un-Approved 350.000 40.000 40.000 0% 11%
District Kamber Shahdadkot 50 Kms. Shahdadkot
Improvement
(On-Going Schemes)
564 Improvement of Hyderabad Shaikh Bhirkio Hyderabad Approved 113.584 30.500 8.500 39.000 10.000 10.000 34% 43%
Gulab Leghari road mile 0/0-27/4 = 27 - 4 (M) =
44.27 Kms.
565 Improvement of Hyderabad Tando Fazal Seri Hyderabad Approved 146.744 7.000 5.000 12.000 10.000 10.000 8% 15%
road mile 0/0-24/0 = 24-0 (M) = 38.64 Kms.
566 Improvement of Hyderabad Mirpurkhas road Hyderabad Approved 357.959 4.700 55.000 59.700 20.000 20.000 17% 22%
mile 2/0-24/0 = 22-0 (M) = 35.42 Kms.
567 Block Schemes for improvement of Provincial Hyderabad Approved 43.421 8.000 8.000 16.000 10.000 10.000 37% 60%
roads in each District. (Hyderabad).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
568 Improvement of Matiari - Nasarpur road mile Matiari Approved 87.363 37.000 8.500 45.500 10.000 10.000 52% 64%
0/0-14/0 = 14-0 (M) = 22.54 Kms.
569 Improvement of Nasarpur to Oderolal Via Matiari Approved 90.014 22.500 8.000 30.500 10.000 10.000 34% 45%
Oderolal Station I/c Link to Haji Muhammad
Saleh Khan Pathan Mile 0/0-15/0 24.15 Kms
570 Block Scheme for improvement of Provincial roads Matiari Approved 38.894 13.000 5.000 18.000 10.000 10.000 46% 72%
in each District. (Matiari).
571 Widening & Reconditioning of Mirwah - Chamber T' Allahyar Approved 113.105 69.000 8.500 77.500 10.000 10.000 69% 77%
Tando Allahyar road mile 0/0-30/6 30-6 (M) =
49.50 Kms.
572 Widening & Reconditioning Sultanabad to T.Allahyar Approved 80.773 54.200 5.000 59.200 7.000 7.000 73% 82%
Mirpurkhas Mirwah road 22nd mile including Bridge
over West Branch and link to Hafiz Sandhano mile
0/0-12/4 = 12-4 (M) = 20.12 Kms.
573 Widening / Reconditioning Shaikh Bhirkio Tando T.Allahyar Approved 64.927 17.500 8.500 26.000 10.000 10.000 40% 55%
Allahyar via Bukera Makan Sharif road mile
0/0-14/0 = 14 -0 (M) = 22.52 Kms.
574 Block Scheme for improvement of Provincial roads T'Allahyar Approved 45.155 12.000 8.000 20.000 10.000 10.000 44% 66%
in each District. (T.Allahyar)
575 Widening / Reconditioning of Tando Allahyar T'Allahyar Approved 153.130 1.000 5.000 6.000 20.000 20.000 4% 17%
Mirwah road Mile 5/4 - 21/0 = 15-4 (M) = 24.95
Kms.
576 Improvement of Tando Muhammad Khan Sujawal T.M.Khan Approved 157.891 120.000 12.750 132.750 20.000 20.000 84% 97%
road mile 0/0-24/0 = 24-0 (M) = 38.64 Kms.
577 Widening / Reconditioning of Bulri Shah Karim to T.M.Khan Approved 85.238 9.000 5.000 14.000 8.000 8.000 16% 26%
Khorwah Chowk mile 0/0-21/0 =21-0 (M) =
33.81 Kms.
578 Reconditioning of Hyderabad - Badin Road mile T.M.Khan Approved 192.621 48.480 21.250 69.730 30.000 30.000 36% 52%
6/0-23-5 = 17-5 (M) = 28.37 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
579 Block Scheme for improvement of Provincial roads T.M.Khan Approved 32.865 12.000 8.000 20.000 10.000 10.000 61% 91%
in each District.
580 Block Scheme for improvement of Provincial roads Karachi Approved 37.295 5.991 5.000 10.991 5.000 5.000 29% 43%
in each District.
581 Widening / Reconditioning of Tando Adam Duthro Sanghar Approved 19.926 19.926 1.000 20.926 5.000 5.000 105% 130%
road mile 0/0-12/4 = 12-4 (M) 20.12 KMS
582 (I)Widening / Reconditioning of Tando Adam Jhole Sanghar Approved 124.149 102.093 10.000 112.093 12.000 12.000 90% 100%
via Dalore Mori road mile 0/0-18/0. (18.0 mile )
(28.96 Kms.)
583 Widening / Reconditioning of Sanghar - Jamrao Sanghar Approved 151.839 130.150 12.000 142.150 10.000 10.000 94% 100%
Head road mile 0/0-30/0. (12' - 18' width) (60.00
Kms.)
584 Block Scheme for improvement of Provincial roads Sanghar Approved 53.229 19.560 8.000 27.560 15.000 15.000 52% 80%
in each District.
585 Widening / Reconditioning Sanghar – Mirpurkhas Sanghar Approved 731.415 8.000 95.000 103.000 30.000 30.000 14% 18%
asphalt surface 68.00 kms.
586 Widening / Reconditioning Hala – Shahdadpur – Sanghar Approved 700.133 5.000 45.000 50.000 10.000 10.000 7% 9%
Sanghar with asphalt surface Mile 0/0-45/1 = 45-1
(M) = 72.65 Kms.
587 Widening / Reconditioning Tando Adam – Sanghar Approved 168.275 5.000 5.000 10.000 20.000 20.000 6% 18%
Shahdadpur Road Mile 0/0 - 11/0 = 11-0 = (M) =
17.71 Kms.
588 Improvement Tando Adam Berani Kundiari with as Sanghar Approved 431.403 9.000 9.000 18.000 15.000 15.000 4% 8%
sphalt surface Mile 0/0-46/4 = 46-4 (M) = 74.86
Kms..
589 W/R Sindhri Khipro Hatung with link to Kamil Sanghar Approved 338.506 8.000 24.000 32.000 30.000 30.000 9% 18%
Hingoro 67.00 Kms
590 Widening / reconditioning Nawabshah – Sanghar Sanghar Approved 440.678 8.000 45.000 53.000 30.000 30.000 12% 19%
asphalt 62.0.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
591 Widening / Reconditioning of Nawabshah Qazi Nawabshah Approved 145.919 51.600 5.000 56.600 20.000 20.000 39% 52%
Ahmed road mile 0/4-20/0 = 19-4 (M) = 31.39
Kms.
592 Widening / Reconditioning of N'Shah to Sanghar Nawabshah Approved 46.171 25.000 5.000 30.000 16.000 16.000 65% 100%
raod mile 0/0-6/0 = 6-0 (M) = 9.66 Kms.
593 Up-gradation i.e. W/R of Sakrand - Sarhari road mile Nawabshah Approved 90.868 26.300 5.000 31.300 20.000 20.000 34% 56%
0/0-13/3 = 13-3 (M) = 21.52 Kms.
594 Block Scheme for improvement of Provincial roads Nawabshah Approved 44.321 8.996 3.000 11.996 25.000 25.000 27% 83%
in each District.
595 Improvement of Mehar-Faridabad road mile Dadu Approved 25.030 18.700 6.330 25.030 0.200 0.200 100% 101%
0/0-4/0 = 4-0 (M) = 6.44 Kms.
596 Widening / Reconditioning of road from Hatim Jatoi Dadu Approved 67.166 8.000 10.000 18.000 15.000 15.000 27% 49%
Phatak to Piyaro Ghoth station via Phulji Station mile
0/0-13/0 = 13-0 (M) = 20.93 Kms.
597 Widening / Reconditioning Mehar to Warrah via Dadu Approved 107.502 17.700 10.000 27.700 30.000 30.000 26% 54%
Gaji Khuhawar 0/0-19/0=19 -0 (M) = 30.59 Kms.
598 Block Scheme for improvement of Provincial roads Dadu Approved 38.354 11.000 9.490 20.490 20.000 20.000 53% 105%
in each District.
599 Improvement of road from Super Highway to Jamshoro Approved 46.686 14.000 10.000 24.000 22.000 22.000 51% 100%
Bypass (Hyderabad) to Kotri via Khanpur upto
Railway Phatak (Asphalt) mile 0/0-5/2 = 5-2 (M) =
8.45 Kms.
600 Block Scheme for improvement of Provincial roads Jamshoro Approved 38.803 10.000 11.500 21.500 15.000 15.000 55% 94%
in each District.
601 Widening / Reconditioning of Mataro Hotel Kario Badin Approved 161.249 63.740 10.000 73.740 15.000 15.000 46% 55%
Ganhwar - Khorwah - Bothoro road mile 0/0 - 34/3
= 34-3 (M) 55.34 KMS.
602 Improvement of Hyderabad Badin road mile T'M Khan / Approved 179.443 158.797 25.000 183.797 15.000 15.000 102% 111%
23/5-43/5 = 20.0 (M) = 32.0 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
603 Widening & Reconditioning of Chamber to Tando Badin Approved 64.079 48.293 13.800 62.093 5.000 5.000 97% 105%
Ghulam Ali road mile 13/2-28/2 =15-0 (M) = 24.15
Kms.
604 Improvement road Talhar Rajo Khanani to Haji Badin Approved 100.218 76.000 10.000 86.000 15.000 15.000 86% 101%
Sawan mile 0/0-15/2 = 15 -2 (M) = 24.55 Kms.
605 Widening / Reconditioning of road from Kadhan to Badin Approved 57.219 24.039 16.250 40.289 15.000 15.000 70% 97%
Ali Bunder road Bridge 120 Rft. Mile 16/0-27/4 =
27 -4 (M) = 18.50 Kms.
606 Widening / Reconditioning Badin - Seerani to Badin Approved 94.454 15.000 16.250 31.250 20.000 20.000 33% 54%
Bhugra Memon road mile 1/4-11/0 =9 -4 15. 29
Kms.
607 Widening / Reconditining Golarchi - Ahmed Rajo Badin Approved 77.414 12.500 21.250 33.750 20.000 20.000 44% 69%
mile 0/0-18/0 = 18-0 (M) = 28.98 Kms.
608 Improvement of Matli Tando Ghulam Ali Dumbalo Badin Approved 124.292 80.880 10.000 90.880 35.000 35.000 73% 101%
with Asphalt concrete surfacing mile 0/5-11/0 =
37.03 Kms(Phase-I).
609 Improvement of W&R of Talhar Tando Bago Badin Approved 146.817 11.000 7.000 18.000 20.000 20.000 12% 26%
Pangrio road mile 0/0-28/2 = 28-2 (M) = 45.48
Kms.
610 Repair of Coal Minse Existing road from Indus Jamshoro Approved 77.034 12.000 12.000 32.327 32.327 16% 58%
Highway to Lakhra Coal Mines 0/0-11/0 M&MD
611 Widening / Reconditioning of Tando Bago to Dehi Badin Approved 86.215 17.500 7.000 24.500 10.000 10.000 28% 40%
Digri road mile 0/0-16/0 = 16-0 (M) = 25.76 kms.
612 Improvement of road from Kario Ganwar to Badin Approved 68.990 13.200 5.000 18.200 10.000 10.000 26% 41%
Golarchi mile 0/0-12/0=12-0 (M) = 19.32 Kms.
613 Block Scheme for improvement of Provincial roads Badin Approved 41.067 20.499 10.500 30.999 12.000 12.000 75% 105%
in each District.
614 Widening / reconditioning of Hyderabad – Badin Badin Approved 269.368 1.000 20.000 21.000 30.000 30.000 8% 19%
road mile 43/5-63/0 with asphalt surface = 19-3 +
(M) = 31.19 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
615 Improvmnet of Matli Tando Ghulam Ali Dumbalo Badin Approved 178.649 5.000 25.000 30.000 30.000 30.000 17% 34%
with asphalt surface phase–II mile 11/0-23/0 = 12-0
(M) = 19.32 Kms.
616 Improvement of Louwari to Nindo road mile Badin Approved 49.368 1.000 13.750 14.750 15.000 15.000 30% 60%
0/0-10/6= 10-6= (M) = 17.30 kms.
617 Widening / Reconditioning Kadhan to Seerani road Badin Approved 83.488 1.000 17.500 18.500 15.000 15.000 22% 40%
mile 0/0-12/0= 12-0 (M) = 19.32 kms.
618 Widening / Reconditioning of road from Chuhar Thatta Approved 56.350 19.500 8.500 28.000 15.000 15.000 50% 76%
Jamali to Chach Jehan Khan via Ladyoon I/c link to
Shah Yaqeeq mile 0/0-13/2 = 13 -2 (M) = 21.33
Kms.
619 Widening / Reconditioning of Sujawal Daro via Belo Thatta Approved 89.842 21.500 11.250 32.750 15.000 15.000 36% 53%
i/c link Dam Dam mile 0/0-22/7 = 27-7 (M) =
36.82 Kms.
620 Widening / Reconditioning of road from Bathoro to Thatta Approved 72.943 24.500 8.500 33.000 15.000 15.000 45% 66%
Banoo via Daro mile 0/0-17/2 = 17-2 (M) = 27.77
Kms.
621 W/R of Jati to Chuch Jehan Road mile 0/0-16/0 = Thatta Approved 84.516 10.000 11.250 21.250 15.000 15.000 25% 43%
16-0 (M) = 25.76 Kms.
622 Block Scheme for improvement of Provincial roads Thatta Approved 44.175 10.000 8.500 18.500 15.000 15.000 42% 76%
in each District.
623 Widening / Reconditioning Gharo–Sakro Buharo to Thatta Approved 174.326 1.000 8.500 9.500 15.000 15.000 5% 14%
Garho Road Mile 0/0-32/6 = 32-6 (M) = 51.52
Kms.
624 Improvement National Highway to Jhampeer via Thatta Approved 117.651 1.000 8.000 9.000 1.000 1.000 8% 8%
Farm Road Mile 0/0-19/4 = 19-4 (M) = 31.39
625 Kms. Widening / reconditioning Jati to Raj Malak Thatta Approved 67.020 1.000 8.000 9.000 15.000 15.000 13% 36%
Road Mile 0/0-12/0 = 12-0 (M) = 19.32 kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
626 Widening & Reconditioning of Mirwah - Kot Mirpurkhas Approved 82.808 36.000 8.000 44.000 15.000 15.000 53% 71%
Ghulam Muhammad road mile 0/0-15/0 = 15-0 (M)
= 24.15 Kms.
627 Widening & Reconditioning of Kot Ghulam Mirpurkhas Approved 85.467 33.600 6.000 39.600 15.000 15.000 46% 64%
Muhammad Digri road miel 0/0-14/0 14-0 (M) =
22.54 Kms.
628 W/R of Kot Ghulam Muhammad - Samaro road Umerkot Approved 58.686 29.500 6.000 35.500 15.000 15.000 60% 86%
mile 0/0-10/1 = 10 -1 (M) = 16.30 Kms.
