0% found this document useful (0 votes)
5 views

Tendernotice_1 (6)

The document is a tender enquiry from Heavy Engineering Corporation Limited for a weighing system for the PSLV Integration Facility, with a submission deadline of April 22, 2022. It outlines the requirements for bidders, including the need for online submission through the e-tender portal, and details the scope of supply and commercial terms. Bidders must ensure compliance with the specified guidelines and submit all necessary documentation to avoid rejection of their offers.

Uploaded by

amresh05verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

Tendernotice_1 (6)

The document is a tender enquiry from Heavy Engineering Corporation Limited for a weighing system for the PSLV Integration Facility, with a submission deadline of April 22, 2022. It outlines the requirements for bidders, including the need for online submission through the e-tender portal, and details the scope of supply and commercial terms. Bidders must ensure compliance with the specified guidelines and submit all necessary documentation to avoid rejection of their offers.

Uploaded by

amresh05verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 34

HEAVY MACHINE BUILDING PLANT

HEAVY ENGINEERING CORPORATION LIMITED


एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Tender Enquiry No. PUR/HMB/2019/962043/EL-6314 Date: 15.04.2022


Due date of Offer submission: 22.04.2022 by 1.00PM
Tender Enquiry (E-Tender) for
WEIGHING SYSTEM FOR FOLDING PLATFORM FOR PSLV INTEGRATION
FACILITY (PIF), SDSC, SHAR, ISRO, SRIHARIKOTA, ANDHRA PRADESH

This tender has seven parts as detailed below, Please read carefully the tender document
before submitting the offer. In case, any clarification is required, it should be mailed to
[email protected]/[email protected] :

SL No. Description Page range


1 Introduction 2-4
2 Annexure-I (Important Points & Commercial Terms & 5-9
Conditions)
3 Annexure-II (Commercial Check List) 10-12
4 Annexure-III (Format of EMD BG) 13-15
5 Annexure- IV ( Format of Security Deposit) 16-19
6 Annexure- V (Format of PBG) 20-21
7 Annexure-VI (Instructions for Online Bid Submission) 22-24
8 Annexure-VII (Technical Specification , Relevant drawings & 25-END
Make List)
9 BOQ/Price Bid format(Uploaded separately in the E- tender
portal)

Note:
i. Any corrigendum in the E-Tender Enquiry shall be notified at www.etenders.gov.in
only.
ii. Offer has to be submitted only online at E-tender Portal: www.etenders.gov.in. Offers
submitted in Hard copy shall not be considered, however Earnest Money Deposit
(Original Demand Draft/bank Guarantee) may be submitted to us in hard copy
separately so as it reaches to us before due date of opening of Tender.
iii. Scan copy of EMD to be uploaded in part-1 of offer i.e techno-commercial bid.

9 Page 1 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Tender Enquiry No. PUR/HMB/2019/962043/EL-6314 Date: 15.04.2022


TENDER ENQUIRY
Subject: E-tendering with E-price bids for WEIGHING SYSTEM FOR FOLDING PLATFORM FOR PSLV
INTEGRATION FACILITY (PIF), SDSC, SHAR, ISRO, SRIHARIKOTA, ANDHRA PRADESH

Tenders are invited on line through website. Tenders are to be submitted strictly as per
guidelines furnished in the website of http://etenders.gov.in here under:

INSTRUCTION TO BIDDERS (ITB)


1.0 Tender Summary :
Tender Ref No. PUR/HMB/2019/962043/EL-6314 dated
15.04.2022
Earnest Money Deposit Rs.1,00,000.00 in favor of “Heavy Engineering
Corporation Limited “Payable at Ranchi.(To
be submitted in form of DD/BG” to the
undersigned through courier/By Hand )
Mode of Tender: E tender with e price bid
Type of tender Two Bids tender
Last date and time for on-line submission 22.04.2022 UPTO 13 Hrs
of tender (IST)
Due date and time for on line opening of 23.04.2022 AT 15 Hrs (IST)
tender :
(Under unforeseen circumstances and if the due date falls on holiday, the tender will be
opened on the next full working day at same time

Bidders are requested to submit their most competitive offer through e- procurement mode only.
Offer submitted through offline mode will not be considered. For more information please visit our
website https://etenders.gov.in/eprocure/app.

Prospective Tenderers are advised to get registered themselves only on at NIC tender portal i.e.
https://etenders.gov.in/eprocure/app, obtain ‘User ID’ & ‘Password’ and go through the ‘Self Help
files’ available in the Home Page after log in to the portal http://etenders.gov.in. They should also
obtain Class III Digital Signature Certificate (DSC) in parallel which is essentially required for
submission of their application. A detailed instruction for online bid submission is mentioned below.
No registration fee would be charged from the bidders.

Bidders are required to upload the bid along with all supporting documents including priced part
(BoQ) only on the e-tendering website (https://etenders.gov.in/eprocure/app), on or before the due
date and time for submission of bid.
NOTE:

9 Page 2 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

1. HEC reserves the right to extend / change the schedule of any activity by intimating the bidders
through a notification on the e-tender portal.

2. For detailed guidance for online bid submission, please refer annexure-IV.

Contents of tender documents:

1 Technical specification & Commercial Terms and Annexure “I” to ‘VII’


Conditions of NIT respectively
2 Template for Price format/BOQ for online submission BOQ.xls
by the bidder
Requirements for Vendors:
A) P.C. connected with internet.
B) Registration with Service provider portal https://etenders.gov.in
C) The vendor should posses a Class-II or Class III Digital Signature certificate (Mandatory). (Bids
will not be recorded without Digital Signature Certificate.)
D) In case of any clarification please contact M/s NIC, before the schedule time of the submission of
bid. Contact person Shri Manoj Das 9297784580
E) Registration / Enrollment of Bidder on e- tender Portal of HEC: In order to submit the bid, the
bidders have to get themselves registered online on the e- tender portal of HEC Ltd with valid Digital
Signature Certificate (DSC ) issued from any agency authorized by CCA and which can be traced upto
the chain of trust to the Root Certificate of CCA. The online Registration of the Bidders on the portal
will be free of cost and one time activity only. The registration should be in the name of the bidder,
whereas DSC holder may be either bidder himself or his duly authorized person.
3.0 For registration, Submission procedure and method of correspondence etc. Please visit our
website: https://www.hecltd.com / https//etenders.gov.in and click on the relevant link for help.
Help for participating in e-tender:
The detailed method for participating in the e-procurement are available in the website
https://www.hecltd.com or https://etenders.gov.in The bidders have to Log on to official website
and then click on the specified links to start participating in the e-procurement process.
Bidders are also free to communicate with the contact person of the service provider to get all
clarifications regarding the mode of the e-procurement process.
NB:
(I) Please note that there is no provision to take out the list of parties downloading the tender
document from the above referred web site. As such, tenderers are requested to see the
website once again before due date of tender opening to ensure that they have not
missed any corrigendum uploaded against the said tender after downloading the tender
document. The responsibility of downloading the related corrigenda, if any, will be that of
the downloading parties.
(II) No separate intimation in respect of corrigendum to this NIT( if any ) will be sent to tenderers
who have down loaded the documents from website. Please see website
i.e.,http://www.hecltd.com or http://www.etenders.gov.in
5.0 The offer should be submitted (uploaded) strictly as per the terms and conditions and Procedures

9 Page 3 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

laid down in the website https://etenders.nic.in tender document failing which the offer is liable
for rejection.
Bidders should download the complete NIT including the Annexure and read carefully before
filling the details and uploading the documents.

