0% found this document useful (0 votes)
8 views4 pages

Entavilla 400KG Kantor Sby HR Muhammad

The document outlines the construction requirements for the Enta Villa lift, detailing specifications for working conditions, shaft construction, and maintenance. It emphasizes that the lift is for private family use only, with strict guidelines on installation site conditions, power supply, and safety measures. Additionally, it includes technical parameters and design considerations to ensure compliance with safety and operational standards.

Uploaded by

erykiattangguh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views4 pages

Entavilla 400KG Kantor Sby HR Muhammad

The document outlines the construction requirements for the Enta Villa lift, detailing specifications for working conditions, shaft construction, and maintenance. It emphasizes that the lift is for private family use only, with strict guidelines on installation site conditions, power supply, and safety measures. Additionally, it includes technical parameters and design considerations to ensure compliance with safety and operational standards.

Uploaded by

erykiattangguh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Requirements on the Construction of enta villa

1. The Working Conditions of the Lift:


1) Private lift is only for the use of a single family, the installation location should be unable to enter in the public area. A single family is composed of the family members of the elevator owner, whose family members include
spouses, parents, children and other close relatives who live together. If people other than family members need to use it temporarily, the passengers should obtain the consent of the elevator owner and fully understand the
operation of the elevator before using it, but the elevator at any time shall not be used as public elevator.
2) The installation site shall not exceed 2000m in altitude (note: for lifts installed in places over 2000m in altitude, selection of their low-voltage electrical appliances shall be rectified as per the requirements of GB/T20645.);
3) The ambient air temperature in the shaft shall remain within the range of -5℃~55℃;
4) The relative air humidity at the installation site shall not exceed 50% when the maximum temperature reaches 40℃, and higher relative humidity is allowed in lower temperature. The monthly average minimum temperature of
the month with the highest humidity shall not exceed 25℃, and the monthly average maximum relative humidity of this month shall not exceed 90%. Corresponding measures shall be taken in case of possible condensation on
the electrical equipment;
5) The power supply of the lift shall be dedicated and shall be transmitted directly from the power distribution room of the building to the P/Cable Junction Box;
6) Range of the supply voltage of the lift shall not exceed ±7% compared to the rated voltage;
7) The neutral line and the grounded line shall always be separated.
8) Power sockets should be provided near elevators for inspection and maintenance.
9) Landing door front depth direction, at least provide a waiting lift space, the depth shall not be less than car depth, the width shall not be less than the shaft width. Equipment such as button, emergency box outside the shaft
shall not be piled up items.
10) After the elevator is put into use, it should be checked regularly by professionals as required to ensure that it is in good condition.
2. Requirements on the Construction of the Shaft:
1) The lift drive machine and its accessory equipment are set in the shaft overhead with solid walls and ceiling --- only accessible to the authorized personnel (of maintenance, inspection and rescue) and the structural strength shall
meet the load requirements specified in the construction drawings.
2) In sections of the building where the shaft is required to assist in preventing the spread of fire, the shaft shall be totally enclosed by imperforate walls, floor, and ceiling. The only permissible openings are :
a. Openings for landing doors;
b. Openings for access and emergency doors to the well and inspection doors;
c. Vent openings for the escape of gas and smoke in the event of fire;
d. Ventilation openings;
e. Necessary functional openings between the shaft and the machine room or the pulley room.
3) The machine equipment zone shall not be used for other purposes than lifts. It shall not contain other ducts, cable or devices but the ones for lifts. It may, however, contain :
a. Equipment for air-conditioning or heating of this space, excluding steam heating and high-pressure water heating;
b. Fire detectors and extinguishers, with a high operating temperature, applicable to electrical equipment, stable over a period of time, and suitably protected against accidental impact.
4) The stale air pumped from other parts of the building shall not be directly discharged into the shaft, so as to protect the motors, equipment and cables from dust, harmful gases and moisture as much as possible. Except for the
space serving the elevator, the shaft shall not be used for ventilation in other rooms.The maximum permissible load shall be indicated on the machine supporting beams and hooks.
5) The walls, floor and ceiling of the well shall have sufficient mechanical strength, and shall be made of solid and non-flammable material which shall not conduce to the generation of dust.
6) For partial closure shaft, need to take special protective measures, please consult our company.
7) Each guide rail shall be equipped with at least 2 rail brackets, Specific requirements see GAD drawing.
8) The following requirements shall be met while the anchor bolts are used to install the guide rail brackets door system brackets, components in pit:
a. The concrete wall shall be solid, and its compressive strength shall be no less than C30;
b. The thickness of the concrete shall exceed 150mm.
9) The ground of pit should be able to withstand the force of each guide rail and each buffer, Specific requirements see GAD drawing.
10) The horizontal distance between the inner surface of the lift shaft and the sill, door frame of the car or closing edge of car sliding doors shall not exceed 150mm, otherwise protection shall be provided on the shaft wall
concerned or the car door lock shall be provided.
11) The pit bottom shall be smooth and flat. The pit shall not be used as a ponding pit. After the installation is completed, the bottom pit shall not leak or ooze water.
02
12) The shaft shall be preferred not to be set above the space accessible to people. If there is actually a space that people can reach under the car or counterweight, the bottom load design of the pit shall be at least 5,000 N/m², and
counterweight should be equipped with safety tongs. 01