629 Widening & Reconditioning of Jhudo Nabisar road Umerkot Approved 91.960 44.000 8.500 52.500 15.000 15.000 57% 73%
mile 0/0-14/5 = 14 -5 (M) = 23.54 Kms.
630 (a) Widening / Reconditioning of road from Mirpurkhas Approved 121.082 31.400 5.000 36.400 15.000 15.000 30% 42%
Mirpurkhas - Khan - Patoyoon Jam Nawaz Ali road
mile (0/0-28/4) upto Patayoon pertain to District
Mirpurkhas.
631 W/R of road from Mirwah to Digri road mile Mirpurkhas Approved 148.872 37.000 20.000 57.000 20.000 20.000 38% 52%
0/0-12/0 = 12 -0 (M) = 19.32 Kms.
632 Improvement of Hingoro to Pithoro via Girore Sharif Mirpurkhas Approved 80.846 40.000 8.000 48.000 10.000 10.000 59% 72%
Road mile 0/0-30/2. (12' - 0 width) (42 Kms.)
633 Widening / Reconditioning of Mirpurkhas Tando Mirpurkhas Approved 258.331 31.000 15.000 46.000 20.000 20.000 18% 26%
Adam road with Asphalt Carpet mile 0/0-25/5 =
25-5 (M) =41.25 Kms.
634 Block Scheme for improvement of Provincial roads Mirpurkhas Approved 41.257 8.000 8.000 16.000 10.000 10.000 39% 63%
in each District.
635 Improvement of Hyderabd – Mirpurkhas road with Mirpurkhas Approved 135.957 1.000 27.500 28.500 30.000 30.000 21% 43%
i/c Mirpurkhas District with asphalt surface Mile
34/4-40/6 = 6-2 (M) = 10.06 kms.
636 Widening & Reconditioning of Samaro-Kunri road Umerkot Approved 67.563 38.500 5.000 43.500 10.000 10.000 64% 79%
mile 0/0-13/0 = 13-0 (M) = 20.93 Kms.
637 Widening & Reconditioning of Samaro - Umerkot Umerkot Approved 116.416 41.500 9.000 50.500 20.000 20.000 43% 61%
road mile 0/0-23/0 23 -0 (M) = 37.03 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
638 W/R of road from Soofi Dhoro Naro via Wali Umerkot Approved 42.352 30.000 5.000 35.000 7.000 7.000 83% 99%
Mohammad Mangrio road mile 0/0-9/0 = 9-0 (M)
= 14.49 Kms.
639 Widening / Reconditioning of road from Kunri to Umerkot Approved 100.945 21.000 5.000 26.000 7.000 7.000 26% 33%
Tali via Nabisar mile 0/0-19/7 = 19-7 (M) = 31.99
Kms.
640 Widening / Reconditioning of Kunri Nabisar Thar Umerkot Approved 54.098 21.000 5.000 26.000 7.000 7.000 48% 61%
Mile 0/0 - 9/0 = 9-0 (M) = 14.89 Kms.
641 Widening / Reconditioning of Bacha Bund to Umerkot Approved 73.838 27.000 8.000 35.000 7.000 7.000 47% 57%
Girhore Sharif via Pithoro Mile 1/0-11/6 =10-6
(M) =17.30 Kms.
642 Block Scheme for improvement of Provincial roads Umerkot Approved 33.169 34.000 4.000 38.000 0.100 0.100 115% 115%
in each District.
643 Re-conditioning / Improvement of Mithi to Diplo Thar Approved 199.751 183.568 43.140 226.708 2.500 2.500 113% 115%
road mile 0/0-24/4 = 24-4 (M) = 39.44 Kms.
644 Improvement / Const of road from Wango to Thar Approved 95.191 107.000 2.400 109.400 0.060 0.060 115% 115%
Khetlari via Luss Farm road mile 0/0-12/5 = 12 -5
(M) = 20.32 Kms.
645 Reconditioning / Construction of road from Khetlari Thar Approved 177.489 127.000 50.000 177.000 0.480 0.480 100% 100%
to Diplo road mile 0/0-12/2 = 12 -2 (M) = 19.72
Kms.
646 W/R of road from Naukot to Wango road mile Thar Approved 210.636 232.000 3.000 235.000 5.000 5.000 112% 114%
0/0-19/5 = 19 -5 (M) = 31.59 Kms.
647 Block Scheme for improvement of Provincial roads Thar Approved 37.025 15.000 24.000 39.000 3.000 3.000 105% 113%
in each District.
648 Improvement / Construction of road from Sultanpur Ghotki Approved 96.862 43.000 5.000 48.000 8.000 8.000 50% 58%
to Thikrato via Roopar mile 0/0-13/4 = 13- 4 (M) =
21.73 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
649 W/R Reconditioning of road from Saleh Pat to Sukkur Approved 165.805 139.000 7.000 146.000 10.000 10.000 88% 94%
Sikandarabad mile 0/0-28/0 = 28-0 (M) = 45.08
Kms.
650 Widening / Reconditining of road from Khanpur Ghotki Approved 185.550 165.925 8.000 173.925 11.000 11.000 94% 100%
Mehar to Ghulam Bund mile 0/0-41/2 = 41-2 (M) =
66.41 KMS.
651 Widening / Reconditioning of road from Jarwar to Ghotki Approved 42.427 32.000 8.500 40.500 3.000 3.000 95% 103%
Mirpur Mathelo mile 0/0-8/0 = 8 -0 (M) = 12.88
Kms.
652 Widening / Reconditioning of Ghotki Mathelo road Ghotki Approved 35.935 19.000 12.500 31.500 5.000 5.000 88% 102%
mile 0/0-6/4 = 6-4 (M) = 10.46 Kms.
653 Widening / Reconditioning of road from Khanpur - Ghotki Approved 88.134 39.900 10.000 49.900 20.000 20.000 57% 79%
Jarwar - Yaru Lund mile 0/0-17/0 = 17-0 (M)
=27.37 Kms.
654 Block Scheme for improvement of Provincial roads Ghotki Approved 39.961 20.000 10.000 30.000 10.000 10.000 75% 100%
in each District.
655 Widening / Reconditioning Daharki to Kenjo road Ghotki Approved 84.873 12.750 12.750 15.000 15.000 15% 33%
Mile 0/0-16/0 = 16-0 (M) = 25.76 kms.
656 Widening / Reconditioning from Chondko to Ghotki Approved 26.834 8.000 10.000 18.000 8.000 8.000 67% 97%
Faqirabad Road Mile 10/4-14/2 = 3-6 (M) = 6.03
Kms.
657 Widening / Reconditioning to Daharki to Raja Farm Ghotki Approved 105.794 22.500 22.500 20.000 20.000 21% 40%
road Mile 0/0-16/2 = 16-2 (M) = 26.16 Kms.
658 Widening / Reconditioning to Adilpur – Sultanpur Sukkur Approved 88.180 30.000 30.000 20.000 20.000 34% 57%
Road Mile 0/0-17/0 = 17-0 (M) = 27.37 Kms.
659 Widening / Reconditioning of road from RQC Shikarpur Approved 138.064 97.784 15.000 112.784 20.000 20.000 82% 96%
Highway (N-65) at Jehano to Faizu Bungalow of
Indus Highway (N-55) mile 0/0-17/4 17-4 (M) =
28.17 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
660 Rehabilitation of Shikarpur City from Indus Highway Shikarpur Approved 28.319 19.000 5.000 24.000 4.000 4.000 85% 99%
to Bypass via Garhi Yasin Naka Gol Market road
mile 0/0-2/2 = 2-2 (M) = 3.62 Kms.
661 Widening / Reconditioning of road from Sukkur Shikarpur Approved 59.941 27.000 10.000 37.000 10.000 10.000 62% 78%
Airport Bagarji Ruk mile 0/0-12/0 =12-0 (M) =
19.32 Kms.
662 Block Scheme for improvement of Provincial roads Shikarpur Approved 39.934 16.400 8.000 24.400 18.000 18.000 61% 106%
in each District.
663 Widening & Reconditioning of Nausheroferoze Phull N'Feroze Approved 71.952 40.684 3.000 43.684 8.000 8.000 61% 72%
to Darya D.K Mari road mile 0/0-17/4 17-4 (M) =
28.17 Kms.
664 Widening & Reconditioning of Tharushah Mithiani N'Feroze Approved 49.166 29.800 3.000 32.800 9.000 9.000 67% 85%
road mile 0/0-10/4 = 10-4 (M) = 16.90 Kms.
665 Widening & Reconditioning Bhirya road to N.Feroze Approved 58.720 56.800 1.000 57.800 1.000 1.000 98% 100%
Karoondi road mile 0/0-13/6 = 13-6 (M) = 22.13
Kms.
666 Widening / Reconditioning of Manaheen Purn Malik N.Feroze Approved 39.099 28.000 3.000 31.000 1.000 1.000 79% 82%
road mile 0/0-8/3 = 8-3 (M) = 13.48 Kms.
667 Reconditioning of road from Bhiria City to N'Feroze Approved 19.853 16.900 1.000 17.900 1.000 1.000 90% 95%
Tharushah road mile 0/0-5/4 = 5-4 (M) = 8.85
Kms.
668 Widening / Reconditioning of Kandiaro Khan N'Feroze Approved 63.380 16.500 3.000 19.500 8.000 8.000 31% 43%
Wahan to Kotri Kabir mile 0/0-16/5 = 16-5 (M) =
26.76 Kms.
669 Reconditioning of Kandiaro to Tharushah road mile N'Feroze Approved 53.787 14.308 3.000 17.308 20.000 20.000 32% 69%
0/0-12/0 = 12-0 (M) = 19.32 Kms.
670 Widening / Reconditioning of road from Saduja N'Feroze Approved 88.306 16.500 3.000 19.500 10.000 10.000 22% 33%
Phul-Masarji Wah upto Moro Bandhi rod mile
0/0-19/0 = 19-0 (M) = 30.59 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
671 Improvement of Widening of Halani Khan Wahan N'Feroze Approved 33.712 11.500 20.000 31.500 2.000 2.000 93% 99%
road mile 0/0-6/2 = 6-2 (M) = 10.06 Kms.
672 Block Scheme for improvement of Provincial roads N'Feroze Approved 50.180 8.700 20.000 28.700 15.000 15.000 57% 87%
in each District.
673 Widening / Reconditioning Noushero Padidan Phul N'Feroze Approved 139.903 3.000 3.000 18.000 18.000 2% 15%
meet Kot Kumb Lalu road Mile 0/0-24/0 = 24-0
(M) =38.64 kms.
674 Widening / Reconditioning of Hingorja - Seharja Khairpur Approved 76.698 71.500 3.000 74.500 5.000 5.000 97% 104%
Thari Mirwah road mile 0/0-17/0 = 17-0 (M) =
27.37 Kms.
675 Widening / Reconditioning of road from Khairpur Khairpur Approved 89.268 75.340 3.000 78.340 5.000 5.000 88% 93%
(Luqman) to main Machi Chowk mile 0/0-8/6 = 8-6
(M) = 14.08 Kms.
676 Widening / Reconditioning of road from Rashdi Khairpur Approved 100.226 100.723 5.000 105.723 5.000 5.000 105% 110%
Petrol Pump to Ripri via Ahmedpur Manghanwari
road mile 0/0-17/2 = 17-2 (M) = 27.77 Kms.
677 Reconditioning of road from Gambat Sobhodero via Khairpur Approved 75.081 33.473 8.000 41.473 8.000 8.000 55% 66%
Thatti mile 0/0-10/0 = 10-0 (M) = 16.10 Kms.
678 Block Scheme for improvement of Provincial roads Khairpur Approved 40.138 37.519 4.000 41.519 0.100 0.100 103% 104%
in each District.
679 Widening / Reconditioning of road from Kot Diji Khairpur Approved 104.230 23.000 30.000 53.000 30.000 30.000 51% 80%
Tando Mastee up to new National Highway Mile
0/0-8/6 = 8-6 (M) = 14.08 Kms.
680 Widening / Reconditioning to Lakha to Kandiari Khairpur Approved 99.577 3.000 8.000 11.000 8.000 8.000 11% 19%
road Mile 0/0-13/6 = 13-6 (M) = 22.13 Kms.
681 Widening / Reconditioning Kot Diji – Tando Masti Khairpur Approved 125.808 26.000 20.000 46.000 20.000 20.000 37% 52%
New N / Way Ahmedpur Wada Mahasar and
Khowaja Road Mile 0/0-17/5 = 17-5 (M) = 28.37
Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
682 Widening / Reconditioning Kumb Kot Lalu up to Khairpur Approved 71.785 13.000 12.500 25.500 15.000 15.000 36% 56%
Nagreja Road Mile 0/0-6/2 = 6-2 (M) = 10.06
kms.
683 Widening / Reconditioning Larkana Shahdadkot via Larkana Approved 228.784 31.000 10.000 41.000 5.000 5.000 18% 20%
Kamber road mile 0/0-31/0 = 31-0 (M) =49.91
Kms.
684 W/R of Larkana Moen-jo-Daro to Veehar via Larkana Approved 65.509 10.500 8.000 18.500 8.000 8.000 28% 40%
Balhareji Karani mile 0/0-8/4 = 8-4 (M) = 74.80
Kms.
685 Block Scheme for improvement of Provincial roads Larkana Approved 44.096 14.500 8.000 22.500 18.000 18.000 51% 92%
in each District.
686 Widening / Reconditioning & Construction of road from K@ Approved 105.798 37.000 8.000 45.000 10.000 10.000 43% 52%
Kandhkot Malguzar mile 0/0-14/0 = 14-0 (M) =
22.54 Kms.
687 Block Scheme for improvement of Provincial roads K@ Approved 39.990 8.000 5.000 13.000 20.000 20.000 33% 83%
in each District.
688 Widening / Reconditioning of Dilmurad Railway Jacobabad Approved 51.389 49.000 6.400 55.400 0.100 0.100 108% 108%
Station to Manjihpur 0/0-14/0 = 14-0 (M) = 22.54
KMS.
689 Widening / Reconditioning of Thull Tangwani road Jacobabad Approved 98.708 13.000 5.000 18.000 8.000 8.000 18% 26%
mile 0/0-16/0 = 16-0 (M) = 25.76 Kms.
690 Widening / Reconditioning of Hamayoon Thull Jacobabad Approved 125.768 4.500 5.000 9.500 8.000 8.000 8% 14%
Byepass i/c link to Mian-jo-Goth road mile 0/0-18/0
= 18-0 (M) = 28.98 Kms.
691 Block Scheme for improvement of Provincial roads Jacobabad Approved 39.144 8.000 5.000 13.000 20.000 20.000 33% 84%
in each District.
692 Widening / Reconditioning of Kamber Ratodero via K@S Approved 133.537 96.765 10.000 106.765 15.000 15.000 80% 91%
Thoof Chousal road mile 0/0-22/2 = 22-2 M =
35.80 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
693 Reconditioning of Kambar Wagan road mile 0/0-7/0 K@S Approved 160.198 50.631 10.000 60.631 15.000 15.000 38% 47%
i/c Construction of Kamber byepass mile 0/0-8/0
total length 15 mile = 15-0 (M) = 24.15 Kms.