6.0 The offers with any deviations to the NIT Terms and conditions shall be liable for rejection.
7.0 The bidder must upload all the documents required as per the terms of NIT. (Any other document
uploaded which is not required as per the terms of the NIT shall not be considered.)
8.0 It may please be noted that E-tendering or e-procurement fall under the purview of the Information
Technology Act 2000 and Information Technology (Amendment) Act 2008 and other relevant acts
and subsequent amendments if any).
9.0 There will be no physical sale of the tender documents.
10.0 PREPARATION OF TENDER DOCUMENTS :
Tender is to be submitted in single bid system in the following manner and shall be submitted through
electronic mode only as detailed below:

a. Techno-commercial offer (Part-1) – The offer are to be scanned and uploaded in our portal as per
technical details as per annexure-VII & Commercial terms & conditions as per annexure-I along with
filled in annexure-II (Checklist of commercial terms & Conditions). The format as per Annexure-II to be
downloaded and the same to be duly filled by the bidder and to be uploaded while submitting the offer.
No price part is to be uploaded in this part.

b. Price-format/BOQ (Part-II): This part of the offer should contain price portion. The format of Price
Bid/BOQ in excel format has to be downloaded by the bidder and rate offered by the bidder shall be
filled in the excel file and uploaded the same excel file of e tendering system while submitting the offer.
The price-format/BOQ which is incomplete and not submitted as per the instructions given will be liable
for rejection.
Note :
Bidders are requested to upload all the attachments /documents in one single PDF File in Other
Important Documents (OID) or as indicated in the online instructions. For Example if more than one
document is to be uploaded in support of Eligibility criteria or proven-ness criteria or any other
requirement then bidder must prepare one single PDF file of all the related documents and then
upload in the system in OID

11.0 Please read carefully before you quote: -

Last date of Receipt of Tender Document: by 1:00 PM (IST) on 22/04/2022

Due date of tender opening (Part-1): at 3:00 PM (IST) on 23/04/2022

12.0 Disclaimer clause:-The Company (Heavy Engineering Corporation Ltd.) nor the service provider
(www.etenders.gov.in) is responsible for any failure of submission of bids due to failure of internet
or other connectivity problems or reasons thereof.

9 Page 4 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Annexure I
Enquiry Schedule
The scope of supply against this tender enquiry consists of design, manufacture, testing at manufacture’s
premises, supply of Electronic weighing system complete with Load cells, weighing controller and all required
accessories startup spares, hardwares and softwares as per the technical specifications. Supervision of erection
of Load cells and commissioning of the weighing system is included in the scope of the tenderer. Calibration of
the load cells will be the responsibility of the tenderer.
The scope of supply of materials, equipment and services to be provided by the tenderer will include but not
limited to the following:

Sl. No. Mechanism Qty.

A: Scope of supply consist of following :

1. Load cell (Compression type Load cell, Capacity-10T, Model no.- 42 Nos.
CR014H0 of Make: IPA Pvt. Ltd.) material code 5533313779 (40 Nos. +
2 Nos. Start-up Spares)
2. FLP Local control Panel consisting of Load cell controller with inbuilt 20 Nos
display material code 5533313780
3. Connecting cables (as required) material code 5533313783 20 Sets
4. Junction boxes & Other accessories etc material code 5533313784 20 Sets
Each set consisting of 2 Nos JB
B. Scope of services consisting of :
5. Supervision of erection of Load cells and commissioning of the 01 lot
weighing system as per technical specification of NIT
Note: Detailed technical specification shall be as per Annexure-VII (enclosed in the NIT)

Commercial terms and conditions:


1. Offers to be submitted on FOR HMBP Stores basis. The rate quoted shall be inclusive of all packing &
forwarding, freight and transit insurance charges. If quoted on Ex Work’s basis then Freight charge to
be clearly notified otherwise offer may not be accepted..
2. The Price quoted by the tenderer should be exclusive of GST. The rate and nature of GST applicable
should be shown separately GST will be paid to the seller at the rate at which it is liable to be assessed or
has actually been assessed on the date of supply provided the transaction of sale is legally liable to GST
and within the delivery period.
3. The rates quoted must be firm and the offers made must remain open for acceptance for minimum
90days from the date of opening of the tender.

4. Payment terms shall be as under:


For supply of total materials 90% of basic order value of supply part along with 100% GST shall be
released through RTGS within 60 days of receipt of materials along

9 Page 5 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

with Guarantee certificate, Test certificate inspection certificate /CRV(


To be issued by HEC) ,original invoice & Performance bank guarantee
of 10% of total order value to be valid till full guarantee period from
any nationalized bank only in HEC’s Format.”

Balance 10% of supply part shall be released within 30 days after


submission of completion certificate of erection from Marketing /
HMBP.
For ‘Supervision of erection of 100% payment for ‘Supervision of erection’ & ‘commissioning
Load cells and commissioning of charges’ along with 100% GST shall be released within 30 days after
the weighing system ‘ submission of successful commissioning certificate issued by
Marketing/HEC.

Note:
i. For payment all the processing charges by the bank shall be on account of the firm.
ii. If you offer any other payment terms other than NIT payment terms then your offered price can be loaded
with bank interest rate (Presently 1% per month i.e. 12% per annum (Maximum ) as per the rules of the
company for L1 consideration only.
5. Quotations erased or over written are likely to be rejected unless all corrections are authenticated with
the tenderer’s signature.
6. Schedule for drawing submission, Delivery of materials & ‘Supervision of erection of Load cells
and commissioning of the weighing system’ at site :

Drawing/Documents Drawings & Documents as per Clause No.8 of annexure-VII of NIT has to
submission for approval after be submitted within two weeks from the date of Issue of Purchase Order
placement of PO
Delivery of materials Firm will raise inspection call within one month maximum from the date
of approval of drawings /manufacturing Clearance from HEC along with
test certificates & other relevant documents as per approved QAP.
Material shall be delivered to Stores/HMBP within 5-7 days after issuing
Dispatch clearance.
Supervision of erection of Load Supplier shall depute their engineers at site for Erection &
cells and commissioning of the Commissioning of supplied material within maximum 5-7 days from the
weighing system date of intimation from HEC for site availability.
Note: It will be supplier’s responsibility to make the manpower
available at site for ‘Supervision of Erection’ & ‘Commissioning of
supplied items’ till the completion of Erection & commissioning of all
supplied materials without any extra cost implication other than quoted
charges for “Supervision of Erection’ & ‘Commissioning’ at site.

7. Full particulars i.e. specification, literature and / or drawing wherever applicable has to be submitted
along with the quotation. The ‘Brand’ and 'Make' name must be indicated.
8. Earnest Money Deposit - Earnest money Rs. 1,00,000.00 will have to be deposited in form of demand
draft / bank guarantee (format is enclosed at annexure-III)from any nationalized bank Payable on the

9 Page 6 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

State Bank of India, Ranchi Hatia Branch, in favor of Heavy Engineering Corporation Ltd. Ranchi. 4. (Scan
copy of DD to be uploaded along with techno-commercial bid & original DD to be sent through courier /
submitted by hand undersigned.
Note: No EMD / Tender Document Cost shall be required under the following cases, if the firm is
registered with:
a) National Small Industries Corporation / Small Scale Industries / Micro, Small-scale Enterprises (MSE),
as per Government directive *.

9. The Corporation does not pledge itself to accept the lowest or any tender and reserves to itself the right
of accepting the whole or any part of tender or portion of the quantity offered and you shall supply the
same at the rate quoted.
10. Supplies will be subject to Inspection by our Inspection wing / or inspection Agencies prescribed by us.
11. Order placed as a result of this tender will be subject to the Corporation's General Terms and Conditions
of contract which can be down loaded from our website (www.hecltd.com).
12. Corporation reserves the right to call for and examine at any time the books of accounts and other
documents and papers of the firm for the purpose of ascertaining whether any excess payments has
been made or the firm likely to be received / received undue benefit out of execution of the particular
contract.
13. The final quantity may vary at the time of finalization of tender; however the proper clarification /
confirmation shall be taken from the firms.
14. LD & Risk Purchase Clasue: The time for and the date of delivery of the Stores stipulated in the
acceptance of tender shall be deemed to be the essence of the contract and delivery must be completed
not later than the dates specified therein. Otherwise:
a) The purchaser to recover from the supplier a sum of 0.5 % per week (completed week) of the price of
the stores(upto maximum 10 %) as liquidated damages, which the contractor has failed to deliver as
aforesaid or,
b) The purchaser may procure the undelivered stores / similar items from elsewhere, without notice to the
contractor at the risk of the contractor without canceling the contract in respect of the consignment not
yet due for delivery or,
c) To cancel the contract or a portion thereof.
15. Tenderers registered with National Small Industries Corporation/ Small Scale Industries/ Micro, Small
scale Industry (MSE) or DGS&D for the tendered item will be exempted from submission of EMD. The
tenderer should enclose an authenticated copy / notarized copy of their valid registration certificate with
NSIC, MSE for grant of exemption.
In case Bidder is covered under MSME criteria, it is mandatory to quote UAM no in Bid Documents.
HEC is registered on TReDS governed by RBI Guidelines and our registration no is HE0000320. All MSME
firms are advised to be get registered on RXIL (Receivable exchange of India-Mumbai)
16. Guarantee – The equipment supplied shall be under warranty for the period of 12 months from the
successful commissioning and acceptance by M/s ISRO.
17. Security Deposit- 5% of the P.O. value to be deposited by the successful bidder within 21 days after
placement of order by HEC which shall remain with HEC for a period beyond the completion of all
contractual obligations by the firm. This clause is mandatory and has to be accepted by all bidders. If
Security deposit clause is not accepted then the offer of the bidder shall not be considered.(Format is
enclosed at annexure-IV)

