The document outlines the application methods and specifications for various waterproofing deck coatings, including EAMIPRIME EP1504, EAMIFLOOR T5000, and EAMIFLOOR EPF211. It details the preparation, mixing, application, and safety guidelines for these products, emphasizing their chemical resistance, durability, and suitability for different environments. Additionally, it provides technical properties, limitations, and warranty information for the products.

Uploaded by

Daniel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views38 pages

Parking Facilities - Flexible Deck Coatings - Twintec - Submittal

The document outlines the application methods and specifications for various waterproofing deck coatings, including EAMIPRIME EP1504, EAMIFLOOR T5000, and EAMIFLOOR EPF211. It details the preparation, mixing, application, and safety guidelines for these products, emphasizing their chemical resistance, durability, and suitability for different environments. Additionally, it provides technical properties, limitations, and warranty information for the products.

Uploaded by

Daniel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 38

PARKING FACILITIES

FLEXIBLE WATERPROOFING DECK COATINGS

www.eamic.co
METHODS OF APPLICATION
PAMPS AND TURNING POINTS
* 5 cm Twentic Concrete

1 Prime coat of EAMIPRIME EP1504

2 Screed Coat of EAMIFLOOR T5000 5


4

3 Base Coat of EAMIFLOOR EPF 211


3 2

4 Top Coat of EAMIFLOOR EPF 211


1

5 PU coat of EAMIFLOOR PU ALS


(For Exposed Areas Only)

PARKING SLOTS AND PEDESTRIAN


AREAS
* 5 cm Twentic Concrete

1 Prime coat of EAMIPRIME EP1504

2 Base Coat of EAMIFLOOR EPF 211

3 Top Coat of EAMIFLOOR EPF 211

www.eamic.co
EAMIPRIME EP1504
Pigmented, Epoxy Resin - Based Primer Sealer

Product Description ▪ To bond epoxy flooring to concrete, steel and


masonry products.
EAMIPRIME EP1504 is a two components, solvent- ▪ Sealing concrete substrates providing more
free (100 % solid), moisture &vapor barrier, tolerant, protection against the chemical reagents, water
low VOC, odorless, low viscosity pigmented epoxy and water-soluble salts.
resin-based primer and sealer.
It is specially formulated to prime & seal concrete and
masonry substrates for high performance applications. Product Features
It is used as a part of flooring systems with high
adhesion to porous concrete surfaces. It provides a ▪ Easy to apply by suitable brush or roller.
very good resistance to aqueous, alkaline and saline ▪ Low VOC, odorless and non - toxic.
solutions. ▪ Pigmented (Assure correct coverage).
▪ Excellent rapid cure even at low temperature.
Primary Applications ▪ Excellent curing under humid conditions.
▪ Superior adhesion to dry surfaces with
excellent tensile & flexural strengths.
EAMIPRIME EP1504 is used for:
▪ Low viscosity and excellent penetration power.
▪ Moisture and water vapor barrier primer on ▪ Very good anticorrosion properties.
substrate concrete or cement based screeds ▪ Excellent resistance to water, waste water and
where EAMIC TRETOL Flooring Systems will salt water.
be applied.
▪ Moisture and water vapor barrier primer
beneath sports surfaces such as running
Standards
tracks, artificial turf …. etc.
▪ Moisture and water vapor barrier primer EAMIPRIME EP1504 complies with the requirements
beneath conventional, classic floor finishes of:
such as PVC, linoleum, carpet, parquet, • ASTM C- 881Type I, Grade 1, Class B & C.
tiles ….. etc. • EN 1504, Part 2: “Products and Systems for the
▪ Promote adhesion between substrates and Protection and Repair of Concrete Structures -
epoxy resin based floor coating, epoxy resin Definitions, Requirements, Quality Control and
self leveling floor toppings and epoxy resin Evaluation of Conformity - Part 2: Surface
floor screed. Protection Systems for Concrete, Principle 1
▪ Protects the substrates against the negative and 2”.
effect of osmosis, bubbles with exposure to • DIN EN 7783.
moisture from the soil.

Technical Properties
Appearance Pigmented Brush-able Viscous liquid (mixed materials)
Specific Gravity 1.45+0.5 @ 25 C
Solid Content 100 % by weight
Application temperature 5 - 35 C.
Over coating Time, Within10 hours@ 25 ºC
Pot-life 30-60 minutes. @ 30 C
Full cure 7 days@ 25 C
Compressive strength, (ASTM D 579) 70+10 N/mm2
Abrasion resistance, (ASTM D 4060) 100 mg
Water Absorption, (ASTM D- 597) 0.05 %
Vapor transmission rate 0.3 gm / m2 / 24 hours
Bond Strength to concrete >3 N /mm2.
Coverage (0.25 - 0.40) kg/m2 depending on the conditions of the
substrate and ambient temperature.