694 Block Scheme for improvement of Provincial roads K@S Approved 39.711 11.000 10.000 21.000 10.000 10.000 53% 78%
in each District.
695 Improvenment of road from Samaro Kunri road at Umerkot Approved 6.860 1.000 1.000 7.000 7.000 15% 117%
Shouki Mari to Abdullah Kapri Mile 0/0-1/7
696 Improvement / Construction of Ghulamullah to Thatta Approved 283.362 2.000 2.000 10.000 10.000 1% 4%
Garho road I/c Bridge over Creek and construction
of link upto National Highway on west of Garho
Town 0/0-25/5.
697 W/R of road from Dumbalo to Bhudho Qambrani Badin Approved 61.896 5.000 5.000 15.000 15.000 8% 32%
mile 0/0-9/0 (District Badin) (14.5 Kms)
698 W/R of Kot Gulam Muhammad Jhudo via Sikriery Mirpurkhas Approved 239.104 5.000 5.000 15.000 15.000 2% 8%
and Tando Jam Mohammad mile 0/0-31/2 (50.0
Kms)
699 W/R of road from Shikarpur to Rustam road mile Shikarpur Approved 52.964 2.000 2.000 10.000 10.000 4% 23%
0/0-7/0.
700 W/R of road from Shikarpur to Gahejo road mile Shikarpur Approved 129.370 2.000 2.000 10.000 10.000 2% 9%
0/0-14/4.
701 Construction / Improvement of road from Ruk Shikarpur Approved 145.566 2.000 2.000 30.000 30.000 1% 22%
Garhiyaseen amrot Nau Shero Abro Mile 0/0-12/2
Kms..
702 W/R of Bhosam to Ratodero-Jacobabad road Mile Shikarpur Approved 80.011 2.000 2.000 10.000 10.000 2% 15%
0/0-10/0.
703 Widening / Reconditioning of Shikarpur Jagan road Shikarpur Approved 123.934 2.000 2.000 5.000 5.000 2% 6%
mile 0/0-14/4.
704 Improvement of road from National Highway to Khairpur Approved 108.526 10.000 10.000 15.000 15.000 9% 23%
Ripri road Mile 0/0-14/0 (Old Tapali Sarak) .
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
705 W/R of road from Gambat Agra upto Razi Dero Khairpur Approved 126.226 5.000 5.000 10.000 10.000 4% 12%
mile 0/0-11/0 = 17.71.
706 W/R of Road from Khairpur Tando Masti mile Khairpur Approved 71.092 5.000 5.000 10.000 10.000 7% 21%
0/0-9/4 15.29 Kms
707 W/R of Road from Therhi to Faiz Wah via Wisrio Khairpur Approved 54.814 2.000 2.000 10.000 10.000 4% 22%
Wahan Road mile 0/0-6/0.
708 W/R of Road from Kumb to Bozdar Wada via Khairpur Approved 66.850 5.000 5.000 10.000 10.000 7% 22%
Babar Road mile 0/0-10/0.
709 W/R of Road from Therhi Pull Old National Khairpur Approved 119.479 2.000 2.000 10.000 10.000 2% 10%
Highway to New National Highway via Baigmagi
Pallah Road mile 0/0-12/0=19.32
710 W/R of Road from Sobhodero to Sagyoon mile Khairpur Approved 61.689 5.000 5.000 10.000 10.000 8% 24%
0/0-7/0.
711 W/R of Road from Piryaloi to New National Khairpur Approved 72.010 2.000 2.000 10.000 10.000 3% 17%
Highway via Razi Toth Road mile 0/0-8/0 = 12.88
Kms
712 W/R of road from Kandiaro to Lakha road mile Khairpur Approved 71.907 3.000 3.000 5.000 5.000 4% 11%
0/0-10/0.
713 Construction of road from Kaloi to Katoran - Jo - Thar Approved 30.633 19.663 1.000 20.663 10.000 10.000 67% 100%
Sun on Dodharo Khatlari road Mile 0/0-2/6 = 2-6 =
4.42 Kms.
714 W/R of orad from Saeedabad Bakhar Jamali. Matiari Approved 85.834 2.000 2.000 5.000 5.000 2% 8%
715 Improvement of Matli Tando Ghulam Ali to road Badin Approved 60.465 2.000 2.000 5.000 5.000 3% 12%
village Ali Akbar Nizamani via Thari (12 K).
Total Improvement (On-Going Schemes) 16393.984 0 4388.727 0 1590.810 0 5979.537 0 1954.867 0 1954.867 0
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Improvement
(New Schemes)
716 Improvement of Road from Shah pur to Dato lorar Matiari Un-Approved 15.000 5.000 5.000 0% 33%
Railway Crossing (2.5 Km)
717 Improvement of Road from Musa Kathian to Pir Matiari Un-Approved 18.000 5.000 5.000 0% 28%
Hajan Shah (3.0 Km)
718 Widening/Reconditioning of road from Indus Dadu Un-Approved 20.000 5.000 5.000 0% 25%
Highway to Bhan Johi road along Inspection Path
Pir Shakh (Diam Brach) I/c Retaingin Wall (2.82
Km)
719 Improvement of Kot Bungalow National Highway to Khairpur Un-Approved 140.000 15.000 15.000 0% 11%
Bye-Pass via Fatehpur (20 Kms).
720 Improvement of road Kumb to Choudaho (15 Khairpur Un-Approved 105.000 12.000 12.000 0% 11%
Kms).
721 Improvement of Road from National Highway to Nawabshah Un-Approved 13.000 12.000 12.000 0% 92%
Punhal Khan Chandio mile 0/0-2/6(4.42 Km)
722 W/R of road from Thariri to Moulaabad mile Khairpur Un-Approved 18.000 9.000 9.000 0% 50%
0/0-2/0 (3 Kms).
723 W/R of road from Sangi to Dubber mile 0/0-3/4 (6 Sukkur Un-Approved 36.000 7.200 7.200 0% 20%
Kms).
724 W/R of road from Ghulam Bund to Dubber mile Sukkur Un-Approved 36.000 7.200 7.200 0% 20%
0/0-3/4 (6 Kms).
725 W/R of road from Katcha Phatak P.Akil to Saeed Sukkur Un-Approved 60.000 10.000 10.000 0% 17%
Ali Indher via village illahi Bux Mangi mile 0/0-6/0
(10 Kms).
726 Improvement / Construction of road from old Sukkur Un-Approved 35.000 7.000 7.000 0% 20%
National Highway to Duffer Jatoi via Wariyam Jatoi
mile 0/0-3/0 (5 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
727 W/R of road from Old National Highway to Sorho Sukkur Un-Approved 30.000 6.000 6.000 0% 20%
via Kotho K.K. Farm mile 0/0-3/0 (5 Kms).
728 W/R of road from National Highway to Kot Bullo Sukkur Un-Approved 12.000 6.000 6.000 0% 50%
nile 0/0-1/0 (2 Kms).
729 Improvement / Construction of road from Jalal Goth Sukkur Un-Approved 35.000 7.000 7.000 0% 20%
to Wazir Malano mile 0/0-3/0 (5 Kms).
730 Improvement of road from Choundiko to Saido Khairpur Un-Approved 24.000 12.000 12.000 0% 50%
Pattan (4 Kms).
731 Improvement of road from Kanchra to Kandri mile Sukkur Un-Approved 49.000 9.800 9.800 0% 20%
0/0-4/0 (7 Kms).
732 Improvement/Construction of road from National Sukkur Un-Approved 20.000 10.000 10.000 0% 50%
Highway to Bagh Pal mile 0/0-2/4 (4 Kms).
733 W/R of road from Rohri to Shadi Shaheed mile sukkur Un-Approved 260.000 20.000 20.000 0% 8%
0/0-16/0 with Asphalt (26 Kms).
734 W/R of road from Rohri Arrore Salehpat mile Sukkur Un-Approved 280.000 25.000 25.000 0% 9%
0/0-17/0 with Asphalt (28 Kms).
735 W/R of road from Arain to Bagerji via Kando Sukkur Un-Approved 42.000 8.400 8.400 0% 20%
Wahan mile 0/0-4/4 (7 Kms).
736 Improvement of road from Rohri Shadi Shaheed to Sukkur Un-Approved 20.000 5.000 5.000 0% 25%
Pir Koko 0/0-2/4 (4.0 Kms).
737 Improvement of road from Beri Chowk Rohri to Sukkur Un-Approved 20.000 5.000 5.000 0% 25%
Atta Hussain Shah Degree College Rohri 0/0-2/4 (4
Kms).
738 Improvement / Construction of road from National Sukkur Un-Approved 35.000 7.000 7.000 0% 20%
Highway to Bagerji road via village Ghouserji, village
Jamal Lashari 0/0-3/0 (5 Kms).
739 Improvement of road from Sanghar Jamrao Head to Sukkur Un-Approved 35.000 7.000 7.000 0% 20%
RD-74 road mile 0/0-4/0 (7 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
740 Improvement/Construction of road Cement Factory Sukkur Un-Approved 35.000 7.000 7.000 0% 20%
Long Fakir road (8 Kms).
741 Improvement of road from Philiui to Jauans Chajan Sukkur Un-Approved 22.200 5.000 5.000 0% 23%
(UC Junas) (1 1/2 miles 2.42 Kms).
742 W/R of road from Haleji MP Check Post upto FFR Sukkur Un-Approved 155.000 5.000 5.000 0% 3%
- MTTS and Watch Tower mile 0/0-19/2. (31
Kms)
743 W/R of road from Bhillini to Shahpur mile 0/0-8/0. Sukkur Un-Approved 65.000 5.000 5.000 0% 8%
(12.8 Kms).
744 W/R of road from Dubar to Rohri Bye pass via Sukkur Un-Approved 68.300 5.000 5.000 0% 7%
Panhwari Village mile 0/0-8/7 (14.28 Kms)
745 W/R of road from Bostan Nabisar Road to village Mirpurkhas Un-Approved 30.000 5.000 5.000 0% 17%
Kazi Mohammad Dars (5.0Kms).
746 W/R Badin – Khadan road mile 0/0-9/0 (Asphalt Badin Un-Approved 145.000 10.000 10.000 0% 7%
Phase–I) (15.00 Kms)
747 W/R Badin – Khoski Wango road mile 0/0-9/0 (24 Badin Un-Approved 145.000 10.000 10.000 0% 7%
ft width with Asphalt Phase -I) (15.00 Kms).
748 W/R Khadan Nindo road mile 0/0-9/0 (15.00 Kms) Badin Un-Approved 101.430 10.000 10.000 0% 10%
(Phase -I)
749 W/R Khoski – Khalifo Qasim road mile 0/0-8/0. Badin Un-Approved 90.160 5.000 5.000 0% 6%
(12.88 Kms)
750 W/R Tando Bago Nindo road 0/0-9/4.(15.295 Badin Un-Approved 107.065 5.000 5.000 0% 5%
Kms).
751 W/R of road from Jiskani to Choodaho road Khairpur Un-Approved 42.000 5.000 5.000 0% 12%
(7Kms).
752 W/R of road from National Highway to Adam Khairpur Un-Approved 90.000 5.000 5.000 0% 6%
Sultan(15Kms.)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
753 W/R of road from Misri Shah Link road to Fatehpur Khairpur Un-Approved 30.000 5.000 5.000 0% 17%
via Dari Kanasara road(5Kms.)
754 Dualization of Hyderabad Mirpurkhas road (67 Hyderabad Un-Approved 1500.000 20.000 20.000 0% 1%
Kms).
755 W/R of road from Saleemabad to Village Syed N'Feroze Un-Approved 30.000 5.000 5.000 0% 17%
Buland Shah (3 Kms).
756 Improvement of Road from village Haji Khalique T. M Khan Un-Approved 50.000 5.000 5.000 0% 2%
Dino sehto to village Nawab Yousuf Talpur (10
kms)
Construction
(On-Going Schemes)
757 Construction of Hyderabad Mirpurkhas Bye pass Hyderabad Approved 104.122 2.000 5.000 7.000 10.000 10.000 7% 16%
road mile 0/0-6/4 = 6-4 = 10.46 Kms.
758 Construction of Dual Carriageway from Hyderabad, Hyderabad Approved 138.895 39.000 26.250 65.250 20.000 20.000 47% 61%
Badin road mile 2/0 (Fateh Chowk) to mile 6/0
(Ganju Takkar) Police Check Post Mile 2/0-6/0 =
4-0 = 6.44 Kms.
759 Block Schemes for construction of Provincial roads Hyderabad Approved 40.162 4.000 5.000 9.000 17.170 17.170 22% 65%
in each District.
760 Block Schemes for construction of Provincial roads Matiari Approved 39.989 1.000 5.000 6.000 10.000 10.000 15% 40%
in each District.
761 Construction of Southern Bypass at Tando Allahyar T'Allahyar Approved 140.660 33.000 8.500 41.500 10.000 10.000 30% 37%
road mile 0/0-5/4 = 5-4 (M) = 8.85 Kms.
762 Block Schemes for construction of Provincial roads T'Allahyar Approved 41.155 10.300 6.000 16.300 8.000 8.000 40% 59%
in each District.
763 Block Schemes for construction of Provincial roads T.M Khan Approved 40.974 1.000 5.000 6.000 18.000 18.000 15% 59%
in each District.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
764 Construction of road from Tando Muhammad Khan T.M Khan Approved 14.256 1.000 10.950 11.950 3.000 3.000 84% 105%
Drigh Mori road Soomarki More at Nizamani Minor
crossing to village ir Ali Nawaz Kot Road Mile
0/0-1/7 = 1-7 (M) = 3.0 Kms.
765 Construction of road from Seerani to Village MD T.M Khan Approved 14.652 5.000 2.000 7.000 7.000 7.000 48% 96%
Qureshi Mile 0/0-2/2
766 Construction of road Gadap to Mole road mile Karachi Approved 95.368 7.000 3.500 10.500 5.000 5.000 11% 16%
10/6-33/6 = 23-0 (M) = 37.03 Kms.
767 Block Schemes for construction of Provincial roads karachi Approved 40.000 1.000 3.500 4.500 5.000 5.000 11% 24%
in each District.
768 Construction of Circuler road around Sanghar Sanghar Approved 41.668 27.026 0.010 27.036 0.010 0.010 65% 65%
Tando Adam mile 0/0-10/0 = 10-0 (M) =16.10
Kms.
769 Construction of road from Ganhawer Zardari Stand Sanghar Approved 13.652 11.632 0.020 11.652 2.000 2.000 85% 100%
to village Noubat Khan Zardari from Saeedabad to
Sarhari link road mile 0/0-2/6 = 2-6 Mile (4.40
Kms) .
770 Construction of road from Nawabshah Shahdadpur Sanghar Approved 251.084 8.000 9.000 17.000 25.000 25.000 7% 17%
Hala Khyber road mile 0/0-38/4 = 38-4 (M) =
61.98 Kms.
771 Block Schemes for construction of Provincial roads Sanghar Approved 51.422 13.000 8.000 21.000 10.000 10.000 41% 60%
in each District.