9 Page 7 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

18. Performance bank guarantee (BG format annexure-V): The successful bidder has to submit the
performance bank guarantee of 10% of order value valid till full guarantee period after supply of the
material. (In case order placed on the firm). If PBG clause is not accepted then the offer of the bidder
shall not be considered.(Format is enclosed at annexure-V)
19. Based on HEC's requirement and in order to ensure security of supply from more than one sources, the
total tendered quantity of any item may be split amongst more than one successful bidder at L1 Landed
price. Hence Purchase Order may be placed on more than one firms and the repeat order for 100%
quantity may be placed on successful bidder.
20. Risk Purchase Clause – If the material is not supplied with in the stipulated period then material can be
procured at the risk & cost of the firm without giving any notice to the firm.
21. There is no obligation on our part to accept delayed / late tenders. Tenders received after the due date of
opening are liable to be summarily rejected.
22. General conditions of the contract :Unless otherwise specified in the Terms & Conditions above, this
order shall be governed by General conditions of contract of purchase of HEC Ltd, which is available in
the web site of HEC.(www.hecltd.com)
Special Note:
While submitting tender pl. mention your Registration No. with HEC as a registered vendor with valid
paper.
If not pl. get registered your firm with HEC Limited immediately.
Please indicate whether your firm covered under MSES/MSES owned by SC/ST or MSE Owned by Women
covered under SSI separately in Techno-commercial bid.
Please submit the form of Terms & Conditions duly filled in and signed by the tenderer along with your
offer in technical (part-1) bid.

23. Law Governing contract-


(1) This contract shall be governed by the laws of India for the being in force.
(2) Irrespective of the place of delivery, the place of payment under the contract, the contract shall be
deemed to have been made at the place from which the acceptance of tender has been issued.
(3)Jurisdiction of Courts: The court of the place from where the acceptance of tender / purchase order
has been issued shall alone have jurisdiction to decide any dispute arising out of or in respect of the
contract,
(4)Marking of Stores: The marking of the stores must comply with the requirements of the laws relating
to Merchandise Marks for the time being in force in India.
24. ARBITRATION
In the event of any dispute or difference of opinion between the Heavy Engineering Corporation or any of
its units / division and the contractors as to the respective rights and obligation of the parties hereafter
or to the true intent and meaning of these presents and the many articles of conditions thereto, such
dispute of difference of opinion shall be referred to the many articles of conditions thereto, such dispute
of difference of opinion shall be referred to the sole arbitration of the Chairman, Heavy Engineering
Corporation and his decision shall be final, conclusive and binding on the parties.

9 Page 8 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

25. Mode of dispatch:


By Road to the consignee at In-charge stores /HMBP/HEC Ltd. Ranchi. For the consignments dispatched
by road, the supplier shall ensure that the following are observed by them:
i) All dispatches must be affected only on receipt of written dispatch clearance from the purchaser.
ii) Material shall be dispatched to In-charge stores/HMBP/HEC Ltd, Ranchi.
iii) Care shall be taken to avoid damages during transit to ensure that all the packages are firmly secured.

9 Page 9 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Annexure II
(To be filled by bidder and scan copy of the same to be uploaded along with Techno-commercial bid)

Sl Terms & Conditions Desired BY HEC Bidders Comment Remarks


No. ( Accepted / Not
accepted )
1 Scope of supply & services as Must be accepted
per NIT
2 Price Term (Ex-Works / FOR FOR main Stores, HMBP, HEC Ltd., Ranchi-4
HMBP)
3 Packing and Fwd. To be included in quoted price.
(Extra/Included/Not
Applicable)
4 GST Registration certificate To be furnished
5 TAXES (GST ) % of Applicable Taxes to be indicated Extra
6 Payment Terms To be confirm in line with NIT Clause No.4
of NIT’s annexure-I
7 Validity of Offer Minimum 90 days from the date of opening
of tender
8 Price Variation Clause Prices will be firm till the Complete
execution of order. (To be confirmed).
9 Delivery Schedule To be confirmed as per Clause no. 6 of
Annexure-I
10 Inspection By QCA/HMBP
11 Freight Charges if Ex-Works Must be included in quoted price

12 EMD of Rs. 1,00,000.00 DD from any nationalized bank in favor of


( Mandatory) as per clause No. HEAVY ENGINEERING CORPORATION
8 of annexure-I LIMITED, payable at Ranchi ( Exempted for
MSME/NSIC/SSI registered firms)

13 Security Deposit for 5% of PO To be deposited by successful bidder within


value as per clause No. 17 of 21 days after placement of order by HEC.
annexure -I This clause is mandatory and has to be
accepted by the bidder. . If Security
deposit clause is not accepted then the
offer of the bidder shall not be considered.

Page 10 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

14 Performance bank guarantee Bank Guarantee for performance from any


for 10% of order value as per nationalized bank in favor of HEAVY
clause No. 18 of annexure-I ENGINEERING CORPORATION LIMITED,
Ranchi as per tender enquiry.
This clause is mandatory and has to be
accepted by the bidder. If PBG clause is
not accepted then the offer of the bidder
shall not be considered.
15 Guarantee/Warranty To be provided (The equipment supplied
Certificate as per clause No. shall be under warranty for the period of 12
16 of annexure-I months from the successful commissioning
and acceptance by M/s ISRO.)
16 L/D Clause Acceptable To be Accepted (As per NIT’s annexure-I)
(Yes/No)
17 Special terms (If Any)
Acceptance of Risk Purchase
18 Clause (Yes/No) To be Accepted as per NIT’s annexure-I
GCC of HEC (available in
tender section at HEC website
19 : www.hecltd.com) To be accepted as per NIT’s annexure-I
Confirmation of Supplying the
materials as per Enquiry
20 Schedule YES/ NO
All NIT conditions are Yes/No, if no then state the
21 acceptable clause wise deviation
If firm is owned by SC/ST
22 /WOMEN Entrepreneurs To be indicated
23 UAM (Udyog Aadhar No) No if To be mentioned by bidder if applicable
registered under MSME
24 Materials shall be To be confirmed
manufactured & supplied in
line with in adherence of
QMS/EMS/OHSAS
25 Whether registered with RXIL To be confirmed (YES/NO)

Page 11 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

NOTE: 1. Please indicate whether your firm is covered under MSEs/MSEs owned SC/ST or covered under SSI
separately in Tech. Bid.
2. Terms & Conditions duly filled in and to be submitted along with offer otherwise your offer may not be
evaluated.

Manager/Purchase /EL
Heavy Machine Building Plant
Heavy Engineering Corporation Limited
Dhurwa, Ranchi – 834004
Jharkhand (India),

Page 12 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Annexure-III
Format of EMD Bank Guarantee

BANK GURANTEE FOR EARNEST MONEY DEPOSIT

NO. Dated:
TO
SDGM/PURCHASE /MM DIVISION
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LTD.
RANCHI-834004, JHARKHAND
INDIA

Dear Sirs,

In consideration of your agreeing to accept the Earnest money deposit of Rs.---------------(Rs---------------


) furnishable to you by M/s
------------------------------------------------------------(Hereinafter Referred to As Contractor) In terms of the
Enquiry No. - - -Dtd. ------------ for Supply of -----------------
------------------------ (Hereinafter Referred to as the Contract) in the form of a Bank Guarantee in the
Manner hereinafter contained we ----------------------------------------------------------- , having registered office
at ----------------------------------------------------- do hereby covenant and agree with you as follows.