13) The clear height of the landing doors shall not be less than 2m, as a result of the limitation of construction and after agreed with customers, can be appropriately reduce the height, but should not be less than 1.8 m. Product Series: ENTAVILLA_MRL_400KG_CO_S_1100X1100_0.4MPS_4STOPS

14) A slight slope shall be set in front of the landing door sill to prevent water from flowing into the shaft during washing and sprinkling. Project Name.: LIFT KANTOR SURABAYA HR MUHAMMAD Scale
15) The natural or artificial lighting of the landings shall have an illuminance of at least 50lx on the ground. Unit No.: 1 1:25
16) The door opening side of the aluminum alloy frame must be close to the building, and the aluminum alloy frame columns must be rigidly connected with the building at the sill of each floor (except the first floor) and at the top Taman Royal 2 Format Page No.
Jl. Singosari Raya No. 62
end to ensure stability. Cipondoh - Tangerang A3 4/4
3. Other
Name Date Signature Version
1) The elevator should not be close to the bedroom. Restricted by conditions the bedroom close to the lift, effective sound insulation and vibration reduction measures must be taken.
Designed ADIT 16/01/2024
Checked - - 02
Approved - -
Drawing No.:
SHOP DRAWING 01
MAIN PARAMETERS
Shaft width 1750
Elevator Type Passenger Lift
Shaft width 1750 920 830
Product Family Enta Villa
920 830 720
Cable Junction Box
Rated Load ( kg ) 400 (5 persons)

Rated Speed ( m/s ) 0.4


Controller

CWT Location at Side


645

645
Hook 15kN Hook 15kN Hook 15kN Control Style Simplex
Shaft depth 1400

Shaft depth 1400


Floor / Stop / Door 4/4/4

190
Traction machine Door Type Centre Opening - 2 panels

200
755

755
Door Opening ( DW x DH ) ( mm ) 800 x 2100
635
Car Dimension ( CW x CD x CH ) ( mm ) 1100 x 1100 x 2300

Suspension Ratio 2:1

635 Traction Machine Gearless

Power Supply A.C 220V 1ɸ 50Hz

SHAFT TOP BEAM LAYOUT HOOK PLAN Power Supply ( Light ) A.C 220V 1ɸ 50Hz

Power Capacity ( kVA ) 4


1
Light Capacity ( kVA ) [ 2+(OH+TH+PD-1) / 7 ]*LP/700

A B Heat Dissipation ( kJ/h ) 1000

130 790
Load Current ( A ) 8
255 65 Car gauge 1200 65 165 920 830

Car width 1100 790 Force ( kN )


Floor Selector Assy
Traveling Cable and Final Limit Switch
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 Fx Fy

200
15 30 21 10 20 -- -- -- -- 14.05 0 0.56 0.1
95

P4 P4 Note : 1 The result of formula Force when safety gear operation


should be rounded up to integer.
50

645

645
P1 The units of OH, TH and PD are
550

refuge space P10


W800xD600xH500 meter, and the unit of LP is watt.
CWT gauge 750

Car depth 1100

COP P2 P3 P5 Fx
Shaft depth 1400

Shaft depth 1400

1035
Fx

179
635 629
190

Fy

85 85
550
200

P1
Door 50 Car Door 50 Car
755

755
50

center center P4 center center P4


Anchor bolt on
470 concrete ground 02
90
30

01
85

60
Anchor bolt on
concrete ground Product Series: ENTAVILLA_MRL_400KG_CO_S_1100X1100_0.4MPS_4STOPS
200

Project Name.: LIFT KANTOR SURABAYA HR MUHAMMAD Scale


Door width 800 1260
Unit No.: 1 1:25
415 Door rough 910 425 200 Shaft width 1750 200
Taman Royal 2 Format Page No.
870 880 Jl. Singosari Raya No. 62
Cipondoh - Tangerang A3 4/4
Shaft width 1750

