Input Data
1553.5
0
250
300 750 PROPERTIES GIRDER COMPOSITE UNIT
150 AREA (A) 0.7375 1.1143 m2
MOMENT OF INERTIA ( Iz) 0.2527 0.4705 m4
Ytop 0.8053 0.7408 m
850 250 Ztop 0.3138 0.6352 m3
1750
Ybot. 0.9447 1.2592 m
Zbot. 0.2675 0.3737 m3
150
300
550
0.701
INNER GIRDER AT MIDSPAN
1631
0
250
300 750 PROPERTIES GIRDER COMPOSITE UNIT
150 AREA (A) 0.7375 1.1331 m2
MOMENT OF INERTIA ( Iz) 0.2527 0.4776 m4
Ytop 0.8053 0.7305 m
850 250 Ztop 0.3138 0.6538 m3
1750
Ybot. 0.9447 1.2695 m
Zbot. 0.2675 0.3763 m3
150
300
550
1553.5
0
250
300 750 PROPERTIES GIRDER COMPOSITE UNIT
38 AREA (A) 1.0263 1.4031 m2
MOMENT OF INERTIA ( Iz) 0.2768 0.5304 m4
Ytop 0.8305 0.8239 m
Ztop 0.3333 0.6437 m3
1750
550 Ybot. 0.9195 1.1761 m
1412
Zbot. 0.3010 0.4510 m3
INNER GIRDER AT SUPPORT
1631
0
250
300 750 PROPERTIES GIRDER COMPOSITE UNIT
38 AREA (A) 1.0263 1.4219 m2
MOMENT OF INERTIA ( Iz) 0.2768 0.5396 m4
Ytop 0.8305 0.8147 m
Ztop 0.3333 0.6624 m3
1750
550 Ybot. 0.9195 1.1853 m
1412
Zbot. 0.3010 0.4553 m3
30.0m
Analysis for dead load is done manually while analyses for SIDL and LL are done by GRILLAGE
analysis using ASTRA-PRO. Only the c/c of bearing has been considered in analysis.
DEAD LOAD
Section 1-1
Support X = 0.000 m
BM = -0.01 t-m
SF = 29.11 t
Section 2-2
At End varying X = 5.000 m
BM = 115.86 t-m
SF = 17.67 t
Section 3-3
At L/4 X = 7.490 m
BM = 154.36 t-m
SF = 13.26 t
Section 4-4
At 3L/8 X = 11.235 m
BM = 191.60 t-m
SF = 6.63 t
Section 5-5
At L/2 X = 14.980 m
BM = 204.01 t-m
SF = 0.00 t
2. Under Deck Slab Load
0.00t 0.97t/m
29.960m
29.960m
Section 2-2
At End varying X = 5.000 m
BM = 61.99 t-m 59.61 t-m
SF = 9.97 t 9.59 t
Section 3-3
L/4 X = 7.490 m
BM = 83.81 t-m 80.59 t-m
SF = 7.55 t 7.26 t
Section 4-4
3L/8 X = 11.235 m
BM = 105.29 t-m 101.24 t-m
SF = 3.92 t 3.77 t
Section 5-5
L/2 X = 14.980 m
BM = 113.16 t-m 108.81 t-m
SF = 0.28 t 0.27 t
3. Shuttering Load
0.50t/m
30.0m
30.0m
Section 1-1
Support X = 0.000 m
BM = 0.00 t-m
SF = 7.49 t
Section 2-2
At End varying X = 5.000 m
BM = 31.20 t-m
SF = 4.99 t
Section 3-3
L/4 X = 7.490 m
BM = 42.08 t-m
SF = 3.75 t
Section 4-4
3L/8 X = 11.235 m
BM = 52.59 t-m
SF = 1.87 t
Section 5-5
L/2 X = 14.980 m