1. We hereby undertake to indemnify you up to a sum of Rs. --------------------- (Rs. --------------------------


------------------ only) against any loss or damage caused to or suffered by you or that may be caused to
or suffered by you by reason of any breach or breaches on the part of the contractor of any of the terms
and conditions contained in the said contract and in the event the Contractor shall make any default or
defaults in carrying out any of the works under the said contract or otherwise in the observance and
performance of any of the terms and conditions relating thereto in accordance with the true intent and
meaning thereof, we shall forthwith on demand and without any protest or demur pay to you such sum
or sums not exceeding in total the said sum of Rs.---------------------- (Rs. -------------amount------------------
--only) as may be claimed by you as your losses and/or damages, costs, charges or expenses by
reason of such default or defaults on the part of the contractor.

2. Not withstanding anything to the contrary contained in this guarantee your decision as to whether the
contractor has made any such default or defaults and the amount or amounts to which you are entitled
by reasons thereof will be binding on us and we shall not be entitled to ask you to establish your claim
or claims or damages or losses suffered by you but will pay the amount demanded by you under this
guarantee forthwith on your demand without any protest or demur.

3. This guarantee shall continue and hold good until it is released by you on the application by the
contractor after expiry of the related warranty period of the said contract and after the contractor have
discharged all their obligations under the said contract and produced a certificate of due completion of
the work under the said contract and submitted a “NO Demand Certificate” provided always that this
Page 13 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

guarantee shall in no event remain in force after the date of---------------- without prejudice to your
claim or claims arisen and demanded from or otherwise notified to us in writing before the expiry of six
months from the said date which will be enforceable against us not withstanding that the same is or are
enforced after the said date.

4. We-------------------------------------, further undertake to extend the validity of this beyond the period
prescribed in clause 3 or as extended from time to time for such further period as may be required in
writing before the Expiry of this and upon such extension(s), all terms and conditions of this shall
remain in full force till the expiry of this extended period(s).

5. You will have the fullest liberty without affecting this guarantee from time to time to vary any of the
terms and conditions of the said contract or extend the time of performance of the contractor or to
postpone for any time or from time to time any of your rights or powers against the contractor and either
to enforce or forbear to enforce any of the terms and conditions of the said contract and we shall not
be released from our liability under this guarantee by the exercise of your liberty with reference to
matters aforesaid or by reason of any time being given to the contractor or any other forbearance, act
or omission on your part or any indulgence by you to the contractor or by any other variation or
modification of the said contract or any other act, matter or things whatsoever, which, under the law
relating to sureties, would but for the provisions hereof, have the effect of so releasing us from our
liability hereunder provided always that nothing herein contained will enlarge our liability hereunder
beyond the limit of Rs. --------------(Rs.----------------------------------------------------) as aforesaid or extend
the period of the guarantee beyond the said Date of --------------------unless expressly agreed to by us in
writing in terms of clause 4 hereof.

6. This guarantee shall not in any way be affected by your taking or varying or giving up any securities
from the contractor or any other person, firm or company on its behalf or by the winding up, dissolution,
insolvency or death as the case may be of the contractor.

7. In order to give full effect to the guarantee herein contained, you shall be entitled to act as if we are
your principal debtors in respect of all your claims against the contractor hereby guaranteed by us as
aforesaid and we hereby expressly waive all our rights of suretyship and other rights, if any, which are
in any ways inconsistent with any of the provisions of this guarantee.

8. Subject to the maximum limit of our liability as aforesaid this guarantee will cover all your claim or
claims against the contractor from time to time arising out of or in relation to the said contract and in
respect of which your claim in writing is lodged on us before expiry of six months from the date of expiry
of this guarantee.

9. Any notice by way of demand or otherwise hereunder shall be in writing and may be sent by special
Courier or Telefax to us or our Local Address as aforesaid.

Page 14 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

10. This guarantee and the powers & provisions herein contained are in addition to and not by way of
limitation or substitution for any other guarantee or guarantees heretofore given to you by us whether
jointly with others or alone and now existing uncancelled and that this guarantee is not intended to and
shall not revoke or limit such guarantee or guarantees.

11. This guarantee shall not be affected by any change in the constitution of the contractor or us nor
shall it be affected by any change in your constitution or by any Amalgamation or absorption thereof or
therewith but will ensure for the benefit or and be available to and enforceable by the absorbing or
amalgamated company or concern.

12. This guarantee is irrevocable during the period of its currency and shall not be revoked without your
previous consent in writing.

13. We further agree and undertake to pay you the amount demanded by you in writing irrespective of
any dispute or controversy between you and the contractor or any reference to arbitration of the said
dispute/controversy pending or a civil suit filed by the contract or in respect of the dispute or
controversy.

14. Not withstanding anything contained herein above our liability under this guarantee is restricted to
Rs.---------------- (Rs. ------------------------------------------------only) and this guarantee shall remain in
force until -----------------------unless a written claim is lodged on us for payment under this guarantee
within six months from the date of expiry of this guarantee . i.e. On or before--------------------all your
rights under this guarantee shall be forfeited and we shall be deemed to have released and discharged
from all liabilities there under, irrespective of whether or not the original guarantee is returned to us.

15. We have power to issue this guarantee in your favour under the memorandum and articles of
association of the bank and the undersigned has full power to execute this guarantee under the power
of Attorney Granted to them by the Bank.

FOR AND ON BEHALF OF

Page 15 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Annexure-IV
Format of BANK GUARANTEE of Security Deposit

TO,
M/S HEAVY ENGINEERING CORPORATION LIMITED
PLANT PLAZA ROAD,
DHURWA,
RANCHI – 4

DEAR SIR,

IN CONSIDERATION OF YOUR AGREEING TO ACCEPT THE SECURITY DEPOSIT OF RS.


……………………’amount’……………………………….. FURNISHABLE TO YOU BY M/S
…………’firms name’ ..........................................(HEREINAFTER REFERRED TO AS CONTRACTOR)
IN TERMS OF THE CONTRACT NO. ……………’HEC’s purchase order
no’………………………….FOR SUPPLY OF ………………’details of
items’ .................................... (HEREINAFTER REFERRED TO AS THE ‘CONTRACT’ ) IN THE FORM
OF A BANK GUARANTEE IN THE MANNER HEREINAFTER CONTAINED WE…..’bank details’………
BRANCH, HAVING REGISTERED OFFICE AT ………’place’………………… DO HEREBY
COVENANT AND AGREE WITH YOU AS FOLLOWS:

1. WE HEREBY UNDERTAKE TO INDEMNIFY YOU UP TO A SUM OF RS.


…………’amount’……………………(RUPEES ……’amount in words’........) AGAINST ANY
LOSS OR DAMAGE CAUSED TO OR SUFFERED BY YOU OR THAT MAY CAUSED TO
OR SUFFERED BY YOU BY REASON OF ANY BREACH OR BREACHES ON THE PART
OF THE CONTRACTOR OF ANY OF THE TERMS AND CONDITIONS CONTAINED IN
THE SAID CONTRACT AND IN THE EVENT THE CONTRACTOR SHALL MAKE ANY
DEFAULT OR DEFAULTS IN CARRYING OUT ANY OF THE WORKS UNDER THE SAID
CONTRACT OR OTHERWISE IN THE OBSERVANCE AND PERFORMANCE OF ANY OF
THE TERMS AND CONDITIONS RELATING THERETO IN ACCORDANCE WITH THE
TRUE INTENT AND MEANING THEREOF, WE SHALL FORTHWITH ON DEMAND AND
WITHOUT ANY PROTEST OR DEMUR PAY TO YOU SUCH SUM OR SUMS NOT
EXCEEDING IN TOTAL THE SAID SUM OF RS. ……’amount’ ............. (RUPEES
……’amount in words’ ) AS MAY BE CLAIMED BY YOU AS YOUR LOSSES AND / OR
DAMAGES, COSTS, CHARGES OR EXPENSES BY REASON OF SUCH DEFAULT OR
DEFAUTS ON THE PART OF THE CONTRACTOR.

