Final Report Demo
Final Report Demo
EAST ZONE
By Padmashri Group
This report presents an analysis of cement requirements, actual sales, and the
corresponding sales shortfall (loss) for the month of April 2025 across east zone listed
parties.
Key Highlights:
6. Support
*This page contains the list of east zone parties included in the cement supply
and requirement analysis for the specified period.
A K Builders
THERMAX LIMITED
April Month Requirement (MT)
*Note: The above table summarizes the monthly cement requirement of the respective parties.
Sales Made in the Month of April’25
(East Zone):
620681C00
Chopel Lachungpa Sikkim SIKKIM 45 45
5
SWASTIK BRIDGE & ROAD WEST
620572S225 Siliguri 742 742
CONTRACT LLP BENGAL
SURYA CONS PRIVATE WEST
620572S209 Tista Bajar 110 110
LIMITED BENGAL
WEST
620572T047 TTC Infra Sevok Siliguri 100 100
BENGAL
Difference
Project OPC OPC TOTAL IN
Code No. Party Name State PPC MT
Location 43 53
620110V009 Vascon Engineering Ltd. Supual (Bihar) BIHAR 0 0 -629 -629
Zetwerk Manufacturing Business
620118Z001 Motihari (BR) BIHAR -210 0 -180 -390
Pvt. Ltd.
Zetwerk Manufacturing Business
620442Z002 Jajpur (OD) ODISHA -120 0 -5 -125
Pvt. Ltd.
Zetwerk Manufacturing Business SundarGarh
620448Z007 ODISHA 0 -60 10 -50
Pvt. Ltd. (OD)
620449T017 THERMAX LIMITED Odisha ODISHA 0 0 -17 -17
620681C00
5
Chopel Lachungpa Sikkim SIKKIM Reason
WEST
620572S209 SURYA CONS PRIVATE LIMITED Tista Bajar
BENGAL
Reason
WEST
620572T047 TTC Infra Sevok Siliguri
BENGAL
Reason
*The table below highlights the reasons for cement sales losses
during the period.
Our key working & services:
Dispatch Reporting: Providing dispatch details to every 10 days, along with
a comprehensive monthly dispatch report at the end of each month.
• Rate Issue - We seek your support in offering the material at rates aligned with our
client's expected pricing, which will enable us to accelerate our sales targets and
enhance market competitiveness.
Thank You.