Layout of Cctv for External Area and Gf Area
Layout of Cctv for External Area and Gf Area
RAMP DOWN
UNIT HEAD HR ACCOUNTS
WITH O/O FENCING C113 C114 C115 C116
500x450
3.0 X 4.50 W2
C118
SCRAP ROOM C117 500x450
DOCK 14.88 X 6.77
T BOOKS 500x450
DOCK OFFICE (1.2X1.5)
W2
LEVELER RCC SLAB ABOVE AT 3.80M LVL
7.17X3.17
PROVISION
LOBBY
2.0 X 2.5
MEETING ROOM
CANT. FROM PLINTH W2
4.43 X 3.50 W2
750KVA FIRE EXIT DOOR LOADING UNLOADING DOCK
WITH NO CANOPY TRANSFORMER 600 RAT
PROOFING OPENING OUTSIDE 21.71 X 3.60
W2
FIRE EXIT C111
C112
SLIDING DOOR
6 NO. T = 275 CONFERENCE HALL (10 NO.)
500x450
DOCK 7 NO. R = 157 7.13 X 6.0
500x450
B
UP
C110
500X750
D
6.31 X 1.50
RS WITH
VENTILATION
W2
HSD
3.0 X 4.0 DEDUSTING HSD D
T RECEPTION
5.29 X 6.0
ADMIN OFC ENT B
FLOWER BED
W2
ADMIN C108
500x450
C109
750 KV D.G SET
500x450
STAFF TIFFIN
QUARANTINE FIRE WALL
D
D
VCB
W1
PORCH SLAB ABOVE AT LVL 3.80
FFL
3 M WIDE PASSAGE
11KV, VCB DOCUMENT STORAGE
7.14 X 6.5O LVL
W2
LOADING -0.30 C107
500x450
UNLOADING AREA 100
D
DG SYNC
C106
C C
PANEL
500x450
TRANSFORMER & PANTRY ROOM
C105
500X750
PCC PANEL ROOM 23.90 X 20.47 6.29 X 3.50 W1 RAMP UP
11.21 X 20.47 M
UPS - 1
LVL
0.0 M SAMPLING
64CH-NVR
W2 JANITOR ROOM
V
ROOM 3.0 X 2.0
MAIN PCC PANEL
LVL
UPS - 2
UPS - 4
V
SERVER ROOM
64CH-NVR
7.14 X 6.50
Battery Rack - 1
UP
Battery Rack - 2
Battery Rack - 3
PANEL FORK LIFT
L
Battery Rack - 4
HSD D G
W2
HSD D CHARGING STATION V
3.0 X 4.0 1.5 X 2.4 CHANGE
COB
1.2 X 2.4
V
D 3.0 X 4.0 HSD 7.14 X 2.0 200
SUNK
MD
D
MCC PANEL 3.0 X 4.0
C101 E/E DN C104
W2 C103 500x450
500x750 500x450
CUT OUTS FOR
OPENING UP TO D CABLES C102 FIRE EXIT
SOFFIT OF BEAM 500x450
FIRE EXIT FIRE EXIT E/E E/E UP
LVL MOVEMENT LVL 5.50 M WIDE PASSAGE FOR FORKLIFT AND MATERIAL MOVEMENT
OUT
13
12
1
SUNK
HSD
2
W2
HSD D
HSD
H.F.
H.F.
CPT
UP
H.F.
H.F.
CPT
CPT
V
CPT
500x750 TOTAL FLR HT 3.80
HSD 24 NO. T = 300
SW 7 HSD
G W1
WC
WC
WC
300x2230
WC
OPENING UP TO 26 NO. R = 152
300x4000
300x4000
S5
SW 5
D SOFFIT OF BEAM
SW 6
2.44 X 2.00
HEIGHT AVAILABLE GENTS TOILETS
14
25
15
26
EMERGENCY EXIT HEIGHT AVAILABLE HEIGHT AVAILABLE FOR ALL HSD
D
TOILET (9.69x3.87M)
G 7.3 M
E LVL 10.8 M 10.8 M
E
W2
W2
ARTIFICAIAL
W2F
C75
W2F
W2F
3 M WIDE PASSAGE
W2F
RL
10.8 M
CELL PHN
DEPOSIT
SERVICE
UP DUCT
DN
COB
W2 V
100.00
C68 C69 500x750
HAND WASH
C66 C67 500x750 500x750 500x750 500x750 500x750 STATIONS
C65 WTP
W2
2.44 X 1.50 500x750 W2
W2
W2
CHILLED 500x450 TOILET
500x750
D
WATER ANTI
10 KL 11.25 X19.36 L
ROOM-2 GENTS CHANGE ROOM
COB
ANTI ROOM-1
PUMP FOR V.A.M.
