Data Kerusakan Alat
Data Kerusakan Alat
TOTAL STOP
TOTAL STOP
TOTAL STOP
4 Elevating Cane Carrier B2 4/26/2017
5/7/2017
6/2/2017
6/18/2017
7/11/2017
7/11/2017
7/30/2017
9/27/2017
TOTAL STOP
TOTAL STOP
TOTAL STOP
TOTAL STOP
TOTAL STOP
10 Mill #1 4/23/2017
4/23/2017
8/24/2017
10/4/2017
TOTAL STOP
11 Mill #2 9/5/2017
TOTAL STOP
Mill #3 1/101/17
10/8/2017
TOTAL STOP
12 Mill #4 9/17/2017
10/2/2017
TOTAL STOP
13 Mill #5 4/23/2017
5/9/2017
5/18/2017
6/18/2017
6/20/2017
7/14/2017
7/15/2017
7/24/2017
7/26/2017
8/2/2017
8/3/2017
8/16/2017
8/26/2017
10/6/2017
TOTAL STOP
14 Cush-Cush #1 5/24/2017
9/22/2017
TOTAL STOP
15 Boiler 4/24/2017
4/27/2017
4/28/2017
4/30/2017
5/3/2017
5/4/2017
5/6/2017
5/8/2017
5/9/2017
5/16/2017
5/19/2017
5/20/2017
5/21/2017
5/22/2017
5/23/2017
6/2/2017
6/2/2017
6/3/2017
6/4/2017
6/5/2017
6/6/2017
6/7/2017
6/8/2017
6/11/2017
6/12/2017
6/12/2017
6/13/2017
6/14/2017
6/15/2017
6/15/2017
6/15/2017
6/15/2017
6/16/2017
6/16/2017
6/17/2017
6/17/2017
6/18/2017
6/18/2017
6/18/2017
6/19/2017
6/19/2017
6/19/2017
6/20/2017
6/21/2017
7/10/2017
7/12/2017
7/17/2017
7/18/2017
7/24/2017
7/25/2017
7/29/2017
8/5/2017
8/5/2017
8/7/2017
8/10/2017
8/14/2017
8/15/2017
8/18/2017
8/26/2017
8/27/2017
8/31/2017
9/7/2017
9/25/2017
9/26/2017
9/27/2017
9/28/2017
9/30/2017
10/1/2017
10/1/2017
10/1/2017
10/2/2017
10/3/2017
10/4/2017
10/5/2017
10/6/2017
10/7/2017
10/8/2017
10/9/2017
10/10/2017
10/11/2017
10/13/2017
10/14/2017
10/15/2017
TOTAL STOP
TOTAL STOP
TOTAL STOP
Turbin Trip
Kemasukan besi dan ganti hammer tip 2 pcs
Turbin Trip lanjut ganti hammer tip 4 baris
Membalik dan mengganti hammer tip yang aus 52 pcs
Membalik hammer tip
ganti dan balik hammer tip
limit switch shredder alarm
choke, lanjut repair casing yang bawah rotor shredder yang sobek
choke
TOTAL STOP
TOTAL STOP
Problem Elektrik/Instrument
Kemasukan Besi
bagasse gantung
Trip sendiri
tebu selip
tebu selip
siku lepas
siku lepas, potong apron yang sobek
leveller B1 choke
TOTAL STOP
Trip dan inverter panas
Siku Lepas
Trip
Trip
Siku Lepas
cek dan potong siku yang mulai lepas
potong casing yang menyebabkan bagasse gantung dan trip
kemasukan besi
TOTAL STOP
trip
TOTAL STOP
Over Speed
Over Speed
Choke
Choke
Overload
Overload
choke dan balik blade
ganti blade yang lepas 1 pcs
Choke
TOTAL STOP
Check alat
Overload
Overload
Kemasukan besi dan repair casing yang berlubang
Check alat dan repair casing yang sobek
TOTAL STOP
Choke
Choke
choke
choke
kemasukan rantai dan besi dari armada LC
sensor tersenggol bagasse
limit switch trip
TOTAL STOP
TOTAL STOP
TOTAL STOP
TOTAL STOP
TOTAL STOP
TOTAL STOP
TOTAL STOP
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Panel Common Trip
Water level Boiler #3 Low
Bearing IDF Boiler #3 terbakar
Steam Drop
Oil seal bearing gearbox N7 rusak
Oil seal bearing gearbox N7 rusak
Steam Drop
Steam Drop
Boiler #2 Trip
Problem Alat Berat (dozer)
Steam Drop
Ganti Governor FDF Boiler #2
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
pipa boiler #2 bocor
Steam Drop
Boiler #3 trip
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Panel Common Trip
ashbin boiler #3 full, Probem armada angkut
Steam Drop
Panel Common Trip
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
coolingmachine power trip 2 unit dan panel common trip 2 kali
kabel control valve feed water dan drum level boiler 1&2 terbakar
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
Steam Drop
TOTAL STOP
TOTAL STOP
TOTAL STOP
35.44 22.12
0.45 11.75
25.83
5.75
0.13
15.97
3.25
0.75
10.52
12.28
141.92
4
13.92 2.29
2.72
1
Lama Perbaikan (Jam) keterangan
1
1
4
2.5
3
1.42
0.08
3.42
5.7
22.12
2
6
1
2
0.25
0.5
11.75
1.25
0.25
9.5
0.5
6.5
4.5
1
1.25
1.08
25.83
0.25
0.5
0.25
0.5
1
1
1.25
1
5.75
0.13
0.13
0.25
0.25
5
2.5
0.25
0.75
2.5
1.5
2.97
15.97
0.25
berbarengan dengan Steam drop
berbarengan dengan Steam drop
2
1
3.25
0.75
0.75
10.52
9
1.5
1.08
0.7
12.28
2.17
0.12
2.29
0.55
2.17
2.72
1.5
1
0.5
berbarengan dengan boiler drop
0.5
0.5
1.5
berbarengan dengan steam drop
1
0.25
1.5
4.5
0.17
1
13.92
0.5
0.5
1
1
1
0.25
1
1
1
0.5
1
0.75
0.5
1.25
2.5
0.5
0.5
1.25
0.5
0.75
1.25
1.5
0.5
2.5
1
1.25
2.5
2 Sebelumnya mill kemasukan rantai
0.5
0.5
8.5
2
0.5
1.5
4.5
3.5
1.5
3
5
1.5
1
5
1.5
3 Las roll mill #5 dan check gear LSD mill #4
0.25
2
0.5
1.25
1
1
1.5
1.25
0.5
2
1
1
1.25
1
0.45
0.17
2.2
0.37
3
1
0.75
0.33
2.42
5.05
1.17
1.2
2.42
3.58
3.99
1.09
1
1.45
3.72
4.9
0.35
1
3.01
3.08
1.42
2.88
2.67
141.92
0.12
0.33
0.45
6.5
1.17
0.5
1.5
0.67
13.1
12
35.44
ll And Boiler
Cane shredder
Cane Stacker
83 Feeding Cane Carrier B1
Elevating Cane Carrier B2
Light Cutting A9
5.75 Cane Cutter #1
0.13 Cane Cutter #2
Intermediate Carrier
15.97 Cane Sheredder Elevator B23
Mill #1
Mill #2
3.25
0.75 Mill #3
Mill #4
10.52
Mill #5
Cush-Cush #1
12.28 Boiler
Bagasse conveyor N6
Bagasse Distribusi Conveyor N7
4
2.29
2.72