www. eamic.co
EAMIPRIME EP1504

Cleaning
Guide for Applications
Surface Preparation Clean tools, equipment after work immediately with
EAMIC SOLVENT .
All surfaces should be sound, clean free from dust,
grease, oils, curing agents & mould releasing agents Packaging
or other materials that may affect the bond of the
product and the substrates. EAMIPRIME EP 1504 is supplied in 5-kg Pack size.
Steel or metal surfaces should be free from rust,
scale or other contaminants.
Storage
Mixing EAMIPRIME EP1504 should be stored in normal
conditions away from any extreme temperatures,
Pour Component A into the Component B and mix
well for 2 -5 minutes until uniform consistency & color
is achieved.
Shelf-life
One year when stored properly in its original sealed
Application package.
Apply the mixed materials of EAMIPRIME EP1504
onto prepared substrates using suitable brush, roller
Health & Safety
or airless spray.
Apply the floor coating, self-level floor toppings and ▪ EAMIPRIME EP1504 is non-toxic, non-
floor screed while the film is still tacky. If it is dried, hazardous during handling, storage and use.
it should be primed again. ▪ For Ecology: Do not dispose directly to water or
soil. Mix with plenty amount of sand before this
to comply with the local regulations.
▪ Splashes on skin should be washed with water
and soap.

Warranty
We warrant our products to be of good quality &
manufactured to rigid standards. This Warranty is in lieu of
any & all other warranties expressed or implied.
This data sheet is published for information only. It is
believed to be correct but no liability is accepted for it or
the suitability of the product for any particular purpose.
EAMIC TRETOL services are free & the company does not
accept liability for any loss arising from it. Max liability is
limited to substituting the same quality of material.

Leaders in Construction Chemical Technology


Edition 01.2019

Cairo : 2 Hadaek El Obour, Salah Salem St. Nasr City, Cairo, Egypt Tel: (202) 22636220/24011024/22619414 Fax:(202) 22639002
Alex : 37 Ismail Serri Street Smouha, Alexandria Tel: (203) 4255066 Fax:(203) 4255066
www.eamic.co
EAMIFLOOR T 5000
Chemical & Abrasion Resistant Heavy Duty Epoxy Resin Mortar

Product Description ▪ Cold rooms and stores.


▪ Dairies and kitchens.
EAMIFLOOR T 5000 is three component, solvent- ▪ Detergent manufacturing areas.
free, floor screeds based on epoxy resins. ▪ Canteens and bottling rooms.
It is formulated to be applied by trowel to concrete
substrate in a thickness up to 5mm. It provides a
durable, non-skid, chemical & abrasion resistance
Product Features
coat with high mechanical strength.
EAMIFLOOR T 5000 is capable of withstanding the ▪ Solvent- free.
heaviest loading and wear. It is supplied in colored ▪ Odorless epoxy.
pre-weighted pack, Resin component (A) , Curing ▪ Chemical resistant.
Agent Component (B) and Aggregate Component ▪ Durable.
(C). ▪ Non shrinkage.
▪ High mechanical strength.
Typical Applications
▪ Easy to mix and to apply.
EAMIFLOOR T 5000 is used to provide a high ▪ Impact and abrasion resistance.
strength, durable, chemical, impact and abrasion ▪ Non-skid finishes.
resistance thin section floor screed in the following
locations: Standards
▪ Abattoirs and warehouses.
▪ Storerooms and battery rooms. EAMIFLOOR T 5000 is formulated to comply with all the
▪ Breweries and chemical processing areas. requirements of both EN 13813: "Screed Materials and
▪ Photographic darkrooms. Floor Screed – Properties and Requirements” and EN
▪ Loading bays and ramps. 1504 Part 2: "Products and Systems for the Protection and
▪ Food processing areas. Repair of Concrete Structures” – “Definition,
▪ Soft drink factories. Requirements, Quality Control and Evaluation of
▪ Oil refineries. Conformity” - Part 2: “Surface Protection Systems of
Concrete.”

Technical Properties
Colors Pigmented mortar
Pot Life 50 minutes @ 20oC and 40 minutes @30oC.
Initial Hardness 16 hours @ 20oC
Final Cure 7 days @ 20oC
Specific Gravity 2.10 ± 0.05 (mixed material)
Working Temperature Between 5oC and 35 ºC
Mechanical Properties Typical results are as shown:
Compressive Strength 71 N/mm2 (ASTM C-579)
Flexural Strength 17 N/mm2 (ASTM C-293)
Tensile Strength 9 N/mm2 (ASTM D-638)
Bond Strength to concrete 3 N/mm2 (ASTM C-882)
Abrasion Resistance EAMIFLOOR T 5000 improves the abrasion resistance of concrete.
Water Absorption 0.1 % (ASTM D-570)
Chemical Resistance It can resist the following chemicals @ 35 ºC
Sulphuric Acid, 50 % Excellent Hydrochloric Acid 50 % Excellent
Phosphoric Acid, 50 % Excellent Citric Acid, 10 5 Excellent
Xylene, acetone, diesel, oil, white spirit, Skydrol, bleach Resistant

www. eamic.co
EAMIFLOOR T 5000
Guide for Application Cleaning
Surface Preparation
All surfaces shall be sound, clean, dry and free Clean all tools and equipment immediately after use with
from oil, grease & loosely adhering particles. The EAMIC SOLVENT No. 2.
age of the new concrete should be 21 days at least,
with moisture content less than 4%. Coverage

Priming Depends on usage rate, approximately 3.2 m2 / 33 kg


pack at 5 mm thickness.
All surfaces to be covered with EAMIFLOOR
T 5000 should be primed EAMIPRIME EP 3 epoxy
resin primer (Review its separate data sheet). Mix
Over Coating
the primer components (A and B) well and apply
the primer using stiff brush or roller in a thin If severe chemical spillage is encountered and doubts
continuous film to the clean & dry-prepared surface. exist regarding the non-porosity of the flooring, a sealer
Avoid over application and paddling. coat should be applied over the cured floor. For the
Apply EAMIFLOOR T 5000 while the primer coat is suitable over coating, consult EAMIC Technical Support
still tacky. for more data.