2. NOTWITHSTANDING ANYTHING TO THE CONTRARY CONTAINED IN THIS


GUARANTEE YOUR DECISION AS TO WHETHER THE CONTRACTOR HAS MADE ANY
SUCH DEFAULT OR DEFAULTS AND THE AMOUNT OR AMOUNTS TO WHICH YOU
ARE ENTITLED BY REASONS THEREOF WILL BE BINDING ON US AND WE SHALL
NOT BE ENTITLED TO ASK YOU TO ESTABLISH YOUR CLAIM OR CLAIMS OR
DAMAGES OR LOSSES SUFFERED BY YOU BUT WILL PAY THE AMOUNT DEMANDED
BY YOU UNDER THIS GUARANTEE FORTHWITH ON YOUR DEMAND WITHOUT ANY
PROTEST OR DEMUR.

Page 16 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

3. THIS GUARANTEE SHALL CONTINUE AND HOLD GOOD UNTILL IT IS RELEASED BY


YOU ON THE APPLICATION BY THE CONTRACTOR AFTER EXPIRY OF THE RELATED
WARRANTY PERIOD OF THE SAID CONTRACT AND AFTER THE CONTRTACTOR
HAVE DISCHARGED ALL THEIR OBLIGATIONS UNDER THE SAID CONTRACT AND
PRODUCED A CERTIFICATE OF DUE COMPLETION OF THE WORK UNDER THE SAID
CONTRACT AND SUBMITTED A ‘NO DEMAND CERTIFICATE’ PROVIDED ALWAYS
THAT THIS GUARANTEE SHALL IN NO EVENT REMAIN IN FORCE AFTER THE DATE
OF …’date’…… WITHOUT PREJUDICE TO YOUR CLAIM OR CLAIMS ARISEN AND
DEMANDED FROM OR OTHERWISE NOTIFIED TO US IN WRITING BEFORE THE
EXPIRY OF SIX MONTHS FROM THE SAID DATE WHICH WILL BE ENFORCEABLE
AGAINST US NOTWITHSTANDING THAT THE SAME IS OR ARE ENFORECED AFTER
THE SAID DATE.

4. WE ………’bank name’……………………, FURTHER UNDERTAKE TO EXTEND THE


VALIDITY OF THIS BEYOND THE PERIOD PRESCRIBED IN CLAUSE 3 OR AS
EXTENDED FROM TIME TO TIME, FOR SUCH FURTHER PERIOD AS MAY BE
REQUIRED IN WRITING BEFORE THE EXPIRY OF THIS AND UPON SUCH
EXTENSION(S), ALL TERMS AND CONDITIONS OF THIS SHALL REMAIN IN FULL
FORCE TILL THE EXPIRY OF THIS EXTENDED PERIOD(S).

5. YOU WILL HAVE THE FULLEST LIBERTY WITHOUT AFFECTING THIS GUARANTEE
FROM TIME TO TIME TO VARY ANY OF THE TERMS AND CONDITIONS OF THE SAID
CONTRACT OR EXTEND THE TIME OF PERFORMANCE OF THE CONTRACTOR OR
TO POSTPONE FOR ANY TIME OR FROM TIME TO TIME ANY OF YOUR RIGHTS OR
POWERS AGAINST THE CONTRACTOR AND EITHER TO ENFORCE OR FOREBEAR
TO ENFORCE ANY OF THE TERMS AND CONDITIONS OF THE SAID CONTRACT AND
WE SHALL NOT BE RELEASED FROM OUR LIABILITY UNDER THIS GUARANTEE BY
THE EXERCISE OF YOUR LIBERTY WITH REFERENCE TO MATTERS AFORESAID OR
BY REASON OF ANY TIME BEING GIVEN TO THE CONTRACTOR OR ANY OTHER
FORBEARANCE , ACT OR OMISSION ON YOUR PART OR ANY INDULGENCE BY YOU
TO THE CONTRACTOR OR BY ANY OTHER VARIATION OR MODIFICATION OF THE
SAID CONTRACT OR ANY OTHER ACT, MATTER OR THINGS WHATSOEVER, WHICH,
UNDER THE LAW RELATING TO SURETIES, WOULD BUT FOR THE PROVISIONS
HEREOF, HAVE THE EFFECT OR SO RELEASING US FROM OUR LIABILITY
HEREUNDER PROVIDED ALWAYS THAT NOTHING HEREIN CONTAINED WILL
ENLARGE OUR LIABILITY HEREUNDER BEYOND THE LIMIT OF RS.
………’amount’……………………(RUPEES ……’amount in words’........) AS AFORESAID
OR EXTEND THE PERIOD OF THE GUARANTEE BEYOND THE SAID DATE OF
…’date’…. UNLESS EXPRESSLY AGREED TO BY US IN WRITING IN TERMS OF
CLAUSE 4 HEREOF.

6. THIS GUARANEE SHALL NOT IN ANY WAY BE AFFECTED BY YOUR TAKING OR


VARYING OR GIVING UP ANY SECURITIES FROM THE CONTRACTOR OR ANY
OTHER PERSON, FIRM OR COMPANY ON ITS BEHALF OR BY THE WINDING UP,
DISSOLUTION, INSOLVENCY OR DEATH AS THE CASE MAY BE OF THE
CONTRACTOR.

Page 17 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

7. IN ORDER TO GIVE FULL EFFECT TO THE GUARANTEE HEREIN CONTAINED, YOU


SHALL BE ENTITLED TO ACT AS IF WE ARE YOUR PRINCIPAL DEBTORS IN
RESPECT OF ALL YOUR CLAIMS AGAINST THE CONTRACTOR HEREBY
GUARANTEED BY US AS AFORESAID AND WE HEREBY EXPRESSLY WAIVE ALL OUR
RIGHTS OF SURETYSHIP AND OTHER RIGHTS, IF ANY, WHICH ARE IN ANY WAY
INCONSISTENT WITH ANY OF THE PROVISIONS OF THIS GUARANTEE.

8. SUBJECT TO THE MAXIMUM LIMIT OF OUR LIABILITY AS AFORESAID THIS


GUARANTEE WILL COVER ALL YOUR CLAIM OR CLAIMS AGAINST THE
CONTRACTOR FROM TIME TO TIME ARISING OUT OF OR IN RELATION TO THE SAID
CONTRACT AND IN RESPECT OF WHICH YOUR CLAIM IN WRITING IS LODGED ON
US BEFORE EXPIRY OF SIX MONTHS FROM THE DATE OF EXPIRY OF THIS
GUARANTEE.

9. ANY NOTICE BY WAY OF DEMAND OR OTHERWISE HEREUNDER SHALL BE IN


WRITING AND MAY BE SENT BY SPECIAL COURIER, SPEED POST OR TELEFAX TO
US AT OUR LOCAL ADDRESS AS AFORESAID.

10. THIS GUARANTEE AND THE POWERS & PROVISIONS HEREIN CONTAINED ARE IN
ADDITION TO AND NOT BY WAY OF LIMITATION OF OR SUBSTITUTUION FOR ANY
OTHER GUARANTEE OR GUARANTEES HERETOFORE GIVEN TO YOU BY US
WHETHER JOINTLY WITH OTHERS OR ALONE AND NOW EXISTING UNCANCELLED
AND THAT THIS GUARANTEE IS NOT INTENDED TO AND SHALL NOT REVOKE OR
LIMIT SUCH GUARANTEE OR GUARANTEES.

11. THIS GUARANTEE SHALL NOT BE AFFECTED BY ANY CHANGE IN THE


CONSTITUTION OF THE CONTRACTOR OR US NOR SHALL IT BE AFFECTED BY ANY
CHANGE IN YOUR CONSTITUTION OR BY ANY AMALGAMATION OR ABSORPTION
THEREOF OR THEREWITH BUT WILL ENSURE FOR THE BENEFIT OF AND BE
AVAILABLE TO AND ENFORCEABLE BY THE ABSORBING OR AMALGAMATGED
COMPANY OR CONCERN.

12. THIS GUARANTEE IS IRREVOCABLE DURING THE PERIOD OF ITS CURRENCY AND
SHALL NOT BE REVOKED WITHOUT YOUR PREVISOUS CONSENT IN WRITING.

13. WE FURTHER AGREE AND UNDERTAKE TO PAY YOU THE AMOUNT DEMANDED BY
YOU IN WRITING IRRESPECTIVE OF ANY DISPUTE OR CONTROVERSY BETWEEN
YOU AND THE CONTRACTOR OR ANY REFERENCE TO ARBITRATION OF THE SAID
DISPUTE / CONTROVERSY PENDING OR A CIVIL SUIT FILED BY THE CONTRACTOR
IN RESPECT OF THE DISPUTE OR CONTROVERSY.