772 Construction of road from M’Khas to N’Shah along Sanghar approved 548.969 5.000 6.912 11.912 8.000 8.000 2% 4%
old alignment Road Mile 0/0-43/0 = 43-0 (M) =
69.23 Kms.
773 Block Schemes for construction of Provincial roads Nawabshah approved 49.450 6.000 5.750 11.750 18.000 18.000 24% 60%
in each District.
774 Construction of road from Chhini village to Tando Dadu approved 28.203 21.551 5.652 27.203 1.000 1.000 96% 100%
Raheem khan mile 12/2-19/0 = 6-6 (M) = 10.86
Kms .
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
775 Const. of Road from existing road track to North Jamshoro Approved 170.167 38.000 38.000 65.178 65.178 22% 61%
Lakhra Block (20 Km) M&MD
776 Construction of road from Thariri Regulator to Dadu approved 16.890 8.000 5.900 13.900 3.000 3.000 82% 100%
Soomar Jamali (Path Rajway) mile0/0-3/0 = 3-0
(M) = 4.83 Kms.
777 Block Schemes for construction of Provincial roads Dadu approved 43.682 11.000 12.250 23.250 18.000 18.000 53% 94%
in each District.
778 Construction of road from Baradhi Laghari village Dadu approved 35.892 2.000 9.250 11.250 20.000 20.000 31% 87%
to Laghari road mile 0/0-4/4 = 4-4 (M) = 7.24
Kms.
779 Construction of road from Ranikot to Meri kot mile Jamshoro approved 49.872 18.500 30.000 48.500 5.000 5.000 97% 107%
0/0- 3/3 = 3-3 (M) = 5.43 Kms.
780 Construction of road from Super Highway to Jamshoro Approved 25.297 9.500 5.000 14.500 10.000 10.000 57% 97%
National Highway (Old Thano Bola Khan )road mile
0/0-5/0 = 5-0 (M) = 8.05 Kms.
781 Construction of road from Sari to Mole road mile Jamshoro Approved 80.973 14.000 6.000 20.000 18.000 18.000 25% 47%
0/0-15/4 = 15-45 (M) = 24.95 Kms.
782 Construction of Tando Ahmed Khan Kachat Center Jamshoro Approved 167.996 8.500 10.000 18.500 5.000 5.000 11% 14%
(Kherthar National Park) Thano Bulla Khan mile
0/0-45/0 = 45-0 (M) = 72.45 Kms.
783 Construction of road from Sehwan to Dadu along Jamshoro Approved 12.170 7.000 5.170 12.170 0.100 0.100 100% 101%
Shershah Suri missing link Mile (5/0-5/5 & 6/5-8/0)
Mile 0/0-2/0 = 2-0 (M) = 3.22 Kms.
784 Block Schemes for construction of Provincial roads Jamshoro Approved 39.915 8.550 6.000 14.550 8.000 8.000 36% 56%
in each District.
785 Construction of road from Ahmed Raju to Zero Badin Approved 233.789 6.710 23.750 30.460 10.000 10.000 13% 17%
point mile 0/0-16/2 = 16-2 (M) = 26.16 Kms.
786 Construction of Matil Bypass road from Hyderabad Badin Approved 51.463 23.655 7.750 31.405 10.000 10.000 61% 80%
Badin road mile 29/0 Matli T.G Ali road mile
0/0-3/5 =3-5 (M) = 5.83 Kms
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
787 Construction / Reconditioning of road from Khalifo Badin Approved 100.530 30.446 6.000 36.446 10.000 10.000 36% 46%
Qasim to Tando Bago - Jhudo road mile0/0-18/0
=18-0 (M) = 28.98 Kms.
788 Construction of missing links in District Badin 3 Badin Approved 46.187 16.500 12.500 29.000 10.000 10.000 63% 84%
Numbers).
(a) Construction of Kario Ganhwar T.M Khan road Badin
via Haji Moulvi Ali Muhammad Meheri village road
mile 0/0- 3/0 = 3-0 (M) = 4.83 Kms.
789 Construction of road from Gulab Leghari to village Badin Approved 22.378 3.510 5.000 8.510 5.000 5.000 38% 60%
Nawab Hassan Ali Talpur (Nawab-Jo-Tambo)
alone bank of Murad via mile 0/0-3/1 = 3-1 (M) =
5.03 Kms.
790 Construction of road from Dehi to Ghulam Shah Badin Approved 52.898 6.200 5.000 11.200 8.000 8.000 21% 36%
road 0/0-3/6 = 3-6 (M) = 6 Kms.
791 Construction of road from Budho Kambrani road Badin Approved 28.753 7.820 10.214 18.034 8.000 8.000 63% 91%
via Mir Muhammad Unnar mile 0/0-3/6 = 3-6 (M)
= 6 Kms.
792 Construction of road from Tando Bago Jhudo at Badin Approved 15.474 1.000 11.000 12.000 3.500 3.500 78% 100%
point Khadim Ali Shah road to Masjid-e-Taqwa
mile 0/0-2/7 = 2-7 (M) = 4.62Kms.
793 Construction of road from Tando Bago Jhudo road Badin Approved 56.080 7.000 16.250 23.250 10.000 10.000 41% 59%
at mile 12/4 to Tando Bago to Tando Jan
Muhammad road via Bachal Khan Leghari.
794 Construction of Tando Bago Bye Pass road mile Badin Approved 52.045 5.845 5.000 10.845 8.000 8.000 21% 36%
0/0-3/7 = 3-7 (M) = 6.23 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
795 Block Schemes for construction of Provincial roads Badin Approved 45.638 11.000 5.000 16.000 10.000 10.000 35% 57%
in each District.
796 Construction of road from Bachoo Bhoot to Blouch Badin Approved 46.930 1.000 16.250 17.250 10.000 10.000 37% 58%
Chak 10.0 kms.
797 Construction of road from Gujjo - Jung Shahi - Thatta Approved 181.193 41.500 5.250 46.750 10.000 10.000 26% 31%
Nooriabad road mile 2/4-39/0 = 36-4 = (M) =
58.76 Kms.
798 Block Schemes for construction of Provincial roads Thatta Approved 40.000 4.250 4.250 18.000 18.000 11% 56%
in each District.
799 Construction of road from Jati Chuch Jehan road at Thatta Approved 5.798 1.000 4.800 5.800 0.100 0.100 100% 102%
13/0 to Wadha village mile 0/0-4/4 = 4-4 (M) =
7.24 Kms.
800 Construction of road from Talhi to Nafees Nagar M.Khas Approved 18.445 11.000 5.000 16.000 2.000 2.000 87% 98%
mile 0/0-3/4 = 3-4 (M) = 5.63 Kms.
801 Construction of road from Naukot Nabisar road to M.Khas Approved 11.315 12.145 0.600 12.745 0.100 0.100 113% 114%
Nohto Village (2 Kms).
802 Construction of road from Sugar Mill (Ram Jago Mkhas Approved 140.279 18.000 5.000 23.000 8.000 8.000 16% 22%
road) to Obaidullah Bhurgari Araro Bhurgari Naban
Khan Budho Khaskheli mile 0/0-17/4 17-4 (M) =
28.17 Kms.
803 Construction of road from Jhudo Kot Ghulam M.Khas Approved 97.257 13.000 5.000 18.000 8.000 8.000 19% 27%
Muhammad road link connecting Deh 305 Khushi
Muhammad Arain to Pujjan Mori mile 0/0-12/4
12-4 (M) = 20.12 Kms.
804 Construction of road from Jhudo kot Ghulam M.Khas Approved 38.398 10.000 5.000 15.000 5.000 5.000 39% 52%
Muhammad road to Haji Yousuf Khaskheli via
Wadero Liaquat Arain mile 0/0-5/0 = 5-0 (M) =
8.05 Kms.
805 Improvement / Construction of Mirpurkhas Chore Mirpurkhas/U Approved 597.450 315.000 42.500 357.500 40.000 40.000 60% 67%
road along Railway line mile 0/0-55/0 = 55-0 (M) =
88.55 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
806 Construction of Mirwah Digri road to Deh 164-B M.khas Approved 6.881 2.800 4.000 6.800 0.081 0.081 99% 100%
village Choudary Abdul Sattar mile 0/0-1/5 =1-5
(M) = 2.61 Kms.
807 Block Schemes for construction of Provincial roads Mirpurkhas Approved 40.028 4.830 5.000 9.830 8.000 8.000 25% 45%
in each District.
808 Construction of road from road from and bridge on M.khas Approved 22.768 1.000 5.000 6.000 8.000 8.000 26% 61%
West Branch Jamrao from Kihan road to village
Umeed Ali Lakho road to Nazikabad mile 0/0-3/1.
= 3-1 (M) = 5.03 Kms.
809 Construction of Mirpurkhas By pass road connect M.Khas Approved 248.017 1.000 25.000 26.000 25.000 25.000 10% 21%
Hyderabad road Tando Adam road Khan road and Mari
Sindhri road with over head bridge near Ratanabad
Road Mile 0/0-11/0 (M) = 17.71 Kms .
810 Construction of road from Attana Mori to Old Shadi Mirpurkhas Approved 64.821 4.000 5.000 9.000 8.000 8.000 14% 26%
Plali mile 0/0-8/2 = 8-2 (M) = 13.28 Kms .
811 Construction of road from Anupani Khinsar via Umerkot Approved 166.200 172.300 5.000 177.300 10.000 10.000 107% 113%
Bagal mile 0/0 - 20/0 = 20-0 (M) = 32.0 Kms.
812 Construction of road from Ratnore to Bagal mile 0/0 Umerkot Approved 162.573 130.758 15.000 145.758 15.000 15.000 90% 99%
- 21/1 = 21-1 (M) = 34.01 Kms.
813 Construction of Road from Annupani to Bhittala mile Umerkot Approved 237.028 50.000 32.500 82.500 10.000 10.000 35% 39%
0/0-17/0 = 17-0 (M) = 27.37 Kms.
814 Construction of Kunri - Jhudo via Darelo I.e.from Umerkot Approved 88.172 49.279 5.000 54.279 8.000 8.000 62% 71%
Char kunri to Nabisar to Samaro Jhudo road mile
0/0-15/0 = 15-0 (M) = 24.15 Kms.
815 Construction of Strategic roads in Thar area: (a) Umerkot Approved 166.439 113.700 15.000 128.700 2.500 2.500 77% 79%
Construction of road from Ratnor to Annupani mile
0/0-13/6 = 13-6 (M) = 22.13 Kms.
(b) Construction of road Liakro to Kapuri Jasar Umerkot Approved 187.202 104.300 15.000 119.300 10.000 10.000 64% 69%
mile 0/0-14/3 = 14-3 (M) = 23.14 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
816 Construction of link road from Dhuro Naro Chorre Umerkot Approved 7.798 7.798 0.050 7.848 0.100 0.100 101% 102%
road Lal Muhammed Soomaro to Soomraser
Station mile 0/0-2/4 = 2-4 (M) = 4.02 Kms.
817 Construction of road from Jeven More to Cattle Umerkot Approved 32.573 9.571 2.000 11.571 8.000 8.000 36% 60%
Farm Seth Haroon at Point Oad Ji Bhiri mile
0/0-6/0 = 6-0 (M) = 9.66 Kms.
818 Construction of road from Kunri Nabisar road at Umerkot Approved 22.977 20.000 3.000 23.000 3.000 3.000 100% 113%
point Kunri Memon to Samaro Kunri road at mile
0/0-12/4 via old Kunri mile 0/0-3/4 =3-4 (M) =
5.63 Kms.
819 Construction of road from New Chore to Perchi Ji Umerkot Approved 38.951 26.000 12.950 38.950 0.100 0.100 100% 100%
Veri (Old) Mile 0/0-4/4 = 4-4 (M) = 7.24 Kms.
820 Construction of road from Samaro road to village M'Khas Approved 20.244 8.000 12.244 20.244 0.100 0.100 100% 100%
Gulzar-e-Khalil. Mile (4 Kms).
821 Block Schemes for construction of Provincial roads Umerkot Approved 41.742 8.000 8.000 16.000 10.000 10.000 38% 62%
in each District.
822 Construction of road from Kunri Border Farm to Umerkot Approved 39.353 6.500 3.000 9.500 5.000 5.000 24% 37%
village Abdullah Kapri & Mian-ji- Samoon. Mile
0/0-4/5 (5.832 Kms)
823 Construction / Widening / Reconditioning & Umerkot Approved 134.432 6.000 8.000 14.000 8.000 8.000 10% 16%
Resurfacing of Umerkot Bye Pass road mile
0/0-16/6 = 16-6 (M) = 26.96 Kms..
824 Construction of road from Jalo-jo-Chaunro to Umerkot Approved 423.650 233.000 42.500 275.500 20.000 20.000 65% 70%
Khokrapar mile 0/0-21/7 = 21-7 (M) = 35.21
Kms.
825 Construction of road from Thakur Balver Singh to Umerkot Approved 8.810 1.000 7.810 8.810 0.100 0.100 100% 101%
Treghati point mile 0/0-1/4 = 1-4 (M) = 2.41 Kms.
826 Construction of road from Danisar Farm to Nabisar Umerkot Approved 25.785 1.000 5.000 6.000 1.000 1.000 23% 27%
Thar Mile 0/0-3/4 = 3-4 (M) = 5.63 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
827 Construction of road from Tebhre Bhambhro to Umerkot Approved 898.000 51.000 76.250 127.250 1.000 1.000 14% 14%
Saeedao Dodhar Samon Road Mile 0/0-52/7 = 52
- 7 (M) = 85.12 Kms.
828 Construction of road from Chaudhry Zulfiqar Road Umerkot Approved 20.377 1.000 3.000 4.000 5.000 5.000 20% 44%
to Village Chaudhry Bashir Kotio Via Alam Din &
Chaudhry Nazeer Ahmed mile 0/0-3/2 = 3-2 (M) =
5.23 Kms.
829 Conctruction of Road from Baghal to Dali mile Thar Approved 96.105 30.000 37.500 67.500 20.000 20.000 70% 91%
0/0-10/0 = 10-0 (M) = 16.0 Kms.
830 Construction of road from Khansar to Dali mile Thar Approved 96.667 33.000 37.500 70.500 24.788 24.788 73% 99%
0/0-9/3 = 9-3 (M) = 15.09 Kms.
831 Construction of road from Nabisar to Naukot mile Thar Approved 192.528 156.000 35.000 191.000 20.000 20.000 99% 110%
0/0-25/0 = 25-0 (M) = 40.05 Kms.
832 Construction of Naukot By- Pass road mile 0/0-7/4 Thar Approved 68.456 29.500 10.000 39.500 12.000 12.000 58% 75%
= 7-4 (M) = 12.07 Kms.
833 Construction of Mithi By-Pass road mile 0/0-7/4 = Thar Approved 98.912 110.000 0.500 110.500 1.000 1.000 112% 113%
7-4 (M) = 12.07 Kms.
834 Construction of road from Wango Pattan to Ali Thar Approved 148.003 83.000 45.000 128.000 20.000 20.000 86% 100%
Bunder mile 0/0-16/0 = 16-0 (M) = 25.76 Kms.