Mixing Packaging

EAMIFLOOR T 5000 should be mixed using EAMIFLOOR T 5000 is supplied in pre-weighted 33 kg


mechanical mixer. containing the three components (A, B and C).
Do not attempt to split the pack. Mix components
(A + B) together first. Place component C into the Storage
mixed resin components (A+B) slowly until a
thorough mixing is completed (till uniform color is EAMIFLOOR T 5000 should be kept in a dry place away
achieved). from direct sunlight and extreme temperatures.
Use the mixed materials within the specified pot life.
Shelf Life
Application
One year when unopened and stored properly in its
The mixed material is laid (in a thickness of 5mm) in sealed original container.
one application while the primer is still tacky.
The mixed material is raked to the required thickness
and tamped with a wooden float, or leveled with a Health and Safety
spreading bar, to ensure full compacting. Final finish
trowel by steel float to achieve the recommended ▪ Epoxy Resins contain irritants, especially to the
finish. skin and the eyes.
▪ Persons handling these materials shall use
appropriate protective clothing, including rubber
Warranty
or plastic gloves.
We warrant our products to be of good quality & ▪ If the epoxy resin should contact the skin, it shall
manufactured to rigid standards. This Warranty is in lieu be removed immediately with a dry cloth or paper
of any & all other warranties expressed or implied. towel, and the areas of contact should be washed
This data sheet is published for information only. It is thoroughly with soap and water.
believed to be correct but no liability is accepted for it or
the suitability of the product for any particular purpose.
EAMIC TRETOL services are free & the company does
not accept liability for any loss arising from it. Max liability
is limited to substituting the same quality of material.

Leaders in Construction Chemical Technology


Edition 01.2019

Cairo : 2 Hadaek El Obour, Salah Salem St. Nasr City, Cairo, Egypt Tel : (202) 22636220/24011024/22619414 Fax : ( 202 ) 22639002
Alex : 37 Ismail Serri Street Smouha, Alexandria Tel : (203) 4255066 Fax : ( 203) 4255066
www.eamic.co
EAMIFLOOR EPF211
Flexible Epoxy, Resin-based Protective Coating
Product Description Limitations
EAMIFLOOR EPF 211 is a flexible epoxy coating used for ▪ Do not apply in ambient temperatures less than 5°C or
coating concrete & metal surfaces where high chemical , greater than 40°C. (Material cures slower at cooler
impact & abrasion resistance are a concern. Its unique temperatures and working time will be substantially
formulation incorporating special polymer into the back- bone reduced at higher temperatures.) Both components
of the epoxy chain prevents "age hardening" which occurs should be stored in a dry condition.
with conventional epoxy coatings. ▪ Do not apply to slabs on grade unless a heavy un-
EAMIFLOOR EPF 211 cures to form a tough, chemical ruptured vapor barrier has been installed under the slab.
resistant film, which typically exceed the performance life of ▪ Do not thin with solvents.
self-leveling epoxy coatings. ▪ Confirm product performance in specific chemical
environment prior to use.
Typical Applications ▪ Substrate temperature must be at least 5°C above the
dew point.
▪ Excellent coating for concrete surfaces such as drum
storage, vehicle service bays, truck unloading areas
and parking decks.
Guide for Application
▪ Chemical processing plants and manufacturing Priming
facilities.
▪ Water treatment facilities and food service plants. Use EAMIPRIME EP3 @ 50 - 75 microns. (Review separate data
▪ Ideal for coating warehouse floors, aisles and sheet).
mechanical rooms.
▪ Effective in applications where normal epoxies chip Epoxy coat
due to dropped items.
▪ Formulated to provide maximum chemical resistance ▪ Floors should be sloped to drain to prevent standing
to dilute acids, caustics and petroleum solvents. water or chemicals.
▪ Always use protective clothing, gloves and goggles
Product Features consistent with OSHA regulations during use.
▪ Avoid eye and skin contact.
▪ Do not ingest or inhale.
▪ Maintains toughness over long term. ▪ Refer to (Material Safety Data Sheet) for detailed safety
▪ Excellent resistance to chipping. precautions.
▪ Excellent penetration and bond strength.
▪ Outstanding chemical protection.
▪ Low odor, 100% solids epoxy. Surface Preparation
▪ Increased thermal shock resistance. Concrete
▪ High abrasion resistant. Apply only to clean, dry and sound concrete substrates that are
free of all coatings, sealers, curing compounds, oils, greases or
any other contaminants. New concrete should be cured to a
Standards minimum of 28 days. Concrete that has been contaminated with
chemicals or other foreign matter must be neutralized or
EAMIFLOOR EPF 211 is formulated to comply with all removed. Remove any laitance or weak surface layers. Surface
the requirements of both EN 13813: "Screed Materials profile shall be CSP-3 to CSP-5 meeting ICRI (International
and Floor Screed – Properties and Requirements” and Concrete Repair Institute) standard guideline #03732 for coating
EN 1504 Part 2: "Products and Systems for the concrete, sandpaper or coarser. Prepare surface by mechanical
Protection and Repair of Concrete Structures” – means to achieve this desired profile. Moisture vapor
transmission should be 1.3 kg or less per 100 square meter for
“Definition, Requirements, Quality Control and Evaluation
over a 24 hour time period, as confirmed through a calcium
of Conformity” - Part 2: “Surface Protection Systems of chloride test or other quantitative testing methods.
Concrete.”

