Project Crashing T9Q1 (b)
Project Crashing T9Q1 (b)
B-D-E-F-H B=667 B=3 D 2 300(2) 17 18 18 19 Commented [TJH1]: Can straight away cut 2 months bcoz
D=300 D=2 =600 fulfil the rule RT of existing path is more than or equal RT of
non-existing path. So, can cut one month only
E=350 E=1
F=450 F=2 Commented [TJH2]: Minus two weeks bcoz time
H=1000 H=1 reduction (2)
B-D-E-F-H B=667 B=3 B 1 667 17 17 17 17 Commented [TJH6]: Cannot straight away cut max 2
B-G-H H=1000 H=1 months bcoz after cut 2 months, we cannot fulfil the rule RT
of existing path is more than or equal RT of non-existing
F&G=810 F&G=2
path. So, can cut one month only
2 5
B-D-E-F-H H=1000 H=1 F&G 1 810 16 16 16 16 Commented [TJH3]: Left F&G can do pair
B-G-H A&B=1067 A&B=2 Commented [TJH4]: 450+360
A-C-G-H B&C=1167 2 2
Commented [TJH5]: Follow the lowest value for crash
A-C-D-E-F-H F&G=810 B&C=1 time
3 1
F&G=2 Commented [TJH8]: B ald use one week so left 2
2 5
Commented [TJH7]: Left A B C F G, can do pair
2427 A&B; A&C; A&F; A&G
B&C; B&F; B&G
C&F; C&G
F&G
*choose those can cut equally one month