835 Construction of road from chachro Waori Hirar Thar Approved 812.490 150.498 35.000 185.498 35.000 35.000 23% 27%
Vaghiji - Veri Bahroo to Dano Dhandhal mile
0/0-78/0 = 78-0 (M) = 125.58 Kms.
836 Construction of road from Chachro vakiro to Thar Approved 392.010 144.000 30.000 174.000 30.000 30.000 44% 52%
Aday-Jo-Tar mile 0/0-44/0 = 44-0 (M) = 70.84
Kms.
837 Construction of road from Kaloi to Diplo via Luss Thar Approved 534.840 153.000 80.000 233.000 30.000 30.000 44% 49%
Farm mile 0/0-39/2 = 39-2 (M) = 63.19 Kms.
838 Construction of road from Diplo Sajai Gurrah Bah Thar Approved 492.692 142.000 71.250 213.250 35.000 35.000 43% 50%
To Naukot road mile 0/0-35/0 = 35-0 (M) = 56.35
Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
839 Construction of road from Islamkot Kehan Jangro Thar Approved 300.978 80.000 91.250 171.250 30.000 30.000 57% 67%
Mile 0/0-23/6 = 23-6 (M) = 38.21 Kms.
840 Improvement / construction Vijheto - Chelhar Thar Approved 259.875 40.000 42.750 82.750 30.000 30.000 32% 43%
Chachro (70 Kms).
841 Construction of road from Mithi to Kaharo Bajir Thar Approved 121.815 65.000 23.500 88.500 30.000 30.000 73% 97%
Venjhniari (48 Kms).
842 Construction of road from Kunri Chelhar Thar Thar Approved 279.352 63.000 46.250 109.250 30.000 30.000 39% 50%
Nabisar to Chelchar Road Mile 0/0-25/0 = 25-0
(M) = 40.25 Kms.
843 Construction of road from Kadhan Wango to meet Thar Approved 266.607 30.000 68.750 98.750 30.000 30.000 37% 48%
Ali Bunder Wango road i/c Bridge over Singhari
Drain (35 Kms).
844 Construction of road to Mithi Diplo via Verijhup Thar Approved 358.036 93.614 85.000 178.614 30.000 30.000 50% 58%
mile 0/0-22/0 = 22-0 (M) = 35.42 Kms..
845 Block Schemes for construction of Provincial roads Thar Approved 42.593 23.300 19.260 42.560 6.000 6.000 100% 114%
in each District.
846 Construction of road from Mithi to Trighatio (Tagai Thar Approved 447.024 1.000 45.500 46.500 30.000 30.000 10% 17%
viaGodhgar & Mahayari mile 0/0-31/0 = 31-0 (M)
= 50.0 Kms..
847 Construction of road from Chelhar to Bhorido mile Umerkot Approved 139.943 1.000 45.500 46.500 30.000 30.000 33% 55%
0/0-10/0 = 10-0 (M) = 16.10 Kms.
848 Const. of road from Diplo to Islamakot (77 Km) Thar Approved 846.466 46.500 160.000 206.500 30.000 30.000 24% 28%
M&MD
849 Construction of Road from Gorh to Nagarparkar Thar Approved 568.376 521.500 40.000 561.500 6.276 6.276 99% 100%
(59.3 Km) M&MD
850 Construction of Road Ali Bunder to Nargarparkar Thar Approved 4185.804 60.000 184.151 244.151 48.000 48.000 6% 7%
(130 Km) M&MD
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
851 Construction of road from Mithi Loonhair Kharo Thar Approved 426.410 1.000 45.500 46.500 30.000 30.000 11% 18%
Amro–Gogasar Katho to Nohto noon Road Mile
0/0-28/0 = 28-0 (M) = 45.08 Kms.
852 Construction of road from Sukhro Jo Tar to Pir Jo Thar Approved 102.823 1.000 45.500 46.500 30.000 30.000 45% 74%
Tar Road Mile 0/0-6/0 = 6-0 (M) = 9.66 Kms.
853 Construction of road from Mithi Diplo road at Point Thar Approved 574.800 1.000 45.500 46.500 35.000 35.000 8% 14%
Winger Well to Saghror Taranjowat Bhadoro to
Dodo Jat, mile 0/0-40/0 (64.36 Kms).
854 Construction of road from Sangrar to village vass Sukkur Approved 47.718 46.737 2.000 48.737 0.100 0.100 102% 102%
mile 0/0- 8/0 = 8-0 (M) = 12.88 Kms.
855 Construction of road from Sangrar Saleh Pat road Sukkur Approved 188.155 125.161 26.839 152.000 20.000 20.000 81% 91%
at mile 7/3 to FFR,MTTS and Watch Tower
mile0/0--27/0 = 27 - 0 (M) = 43.47 Kms.
856 Block Schemes for construction of Provincial roads Sukkur Approved 42.341 6.000 8.500 14.500 10.000 10.000 34% 58%
in each District.
857 Construction of road from Nara gate to Khairpur Approved 144.533 28.000 30.000 58.000 35.000 35.000 40% 64%
Sikanderabad along left side of Naira Canal Road
Mile 0/0-12/4 =12-4 (M) = 20.12 Kms.
858 Construction of road from Kandera to Khenjo mile Sukkur Approved 64.517 39.000 4.000 43.000 5.000 5.000 67% 74%
0/0 - 8/6 = 8-6 (M) = 14.08 Kms.
859 Construction of road from Sardargarah to near Ghotki Approved 118.343 48.100 5.000 53.100 10.000 10.000 45% 53%
Rehmat Well -I mile 0/0 - 22/6 = 22-6 (M) =
36.62 Kms.
860 Construction / Improvement of Rehmat Welll to Ghotki Approved 166.180 20.000 32.000 52.000 10.000 10.000 31% 37%
Sorah road mile 22/6- 69/2 = 46-4 (M) = 74.86
Kms.
861 Construction of road from Khanju Chanessar via Ghotki Approved 198.750 143.200 5.000 148.200 10.000 10.000 75% 80%
Tham and Gaber 0/0 - 27/6 = 27-6 (M) = 44.67
Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
862 Construction of road from Yaru Lund to Sardar Ghotki Approved 93.928 25.000 22.500 47.500 10.000 10.000 51% 61%
Garh mile 0/0-13/0 = 13-0 (M) = 20.93 Kms..
863 Construction / Improvement of road from Khanpur Ghotki Approved 77.288 14.500 10.000 24.500 10.000 10.000 32% 45%
to Yaru Lund mile 0/0-12/0 = 12-0 (M) = 19.32
Kms.
864 Construction of road from Channesar to Yaru Lund Ghotki Approved 103.613 19.300 10.000 29.300 10.000 10.000 28% 38%
mile 0/0-14/0 = 14-0 (M) = 22.54 Kms.
865 Construction of road from Pir Pakhorai road Abdul Ghotki Approved 13.254 7.986 1.000 8.986 6.000 6.000 68% 113%
Qadir Mehar Petrol Pump to vilalge Jan Muhammad
Mehar mile 0/0-3/1 = 3-1 (M) = 5.03 Kms.
866 Block Schemes for construction of Provincial roads Ghotki Approved 37.743 11.800 10.000 21.800 10.000 10.000 58% 84%
in each District.
867 Construction of road from Arab Mahar to link road Ghotki Approved 4.247 3.000 0.050 3.050 1.000 1.000 72% 95%
Ibrahim via Bahab Mahar mile 0/0-0/5 = 0-5 (M) =
1.00 Kms.
868 Construction of road from Fathepur Thahim to Ghari Shikarpur Approved 51.593 38.012 5.000 43.012 8.000 8.000 83% 99%
Yasin Ratodero road mile 0/0 - 15/0 = 15-0 (M) =
24.15 Kms.
869 Block Schemes for construction of Provincial roads Shikarpur Approved 39.969 8.000 5.000 13.000 18.000 18.000 33% 78%
in each District.
870 Construction of metalled road from back side of Shikarpur Approved 6.122 5.000 5.000 1.000 1.000 82% 98%
Rice Units situated link road to Mian-jo-Goth upto
Hospital mile 0/0-0/6 = 0-6 (M) = 1.20 Kms.
871 Construction of Raj road from Old National N'Feroze Approved 17.502 13.000 2.000 15.000 3.000 3.000 86% 103%
Highway road mile 243/0 connected to at Point
Railway Crossing near Grain Godown and National
Highway mile 0/0- 3/1 = 3-1 (M) = 5.03 Kms.
872 Road connecting Kotri Kabir Khanwahan to Dehat N'Feroze Approved 15.913 9.721 2.000 11.721 3.000 3.000 74% 93%
via village Ali Muhammad Phararo (3 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
873 Construction of road from Khanwahan Bye pass N'Feroze Approved 15.280 7.000 1.000 8.000 7.000 7.000 52% 98%
road connecting Koti Kasbir and Kandiaro road
mile 0/0-0/5 = 0-5 (M) = 1.0 Kms..
874 Block Schemes for construction of Provincial roads N'Feroze Approved 42.630 5.000 5.000 10.000 8.000 8.000 23% 42%
in each District.
875 Construction of link road from Padidan to Kot Lalo N'Feroze Approved 51.126 2.000 2.000 4.000 8.000 8.000 8% 23%
Road Mile 0/0-7/4 = 7-4 (M) = 12.07 Kms.
876 Construction of road from remaining portion from N, Feroze Approved 19.652 1.000 1.000 2.000 8.000 8.000 10% 51%
Mithiani link roadto Bacho Chandio via
Ghareebo-Behan Road Mile 0/0-6/0 = 6-0 (M) =
9.66 Kms.
877 Construction of road from remaining portion from N.feroze Approved 16.837 1.000 2.000 3.000 5.000 5.000 18% 48%
National Highway to village Hussain Behan via Yar
Muhammad Behan to Moro Mithiani l road Mile
0/0-2/4 = 2-4 (M) = 4.02 kms.
878 Block Schemes for construction of Provincial roads Khairpur Approved 53.678 41.005 2.000 43.005 5.000 5.000 80% 89%
in each District.
879 Construction of road from Tajjal– Lakh Sharif Khairpur Approved 224.066 2.000 82.500 84.500 50.000 50.000 38% 60%
Padhrio Mile 0/0-28/4 = 28-4 (M) = 45.88 Kms.
880 Construction f road from Tajjal road Younous Road Khairpur Approved 35.274 26.200 1.000 27.200 5.000 5.000 77% 91%
Mile 0/0-6/2 = 6-2 (M) = 10.06 Kms.
881 Construction of road from National Highway to Khairpur Approved 32.799 5.000 10.000 15.000 17.800 17.800 46% 100%
Shahjara Road Mile 0/0-5/0 = 5-0 (M) = 8.05
Kms.
882 Construction of road from Tharoo Dero to Village Larkana Approved 26.560 3.000 10.000 13.000 13.500 13.500 49% 100%
Sathi Khan Umrani mile 0/0-2/2 =2-2 (M) = 3.62
Kms.
883 Construction of road from Bedeh to Radhan village Larkana Approved 141.964 8.663 14.250 22.913 20.000 20.000 16% 30%
via Seehar Station along Sehwani Sarak mile
0/0-12/0 =12-0 (M) = 19.32 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
884 Construction of internal road from Larkana Akil Larkana Approved 10.035 9.338 0.100 9.438 0.100 0.100 94% 95%
road to rice canal via Dr. Khalid Mehmood Soomro
road Mile 0/0-0/7 = 0-7 (M) = 1.40 Kms..
885 Block Schemes for construction of Provincial roads Larkana Approved 40.058 13.000 8.000 21.000 15.000 15.000 52% 90%
in each District.
886 Construction of link road from Ali Bilawal Buxapur Kandhkot Approved 19.844 10.662 10.500 21.162 1.600 1.600 107% 115%
to village Garhi Habibullah khan Domki mile 0/0 -
9/0 = 9-0 (M) = 14.49 Kms.
887 Construction of road from Guddu along Patt Feeder Kandhkot & Approved 987.865 61.000 52.500 113.500 100.000 100.000 11% 22%
Canal upto RD Shahi Wah upto Border of Jacobabad.
Blouchistan province mile 0/0-90/0 =90-0 (M) =
144.90 Kms.
888 Construction of road from Shahdadkot Sheralabad Kandhkot Approved 55.615 8.700 8.000 16.700 13.000 13.000 30% 53%
road at mile 2/2-village Sobho Khan Sanwand
Bahadur Khan Sabzoi Misri Sabzoi upto Bhannar
road mile 0/0-7/5 = 7-5 (M) = 12.27 Kms.
889 Block Schemes for construction of Provincial roads Kandhkot Approved 39.311 6.000 3.000 9.000 18.000 18.000 23% 69%
in each District.
890 Construction of road from Sanhari Sarak to Noor Jacobabad Approved 133.129 9.000 6.000 15.000 18.000 18.000 11% 25%
Wah mile 0/0-18/6 = 18-6 (M) = 30.18 Kms
891 Construction of road from Badani to Gander Wah Jacobabad Approved 53.703 4.000 8.500 12.500 20.000 20.000 23% 61%
via Jam Muhammad Samejo mile 0/0-5/5 = 5-5
(M0 = 9.0 Kms.
892 Construction of road from Buxapur Ali Bilawal road Jacobabad Approved 23.466 2.000 8.500 10.500 10.000 10.000 45% 87%
at mile 3/0 to village Mir Ghalib Hassan Khan
Domki mile 0/0-3/0 =3-0 (M) = 4.83 Kms.
893 Block Schemes for construction of Provincial roads Jacobabad Approved 36.462 6.000 10.000 16.000 10.000 10.000 44% 71%
in each District.
894 Construction of mattaled road from F protective K@S Approved 44.093 9.050 8.000 17.050 10.000 10.000 39% 61%
Bund to Hamal village Road Mile 0/0 - 4/6 = 4-6
(M) = 7.64 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
895 Block Schemes for construction of Provincial roads K@S Approved 39.622 14.000 6.638 20.638 15.000 15.000 52% 90%
in each District.
896 Construction of roads in Taluka Pithoro Length Umerkot Approved 139.710 25.000 20.000 45.000 15.000 15.000 32% 43%
(37.34 Kms)
897 Construction of road from Dhoronaro to Kharor Umerkot Approved 101.632 20.000 30.000 50.000 30.000 30.000 49% 79%
Abdul Karim Samoon Mile 0/0-10/0.
898 Construction of road from New Chore to Umerkot Approved 340.316 10.000 25.000 35.000 30.000 30.000 10% 19%
Mendhrejopar mile 0/0-28/4.
899 Construction of road from Pholri road to RD-463 of Khairpur Approved 305.240 17.000 65.000 82.000 20.000 20.000 27% 33%
Nara Canal upto Pir Bux Gaho Mile 0/0-36/0.
900 Construction of road from Hathungo to Khairo Sanghar Approved 712.684 20.000 42.500 62.500 30.000 30.000 9% 13%
Arisar via Khalifo Sahentio Din Muhammad Gajoo
Jaffrao Mile 0/0-68/3.