Technical Properties
Appearance Pigmented liquid of medium viscosity.
Specific Gravity@ 25ºC 1.4  0.095
Compressive Strength 75 N/ mm2
Tensile Strength 10 N/ mm2
Tensile Elongation 100 %
Crack Bridging 1 mm
Flexural Strength 15 N/ mm2,
Hardness, Shore D 75 - 80
Bond Strength >3 N/ mm2
Abrasion Resistance 0.07 gm
Water Absorption 0.10 %.
Low Temperature Flexibility 360°¼” Mandrel @ -15°F, 10 mil Thick. Passed
Pot Life @ 25ºC 60 minutes
Foot Traffic @ 25°C 72 hours
www. eamic.co
EAMIFLOOR EPF 211
All surface irregularities, cracks, expansion joints and control ▪ When applied as a non-skid coating, broadcast clean,
joints should be properly addressed prior to application. Out dry (20/40) mesh sand or aluminum oxide aggregate
gassing may occur due to the porosity of some concrete into wet resin. Allow to dry.
surfaces. To reduce the effect of out gassing, the primer and Brush off excess grit before applying second coat. A full
coating should be applied when the temperature of the broadcast to refusal will produce the most consistent
concrete substrate is dropping. and durable system. Do not broadcast aggregate into
This usually occurs in the evening; however, the concrete the prime coat.
substrate temperature should measure with a surface ▪ For best results, clean tools and equipment with EAMIC
thermometer for verification. Double priming will greatly Cleaner, a non-flammable and non-evaporating
reduce the effects of out gassing by additionally filling the cleaner. Always wear gloves when using this product.
pores in the concrete.
Packaging
Steel 5 kg kit packs in two components: Component A: Resin and
For splash and spillage exposure, a "Near White", SP-10-63 Component B: Curing Agent.
or NACE No. 2 is required.
Coverage
Installation Procedures
Coverage is approximately: 3.3 m2/kg depending on the
substrate profile.
▪ Prime surface with EAMIPRIME EP3 (Review data
sheet for application details).
▪ Component A: Resin should be premixed prior to Cleaning
using due to possible pigment settling that may Clean all tools and equipment immediately after use with
occur during transportation and storage. EAMISOLVENT No. 2.
▪ Pour Component B: Hardener into the Component
A, Resin pail and mix well with a mechanical jiffy-
type mixer operated at low speed. Scrape the side Storage
of the pail to insure the entire product has been
properly mixed; any unmixed material left on the EAMIFLOOR EPF211 should be stored at room temperature in
side of the pail will not cure. dry warehouse away from any extreme temperatures.
Do not turn the pail upside down and allow
draining onto substrate. Shelf Life
▪ Apply by squeegee and back-roll or roller to
surface. Empty contents of pail onto surface as One year if stored properly in its original sealed container.
soon as possible. Material left in the pail will
generate heat and have a reduced pot life. After
Health and Safety
the first coat has become tack free, apply an ▪ Epoxy Resins contain irritants, especially to the skin
additional coat of resin hardener mixture according and the eyes.
to the step above. ▪ Persons handling these materials shall use appropriate
protective clothing, including rubber or plastic gloves.
▪ If the epoxy resin should contact the skin, it shall be
removed immediately with a dry cloth or paper towel,
and the areas of contact washed thoroughly with soap
and water.
Warranty
We warrant our products to be of good quality &
manufactured to rigid standards. This Warranty is in lieu of
any & all other warranties expressed or implied.
This data sheet is published for information only. It is
believed to be correct but no liability is accepted for it or the
suitability of the product for any particular purpose.
EAMIC TRETOL services are free & the company does not
accept liability for any loss arising from it. Max liability is
limited to substituting the same quality of material.