14. NOTWITHSTANDING ANYTHING CONTAINED HEREIN ABOVE OUR LIABILITY UNDER


THIS GUARANTEE IS RESTRICTED TO RS.
………’amount’……………………(RUPEES ……’amount in words’........) AND THIS
GURANTEE SHALL REMAIN IN FORCE UNTILL ……’date’…. UNLESS A WRITTEN
CLAIM IS LODGED ON US FOR PAYMENT UNDER THIS GUARANTEE WITHIN SIX
MONTHS FROM THE DATE OF EXPIRY OF THIS GUARANTEE i.e. ON OR BEFORE
Page 18 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

…’date’ + ‘6 month’…… ALL YOUR RIGHTS UNDER THIS GUARANTEE SHALL BE


FORFEITED AND WE SHALL BE DEEMED TO HAVE REALEASED AND DISCHARGED
FROM ALL LIABILITIES THEREUNDER. IRRESPECTIVE OF WHETHER OR NOT THE
ORIGINAL GUARANTEE IS RETURNED TO US.

15. WE HAVE POWER TO ISSUE THIS GUARANTEE IN YOUR FAVOUR UNDER THE
MEMORANDUM AND ARTICLES OF ASSOCIATION OF THE BANK AND THE
UNDERSIGNED HAS FULL POWER TO EXECUTE THIS GUARANTEE UNDER THE
POWER OF ATTORNEY GRANTED TO THEM BY THE BANK.

FOR AND ON BEHALF OF


‘name of bank’

‘signature with seal’

Page 19 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Annexure-V
FORMAT OF PERFORMANCE BANK GURANTEE
(TO BE STAMPED IN ACCORDANCE WITH STAMP ACT & TO BE ISSUED BY ANY NATIONALISED /SCHEDULED BANK
AUTHORISED BY RBI TO ISSUE A BANK GUARANTEE)
Name of Equipment: Guarantee NO
Purchase Order No.: dated: - Date:
Validity
Claim period-----------

To:
M/s Heavy Engineering Corporation Ltd.
Heavy Machine Building Plant
Ranchi-834004 Jharkhand

In consideration of your having placed an order bearing Purchase Order No.------------dated:----------- with-----------

-----------------------------------------(hereinafter referred to as Supplier) for the supply of----------------------


(hereinafter referred to as the

We------------------------------------------------------------------------- do hereby agree with you irrevocably that, should the


machinery and equipment fail to give the guarantee performance and achieve the efficiency as stipulated in the
Purchase Order within the period of guarantee or should the material and/or workmanship of the machinery
and equipment supplied or any part thereof be found defective and/or fully, as per the purchase order, we
undertake to pay without any demur merely on demand a sum of Rs. ---------------------------------------------------------
being 20% of the value of Rs. for the supply of

Your decision whether the supplier have made any such defaults and the amount to which you are entitled by
reasons thereof shall be conclusive and bind on us, subject to maximum of Rs. ---------------------------------------------
as aforesaid.

We further guarantee that the machinery and


equipment manufactured and supplied by the supplier shall be new, of good quality materials and of the first
class workmanship as specified in the Purchase order and should the machinery and equipment supplied or any
part thereof be found defective and that should the defect as pointed out in inspection note be not made good
and/or in case of failure within guarantee period same shall be replaced on free of cost or repaired on free of
cost to the entire satisfaction of Heavy Engineering Corporation Ltd.

We----------------------------------- agree that the guarantee herein contained shall remain in full force and effect till
the machinery and equipment give the desired performance and it shall continue to be enforceable till your
dues have been fully paid and claims satisfied or discharged subject to a period not later than ------- --. In the
event of any extension granted for commissioning/dispatch suitable extension shall be given on your request.

Page 20 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

We------------------------------------, further agree that any neglect, omission or forbearance or indulgence in


enforcing any claim as per the terms and conditions of your purchase order or performance guarantee or any of
them or any extension of the time granted for the performance or payment of penalty under the guarantee or
any dispute between the supplier and yourselves as regard performance of machinery and equipment supplied
or issued related to your Purchase order, shall not effect in any way our liability under this guarantee until the
full payment, but in any case, shall not extend beyond ---------------- --.

This guarantee is in addition and not substitution for guarantee given to you by the seller or by their bankers on
their behalf.

We-------------------------------------------- lastly undertake not to revoke this bank guarantee during its currency
except with the previous consent of the corporation in writing.

Notwithstanding anything to contrary stated above, our liability under this guarantee will be restricted to Rs. ----
------------------------------------------ and shall remain in force up to ------------------ , unless a demand or claim under
this guarantee is made from the date i.e. on or before--------------------------------all your rights under the said
guarantee shall be forfeited and we shall be released and discharged from all liabilities there under.

Dated at day of

Seal of the Bank

Page 21 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

Annexure VI
Instructions for Online Bid Submission

The bidders are required to submit soft copies of their bids electronically on the CPP Portal, using valid
Digital Signature Certificates. The instructions given below are meant to assist the bidders in registering
on the CPP Portal, prepare their bids in accordance with the requirements and submitting their bids online
on the CPP Portal.
More information useful for submitting online bids on the CPP Portal may be obtained at:
https://eprocure.gov.in/eprocure/app.
REGISTRATION
(i) Bidders are required to enroll on the e-Procurement module of the Central Public Procurement Portal
(URL: https://etenders.gov.in/eprocure/app) by clicking on the link “Online bidder Enrollment” on the
CPP Portal which is free of charge.
(ii) As part of the enrolment process, the bidders will be required to choose a unique username and
assign a password for their accounts.
(iii) Bidders are advised to register their valid email address and mobile numbers as part of the
registration process. These would be used for any communication from the CPP Portal.
(iv) Upon enrolment, the bidders will be required to register their valid Digital Signature Certificate (Class
II or Class III Certificates with signing key usage) issued by any Certifying Authority recognized by CCA
India (e.g. Sify / nCode / eMudhra etc.), with their profile.
(v) Only one valid DSC should be registered by a bidder. Please note that the bidders are responsible to
ensure that they do not lend their DSC’s to others which may lead to misuse.

(vi) Bidder then logs in to the site through the secured log-in by entering their user ID / password and the
password of the DSC / e-Token.

SEARCHING FOR TENDER DOCUMENTS

i) There are various search options built in the CPP Portal, to facilitate bidders to search active tenders
by several parameters. These parameters could include Tender ID, Organization Name, Location, Date,
Value, etc. There is also an option of advanced search for tenders, wherein the bidders may combine
a number of search parameters such as Organization Name, Form of Contract, Location, Date, Other
keywords etc. to search for a tender published on the CPP Portal.
ii) Once the bidders have selected the tenders they are interested in, they may download the required
documents / tender schedules. These tenders can be moved to the respective ‘My Tenders’ folder.
This would enable the CPP Portal to intimate the bidders through SMS / e-mail in case there is any
corrigendum issued to the tender document.
iii) The bidder should make a note of the unique Tender ID assigned to each tender, in case they want to
obtain any clarification / help from the Helpdesk.

PREPARATION OF BIDS
i) Bidder should take into account any corrigendum published on the tender document before
Page 22 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

submitting their bids.


ii) Please go through the tender advertisement and the tender document carefully to understand the
documents required to be submitted as part of the bid. Please note the number of covers in which the
bid documents have to be submitted, the number of documents - including the names and content of
each of the document that need to be submitted. Any deviations from these may lead to rejection of
the bid.
iii) Bidder, in advance, should get ready the bid documents to be submitted as indicated in the tender
document / schedule and generally, they can be in PDF / XLS / RAR formats. Bid documents may be
scanned with 100 dpi with black and white option which helps in reducing size of the scanned
document.
iv) To avoid the time and effort required in uploading the same set of standard documents which are
required to be submitted as a part of every bid, a provision of uploading such standard documents
(e.g. PAN card copy, annual reports, auditor certificates etc.) has been provided to the bidders. Bidders
can use “My Space” or ‘’Other Important Documents’’ area available to them to upload such
documents. These documents may be directly submitted from the “My Space” area while submitting a
bid, and need not be uploaded again and again. This will lead to a reduction in the time required for
bid submission process.
Note: My Documents space is only a repository given to the Bidders to ease the uploading process. If
Bidder has uploaded his Documents in My Documents space, this does not automatically ensure these
Documents being part of Technical Bid.