BM = 56.10 t-m
SF = 0.00 t
LIVE LOAD BM SUMMARY
HA & HB_45_6
HA & HB_45_11
HA & HB_45_16
HA & HB_45_26
Summary
BM SEC. (5-5) 951.00 tm SF(SEC. 5-5) 47.45 t
Section Mark ULS L.F SLS (t-m) ULS (t-m) Section Mark ULS L.F SLS (t) ULS (t)
BM SEC. (1-1) 1.35 -0.01 -0.01 SF(SEC. 1-1) 1.35 29.11 39.30
BM SEC. (2-2) 1.35 115.86 156.41 SF(SEC. 2-2) 1.35 17.67 23.85
BM SEC. (3-3) 1.35 154.36 208.38 SF(SEC. 3-3) 1.35 13.26 17.90
BM SEC. (4-4) 1.35 191.60 258.66 SF(SEC. 4-4) 1.35 6.63 8.95
BM SEC. (5-5) 1.35 204.01 275.41 SF(SEC. 5-5) 1.35 0.00 0.00
Section Mark ULS L.F SLS (t-m) ULS (t-m) Section Mark ULS L.F SLS (t) ULS (t)
BM SEC. (1-1) 1.35 0.00 0.000 SF(SEC. 1-1) 1.35 14.83 20.02
BM SEC. (2-2) 1.35 61.99 83.69 SF(SEC. 2-2) 1.35 9.97 13.46
BM SEC. (3-3) 1.35 83.81 113.15 SF(SEC. 3-3) 1.35 7.55 10.20
BM SEC. (4-4) 1.35 105.29 142.15 SF(SEC. 4-4) 1.35 3.92 5.29
BM SEC. (5-5) 1.35 113.16 152.76 SF(SEC. 5-5) 1.35 0.28 0.38
Section Mark ULS L.F SLS (t-m) ULS (t-m) Section Mark ULS L.F SLS (t) ULS (t)
BM SEC. (1-1) 1.0 0.00 0.00 SF(SEC. 1-1) 1.0 7.49 7.49
BM SEC. (2-2) 1.0 31.20 31.20 SF(SEC. 2-2) 1.0 4.99 4.99
BM SEC. (3-3) 1.0 42.08 42.08 SF(SEC. 3-3) 1.0 3.75 3.75
BM SEC. (4-4) 1.0 52.59 52.59 SF(SEC. 4-4) 1.0 1.87 1.87
BM SEC. (5-5) 1.0 56.10 56.10 SF(SEC. 5-5) 1.0 0.00 0.00
Section Mark ULS L.F SLS (t-m) ULS (t-m) Section Mark ULS L.F SLS (t) ULS (t)
BM SEC. (1-1) 1.75 12.50 21.88 SF(SEC. 1-1) 1.75 8.20 14.35
BM SEC. (2-2) 1.75 32.00 56.00 SF(SEC. 2-2) 1.75 7.20 12.60
BM SEC. (3-3) 1.75 59.00 103.25 SF(SEC. 3-3) 1.75 4.70 8.23
BM SEC. (4-4) 1.75 74.00 129.50 SF(SEC. 4-4) 1.75 2.50 4.38
BM SEC. (5-5) 1.75 79.00 138.25 SF(SEC. 5-5) 1.75 1.00 1.75
Section Mark ULS L.F SLS (t-m) ULS (t-m) Section Mark ULS L.F SLS (t) ULS (t)
BM SEC. (1-1) 1.35 21.50 29.03 SF(SEC. 1-1) 1.35 15.50 20.93
BM SEC. (2-2) 1.35 57.00 76.95 SF(SEC. 2-2) 1.35 13.30 17.96
BM SEC. (3-3) 1.35 105.80 142.83 SF(SEC. 3-3) 1.35 8.10 10.94
BM SEC. (4-4) 1.35 131.30 177.26 SF(SEC. 4-4) 1.35 4.00 5.40
BM SEC. (5-5) 1.35 140.00 189.00 SF(SEC. 5-5) 1.35 1.00 1.35
BM & SF DUE TO LIVE LOAD
Section Mark ULS L.F SLS (t-m) ULS (t-m) Section Mark ULS L.F SLS (t) ULS (t)