Leaders in Construction Chemical Technology


Edition 01.2019

Cairo : 2 Hadaek El Obour, Salah Salem St. Nasr City, Cairo, Egypt Tel : (202) 22636220/24011024/22619414 Fax : ( 202 ) 22639002
Alex : 37 Ismail Serri Street Smouha, Alexandria Tel : (203) 4255066 Fax : ( 203) 4255066
www.eamic.co
EAMIFLOOR PU ALS
Polyurethane Trafficable Bearing UV-Resistant Coating

Product Description Guide for Application


EAMIFLOOR PU ALS is a two component hard wearing Application
pigmented aliphatic polyurethane coating that is Deck Coating System:
recommended for use as a deck trafficable floor coating
on concrete & over epoxy flooring. EAMIFLOOR PU ALS is recommended for use as a Traffic
EAMIFLOOR PU ALS provides a tough anti skid, durable Deck coating when applied on concrete and Epoxy coating.
hard wearing high chemical & abrasion resistance floor
coating with aesthetically appealing colorful look. Surface Preparation:
Concrete: Apply only to clean, dry and sound concrete
Typical Applications substrates that are free of all coatings, sealers, curing
compounds, oils, greases or any other contaminants.
EAMIFLOOR PU ALS is design for use in following
▪ New concrete should be cured to a minimum of
applications:
28 days.
▪ Pedestrian walk ways.
▪ Concrete that has been contaminated with chemicals
▪ Roof decks.
or other foreign matter must be neutralized or
▪ Stadium floors.
removed.
▪ Industrial areas.
▪ Remove any laitance or weak surface layers.
▪ Warehouse & storage.
▪ Concrete should have a minimum surface tensile
▪ Balconies .
strength of at least 300 PSI per ASTM D-4541
▪ External UV top coat on concrete & epoxy.
▪ Surface profile shall be CSP-3 to CSP-5 meeting
▪ Mechanical rooms.
ICRI (International Concrete Repair Institute )
▪ Athletic surfaces.
standard guideline #03732 for coating concrete ,
producing a profile equal to 60-grit sandpaper or
Product Features coarser. Prepare surface by mechanical means to
▪ Excellent impact & abrasion resistance. achieve this desired profile .
▪ UV & weather resistance. ▪ Moisture vapor transmission should be 3 pounds or
▪ Good chemical & oil resistance. less per 1, 000 square feet over a 24 hour time
▪ Reduce surface porosity. period, as confirmed through a calcium chloride test,
▪ Non-skid. as per ASTM E-1907. Quantitative relative humidity
▪ Excellent flexibility & durability . (RH) testing, ASTM F- 2170 should confirm concrete
▪ Non yellowing . RH results <75%.
▪ Provides excellent adhesion to common ▪ All surface irregularities, cracks, expansion joints and
substrates. control joints should be properly addressed prior to
Standard Colors application.

White, Light Grey, Silver Grey and Dark Grey. For large
quantities any color can be available under request.

Technical Properties
Appearance Coloured liquid
Specific Gravity@ 25ºC (ASTM D1475-2013) 1.44 ± 0.05
Solid Content 91.4%
Pot Life @ 20ºC 30 ± 10 minutes
Touch Dry 1 Hours depend on temperature
Recoat time @ 25ºC 6-12 Hours
Light Traffic @ 25ºC 72 Hours
Full Cure @ 25ºC 7 days
Elongation at break (ASTM D412-2016) 75%
Adhesion (ASTM D3359-2017) 5B (Cross-Cut test)
Pull off Test (ASTM D4541-2017) <3.4 (MPa)
Abrasion Resistance (ASTM D4060-2019) 30 mg ≤ 50 mg pass1000 cycle
(using a wheel no.CS-10 measure weight loss)
Impact Resistance (ASTM D2794-2019) Pass at 60 cm height
Bending Resistance (ASTM D522-2017) Pass ( dry film thickness 100 , on a mandrel with 3mm diameter )
Hardness ( Shore A) (ASTM D2240) 85-95
Chemical Resistance
Distilled water resistance at room temperature (ASTM D870-2015) Pass
Alkali resistance (5 wt% NaOH solution ) at room temperature (ASTM D1308-2013) Pass
Soap solution (5 wt%) at room temperature (ASTM D1308-2013) Pass
Mineral Oil Resistance (2 hrs) at room temperature (ES 981-2008) Pass ( occasional spillage)
Gasoline Resistance (2 hrs) at room temperature (ES 981-2008) Pass ( occasional spillage)
Ethyl alcohol resistance using solvent rubs ( 50 rubs) (ASTM D5402-2019) Pass ( occasional spillage)

www. eamic.co
EAMIFLOOR PU ALS
Primer
Cleaning
For porous concrete surface use EAMIPRIME EP3 @
50-75 microns. All tools and equipment shall be cleaned with water after work
For metal surfaces use EAMIPRIME EPZR @ 75-100 immediately and before curing.
microns

Coating
Packaging
EAMIFLOOR PU ALS is supplied in 5 kg / packs
Apply EAMIFLOOR PU ALS with medium nap roller or
brush. When used as a paint coating on concrete
intended for use as a wearing surface, it is recommended
Storage
that an aggregate (Approx.30-40 mesh) be incorporated
in to the coating to increase wear and abrasion EAMIFLOOR PU ALS shall be stored in dry warehouse away
resistance. from any source of moisture..
A successful application may be dependent on proper
aggregate size and loading. In all applications a test Shelf Life
patch must be placed and the finish approved by the
owner prior to begin the job. 12 months if stored properly as recommended.