(1.87 X 6.09M)
WORKERS
W2
W2
MANUAL 2.87x6.09M
W2F
W2F
DN
PUF PANEL 7.27x6.09M
W2F
W2F
LOADING
D
WORKER'S
PASSAGE
COB COB
FACILITY
500x450 MANAGEMENT
C61
FACILITY
W2
7.5 M WIDE INTERNAL ROAD
2.44 X 8.00 C57 C58 C59 C60 C62 C63 CELL PHN
DEPOSIT
ANTI ROOM-2
(1.87 X 3.27M)
ROOM-2 W2
WATER
300x4000
W2
W2
10 KL 2.87x3.27M
SW4
PUMP FOR V.A.M.
300x4500
COB
F 230 THK RCC 3 M. DEEP PIT HAND WASH STAFF/WORKERS
F
W2
W2
SW 3
DN
300x4000 LADIES TOILET
D
D
1 7
C32
D
C38 W2
W2 W2
D
W2
C50 C51
W2
C52
D (9.74x3.0M)
L W3
WC
C35
WC
ARTIFICAIAL
WC
D C34 D C36 C37 D W3
W2
C46 C47 C48 C49 C53 JANITOR
C29 C30
500x750 C33 W2 W2 600x750 1000x750 C40 C41 C42 C43 C44 C45 1000x750 600x750 1000x750 500x750 LIGHT & VENT ROOM
C31 1000x750 1000x750 600x750 C39 LVL 600x750 600x750 1000x750 1000x750 (2.5X1.65M)
500x450 500x450
CPT
CPT
H.F.
H.F.
1000x750
H.F.
500x750 750x500 600x750 1000x750 1000x750 1000x750 600x750 600x750 PIPE CARRIER TO
3 M WIDE PASSAGE FOR WORKER MOVEMENT
0.0 M REST ON BUILDING C27
D
C20 D
WORKER MOVEMENT 500x450
C14 C15 3 M WIDE PASSAGE FOR 500x450
ENTRANCE
@LVL3.50 & 7.0 SUNKEN D
WORKERS
2.5 X 2.84 T = 300
LIFT SHAFT LVL -0.825 1.80 X 4.00
(7.70X7.04M)
2.5 X 2.84 BLOWER ROOM R = 152.17 D 48 SEATS TIFFIN WASH
G 9.33 X 6.30
2
DN
KITCHEN
2.50x2.81 G
W2
2 TIME OFFICE
RS 2 W1
12
3.70 X 4.0 M
12
12
LIVE LOAD 750 KG/SMT LANDING
TROUGH UMBRELLA
D
D
ACOUSTIC 1 C12
15
D C8 C9 C11 C13
1 C7 EMERGENCY EXIT W1 W1 C10 V2 W3 W3
500x450
C5 C6 500x450
W1 C7A 500x450 500x450 750x450 500x450
1 C4 EMERGENCY EXIT 500x450 750x450
500x450 500x450 500x450
C1 W1 W1 W1 W1 C2 C3A EMERGENCY EXIT C3 W2 W2
S2 S3
M
S1 CORN
ER
N OF
ECTIO
W
6.5 M WIDE INTERNAL ROAD
RL
CONN RRIER
A
PIPE C
RL
ID
E
H
G
H
G
RA
RNAL ROAD
UP
PLATFORM
M
1 PLOT BOUNDARY
DOCK
2.00 M WIDE RL
99.85 C2
IN
C1 W
150 X 400
150 X 400
W1 SECURITY
4.0 X 2.60 W
9
DOCK
2.00 M WIDE METERING ROOM 2 3 4
1
W/V 7.0 X 3.0 W D
600.00
UP
M
10 W
W/V C4
150 X 400
C3
150 X 400
W/V
AR
E
I W D
ENTRANCE GATE
6.0 M WIDE INT
18
PLATFORM
W/V
6 M WIDE MAIN
POINT OF SUPPLY
W/V
G
LOAD ON W/V
FOUNDATION
WTP NK 1
SLOPE
FIRE WATER TA