901 Construction of road from Chotiaryoon to Hathungo Sanghar Approved 393.329 40.000 77.500 117.500 30.000 30.000 30% 38%
Mile 0/0-40/0.
902 Construction of road from Usman Behan to Sanghar Approved 600.138 20.000 70.000 90.000 30.000 30.000 15% 20%
Chotiaryoon mile 0/0-57/4.
903 Construction of roads in Taluka Sindhri (6.0 Kms). M.Khas Approved 23.572 5.000 5.000 10.000 0.500 0.500 42% 45%
904 Construction of road from Dargah Mehmood road Umerkot Approved 11.563 0.800 0.800 5.000 5.000 7% 50%
to Syed Ali Muhammad Shah Via Syed Ismail Shah
@ Mile 0/0-1/7.
905 Construction of road from Samaro kunri Road to Umerkot Approved 3.724 0.800 0.800 3.000 3.000 21% 102%
Haji Aleem Kapri Mile 0/0-0/5.
906 Construction of road from Abdullah Khan Kapri Umerkot Approved 9.334 0.800 0.800 5.000 5.000 9% 62%
road Baharo Khan Banglani and link Moharam
Banglani Mile 0/0-1/4.
907 Construction of road from Talhi to Village Umerkot Approved 10.106 0.800 0.800 5.000 5.000 8% 57%
Muhammad Hashim Gishkori Mile 0/0-1/5.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
908 Construction of road from Rahmoor to Talhi Road Umerkot Approved 21.299 0.800 0.800 5.000 5.000 4% 27%
@ Mile 0/0-3/4.
909 Construction of road from Shahi Khan to Bero Umerkot Approved 11.450 0.800 0.800 5.000 5.000 7% 51%
Khan Rind
910 Construction of road from Jeewan More Old Talhi Umerkot Approved 7.206 0.800 0.800 6.500 6.500 11% 101%
road Tochoudhr Rehmatullah Mile 0/0-1/1.
911 Construction of road from Kunri Jhudo road at point Umerkot Approved 10.675 0.800 0.800 10.000 10.000 7% 101%
Warand Khan Chandio to Mohammad Yousif
Chandio via Fakeer Jan Mohammad mile 0/0-1/4.
912 Construction of Sindh Coastal Highway Gaghar Thatta Approved 2407.949 50.000 50.000 200.000 200.000 2% 10%
Phatak - Keti Bunder - Shah Bunder Ali Bunder
(Hgahar Phatak - Keti Bunder Phase-I) of 90 Kms.
913 Feasibility study for construction of road from Dadu Approved 2.500 2.000 2.000 1.500 1.500 80% 140%
Sehwan via Chhini Tando Rahim - Wahi Pandi upto
Gorak Hill Mile 0/0-62/0.
914 Construction / Repair of road from Tando Bago Badin Approved 69.146 2.000 2.000 8.000 8.000 3% 14%
Jhudo road at mile 17/0 to connect Tando Bago
Digri road at point Alamabad mile 0/0-8/6 (14.08
Kms).
915 Construction of road from Jati - Chach Jehan Khan Thatta Approved 61.928 2.000 2.000 10.000 10.000 3% 19%
road at mile 12/4 to Allah Rakhio Theam via Haji
Mohammad Hashim Jat & Haji Siddique Thareem
road mile 0/0-6/4 (10.44 Kms).
916 Construction of road from Nabisar road Jamal Via Umerkot Approved 78.876 5.000 5.000 2.000 2.000 6% 9%
Palio Khan Rin with Sawan Khan to Sher Khan
Rind Mile 0/0-8/6.
917 Construction of link road from Ge Cheta Chowk to Umerkot Approved 121.500 5.000 5.000 2.000 2.000 4% 6%
Haji Arab Ji Dhani Rio Mokaryar Haji Adam Wahri
(15 Kms)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
918 Construction of road from Old N.H.Way (Shah Khairpur Approved 117.714 5.000 5.000 10.000 10.000 4% 13%
Abdul Latif University) to New N.H.Way road mile
0/0-6/0 - 10.0 Kms
919 Construction of road from Sukkur - Larkana road to Shikarpur Approved 49.527 1.000 1.000 5.000 5.000 2% 12%
Faiz Muhammad Jeho via Wali Muhammad Jeho
mile 0/0-1/5 I/c 350 Rft Bridge over Rice Canal and
200 Rft Bridge over Dadu Canal
920 Construction of road from Tangwani Bugti Colony Jacobabad Approved 14.193 1.000 1.000 2.000 2.000 7% 21%
to Village Muhammad Mureed Nindwani Taluka
Tangwani Mile 0/0-2/0
921 Construction of road from Village Nabi Bux Dahri to Jacobabad Approved 74.755 4.000 4.000 5.000 5.000 5% 12%
Grave Yard (Vill) Haji Abdul Hassan mile 0/0-8/6
(14.0 Km)
922 Construction of road from Dehi Tando Jan Badin Approved 122.570 1.000 1.000 10.000 10.000 1% 9%
Mohammad road @ point 57 Mori to Jhudo with
link to village Haji Ibrahim Jalo and village Rori
village Ghulam Mustafa Brohi 0/0-12/0
923 Construction of road from Nara - Tajal Gate to Khairpur Approved 50.713 10.000 10.000 15.000 15.000 20% 49%
Kamraho Channel (Nauabad) mile 0/0-6/2
924 Construction of road from Vass to Matto Mangrio Sukkur Approved 146.190 4.000 4.000 20.000 20.000 3% 16%
road mile 0/0-12/4
925 Construction of road from Pacca Chang Bhangoo Khairpur Approved 66.352 2.000 2.000 1.000 1.000 3% 5%
road to Ranjho Mashori via Pir Ghulamullah Shah to
village Khaskheli & Atta Mohammad Mashor Mile
0/0-6/4
926 Cosntruction of road from Malak Chodagi to Khairpur Approved 67.482 4.000 4.000 1.000 1.000 6% 7%
Nandhi Thari Mile 0/0-7/4
927 Construction of road from Kumb Kot Lalu road to Khairpur Approved 67.788 2.000 2.000 1.000 1.000 3% 4%
Jhango road to village Talpur Wada via Manzoor
Phull to Sial village road Mile 0/0-7/0
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
928 Construction of road from Haji Mohammad Hussain Khairpur Approved 75.523 2.000 2.000 1.000 1.000 3% 4%
Chang to Habibullah Brohi via Fakir Amir Bux
Majeedano & Wali Mohammad Majeedano Mile
0/0-7/6
929 Construction of road from Kot Lalu Nawabshah Khairpur Approved 75.764 2.000 2.000 1.000 1.000 3% 4%
road to Wadero Abdullah Lakhijo Qabool Ahmed
Rajper Liaquat Rajper and Kori Jalalji Mile 0/0-8/1
930 Construction of road from Setharja Pir Budiro road Khairpur Approved 58.511 2.000 2.000 1.000 1.000 3% 5%
to Haji Rajper via Khaskheli village Mile 0/0-6/2
931 Construction of road from Palyio Fakir Chang to Khairpur Approved 67.389 2.000 2.000 1.000 1.000 3% 4%
Mirwah Bridge village Fakir Usam Shar to Bunglow
Pir Sahab Pagaro road Mile 0/0-7/4
932 Construction of road from Abdul Majeed Khaskheli Khairpur Approved 81.921 2.000 2.000 1.000 1.000 2% 4%
to Ustad Naimatullah Jamali via Baqir Khan Punjabi
Khamtia Zerdari - Raees Lahro Jamali Mile 0/0-8/1
933 Construction of road from Kot Lalu - Akro road to Khairpur Approved 72.349 2.000 2.000 1.000 1.000 3% 4%
Kumb - Nawabshah road via Hakeem Ali Nawaz
Shar Mile 0/0-7/4
934 Construction of road from Dubar to Bhelani Mile Sukkur Approved 161.800 2.000 2.000 5.000 5.000 1% 4%
0/0-12/0
935 Construction of road from Daulatabad to Girhore Mirpurkhas Approved 52.328 5.000 5.000 8.000 8.000 10% 25%
Sharif Mile 0/0-6/4
936 Construction of road from Qaim Mahar to Allah Ghotki Approved 16.179 2.000 2.000 10.000 10.000 12% 74%
Abad Mile 0/0-2/0
937 Construction of road from Dumbalo to Ghulam Shah Badin Approved 91.486 1.000 1.000 15.000 15.000 1% 17%
Mori Road via S.B. H.B.A. UD Arian mile
5/5-15/0. Phase - II
938 Construction of Chutto Madrani via Haji Nabi Badin Approved 65.198 1.000 1.000 12.000 12.000 2% 20%
Buksh Arain Village to Digri Road mile 0/0-7/0.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
939 Reconstruction of road from Phurdo Jamali to Badin Approved 62.523 2.000 2.000 12.000 12.000 3% 22%
Khudro Mile 0/0-7/0
940 Contruction of road from Hongorja Saggyoon road Khairpur Approved 34.000 1.000 1.000 8.000 8.000 3% 26%
on the left bank of Masher Shakh to National
Highway Saifal Khan Khaskheli Mile 0/0-3/1
941 Reconstruction of road from Lakha road Railway N'Feroze Apprpved 18.129 1.000 1.000 8.000 8.000 6% 50%
Station to hot Khan Jalbani Mile 0/0-3/6.
942 Construction of road from Nooh Kalhoro to Sher N'Feroze Approved 37.316 1.000 1.000 8.000 8.000 3% 24%
Muhammad Abro Mile 0/0-4/4
943 Construction of link road from Padidan Phul road to N.Feroze Approved 43.072 1.000 1.000 8.000 8.000 2% 21%
village Idrees palah Mile 0/0-5/0
944 Construction of road from Umerkot To Soofi Umerkot Approved 90.000 5.000 5.000 5.000 5.000 6% 11%
Dhoro-Naro road on Kotwah Path via Hurabad 7
Mile Mori (18.0 Kms)
945 Const: of Link road from Kandhkot Saifal road to Kashmore Approved 41.332 5.000 5.000 0% 12%
village Karam Khan Bajkani via Arab Khan Bajkani @ K.Kot
(10.06 Km)
Total Construction (On-Going schemes) 30119.020 0 4915.773 0 3051.970 0 7967.743 0 2533.803 0 2533.803 0
Construction
(New Schemes)
946 Construction of Road from village Lekoria to Thar Unapproved 84.000 4.000 4.000 0% 5%
Ankerio Salt Lake (12.00 Km)
947 Construction road from Village Rasheed Arain to Badin Unapproved 18.000 4.000 4.000 0% 22%
Jhudo Sangi Phararo Road (3.00 Km)
948 Construction of Road from Indus Highway at Mile Dadu Un-approved 92.875 5.000 5.000 0% 5%
157/0 to Suprio Bund along Rajwah inspection Park
Mile 0/0-10/0 16 Kms)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
949 Construction of road from Abdul Rahim Abro to Dadu Unapproved 20.000 4.000 4.000 0% 20%
village Haji Jamal Panhwar via Dhani Bux Panhwar,
Buxal Abro, Ali Bux Machi (3.21 Km)
950 Construction of road from Abdul Rahim Abro to Dadu Unapproved 42.000 4.000 4.000 0% 10%
village Chutto Abro via Wasal Noorani, Idrees
Bozdar Gullo Wakan upto Khara (7.24 Km)
951 Construction of road from Sucharo road to Village Dadu Unapproved 15.000 5.000 5.000 0% 33%
Sardar Arain via Gul Mohammad Punjabi (2.61
Km)
952 Const: of road from Mounder to Mureed Ja Bhan Dadu Unapproved 30.000 4.000 4.000 0% 13%
Lukman Shahani (4.82 Km) I/c 1000 Rft Bridge
953 Const: of road from Piaro Sation to Mullah Jee Dadu Unapproved 42.000 4.000 4.000 0% 10%
Kelree via Hasual Chandio via Muhrai Chandio (6.0
Km)
954 Const: of road from F.P.Bund to Mounder via Dadu Unapproved 30.000 5.000 5.000 0% 17%
Freed Khan Khushk, Jan Muhammad Khushak, Gul
Mohammad Shahani, Mitho Khakhi (4.82 Km)
955 Const: of road from Jhallo to village Adam Panhwar Dadu Unapproved 30.000 5.000 5.000 0% 17%
via village Doong (4.82 Km)
956 Const: of road from village Qaim Kharal (2.8 Km) Dadu Unapproved 20.000 5.000 5.000 0% 25%
957 Const: of road from Allahbad to Mana Mori via Dadu Unapproved 30.000 5.000 5.000 0% 17%
Saffar Darkhan Mevo Khoso Chutto Behmani,
Solangi Khara (4.82 Km)
958 Const: of road from Kalri to Bachal Chandi vial Dadu Unapproved 30.000 5.000 5.000 0% 17%
Fateh Mohammad Chandio (4.82 Km)
959 Const: of road from Gazi Faqir to Hassal Chandio Dadu Unapproved 30.000 5.000 5.000 0% 17%
via Chack Ahmed (4.6 Km)
960 Const: of road from Phulji Piaro Road to Village Dadu Unapproved 20.000 5.000 5.000 0% 25%
Noorpur via Budho Khan Panhwar via Gul Baig
Panhwar via New Piaro Goth (3.2 Km)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
961 Const: of road from village Khamiso Machi Dadu Unapproved 42.000 5.000 5.000 0% 12%
Karimabad Chandio, via Guhino Chandio, Gul
Mohd: Bogar Subho Chandio and Khair
Muhammad Chandio (6.00 Km)
962 Const: of road from Phulji Dawatch road to village Dadu Unapproved 30.000 4.000 4.000 0% 13%
Pir Tarrho (4.82 Km)
963 Const: of road from Indus Highway to village Dadu Unapproved 30.000 4.000 4.000 0% 13%
Samtani via Faqeerabad via Allahdino Panhwar
(4.82 Km)
964 Const: of road from Long Rahuja to village Agan Dadu Unapproved 10.000 5.000 5.000 0% 50%
Rahuja and Gul Sher (1.6 Km)
965 Const: of road from Hussain Arain road to Kotain Dadu Unapproved 15.000 5.000 5.000 0% 33%
Arain (2.4 Km)
966 Construction of road from Shadi Shaheed road to Khairpur Un-Approved 21.000 9.000 9.000 0% 43%
Manghee Khan Katohar to Hussainabad Aftababad
upto Badal Mangi (3 Kms).
967 Construction of road from Pir Hafiz Chakar Khairpur Un-Approved 14.000 4.000 4.000 0% 29%
Warysso to Goth Ghulam Muhammad Manejo
(2.00 Kms)
968 Construction of road from Baberloi Piryaloi road to Khairpur Un-Approved 21.000 9.000 9.000 0% 43%
Faiz Wah Malhyd road (3 Kms)..
969 Construction of road from F.T.M. road to Udhar Khairpur Un-Approved 14.000 5.000 5.000 0% 36%
Shah Colony via Grid Station road (2 Kms).
970 Recondition of road from Khairpur Machi road from Khairpur Un-Approved 21.000 5.000 5.000 0% 24%
village Sono Solangi upto Gagri road (3 Kms).