SUBMISSION OF BIDS
i) Bidder should log into the site well in advance for bid submission so that they can upload the bid in
time i.e. on or before the bid submission time. Bidder will be responsible for any delay due to other
issues.
ii) The bidder has to digitally sign and upload the required bid documents one by one as indicated in the
tender document.
iii) Bidder has to select the payment option as “offline” to pay the tender fee / EMD as applicable and
enter details of the instrument.
iv) Bidder should prepare the EMD as per the instructions specified in the tender document. The original
should be posted/couriered/given in person to the concerned official, latest by as specified in the
tender documents. The details of the DD / any other accepted instrument, physically sent, should tally
with the details available in the scanned copy and the data entered during bid submission time.
Otherwise the uploaded bid will be rejected.
v) Bidders are requested to note that they should necessarily submit their financial bids in the format
provided and no other format is acceptable. If the price bid has been given as a standard BOQ format
with the tender document, then the same is to be downloaded and to be filled by all the bidders.
Bidders are required to download the BOQ file, open it and complete the white coloured
(unprotected) cells with their respective financial quotes and other details (such as name of the
bidder). No other cells should be changed. Once the details have been completed, the bidder should

Page 23 of 33
HEAVY MACHINE BUILDING PLANT
HEAVY ENGINEERING CORPORATION LIMITED
एच॰ई॰सी॰
(A Govt. of India Enterprise)
ISO 9001:2000
Ranchi – 834 004 (INDIA)

save it and submit it online, without changing the filename. If the BOQ file is found to be modified by
the bidder, the bid will be rejected.
vi) The server time (which is displayed on the bidders’ dashboard) will be considered as the standard
time for referencing the deadlines for submission of the bids by the bidders, opening of bids etc. The
bidders should follow this time during bid submission.
vii) All the documents being submitted by the bidders would be encrypted using PKI encryption
techniques to ensure the secrecy of the data. The data entered cannot be viewed by unauthorized
persons until the time of bid opening. The confidentiality of the bids is maintained using the secured
Socket Layer 128 bit encryption technology. Data storage encryption of sensitive fields is done. Any bid
document that is uploaded to the server is subjected to symmetric encryption using a system
generated symmetric key. Further this key is subjected to asymmetric encryption using buyers/bid
openers public keys. Overall, the uploaded tender documents become readable only after the tender
opening by the authorized bid openers.
viii) The uploaded tender documents become readable only after the tender opening by the authorized
bid openers.
ix) Upon the successful and timely submission of bids (i.e. after Clicking “Freeze Bid Submission” in
the portal), the portal will give a successful bid submission message & a bid summary will be
displayed with the bid no. and the date & time of submission of the bid with all other relevant
details.
x) The bid summary has to be printed and kept as an acknowledgement of the submission of the bid.
This acknowledgement may be used as an entry pass for any bid opening meetings.

ASSISTANCE TO BIDDERS
i) Any queries relating to the tender document and the terms and conditions contained therein
should be addressed to the Tender Inviting Authority for a tender or the relevant contact person
indicated in the tender.
ii) Any queries relating to the process of online bid submission or queries relating to CPP Portal in
general may be directed to the 24x7 CPP Portal Helpdesk.
Note: For any query related to registration and processing on the Portal please visit FAQ available at
https://etenders.gov.in/eprocure/app?page=FAQFrontEnd&service=page
You may call the Helpdesk. The 24 x 7 Help Desk Numbers are

0120-4200462, 0120-4001002, 0120-4001005, 0120-6277787

E-Mail: [email protected]

Page 24 of 33
Annexure-VII
1. 0 INTRODUCTION :-

This specification covers the design, manufacture, testing at manufacture’s premises and supply of
Electronic weighing system FOR HMBP, Ranchi for Folding Platform of PSLV Integration Facility (PIF)
building, SDSC, SHAR Centre of Indian Space Research Organization (ISRO), Sriharikota, Andhra
Pradesh.

2.0 SCOPE OF SUPPLY & WORK :-

2.1 The scope of supply against this tender enquiry consists of design, manufacture, testing at
manufacture’s premises, supply of Electronic weighing system complete with Load cells, weighing
controller and all required accessories startup spares, hardwares and softwares as per the
technical specifications
Supervision of erection of Load cells and commissioning of the weighing system is included in the scope
of the tenderer. Calibration of the load cells will be the responsibility of the tenderer.

The scope of supply of materials, equipment and services to be provided by the tenderer will include
but not limited to the following:

Sl.
Mechanism Qty. Material code
No.

Load cell ( Compression type Load cell, 42 Nos.


Capacity-10T, Model no.-CR014H0 of (40 Nos. +
1. 5533313779
Make: IPA Pvt. Ltd.) 2 Nos. Start-up
Spares)
FLP Local control Panel consisting of
2. Load cell controller with inbuilt display. 20 Nos 5533313780

3. Connecting cables (as required) 20 Sets 5533313783

4. Junction boxes & Other accessories etc 20 Sets 5533313784

NOTES:- FLP double compression cable glands and copper cable lugs for above items shall be provided
by the tenderer. Cable O.D. shall be furnished during detailing.

2.2 Calibration of Load cells shall be done by tenderer.

2.3 Getting statutory clearance from the Statutory Authority if any shall be the responsibility of the tenderer.

2.4 Any other supply voltage required other than 230V AC,1Ph in the system shall be provided by the
tenderer.

3.0 BASIS AND SITE CONDITIONS :-


4. 0 1. Ambient temperature 50⁰C.

95% Maximum, However, both maximum


2. Relative humidity ambient and maximum relative humidity may
not occur simultaneously.

3. Altitude Less than 1000M above MSL.

4. Hazardous area classification Zone – I, Gas group IIB.

5. Temperature Classification T4 as per IS: 8239 – 76.

6.
Type of enclosure Flame proof, Ex d.

7.
Power Supply of conditions :-

a) Power supply 230VAC, 1Ph, 50Hz UPS supply.

b) System Earthing
Solidly earthed

APPLICABLE STANDARDS:-

Flame proof enclosures for electrical apparatus – IS: 2148 (Latest revision).
1.

2. Guide for selection of electrical equipment for Hazardous Area. – IS: 5571-2009

Classification of Hazardous Area (other than mines) for electrical installations. –


3.
IS:5572-2009

Specification for Intrinsically safe Electrical Apparatus and Circuits. – IS:5780 (Latest
4.
revision)
Classification of maximum surface temperature of electrical equipments for use in
5.
explosive atmosphere- IS: 8239 (Latest revision)
The equipment shall also comply with provisions of Indian Electricity Act and Indian
6. Electricity Rules as amended up to date in addition to the statutory requirement of
state of Andhra Pradesh.

5.0 WARRANTY:-
5.1 The equipment supplied shall be under warranty for the period of 12 months from
the successful commissioning and acceptance by M/s ISRO.

6.0 LICENSING AND CERTIFICATION FROM APPROVED AUTHORITIES :-

6.1. The tenderer shall have obtained license from Indian standards institution for
manufacture of flame proof electrical equipment.

6.2. All electrical equipment shall have been tested and approved for flame proof
enclosures by Central Institute of Mining and Fuel Research (CIMFR), Dhanbad.

6.2.1 Approval of certificates shall have been obtained from the Government authorities in India.

6.2.2 In case of countries other than India, certificates from equivalent institutions shall be submitted
and shall be acceptable to M/s ISRO.

6.3. Applicable test reports and test certificates shall be submitted to the purchaser before inspection
of materials. Materials can be dispatched only after approval of test certificates.

6.4 After placement of order and during drg. approval stage, if any minor changes / certification of
equipment is required by M/s ISRO. The same shall have to be furnished by the tenderer without
any price implications.