50 MM
LOAD ON 15 TONN RL
W/V
FOUNDATION E SHED 9.0 X 10.0 E CLEAR) 99.85
FUEL STORAG 6.5 X 9 X 3 (INSID
RL
15 TONN
NO
100.30
9.0 X 10.0 E
RL BOILER HOUSE WATER STORAG
PLATFORM
W/V 100.30
16.23 X 10.0
6.5 X 9.0 X 2.7
.1
IDE CLEAR)
W/V 6.5 X 2.0 X 3 (INS
E
WATER STORAG
6.5 X 2.0 X 2.7
RL RS1
99.95 35.1 KL
W/V
8
RS1
D DOCK
1.50 M WIDE
EST W/V
R TO R T 1.50 M WIDE
DOCK
ARRIE AS
W/V
PIPE C TING PREC
R0
10.12.2018
24.12.2018 HARI
R1 SUDHAKAR FORPER
AS COMMENTS
MOM 18.12.2018 J.RAO RK
J.RAO
RK
IS J
ON EX J
TRANSFORMER
6.5 X 6.5
WITH
O/O FENCING
Chennai, Tamil Nadu, INDIA. Hyderabad, Telengana
1.5 HIGH
750KVA
TRANSFORMER
UP
RL
DOCK
6.31 X
C110 1.50
500X750 RS WITH
AL ROAD
D
VENTILATION
W2
W2
600 RAT
99.30
PROOFING 6 M FABRICATED
ROOF LEAN
AS PER
D.G SET
SECTIONTO
INTERN
FIRE EXIT
OPENING DOOR
OUTSIDE
750 KV
VCB
W2
6 NO. T = 275
11KV, VCB 7 NO. R
= 157 DOCK
WIDE
LEVELER
C105 PROVISION
W2
11.21 ROOM W2
W2 C120
7.5 M
M 500x450 C121
UPS - 1
LOADING Z1
W2 500x450
W2
UNLOADING C115
LVL 21.71 X 500x450 W2 W2
W2
500x450
UPS - 2
LVL SCRAP
PCC ROOM
RCC SLAB 14.88 X 6.77
UNIT HEAD
PCC PANEL
3 M WIDE
DIRECTOR
0.0 M HSD ABOVE 6.16 X 4.50
HR C123
Battery
Rack
-1 3.0 X FIRE EXIT W2 AT 3.80M
LVL
ACCOUNTS 500x450
Battery
4.0 3.0 X
PANEL
Rack 4.50
-2
DEDUSTING W2
DOWN
UP T
(1.2X1.5) BOOKS
Battery
MAIN
W2 Battery
Rack
Rack
-3
-4
ROOM
RAMP
HSD
PASSAGE
RAMP
UP FOR
STACKER
C102
500x450
UNLOADIN
FIRE EXIT
T
DOOR
C111
23.90 X G AREA
FFL RECEPTION
500x450
SLIDING
C76
500x750 C77 LVL 20.47 5.29 X 6.0
ADMIN OFC
ENT
C112
500x450
RL 600 RAT
PROOFING EMERGENCY
500x450 C79 WIDE
PASSAGE
1.2 X 2.4
ADMIN W2
BED
EXIT 200
SUNK
900x750 FIRE
WALL
FOR SAMPLING
FLOWER
V
FORKLIFT
RAMP
DOWN HSD C80 AND ROOM OFFICE
D
100.00
22 NO. 2.44 X 2.00 1000x750 MATERIAL C108
300x2230
T = 300 STAFF
D
W2
DUCT
10.8 M AVAILABLE HEIGHT 1000x750 C85 PORCH
HSD 0.0 M
3.0 M
10.8 M AVAILABLE
W2F
600x750 ABOVE
L ROAD
W2 AT LVL
C86
10 KL
HSD 3.80
WID
TOILET
500x750 HEIGHT HSD C87 3.0 X 4.0 PANTRY
ROOM
L AVAILABLE 1000x750 C88 C106 C107
HSD 6.29
W2F
W2
WIDE
W1
PASSAGE
C56
2.18 M
500x450 RAMP
FOR V.A.M.