971 Construction of road from Hingorjo Sobho Dero Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
road to Wadero Ali Murad Manejo via Machar
Shah (5.00 Kms).
972 Construction of road from Sahdi Shaheed road to Khairpur Un-Approved 14.000 5.000 5.000 0% 36%
village Manjial Fakir Morejo (2 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
973 Construction of road from Fakir Abad Faizal Mahar Khairpur Un-Approved 14.000 5.000 5.000 0% 36%
road to village Allah Dad Bhatti( 2.0 Kms).
974 Construction of road from Fateh Pur to village Khairpur Un-Approved 17.000 5.000 5.000 0% 29%
Karim Bux Brohi (2.5 Kms).
975 Construction of road from Fakir abad Khairpur Un-Approved 14.000 5.000 5.000 0% 36%
Bholoo-Ji-Bhitt to village Sanwal Waro (2.0 Kms).
976 Construction of road from Channar to village Khairpur Un-Approved 24.000 4.800 4.800 0% 20%
Soomar Mallah via Gul Hassan Ujjan (3.5 Kms).
977 Construction of road from Noor Bozdar Mirwah Khairpur Un-Approved 23.000 8.000 8.000 0% 35%
Bridge to village Haji Hidayat Ali Bozdar and
Bhambra village (3.2 Kms).
978 Construction of road from Faizal Mahar to Dost Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Muhammad Brohi via Waryam Thebo (5 Kms)..
979 Construction of road from Kumb Naroo Dhoro Khairpur Un-Approved 26.000 8.000 8.000 0% 31%
road at Adam ujjan to Bhoolo-Ji-Bhitt Fakir Abad
road via Ghulam Hyder Ujjan Ishaque Ujjan Nawab
Ujjan and Abdullah Bhatti (3.6 Kms).
980 Construction of road from Thari Jiskani to Rani Pur Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Bozdar road via Brohi Khaskheli and Shambani (5
Kms).
981 Construction of road from Hussain Abad Naro Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Dhoro road to Jam Goth Mitheri via Shambani (5
Kms).
982 Construction of road from Khairpur Tando Masti Khairpur Un-Approved 14.000 5.000 5.000 0% 36%
road to Sajjan Khaskheli ( 2 kms).
983 Construction of road from National Highway Karam Sukkur Un-Approved 7.000 5.000 5.000 0% 71%
Abad to Pir Bux Malho road (2 Kms).
984 Construction of road from Khairpur Machi road to Khairpur Un-Approved 28.000 5.600 5.600 0% 20%
Shah Hussain Sim Nala to Torail Badshah road (4
Kms) .
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
985 Construction of road from Ali Mehar road to Haji Sukkur Un-Approved 14.000 2.000 2.000 0% 14%
Qadir Bux Petafi (2 Kms).
986 Construction of road from Shah pur Lohi road to Sukkur Un-Approved 21.000 3.000 3.000 0% 14%
link wari daro village Budho Khan, Ramzan
Bhambhro (3 Kms)..
987 Construction of road from New National Highway Sukkur Un-Approved 35.000 5.000 5.000 0% 14%
Bheri to village Palah road (5 Kms)..
988 Construction of road from Arrore Bachal Shah road Sukkur Un-Approved 42.000 5.000 5.000 0% 12%
to Nara Canal via Indher from 0/0-3/4 (6 Kms).
989 Construction of road from Sangrar Seerahi road to Sukkur Un-Approved 56.000 8.000 8.000 0% 14%
village New Abad mile 0/0-5/0 (8 Kms).
990 Construction of road from RD-99 to RD-86 Panell Sukkur Un-Approved 42.000 6.400 6.400 0% 15%
to Nara Canal mile 0/0-3/0 (6 Kms).
991 Construction of road from RD-99 to RD-110 Sukkur Un-Approved 35.000 5.000 5.000 0% 14%
Riazabad mile 0/0-2/0 (5 Kms).
992 Construction of road from Abad Minor to Satheyo Sukkur Un-Approved 21.000 5.000 5.000 0% 24%
Wah mile 0/0-2/4 (3 Kms).
993 Construction of road from Kandri to Hyder Shahani Sukkur Un-Approved 28.000 8.000 8.000 0% 29%
via Ruhal Fakir mile 0/0-2/4 (4 Kms).
994 Construction of road from Trimounh to Qadir Bux Sukkur Un-Approved 28.000 8.000 8.000 0% 29%
Ja Quba to village Sachal Maitelo mile 0/0-3/0 (4
Kms).
995 Construction of road from Pir Koko road to Leemo Sukkur Un-Approved 91.000 8.000 8.000 0% 9%
Khan Maitelo 0/0-1/0 (13 Kms).
996 Construction of road from Imam Bux Katohar to Sukkur Un-Approved 14.000 7.000 7.000 0% 50%
Morkhani Sim Nala via Machyoon mile 0/0-2/0 (3.2
Kms).
997 Construction of road from Darawahan to Kandri Sukkur Un-Approved 28.000 8.000 8.000 0% 29%
road mile 0/0-2/0 (4 Kms)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
998 Construction of road from Trimoho to R-99 via Sukkur Un-Approved 21.000 8.500 8.500 0% 40%
Arore Bachal Shah mile 0/0-2/0 (3 Kms).
999 Construction of road from Haleji Dhandhi road to Sukkur Un-Approved 42.000 8.400 8.400 0% 20%
Bati Chowk to Mangai Adho Soouro mile 0/0-3/4
(6 Kms).
1000 Construction of road from National Highway to Pir Sukkur Un-Approved 28.000 5.000 5.000 0% 18%
Kali Shah mile 0/0-2/0 (4 Kms).
1001 Construction of road from Police Check Post Junass Sukkur Un-Approved 49.000 5.000 5.000 0% 10%
to Kazi Wah @ village mitho Kalhoro mile 0/0-4/3
(7 Kms).
1002 Construction of road from Sangi to Abdul Wahab Sukkur Un-Approved 21.000 7.000 7.000 0% 33%
Mahar mile 0/0-2/0 (3 Kms).
1003 Construction of road from village Saeed Ali Indher Sukkur Un-Approved 35.000 7.000 7.000 0% 20%
to Drib via Haji Illahi Bux Mangi, Abdul Haleem
Qazi Khalid Jo Khoh, village Major Goth mile
0/0-3/0 (5 Kms). Sukkur
1004 Construction of road from Noor Muhammad Gumb Un-Approved 21.000 7.000 7.000 0% 33%
to village Khuda Bux Mirbahar mile 0/0-2/0 (3
Kms). Sukkur
1005 Construction of road from village Kalwar to Lal Sukkur Un-Approved 28.000 7.000 7.000 0% 25%
Kalwar viz Mitho Kalwar mile 0/0-2/4 (4 Kms) .
1006 Construction of road from Daffar Jatoi to Wariyam Sukkur Un-Approved 21.000 5.000 5.000 0% 24%
Jatoi mile 0/0-2/0 (3 Kms).
1007 Construction of road from Nauraja link road to Sukkur Un-Approved 21.000 5.000 5.000 0% 24%
Makoro Kato mile 0/0-1/4 (3 Kms).
1008 Construction of road from village Piral Almani to Sukkur Un-Approved 28.000 7.000 7.000 0% 25%
village Choungha via Farakpur mile 0/0-2/0 (4
Kms).
1009 Construction of road from Jumani mahar to village Sukkur Un-Approved 21.000 5.000 5.000 0% 24%
Ghouserji 0/0-1/4 (3 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1010 Construction of road from village of Jatoi’s Taluka Sukkur Un-Approved 35.000 5.000 5.000 0% 14%
P.Akil length 5 K.M. case of Haji Anwar Ahmed
Khan Mahar (5 Kms).
1011 Construction of road from M.Khaskheli road mile Thatta Un-Approved 14.000 7.000 7.000 0% 50%
1/3- to villageUsman Bazi Baloch mile 0/0-1/1.
Taluka Mirpur Sakro District Thatta (2 Kms).
1012 Construction of road from Matiari Nasarpur road Matiari Un-Approved 21.000 10.500 10.500 0% 50%
@ Bilawal Phatak to village Haji Lutuf Ali shah (3
Kms.)
1013 Construction of road from Patidan to Jalalji N'Feroze Un-Approved 21.000 10.500 10.500 0% 50%
Chowdagi road to village Habibullah Rajper via Faiz
Gang. Canal. Non–Inspection Path (3 Kms)
1014 Construction of road from Nawabshah 60 mile road N'Shah Un-Approved 35.000 7.000 7.000 0% 20%
to village Shahmir Khan Birahmani via Gul Mir Mari
(5 Kms).
1015 Construction o froad from 3-Chack Suhelo Stop N'Shah Un-Approved 21.000 8.500 8.500 0% 40%
link road to village Kamil Khan rind via Choudhry
sultan Arain (3 Kms).
1016 Construction of road form 60 mile Jumo Khan Mari N'Shah Un-Approved 35.000 7.000 7.000 0% 20%
road to village Syed Warial shah upto village moula
Bux Mari (5 Kms)
1017 Construction o forad from Dargah Baloo-Ja-Quba N'Shah Un-Approved 49.000 9.800 9.800 0% 20%
to connect Bye pass road (7 Kms).
1018 Construction of road from Nawabshah 60 mile road N'Shah Un-Approved 35.000 7.000 7.000 0% 20%
to village Abdul Khalique Jalbani (5 Ksm).
1019 Construction of road from Sirhari-Nawaz Dahri N'Shah Un-Approved 49.000 9.800 9.800 0% 20%
road to Village Illahi Bux Khoso (7 Kms).
1020 Construction of road from Shakel Jamali road to N'Shah Un-Approved 35.000 7.000 7.000 0% 20%
village Dhigano Zardari (5 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1021 Construction of road from Panjo Khan Minor to N'Shah Un-Approved 35.000 7.000 7.000 0% 20%
village Baz Muhammad Brohi (5 Kms).
1022 Construction of road from Gulo wahan to Gambat Khairpur Un-Approved 26.740 7.000 7.000 0% 26%
Agra road via village Haji Ismail deh Golo Wahan.
(3.82 Kms).
1023 Construction of road from Sobhodero to Jado Khairpur Un-Approved 24.500 6.000 6.000 0% 24%
Wahan Kharo via Ali Bux Jamro via Juman Shah
(3.50 Kms).
1024 Construction of road from Mehmood Shah link to Khairpur Un-Approved 12.900 5.000 5.000 0% 39%
village Khameso Khan old Kotlo (0/0-1/7 = 3
Kms).
1025 Construction of road from Phone Shakh road to Lal Sukkur Un-Approved 21.000 4.000 4.000 0% 19%
Dino Sehto Pir Godo Othani Sodal Sehto
Muhammad Achar Sehto village Muhammd Khan
Jangri (4.5 Kms).
1026 Construction of road from Village Sodal Saheto to Khairpur Un-Approved 24.500 5.000 5.000 0% 20%
Depharja Pull Rohri Canal (3.5 Kms).
1027 Construction of road from Highorja Sobhodero Khairpur Un-Approved 12.900 4.000 4.000 0% 31%
Macher Shakh to village Ali Murdan Mangrejo (3.0
Kms).
1028 Construction of road from N.H.Way to Bagmaji via Khairpur Un-Approved 56.315 5.000 5.000 0% 9%
Mastoi Allah Dino Shaikh, Gangani road mile
0/0-5/0 (8.04 Kms).
1029 Construction of road from village Langhan Shaikh to N'Feroze Un-Approved 25.340 5.000 5.000 0% 20%
Laloo Kalhoro mile 0/0-2/2.(3.62 Kms).
1030 Construction of road from Thehri Pull to village Khairpur Un-Approved 38.010 5.000 5.000 0% 13%
Umina mile 0/0-3/3 (5.43 Kms).
1031 Construction of road from N.H.way Bye pass @ Khairpur Un-Approved 56.280 5.000 5.000 0% 9%
Moosani to Jaral Shah mile 0/0-5/0 (8.04 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1032 Construction of road from Badin Sujawl @ 41/0 Thatta Un-Approved 35.000 5.000 5.000 0% 14%
Kadir Bux via Azeem Khan Pasha 0/0-3/0 (5
Kms),
1033 Construction of road from village Water Malano to Sukkur Un-Approved 45.010 5.000 5.000 0% 11%
Village Bhambhro Malano to Village Dhani Bux
Malik to Village Adam Gopang via Thath Minor 4
miles (6.43 Kms).
1034 Construction of road from National Highway to Sukkur Un-Approved 22.470 5.000 5.000 0% 22%
Village Jumo Juskani and Village Jurayo Mirbahar 2
miles (3.21 Kms).
1035 Construction of Arrore Bachal Shah road @ mile Sukkur Un-Approved 80.750 7.000 7.000 0% 9%
8/6 to Rohri Salehpat mile 0/0-4/7.
1036 Construction of road from Old Sukkur (Numaish Sukkur Un-Approved 35.000 5.000 5.000 0% 14%
ground) Fire brigade to Jafferabad via Rahuja on
protect Bund mile 0/2-3/2. (4.83 Kms).
1037 Construction of road from Arrore o Dodanko via Sukkur Un-Approved 16.095 5.000 5.000 0% 31%
Bhit Noor Shah road to Pir Ali Abbas Shah mile
0/0-1/4.(2.415 Kms)
1038 Construction of road from Badin–Khoski at point Badin Un-Approved 67.620 5.000 5.000 0% 7%
scape to Luari Mando road via Village Noor
Muhammad Farooqi mile 0/0-6/0 (9.66 Kms).
1039 Construction of road from village Lal Bux Nautkani Badin Un-Approved 123.970 5.000 5.000 0% 4%
road to Pir Fateh shah via Mazhar Khan Chang
0/0-11/0 (17.71 Kms)
1040 Construction of road from Khalifo Qasim – Jhudo Badin Un-Approved 135.240 5.000 5.000 0% 4%
road to Olya Khan Shah road via Talib Odejo and
Noor Kiryo 0/0-12/0 (19.32 Kms)
1041 Construction of road from Buxo Lund to Mahboob Badin Un-Approved 67.620 5.000 5.000 0% 7%
Shah road via Daato Junejo 0/0-6/0.(9.66 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1042 Construction of road from Bhulri Shah Karim to T.M.Khan Un-Approved 28.000 5.000 5.000 0% 18%
Khorwah Makal Wah to Urs Soomro via Noor
Muhammad Soomro 4 Kms UC Bhulri Shah Karim.
1043 Construction / Repair of 10 Kms road of village Sari Jamshoro Un-Approved 70.000 5.000 5.000 0% 7%
Taluka Thano Bulla Khan District Jamshoro.
1044 Construction of road from Thano Ahmed Khan to Jamshoro Un-Approved 21.000 5.000 5.000 0% 24%
Astan Ghru Bal Puri Garh (3 Kms).
1045 Construction of road from Indus Highway to village Jamshoro Un-Approved 21.000 5.000 5.000 0% 24%
Khasaee mile 0/0-2/0 Taluka Manjhan (3.22 Kms)
1046 Construction of road from Kala Bahan road to Dadu Un-Approved 14.000 5.000 5.000 0% 36%
Misri Chandio Dargah Ahmed Shah (2 Kms).