Limitation Health and Safety


▪ Do not apply to damp or contaminated surfaces .
▪ Use with adequate ventilation. ▪ EAMIFLOOR PU ALS is non – flammable, but it
▪ Application temperature between 50C -400C. contains cement, Protective gloves and goggles shall
▪ Vapor barrier should be installed on slab on be used during mixing and applications.
grade . ▪ Any splashes on skin should be washed with water.
▪ Partial mixing is not allowed. ▪ Seek medical assistance in case of contact with eyes,
▪ Substrate temperature should be more than 50C after washing it with running water.
& humidity less than 4% . ▪ For any details, please refer to the product MSDS.

Coverage
Coverage for use as a concrete paint/sealers dependent
on surface porosity of concrete , number of coats used
and aggregate texture chosen and may range from 1 .65
to 2.50 m2 per kg.
Coverage over epoxy will range from 2.50-4 m2 per kg
depending on recommended thickness

Warranty
We warrant our products to be of good quality &
manufactured to rigid standards. This Warranty is in lieu of
any & all other warranties expressed or implied.
This data sheet is published for information only. It is
believed to be correct but no liability is accepted for it or the
suitability of the product for any particular purpose.
EAMIC TRETOL services are free & the company does not
accept liability for any loss arising from it. Max liability is
limited to substituting the same quality of material .

Leaders in Construction Chemical Technology


Edition 01.2019

Cairo : 2 Hadaek El Obour, Salah Salem St. Nasr City – Cairo Egypt Tel: (202) 22636220/24011024/22619414 Fax: (202) 22639002
Alex : 37 Ismail Serri Street Smouha- Alexandria Tel: (203) 4255066 Fax: (203) 4255066
www.eamic.co
1 8-Sep-22 AA YH ISSUED FOR APPROVAL YH

Rev Date Author Checked Description of revision Approved

Egyptian Army Stadium


International City for Olympic Games in the New Administrative Capital City

BOP Contractor: Subcontractor:

Type of Document:
Material Submittal
1+ 25 A4
Contractor Code NCNAS O C M A G E N _ G E N G N 8 1 4 0 0 1 Sheets :
Pages
Number: Project Originator Doc. Type AX Level Dwg No. Rev. Scale :
Document Title:
Alternative Polyurethane, waterproofing and protective
traffic-deck coating system

Subcontractor Reference:
Reference Specification(s): COSMOS Code No.:
For Contractor:

Name: Signature: Date: 08 Sep 2022


ENGINEER ACTION:
Egyptian Army Stadium
ALTERNATIVE POLYURETHANE, WATERPROOFING AND Sept, 08, 2022
PROTECTIVE
REVISION: 1
TRAFFIC-DECK COATING SYSTEM
MATERIAL SUBMITTAL Page 1 of 2
NCNAS-OC-MA-GEN-GEN-GN-8140

TABLE OF CONTENTS

1 INTRODUCTION

2 MATERIALS

3 ENCLOSURES
Egyptian Army Stadium
ALTERNATIVE POLYURETHANE, WATERPROOFING AND Sept, 08, 2022
PROTECTIVE
REVISION: 1
TRAFFIC-DECK COATING SYSTEM
MATERIAL SUBMITTAL Page 2 of 2
NCNAS-OC-MA-GEN-GEN-GN-8140

1 INTRODUCTION

This submittal introduces the technical specification and performance requirements for the
Alternative Polyurethane, waterproofing and protective traffic-deck coating system
that will be used wherever required in The Project's Specifications and Drawings.

2 MATERIALS

The proposed coating system will be supplied and install by Eamic and Manufacture as
below and as per the attached data sheets.

3 ENCLOSURES

• Methods of application and Systems Layers.

• Technical Data Sheets

• Testing reports for polyurethane Coat.

• Job reference for Epoxy based flooring.

• Job reference for Polyurethane flooring.


EAMIC JOB REFERENCE
Epoxy Based Flooring
Job Reference
Project Location Consultant / Owner Contractor

Central Station New Alamein Khatib w Alami ASA GIECO

Triple Treatment Sewage Station New Capital Hassan Allam / AAW

Old City New Alamein ECG Orascom

Olympic City ECG Concord

25 January Village Ismailia El Dawlia For Contructing and Supplies

Abu Rawash Waste Water Desalination Plant Abu Rawash - Giza Dr. Ahmed Abd El Wareth Orasqualia

Abu Zabaal Fertilizers Factory Kaliobia Abu Zabaal Fertilizers Master Guard

Abu Zabaal Fertilizers Factory Abu Zabaal Abu Zabaal Fertilizers Delta

Agility 8 - Twintic

Agility Repairs 7 - Twintec

Air Mall (Cairo Airport Mall) Cairo Moharram Bakhoum (ACE) Ginza

Al Alamya Factory 10 th of Ramadan City Al Alamya Factory Payenger International Co.