BM SEC. (1-1) 1.50 86.34 129.51 BM SEC. (1-1) 1.50 97.14 145.72
BM SEC. (2-2) 1.50 365.70 548.55 BM SEC. (2-2) 1.50 411.46 617.20
BM SEC. (3-3) 1.50 760.80 1,141.20 BM SEC. (3-3) 1.50 856.01 1,284.01
BM SEC. (4-4) 1.50 994.60 1,491.90 BM SEC. (4-4) 1.50 1119.06 1,678.59
BM SEC. (5-5) 1.50 951.00 1,426.50 BM SEC. (5-5) 1.50 1070.01 1,605.01
SF(SEC. 1-1) 1.50 196.50 294.75 SF(SEC. 1-1) 1.50 221.09 331.63
SF(SEC. 2-2) 1.50 196.50 294.75 SF(SEC. 2-2) 1.50 221.09 331.63
SF(SEC. 3-3) 1.50 99.69 149.54 SF(SEC. 3-3) 1.50 112.17 168.25
SF(SEC. 4-4) 1.50 82.53 123.80 SF(SEC. 4-4) 1.50 92.86 139.29
SF(SEC. 5-5) 1.50 47.45 71.18 SF(SEC. 5-5) 1.50 53.39 80.08
Section Mark ULS L.F SLS (t) ULS (t) Section Mark ULS L.F SLS (t) ULS (t)
SF(SEC. 1-1) 1.50 196.50 294.75 SF(SEC. 1-1) 1.50 221.09 331.63
SF(SEC. 2-2) 1.50 196.50 294.75 SF(SEC. 2-2) 1.50 221.09 331.63
SF(SEC. 3-3) 1.50 103.40 155.10 SF(SEC. 3-3) 1.50 116.34 174.51
SF(SEC. 4-4) 1.50 82.53 123.80 SF(SEC. 4-4) 1.50 92.86 139.29
SF(SEC. 5-5) 1.50 50.71 76.07 SF(SEC. 5-5) 1.50 57.06 85.58
BM SEC. (1-1) 1.50 86.34 129.51 BM SEC. (1-1) 1.50 97.14 145.72
BM SEC. (2-2) 1.50 365.70 548.55 BM SEC. (2-2) 1.50 411.46 617.20
BM SEC. (3-3) 1.50 719.60 1,079.40 BM SEC. (3-3) 1.50 809.65 1,214.48
BM SEC. (4-4) 1.50 994.60 1,491.90 BM SEC. (4-4) 1.50 1119.06 1,678.59
BM SEC. (5-5) 1.50 886.60 1,329.90 BM SEC. (5-5) 1.50 997.55 1,496.32
Cable1
Projected Length = 30700 mm Wobble coeff. k = 0.0020 per m
Cable Type = 17K 13 Mod. of Elasticity Es = 1.950E+07 t/m^2
Type of Duct = HDPE Ratio of Jacking force to UTS = 0.729
Coeff. of Friction, µ = 0.170 Slip at Live Anchorage s = 6 mm
Profile in Elevation Profile in Plan LEGEND:
a (mm) 1000 (dy/dx)L 0.131 p (mm) 1000 q(m) 6.50 apR1 0.000 p1(mm) 1000 a (mm) St. length of cable at left end in elevation
b(mm) 13000 (d2y/dx2)L 0.010 q(mm) 6500 apL1 0.000 cp2 4.2E+07 q1(mm) 6500 b(mm) Length of curved profile in elevation
d(mm) 13000 rL (m) 102.049 r (mm) 6500 cp1 42250000.0 t1(m) 6.500 r1(mm) 6500 c(mm) St. length of cable at mid in elevation
c(mm) 2700 (dy/dx)R -0.131 s (mm) 2700 q1(m) 6.500 (dz/dx) R1 0.000 s1(mm) 2700 d(mm) Length of curved prfile in elevation