7.0 INFORMATION ALONG WITH THE OFFER :-

7.1 Point wise confirmation of the enquiry specifications, clearly listing out
deviations, if any.

7.2 Block diagram of the offered weighing system.

7.3 Technical Catalogue of weighing equipment indicating details.

7.4 B.O.M indicating Qty, make, type and rating of each items.

7.5 GA and installation drg. of weighing equipment showing Local control panel, Load cells and
constrainers etc.

7.6 Details of cables showing type, make, size & current rating etc.

7.7 Data sheet of Load cells.

7.8 Max. operating temperature of the weighing equipments.

7.9 Communication protocol and connectivity for the Weighing controller.

7.10 Filled up data as per Annexure-A of enquiry.


8.0 DRGS. & DOCUMENTS:-

8.1. The following drgs./ documents shall be furnished by the successful tenderer in 5 Sets within two
weeks after placement of order :-

a) Valid test certificates for all type tests


b) Certificate for conformity of the design to specified Flame proof enclosure and degree of
protection of enclosure.
c) Any other drg. certification of equipment required by M/s ISRO for their scrutiny and
reference.

8.2. The submission of drawing / documents in 5 Sets by the vendor for approval
from M/s ISRO shall be routed through M/s HEC, but the approval of drawing and documents
from M/s ISRO shall be responsibility of the tenderer. Any minor changes/ certification of
equipments required by them during drawing approval stage shall be the responsibility of the
tenderer and the same shall have to be incorporated by the tenderer without any price
implications.

8.3. After approval of drgs./ documents, another 5 Sets of all approved drgs. and
documents shall be furnished by the manufacturer to M/s ISRO for necessary distribution.

All drgs. shall be made in AUTOCAD of Latest version.

8.4. Required no. of set of drgs./ documents for approval of statutory authority ( if
required ) shall be submitted at least 3 months prior to first shipment or
sufficiently in advance so as to take care of statutory clearances required at
appropriate time.

Obtained statutory clearance from statutory authorities shall be the responsibility of the
tenderer.

8.5. 5 Sets of prints and softcopies of all drgs./documents etc. incorporating approved changes, if
any, shall be supplied to M/s ISRO. All these drgs. shall be marked as “As Built”.

8.6. 5 Sets of Operation and Maintenance manual of Weighing system shall also be submitted.

8.7. The instruction manuals shall present the following basic categories of
information in a comprehensive manner:-

a). Instruction manuals for pre commissioning check up, operation, abnormal
condition, maintenance and repair.

b). Schedule of preventive maintenance.

c). Ordering information for spares.

9.0 General requirements for the Weighing System :-

9.1 The Weighing system shall be installed on each Folding Platforms. Total nos. of Folding platform
is 20 Nos.
9.2 Each Weighing system of Folding Platform shall consists of 2 Nos. of compression type Load
cells, FLP Local control panel with Load cells controller (inbuilt display) in line with enclosed SLD-
SK-EDB-1382.

9.3 The offered weighing system shall include all accessories like special cables, Junction boxes etc.
Any other item, if required for successful operation and meeting the performance requirements,
whether specifically mentioned in the specifications or not, are included in tenderer’s scope.

9.4 The whole system is locally operated from Local Control Panel only. Load sensing devices (Load
cells) are positioned below the drive system pulleys with amplifiers and is positioned near the Local
Control Panel. The weighing system shall be adjusted such that in the event of load exceeding
125% of the normal operating load ( Since the rope tensions require for folding about front hinges
and rear hinges are different, the folding movement has to trip at two different settings
corresponding to 125% of the rope tension under normal operating condition for these folding
operation). The weighing system will produce trip signals (potential free NO / NC contact), So that
the folding movement of the Folding platform about the front hinges as well as the rear hinges shall
be stopped.

9.5 The weighing system shall have following technical features :-

9.5.1 Load cells :-

Load cell shall be compression type. Material of construction for the load cell, shall be SS316.
The enclosure shall be of Intrinsic safe type suitable for Gas group IIB, Temperature class T4.
Capacity of load cell shall be 10T, Model no.- CR014H0 of Make: IPA Pvt. Ltd.
Maximum safe central overload capacity of 200% and an ultimate central overload capacity of
300%.

9.5.2 Local Control Panel (with Load cell controllers):-

Local Control Panel (LCP) for load cells of folding mechanism shall be mounted on the portal frame
of the building ( wall mounting type) suitable for operation in Flame proof, Zone-1, Gas group- IIB
and Temperature class T4.

All control terminals shall have indelible terminal nos. marked on them.
30% (approx.) extra control terminals shall be provided in the Local control Panel.
All the fixing bolts, nuts, washers and other hardware necessary for panel fixing shall be supplied as
part of the panels and shall be cadmium plated or Zinc passivated.

The Weighing controllers with all accessories shall be mounted inside Local control Panel. Each
Local Control Panel shall consists of microprocessor based digital Load cell controllers with all
necessary protection and features. Load on individual loadcell need to be displayed.

The Load cells controllers shall provide trip signal (potential free NO / NC contact ). In case of
overload at two different settings corresponding to 125% of the rope tension (for front hinges and
rear hinges) under normal operation conditions.

The weighing system shall have auto zero & auto calibration facilities.
10. 0 INSPECTION & TESTS: -

10.1 Inspection & Tests shall be carried out as per relevant National / International standards and
approved QAP.

10.1.1 Type test certificates shall be furnished before Inspection.

10.1.2 Routine Tests shall be carried out in presence of M/s ISRO/ HEC.

10.2 Inspection and tests shall be carried by M/s ISRO’s representative or 3rd party inspection at
manufacture’s premises.

10.3 The Successful tenderer shall conduct all tests required to ensure that the equipment supplied shall
conform to the requirement of the specifications and compliance to the requirements of the
applicable codes.
ANNEXURE-A

PRIMARY SENSOR

Sl. Description Requirements as Per T.S. Vendors to


No. furnish
details
1 Model no.
2 Type
3 Range : 0-10 Ton
4. Weather Protection IP 67– Explosion proof
5. Material of SS 316
construction
6. Excitation voltage 10V DC
7. Safe Over load For compression type: 150 % of Rated
capacity
8. Ultimate Overload For compression type : 300 % of Rated
capacity
9. Accuracy For all Active load Cells : 0.05% or better
For Active – Dummy combination: 0.1% or
better
10. Input Resistance
11. Output Resistance
12. Integral cable length Tenderer to specify (i.e. Either 4 core or 6
from Load cell to core etc)
Junction box
13. Type of integral Tenderer to specify (i.e. Either 4 core or 6
cable from core etc)
Primary sensor to
Junction box
14. Sensitivity
15. Temperature Drift for
Zero and Full scale
WEIGHT INDICATOR

16. Model no.


17. Type Digital microprocessor based
18. Location Panel mounted (Refer note-1 at page 8 of
8)
19. Weather Protection IP-65 with front panel cover
20. Housing Die cast aluminium – Explosion proof
21 Power Supply 24 V DC ±10%
OUTPUT

22. Output 4-20 mA over HART


23. Serial Port (RS - RS-232 or RS-485
232/485)
24. Weigh display 5 Digit, 7 Segment LED Display
25. Display cover The Digital Display for load indication shall
be provided with digital microprocessor
based, 5 digit, 7 segment LED Display, with
temperature class T6 with glass window.
26. Display Resolution
27. A/D Conversion Min 24 Bit A/D
28. Power Consumption
29. Keyboard Integrated, Alphanumeric and Function
Keys (shall be provided with skinned
membrane over keypad)
MOUNTING ASSEMBLY

30. Material of construction SS (including plates, nuts, bolts etc)


31. Inbuilt Constrainer Required
32. Full floating top plate Required
33. Anti lift protection Required
ACCESSORIES

34. Junction Box Required for connecting primary sensor


wires
35. Type of cable from ( It shall be of armoured
junction box type cable )
to Weight indicator
36. Quantity 1 No. each Load cell assembly
37. Make
38. MOC Die Cast Aluminium
39. IP Protection IP 65– Explosion proof
40. Terminals
41. Cable Glands SS ,Double Compression type
42. Cable Length between Approx. 20M length of cable with each
JB to indicator
Indicator

43. Accessories All required accessories to make the


system complete and shall be provided
by the tenderer

Notes:
1. The Weight indicator shall be provided with suitable enclosure with min.
protection of IP-65. The enclosure shall be of Die cast aluminium material.
Signature Not Verified
Digitally signed by PREM SHANKAR
PASWAN
Date: 2022.04.15 11:32:38 IST
Location: eProcurement System for
Central PSUs

You might also like