Al Amir Group Factory Obour City - Cairo Al Amir Group Twintec

Al Azhar General Library Cairo EHAF SIAC

Al Briegat Air Base Sadat City Air Force Archirodon

Al Burullus CCPP - Orascom Construction

Al Burullus Power Plant Kafr Al Sheikh PGESCo Orascom (OCI) / A-Build

Al Burullus Power Plant Kafr Al Sheikh PGESCo A-Build


Project Location Consultant / Owner Contractor

Al Galala Factory Ain Sokhna - CHEM BUILD

Al Galala Marble and Granite Factory Ain Sokhna Moharram Bakhoum (ACE) Archirodon

Al Haram Power Sub Station Haram - Giza - Hinalco

Al Maliz - CHEM BUILD

Al Meliz Air Base North Sinai Air Force Archirodon

Al Meliz Aircraft - Archirodon


National Organization for Potable Water &
Al Menia Sanitary Drainage Menia ABB SUSA
Sanitary Drainage
Al Moltaka Al Arabi Smart Village Smart Vilage Al Moltaka Al Arabi

Al Moltaka Al Arabi Investments Al Moltaka Al Arabi Twintec

Al Nassagoun Al Sharkioun Factory 10 th of Ramadan City Al Nasagoun El Sharquon Jet Contracting

Al Nassagoun Al Sharkioun Fibers Factory 10 th of Ramadan City Al Nasagoun El Sharquon Twintec

Al Obayed Gas Plant Marsa Matrouh Brown & Root Petrojet

Al Salheya Air Base Sharqia Air Force Archirodon

Al Salheya Air Base Sharqia Air Force Archirodon

Al Salheya Air Base Sharqia Air Force Archirodon

Al Shabab Power Plant Ismailia PGESCo Archirodon

Al Shabab Power Station Ismailia PGESCo Archirodon

Al Takamol Hospitals Upgrade 6 th of October City Dr. Al Awady Office

Al Takamol Hospitals Upgrade Various Locations Dr. Al Awady Office Al Fawakhry Corporation for Contracting

Al Takamol Hospitals Upgrade Various Locations Dr. Al Awady Office Al Madaen Housing Company

Alex Factory Alexandria - Ray Egypt

Alexandria Carbon Black Factory Extension Amerya - Alexandria Alexandria Carbon Black Co. Misr Concrete

Almasa Hotel New Capital - Eng. Alaa Naser Shehata


Project Location Consultant / Owner Contractor

Anchor Cheese Factory 10 th of Ramadan City - Al Fady

Arabian African Bank Head Quarters New Cairo Moharram Bakhoum (ACE) Contrast

Aramex Dock Leviers Aramex Twintec

ASORC Naphtha Complex Project Assiut ASORC/ Enppi A-Build

Assiut Oil Refining Company (ASORC) Assiut Enppi Orascom (OCI)

Assiut Oil Refining Company (ASORC) - Vision Coating Solutions for Paints Contracting

‫تكن بيلد‬ ‫ر‬


Assiut Oil Refining Company (ASORC) - ‫شكة ي‬
Assiut Oil Refining Company (ASORC) - ‫رشكة ديو بوينت للمقاوالت والتوريدات العمومية‬

Assiut Oil Refining Company (ASORC) - ‫كونكريت هاوس للمقاوالت‬

Assiut Oil Refining Company (ASORC) Assiut Enppi Orascom (OCI) / Petrojet

Assiut Oil Refining Company (ASORC) Assiut ASORC/ Enppi Middle East Contracting Group

Assiut Oil Refining Company (ASORC) - Vision Coating Solutions for Paints Contracting

‫تكن بيلد‬ ‫ر‬


Assiut Oil Refining Company (ASORC) - ‫شكة ي‬
Assiut Oil Refining Company (ASORC) - ‫رشكة ديو بوينت للمقاوالت والتوريدات العمومية‬

Assiut Power Plant - Orascom Construction

Assiut Power Plant Assiut PGESCo Orascom (OCI)

Assiut Super Critical Power Plant Assiut ECG / PGESCo Orascom (OCI) / Veolia Water Technologies

Assiut Super Critical Power Plant Assiut PGESCo Orascom (OCI)

Assiut Super Critical Power Plant Assiut PGESCo Veolia Water Technologies

Beni Suef Power Plant EPC Beni Suef - El Sewedy Electric PSP

Beyti After Care Factory Nubaria City Beyti Twintec

Beyti After Care Factory 10 th of Ramadan City Beyti Twintec

Beyti New Juice Bottling Plant Nubaria City Beyti Twintec


Project Location Consultant / Owner Contractor

Beyti New Juice Bottling Plant Nubaria City Howedy for Engineering Consultations Twintec

BMW Show Rooms Repairs Cairo BMW Twintec

Cairo Festival City Malls Parking New Cairo ECG Twintec

Cairo International Airport Cargo Village Cairo CAC The Egyptian Construction Group

Cairo West Power Station Giza PGESCo Veolia Water Technologies / Power Project

Cairo West Power Station Giza PGESCo Archirodon

Cairo West Water Project (Contract 16/2) Helwan - Cairo Ambric Arab Contractors

Car Maintanance Centre New Cairo - Evocare

Company Project Cairo - Egybrit

Damiatta Power Station - ‫رومان متوشالح‬


‫ي‬
Edita Factory Renovatian 10 th of Ramadan City Edita Twintec

Edita Factory Renovatian 6 th of October City Edita Twintec


th
Egyptian Italian Company Factory 10 of Ramadan City - Mohy Kandil

El Katamya Air Base New Capital Air Force Archirodon


Fayoum / Beni Suef Middle Cities Waste Water Treatment
Fayoum - Beni Suef Harza ABB SUSA
Plant
Fine Line Factory 6 th of October City - Interchem