Name Date Signature Version


A B Designed ADIT 16/01/2024
Checked - - 02
SHAFT PLAN PIT PLAN Approved - -
Drawing No.:
SHOP DRAWING 02
F F

≥ 400

≥ 400

≥ 400
UNP 150 (by customer) UNP 150 (by customer)

Hole for
200 Emergency box 200
Hole Ø80 Hole Ø80

Door rough height 2210

Door rough height 2210


for LIP/LOP for LIP/LOP

200

Door height 2100

Door height 2100


2210

2210
300
1225

1225
1125
Door 50 Car Car 50 Door
center center center center

FFL FFL FFL FFL

150 150 150 150


Door rough 910 Door rough 910
X Y
415 425 425 415

870 880 880 870 SECTION F-F SECTION F-F


200 Shaft width 1750 200 200 Shaft width 1750 200 ( 1st Floor ) ( 2nd~3rd Floors )
F F
ENTRANCE SECTION ENTRANCE SECTION
( 1st~3rd Floors ) ( 4th Floor ) Finishing Floor Level Finishing Floor Level
Construction Floor Level
FFL FFL Construction Floor Level

30

60
60
85

Emergency box
LIP/LOP LIP/LOP DETAIL - X
DETAIL - Y
Door height 2100

Door height 2100


02
01
Product Series: ENTAVILLA_MRL_400KG_CO_S_1100X1100_0.4MPS_4STOPS
Project Name.: LIFT KANTOR SURABAYA HR MUHAMMAD Scale
Unit No.: 1 1:25
Taman Royal 2 Format Page No.
Jl. Singosari Raya No. 62
Cipondoh - Tangerang A3 4/4
FFL FFL
Name Date Signature Version
470 Door width 800 480 480 Door width 800 470
Designed ADIT 16/01/2024
870 880 880 870
Checked - - 02
Shaft width 1750 Shaft width 1750
Approved - -
ENTRANCE VIEW ENTRANCE VIEW Drawing No.:
( 1st~2nd Floors ) ( 4th Floor ) SHOP DRAWING 01
Exisiting 1900 Exisiting 1900

Exhaust Fan

150
HBEAM 100 HBEAM 100

(245)

(245)
(450)

(450)
(650)

(650)

(650)

(650)
Intermediate beam
UNP 150 (by customer) UNP 150

Existing 3310
1200

1200
1200

1200
Overhead 3000

Overhead 3000
3310

Intermediate beam
2415

2415
UNP 150 (by customer) UNP 150

1360

1360

1360

1360
4th Fl. 4th Fl.

4872

4872

4872

4872
FFL FFL

HBEAM 100 Intermediate beam HBEAM 100


(by customer)

2500

2500

2500

2500
3510

3510
Intermediate beam
UNP 150 (by customer) UNP 150

3rd Fl. 3rd Fl.


FFL FFL

HBEAM 100 HBEAM 100


2500

2500

2500

2500
5000

5000

5000

5000
Travel height 10590

Travel height 10590


Intermediate beam
UNP 150 UNP 150
3460

3460
(by customer)
2500

2500

2500

2500

2nd Fl. 2nd Fl.


FFL FFL

HBEAM 100 HBEAM 100

UNP 150 Intermediate beam UNP 150


(by customer)
3620

3620
2500

2500

2500

2500
3388

3388

3388

3388

UNP 150 Intermediate beam UNP 150


(by customer)
1st Fl. 1st Fl.
500

500

500

500
Pit depth 60

Pit depth 60

FFL FFL
10

10

10
5

5
(5) Other Guide Rail

(5) Other Guide Rail


(5) Car Guide Rails on Governor Side

(5) Car Guide Rails on Governor Side


(500) Car Guide Rail (beside T/M) Brackets

(500) Car Guide Rail (beside T/M) Brackets


(500) Car Guide Rail (beside governor) Brackets and CWT Guide Rail Brackets

(500) Car Guide Rail (beside governor) Brackets and CWT Guide Rail Brackets

Shaft depth 1400 Shaft depth 1400

SECTION A-A SECTION B-B

02
01
Product Series: ENTAVILLA_MRL_400KG_CO_S_1100X1100_0.4MPS_4STOPS
Project Name.: LIFT KANTOR SURABAYA HR MUHAMMAD Scale
Unit No.: 1 1:50
Taman Royal 2 Format Page No.
Jl. Singosari Raya No. 62
Cipondoh - Tangerang A3 4/4
Name Date Signature Version
Designed ADIT 16/01/2024
Checked - - 02
Approved - -
Drawing No.:
SHOP DRAWING 04

You might also like