1047 Construction of road from Tajpur to Kot Nooe Matiari Un-Approved 14.000 5.000 5.000 0% 36%
Shah Bukhari UC Tajpur (2 Kms).
1048 Construction of road from noor Madarsa to Village Matiari Un-Approved 14.000 5.000 5.000 0% 36%
Deegano Jamali UC BD Kaka (2 Kms).
1049 Construction of road from Badin Sujawal Road to Badin Un-Approved 14.000 5.000 5.000 0% 36%
Suman Nagar Haji Soomar Samoon UC Khorwah
(2 Kms).
1050 Construction of road from Pirano Dero to Village Dadu Un-Approved 14.000 5.000 5.000 0% 36%
Ghulam Hussain kalhoro UC Phulji Taluka District
Dadu. (2 Kms).
1051 Construction of road from National Highway Thatta Un-Approved 14.000 5.000 5.000 0% 36%
Karachi Hyderabad road to village Bhai Khan
Baber UC Ongar Taluka Thatta District Thatta (2
Kms).
1052 Construction of road from Kothi to Anwar Fazal Thatta Un-Approved 21.000 5.000 5.000 0% 24%
road Taluka Jati District Thatta (3 Kms).
1053 Construction of road from Goth Zahid Ali Khan Umerkot Un-Approved 17.500 5.000 5.000 0% 29%
Bhurgari near Arif Khan link road Taluka Samaro
District Umerkot (2.5 Kms).
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1054 Construction of road from Village Wali Muhammad Badin Un-Approved 14.000 5.000 5.000 0% 36%
Laghari to Village Phelwan Khan Leghari (2 Kms).
1055 Construction of road meassuring (4 Kms) Village Thatta Un-Approved 28.000 5.000 5.000 0% 18%
Qasim Shoro upto Super Highway Taluka Thatta
District Thatta
1056 Construction of metaled road from Tando Adam - T.A.Yar Un-Approved 14.000 5.000 5.000 0% 36%
Mirpurkhas to village Haji Sawan Khan Babar
Taluka Jhando Mari (2Kms).
1057 Construction of road from village Pir Bux Liskani to Sanghar Un-Approved 17.500 5.000 5.000 0% 29%
Deh Paniri Taluka Khipro(2.5Lms).
1058 Construction of road from Umerkot-Chhore road Sanghar Un-Approved 14.000 5.000 5.000 0% 36%
to Ahori Ali Mardan Shah via village Dr.Noor Ali
Shah & Gul Mohammad Khaskheli(2Kms).
1059 Construction of road from Odero Lal via Mulla Sanghar Un-Approved 14.000 5.000 5.000 0% 36%
Makhan Shahdadpur road village Haji Khan
Mohammad Dero to Sikandar Hayat Dero(2Kms).
1060 Construction of road from Mir Ghaffar Laro to N'Feroze Un-Approved 14.000 5.000 5.000 0% 36%
Baro Khoso(2Kms).
1061 Construction of road from Lakha Mehrabpur to N'Shah Un-Approved 14.000 5.000 5.000 0% 36%
village Yousuf Nagore UC Junejo Rajper(2Kms).
1062 Construction of road from Kotri Kabir to Pir N'Feroze Un-Approved 14.000 5.000 5.000 0% 36%
Unnar via Gahi Rahu UC-2 Mehrabpur (2Kms).
1063 Construction of road from Karim Khan to Nigal K@ Un-Approved 14.000 5.000 5.000 0% 36%
Magsi village 2 Kms. Shahdadkot
1064 Construction of raod from Kaser Basti to Village Ghotki Un-Approved 14.000 5.000 5.000 0% 36%
Wahid Bux Mazari Mangwani District Ghotki 2
Kms.
1065 Construction of road from Kenjhar Yaru Lund road Ghotki Un-Approved 42.000 5.000 5.000 0% 12%
to Behram Petafi 6 Kms.
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1066 Construction of road from Village Haroon Jatoi to Sukkur Un-Approved 14.000 5.000 5.000 0% 36%
village Khan Jatoi Taluka Pano Aqil 2 Kms.
1067 Construction of Link road from Bahador Pur to J'bad Un-Approved 35.000 5.000 5.000 0% 14%
village Shah Bux Gabool 5 Kms.
1068 Construction of road from Arbab Solangi to Kumb Khairpur Un-Approved 49.000 5.000 5.000 0% 10%
via Mall Fakir, Dhani Bux Ujan. Ghulam Qadir,
Mouhib Ali Ujan, Brohi, Srohi, Habibullah,
Muhammad Sharif Ujjan, Dilber, Yar Muhammad
Bhatti, Mehran Colony, Jabbal Shabani (7 Kms)
1069 Construction of Noor Bozdar to haji Hidayat Ali Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Sakhani. (5 Kms)
1070 Construction of road from Old National Highway to Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Raja Fruit Farm (5 Kms)
1071 Construction of road from Fazal Mahar to Dost Khairpur Un-Approved 49.000 5.000 5.000 0% 10%
Muhammad Brohi via Waryam Thebho (7 Kms)
1072 Construction of road from Shadi Shaheed Manjhi Khairpur Un-Approved 56.000 5.000 5.000 0% 9%
Khan Katohar to Hussainabad, Aftabad upto Badal
Mangi. (8 Kms)
1073 Construction of road from Ranipur Bozdar to Kirar Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Haji Goth via Jado Sobhoaro (5 Kms)
1074 Construction of road from Shadi Shaeed Gondaro Khairpur Un-Approved 70.000 5.000 5.000 0% 7%
road to Ubhan Shah via Ghulam Rasool Dharejo,
Rajpari and sher Khan Rind (10 Kms)
1075 Construction of road from Shadi shaheed Maghi Khairpur Un-Approved 70.000 5.000 5.000 0% 7%
Khan Kathore at Seria Imam Dino to Old National
Highway via Ameer Shah. (10 Kms)
1076 Cosntruction of road from Khairpur Tnado Masti to Khairpur Un-Approved 42.000 5.000 5.000 0% 12%
Hussababad Narodhoro road at Point Fate Ali
Lashari via Raheem Bux Lashari, Mattan Lashari
and Muharram Khaskheli (6 Kms)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1077 Construction of road from Kotdiji Dhari road to Khairpur Un-Approved 42.000 5.000 5.000 0% 12%
Fateh Ali Lashari via Allan Lashari Syed Raid Ali
Khan Shah, Saifal Shambani (6 Kms)
1078 Construction of road from Thari Jiskani road to Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Ranipur Bozdar road via Abdul Raheem Khaskheli,
Dhanar Khan Khaskheli, Village Tajo Khan and
Payaro Sakhani (5 Kms)
1079 Construction of raod from Hussainabad Naro Dhoro Khairpur Un-Approved 42.000 5.000 5.000 0% 12%
to Jam Goth (Mithri) via Shambani (6 Kms)
1080 Construction of road from Mohbat Kathore to Khairpur Un-Approved 42.000 5.000 5.000 0% 12%
Khanan Buriro via Hazoor Bux Kathore and
Soomar Buiriro (6 Kms)
1081 Construction of raod from Khadim Hussain Kathore Khairpur Un-Approved 42.000 5.000 5.000 0% 12%
to Tri Mori via Arbab Kathore (6 Kms)
1082 Construction of road from Shahdi Shaheed road to Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Chibher Kathore via Solangi (5 Kms)
1083 Construction of road from Gundarra Regulator to Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
village Dilwar Kathore via Bhawal Kathore (5 Kms)
1084 Construction of road from Zameer Lunjwani to Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Hamayoon via Kansara lbu Pota (5 Kms)
1085 Construction of road from Ranipur Bozdar road to Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
Fazal Muhammad Bhanbhro via Haji Hayat Ali
Bozdar and village Khuwaja. (5 Kms)
1086 Construction of Mattled road for village Deh Sohu Khairpur Un-Approved 35.000 5.000 5.000 0% 14%
(C/o Milaha Sohu) (5 Kms)
1087 Construction of road from Sojhro Kandhro to village Khairpur Un-Approved 25.000 5.000 5.000 0% 20%
Sahib Khan Rind road (3.54)
1088 Construction of road for Town Portion Saddar Jee Khairpur Un-Approved 49.000 5.000 5.000 0% 10%
Bhatyoon (7 Kms)
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1089 Construction of road from Thari Mirwah to Kathore Khairpur Un-Approved 180.000 11.000 11.000 0% 6%
Connecting Wassanabad I/c links (40 Kms)
1090 Construction of road from Long Fakir to Saleh Pat Khairpur Un-Approved 105.000 15.000 15.000 0% 14%
Nara Canal Bridge. (15 Kms)
1091 Constrcution of road from RD-250 Saido Pattan to Khairpur Un-Approved 154.000 25.000 25.000 0% 16%
Kathore RD-320 via Nara Gate. (22 Kms)
1092 Constt:/Improvement of road from N'Feroze to Nawabhshah Un-Approved 412.500 12.000 12.000 0% 3%
Nawabshah.
1093 Construction of road from Ghora Sakro road 8 mile Thatta Un-Approved 10.000 7.000 7.000 0% 70%
to Euro Farm (2 k).
1094 Constt: of link road from Budo Mado road to Dadu Un-Approved 10.000 7.000 7.000 0% 70%
Village M. Umar Sangi Taluka Mehar (2 K).
1095 Constt: of road from Haji Jalal Tunio to Bela Wah N'Feroze Un-Approved 20.000 4.000 4.000 0% 20%
including of Bridge over Dhoro Jalbani (4 K).
1096 Construction of road from Kumb Kot Lalo road to Khairpur Un-Approved 18.000 5.000 5.000 0%
village Shambani via Bhatti Awan, Jumrani 3 Kms
1097 Construction of road from National Highway to Khairpur Un-Approved 12.000 7.000 7.000 0% 58%
Jainning Factory Kumb 2 Kms
1098 Construction of road from Chodaho road to Imam Khairpur Un-Approved 12.000 7.000 7.000 0% 58%
Ali Shah via Village Karim Dino Wasan, Ghulam
Hussain Wasan, Ahdi Khan Wasan 2 Kms
1099 Construction of road from Jungo Ahdi Khan Rajpur Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
to village Iqbal Wasan & Haji Khuda Bux Wasan 2
Kms
1100 Construction of road from Kumb By-pass to Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
Shaheed Benazir Bhutto Colony 2 Kms
1101 Construction of road from Sohu Kanasra to Khairpur Un-Approved 18.000 5.000 5.000 0% 28%
Hussainabad via Budho Sohu Muhammad Bux
Shambani Gul Sher Kanesero & Jan Muhammad
Solanghi 3 Kms
PROVINCIAL
TRANSPORT & COMMUNICATION
(Rs. in million)
General Status Estimated Cost Expenditure upto Revised Allocation Estimated Expenditure upto Allocation for Foreign Physical Progress in %Age
Location of
Serial Sector/Sub-Sector/Agency scheme of the June-07 2007-2008 June 2008 2008-09 Project Asst. Terms upto the End of
No Name of Scheme Scheme Total FPA Total FPA Total FPA Total FPA Capital Revenue Total 2008-09 2007-08 2008-09
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1102 Construction of road from Fateh Rajpar to village Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
Qadir Bux Jamro 2 Kms
1103 Construction of road from Sohu Kanesro Khan Rind Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
to Dargha Shadi Shaheed Road 2 Kms
1104 Construction of road from Jeskani Soomar Malha Khairpur Un-Approved 18.000 5.000 5.000 0% 28%
road to village Gul Hassan Ujjan 3 Kms
1105 Construction of road from Jeskani Chodhaho road Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
to village Mohammad Bux Wasan 2 Kms
1106 Construction of road from National Highway to Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
village Mithri Metri 2 Kms
1107 Construction of road from National Highway to Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
village Deh Sohu 2 Kms
1108 Construction of road from Kabolani to village Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
Murad Gopang 2 Kms
1109 Construction of Road from Saeedabad to Nawabshah Un-Approved 480.000 17.000 17.000 0% 2%
Nawabshah road including Bridge over Rohri Canal
(35 kms)
1110 Construction of road from Village Mithri to village Khairpur Un-Approved 12.000 5.000 5.000 0% 42%
Shambhani 2 Kms
1111 Constrcution of road from Gaji Panhwar link to road Dadu Un - Approved 28.000 5.000 5.000
to village Saindad Panhwar (4.00 Kms).
Bridges
(On-Going Schemes)
1112 Construction of New Bridges in various district of Sindh Approved 205.818 56.861 58.003 114.864 70.000 70.000 56% 90%
Province (12 Nos)
1113 Feasibility Study for Construction of Bridge over Sindh Approved 6.894 6.900 6.900 0% 100%
Indus River to connect
(a) Sann - Mehrabpur (8350 RFT)
(b) Jhirik-Mullakatiar (4500 RFT)
1114 Rehabilitation / Restoration of Damage Prestressed M.Khan Approved 21.600 11.300 11.300 11.000 11.000 52% 103%
Bridge:
(a) Bridge over Spian Drain RD No:592+027 along
Mirpurkhas-Jhurbi road @ mile 8/2
(b) Bridge over Spinal Drain RD No:630+366 along
Mirpurkhas-Khipro to Bisham Brohi Link road mile
4/2
Total Bridges (On-Going Schemes) 234.312 0 56.861 0 69.303 0 126.164 0 87.900 0 87.900 0
Bridges
(New Schemes)
1115 Construction of over Head Bridge over Main Khairpur Un- Approved 615.550 50.000 50.000 22.725 22.725 8% 12%
Railway Line at Luqman including approach road
upto New Rohri Canal Bridge to Pir-jo-Goth road
(2000 Rft)
1116 Construction of New Bridges in Sindh Sindh Un-Approved 160.000 100.000 100.000 0% 63%
1117 Construction of Pre-Streesed Bridges over Nara Khairpur / Un-Approved 80.000 30.000 30.000 0% 38%
Canal at RD-99 & RD-314. Sukkur
1118 Sindh Road Sector Development Project (Road Sindh Approved 14141.960 10081.500 4817.810 2758.990 4300.000 2800.000 9117.810 5558.990 800.000 800.000 3000.000 72% 100%
Sector Development Project) ADB Assisted Loan
No. 1892-1893 Pak (SF) & OPEC-899 P
1119 Japanese Assisted Rural Roads Construction Sindh Approved 5114.000 4729.000 200.000 200.000 100.000 0% 14%
Project-II (Sindh)
Total Foreign Aided Project (On-Going ) 19255.960 14810.500 4817.810 2758.990 4300.000 2800.000 9117.810 5558.990 1000.000 0 1000.000 3100.000
Total Transport & Communication (On-Going) 74998.205 14810.500 15778.664 2758.990 9933.839 2800.000 25712.503 5558.990 6628.000 0 6628.000 3100.000
Total Transport & Communication (New) 19514.340 0 0 0 50.000 0 50.000 0 2372.000 0 2372.000 0
Total Transport & Communication 94512.545 14810.500 15778.664 2758.990 9983.839 2800.000 25762.503 5558.990 9000.000 0 9000.000 3100.000