First Hotel Dokki - Cairo - First

Fish Market Restaurant Obour City - Cairo Moharram Bakhoum (ACE) Concrete Cure

Gabal Al Galala Desalination Plant Ain Sokhna Military Orascom (OCI) - Metito

Gabal Al Galala Desalination Plant Ain Sokhna Military Somie Egypt

Golden Coast - Sharm El Sheikh Sharm El Sheikh ARCo City Stars for Construction

Golden Coast - Sharm El Sheikh Sharm El Sheikh Golden Coast City Stars for Construction

Grand Egyptian Museum III Giza HILL INT. / EHAF HAZ / Mermer Marble - J.V.
Project Location Consultant / Owner Contractor

Green Vally Repairs Green Vally Twintec

Habata Air Base - Archirodon

Habata Air Base Marsa Matrouh Air Force Archirodon / Chem Build

Habata Air Base Marsa Matrouh Air Force Chem Build

Habata Air Base Upgrade Marsa Matrouh Air Force Orascom (OCI)

Heliopolis Hospital X-Ray Rooms Cairo Heliopolis Hospital Heliopolis Hospital

IBIS PHARMA STORES - 6 TH OF OCTOBER - Twintec

International Company Group Factory 10 th of Ramadan City International Company Group Twintec

Jotun Factory 10 th of Ramadan City Jotun GAMA

Jotun Phase 1 10th OF RAMADAN

Kama Factory for Glass 10 th of Ramadan City - Mohy Kandil

Kama for Metal Painting 10 th of Ramadan City Kama for Metal Painting Interchem
th
Kandil Steel Complex 10 of Ramadan City Kandil for Steel Kandil Group

Knauf Factory Phase 2 Suez Knauf Twintec

Knauf Factory Phase 3 Suez Knauf Twintec

KNAUF PHASE 2 ATTAKA - Twintec

Liquefied Natural Gas Project (LNG) Edco - Alexandria Bechtel Petrojet

Mansoura 2 Palace Phase 2 New Capital Military Twintec

Meridian Heliopolis Hotel Cairo Meridian International Interchem

Midor Oil Refinery Alexandria Midor Petrojet

Midwater Water Treatment Plant Alexandria Midwater Petrojet

Military Region New Capital Military KASED KHIER

Mivida - Anan Contracting & Engineering


Project Location Consultant / Owner Contractor

Mivida - CCC - HAC - Smart Print

National Bank of Egypt Warehouse 10 th of Ramadan City National Bank of Egypt Twintec

National Medical Factory 10 th of Ramadan City - International Construction Chemicals

Nawal Power Substation Agouza - Giza Egyptian Electricity Authority Hinalco

New Capital Power Plant New Capital PGESCo Power Projects / Orascom (OCI)

O.W KING TUT - Twintec

O.W PACKING HOUSE MASOURA 2 Twintec

O.WEST - Red Sea Construction and Development

Olympic City - Power Project

OW KING PHASE 2 - Twintec

Pacer Forge Various Locations U.S. Corps of Engineers Washington International

Petrogas Alexandria Petrogas Petrojet

Petrojet Material Testing Laboratory Building Nasr City - Cairo Enppi Petrojet

Pharma Overseas Menia Pharma Overseas Twintec

Plastic Factory Cairo - Suez Road Egypt Air Net Pro

Presidential Palaces New Capital Military Qased Kheir for General Supplies and Contracting

Racta Papers Company Abu Qir - Alexandria Dr. El Hadary & Dr. El Khouly Ibrahim Khalil Sons

Ramsis Hilton - Conserv Construction Inc.

Ras Ghareb Wind Power Plant Red Sea PGESCo Orascom (OCI) / A-Build

Semiramis Hotel Cairo Semiramis Organization Interchem

Seoudi Market Repairs - Twintec

Shooting Club - Orascom Construction

Shorouk Ground Floor El Obour Twintec


Project Location Consultant / Owner Contractor

Sidi Barani Air Base Marsa Matrouh Air Force Al Arish General Contracting Company

Siro Misr Designs Repairs 10 th of Ramadan City Siro Misr Twintec

Siro Misr Factory For Plastics 10 th of Ramadan City Siro Misr Twintec

South Helwan Power Plant Al Koryemat - Beni Suef PGESCo A-Build

South Helwan Power Station Helwan - Cairo PGESCo Power Project

South Helwan Power Station Kurayemat - South Helwan PGESCo Power Project

South Helwan Power Station HOLD Power Project

South Helwan Power Station Al Koryemat - Beni Suef PGESCo Power Projects

Suez Power Station - Arab Contractors Suez Branch

Sumed Project Sidi Krir - Alexandria Sumed Petrojet

Sumed Project Sidi Krir - Alexandria Sumed Petrojet

Utopia New Stores 2 10 th of Ramadan City Utopia Factory Twintec


New Damietta City International Coastal
West Damietta Power Plant PGESCo Archirodon
Road
Zamil Steel Factory Sadat City Zamil Steel Twintec