C90 UP
HEIGHT 0.0 M
INTERNA
FACILITY
C70 AVAILABLE 600x900
MANAGEMENT 7.3 M
W2
W2F
RO WATER 500x750
CORRIDOR
W2F
C91
PUMP
10KL
2.44 X 8.00 HSD SERVER
ROOM
7.14 X 6.50
JANITOR
3.0 X 2.0
ROOM
HEIGHT 600x900 5.50 M
V
1
7.3 M HSD D
W2F
7 OPENING D
HSD 600x900
IN WALL FOR
FORKLIFT
300x4500
500x750 C94
SW 3
2.45 X
C31 3.0 CUT 500x750 W2 AND
W2F
500x750 AT LVL
3.50
COB
CHANGE L
C73 MOVEMENT
PASSAGE
C32
500x750 C59 500x750 C74 1000x900 G
W2F
15
W2
MD
750x500 W2
500x450
W2
D
500x750 PREPARATION 1000x900 C104
C15 C34 7.88 X 14.30 PUF C98 500x450
PANEL
W2
75
PARAPET MM RCC
D W2 D 230 THK RCC
C63 7.88
RS / RAILING
C36 500x750 X 14.30 OPENING C99
UP
1000x750 PARDI 3 M. DEEP
PIT
SOFFIT OF UP TO
BEAM D
750x450 UP
LIFT
1 C37 FOR PNEUMATIC
FOR ALL
3 M 600x750
CPT
H.F.
ID
WIDE
CPT
H.F.
D
C16 C38
CPT
H.F.
M
PASSAGE
W2
SW 6
H.F.
D
WC
CPT
1000x750 D
WC
W2 W3
W2
500x450 FOR
WC
G
WC
WORKER
DN
C39 W2
PIT - 3M
G
1
2
2
BLOWER W2 MOVEMENT 600x750 DEPTH UP
E
12 M WIDE INTERNAL
W1 W2 (9.69x3.87M)
W2
RL W2 1000x750 SW 2 LIGHT W1
TOTAL FLR
LIVE LOAD C42 300x4000 HT 3.80
26
25
6.5 M
W2
ROAD
15
W2 R = 152
500x450 C43 C75
14
C3A ACOUSTIC W2
C20 600x750 500x450
INTERNAL 500x450 EMERGENCY C19 500x450 LVL S5 METERING
W2
EXIT HAND
COB
100.00
C3 500x450 W2 C44 WASH 7.0 X 3.0 ROOM
DEPOSIT
CELL PHN
ROAD 500x450 W2
W2 0.0 M 600x750 STATIONS
S1 W2
D
AM
C1
W2
C4 FLOOR
LANDING C45 ANTI
ROOM-2
W 150 X
400
W
SECURITY
C2
150 X 400
/ RAILING
600x750 1 2 3
COB
UP
GENTS
500x450 W2 CHANGE
4 W
D
1 C22 3 M 600x750
WORK 12 M WIDE POINT
K
7.27x6.09M
500x450 W2 WIDE W2
600.00
LIFT SHAFT
OF SUPPLY
8
PASSAGE
ROOM-1
(1.87 X 6.09M)
W
IN
C3
2.5 X 2.84
ER'S
150 X
400
W2 FOR C48 D
WORKER
APPRO
C4
150 X
400
ANTI
1000x750
CORRIDOR
COB
ANTI
2 R = 152.17 500x450W2
FACILITY ACH ROAD
SW4
COB
PIPE C49 W2
ROOM-2 C64
GATE
12
BUILDING C50 DN
HAND
WASH
CELL PHN
TOWARDS FACTORY
1000x750 DEPOSIT
(1.87 ROOM-2
D C25 STATIONS
X 3.27M)
C51
COB
WORKER'S
LADIES
500x450 C27 W2
WORKER'S
CHANGE
C5 1
ENTRANCE
STAFF/WORKERS
ROOM
600x750
ANTI
EMERGENCY W2
EXIT C6 500x450 1000x750
D
500x450 C53 C54
FLOOR
W1 LANDING D 500x750 LADIES 700x750 STEPS TO MERGE
S2 TOILET
WC
(9.74x3.0M)
WIDE
WC
PARAPET75 MM RCC
WITH PLATFORM FIRE WATER
G
C28
WIDE
WC
/ RAILING
TANK 2
ARTIFICAIAL
L C55
H.F.
CPT
CPT
@LVL3.50 M
3.37 M
LIFT SHAFT
LTR
WIDE
ROOM
(2.5X1.65M)
W3
INTERNAL W1 CRECHE
4.17 X
SUNKEN
6.30 M
G
D
D
1.82 X 2.85
C29
500x450 W/V 2.00 M WIDE
ROAD
2
12
E/E
OUT D
2.50
BOX
X 3.00
500x450
PLATFORM PATHWAY
. 18
3.70 X 4.0 UP
C7A 1 M DN 1.80 X 4.00
ROAD
500x450500x450
PARKING
HAND WASH
KITCHEN D WORKERS W/V
AT LVL
H
EMERGENCY LOAD ON
3500.05
DINING
CORNER EXIT C9 (7.70X7.04M)
W/V
FOUNDATION
15 TONN
1
SLOPE
500x450 W1
50 MM
48 SEATS
CONNECTION OF LOAD W/V
SLAB ABOVE
0.15 DN ON
FOUNDATION
RL
TIFFIN
PIPE CARRIER
S3
15 TONN
W1 WASH 100.30
BOILER
2.50x2.81 HOUSE RL
C10 16.23 X 10.0
ENTRANCE
WORKERS
9
750x450 100.30
W/V
POINT OF
SUPPLY
INTERNAL
CANOPY
V2
STAFF
W3 10
C11 TROUGH FUEL STORAGE W/V
9.0 X 10.0 SHED
PLATFORM
W/V
750x450
STP
UMBRELLA
CANT
LANDING W/V
W3 PIPE CARRIER TO REST WTP
7998,35
SECURITY
9.0 X 10.0 CABIN
C12 ON EXISTING PRECAST 18
TOWARDS
4.0 TRANSFORMER
X 4.0
500x450 RCC WALLS D FORPER
R0
24.12.2018
10.12.2018
AS
R1
J.RAO
SUDHAKAR
RK
HARI COMMENTS
MOM 18.12.2018 RL
99.95
W/V
C13
500x450 W/V
FIRE WATER
W/V
W/V TANK 1
6.5 X 9 X 3
SS COVER
D (INSIDE TOILET
W/V
WATER STORAGE CLEAR)
TREATED
RS1 RL 4.0 X
SEWAGE
99.85
6.0 M WIDE
1.50
6.5 X 9.0
TANK
X 2.7
59
RS1
6.5 M 157.95 KL
58
1.50 M WIDE
PLATFORM
WIDE DOCK
36
DOCK DOMESTIC
6.5 X 2.0 X TANK
3 (INSIDE CLEAR)
2.0 M.
WATER
1
ROAD BLOWDOWN
CHAMBER
STORAGE
6.5 X 2.0 X
35.1 KL
2.7
2.0 M. Wide
Wide Drive
CONNECTION OF
52
42
29
3.0 M.
6.5 M Wide Drive
8
Way
WIDE
INTERNAL
INTERNAL
Ramp
ROAD
43
28
Up
1
Four Wheeler
PATHWAY
2.0 M.
7 M WIDE
Wide Drive
Parking
Way
3
51
20
19
WELL
L L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16