e(mm) 1000 (d2y/dx2)R -0.010 t (mm) 6500 (dz/dx) L1 0.000 (d2z/d2x) R1 2.850 t1(mm) 6500 e(mm) St. length of cable at left end in elevation
Y1(mm) 1100 Rr (m) -102.049 u (mm) 6500 (d2z/d2x) L1 0.000 RpR1 (m) 3.5E-01 u1(mm) 6500 Y1(mm) Coordinate of cable at jacking end
Y6(mm) 1100 θL( rad) 0.130 v (mm) 1000 RpL1 (m) 4.23E+07 u(m) 6.5E+00 v1(mm) 1000 Y6(mm) Coordinate of cable at jacking end
Y3(mm) 120 θR( rad) -0.130 Z1 (mm) 0 r(m) 6.50 apR2 0.000 LP(mm) 30700 Y3(mm) Coordinate of cable at mid span
Y4(mm) 120 Length 30700 Z2 (mm) 0 apL2 0.000 cp2 4.2E+07 p (mm) St. length of cable at left end in plan
Y2(mm) 969 a1 (mm) 1009 Z3 (mm) 0 cp2 42250000.0 u1(m) 6.500 q(mm) Length of curved profile in plan
Y5(mm) 969 b1(mm) 13037 Z4 (mm) 0 r1(m) 6.500 (dz/dx) R2 0.000 r (mm) Length of reverse curve in plan
o
θL( ) 7.444 c1(mm) 2700 Z5 (mm) 0 (dz/dx) L2 0.0000 (d2z/d2x) R2 0.000 s (mm) St. Length of cable at mid in plan
o
θR( ) -7.444 d1(mm) 13037 Z6 (mm) 0 (d2z/d2x) L2 0.000 RpR2 (m) 4.2E+07 t (mm) Length of curved profile in plan
aL(per m) 5.0256E-03 e1(mm) 1009 Z7 (mm) 0 RpL2 (m) -4.2E+07 u (mm) Length of reverse curve in plan
aR(per m) -5.0256E-03 Le(mm) 30791 Z8 (mm) 0 t(m) 6.5 v (mm) St. length of cable at left end in plan
Z1 (mm) Coordinate of cable at jacking end in plan
Cable Profile Results in Elevation Cable Profile Results in Plan Z4 (mm) Coordinate of cable at mid span in plan
From Live End From Live End
Xe1(m) 0.000 Y3(m) 0.120 Xp1(m) 0.000 zp1(m) 0.000 apL1 0.000
Xe2(m) 1.000 Y4(m) 0.120 Xp2(m) 1.000 zp2(m) 0.000 apL2 0.000
Xe3(m) 14.000 Y5(m) 0.969 Xp3(m) 7.500 zp3(m) 0.000 apR1 0.000
Xe4(m) 16.700 Y6(m) 1.100 Xp4(m) 14.000 zp4(m) 0.000 apR2 0.000
Xe5(m) 29.700 aL(per m) 0.005 Xp5(m) 16.700 zp5(m) 0.000 θp1 0.000
Xe6(m) 30.700 aR(per m) -0.005 Xp6(m) 23.200 zp6(m) 0.000 θp2 0.000
Y1(m) 1.100 θL( rad) 0.130 Xp7(m) 29.700 zp7(m) 0.000 θp3 0.000
Y2(m) 0.969 θR( rad) -0.130 Xp8(m) 30.700 zp8(m) 0.000 θp4 0.000
Design of Superstructure
Design Calculation Cable 1
Distance from
Stressing X (m) 0.000 5.000 8.575 12.863 17.150
Anchorage
Elevation Angle α (rad) 0.1299 0.0902 0.0545 0.0114 -0.0045
Cumulative
Change in Σ∆α (rad) 0.0000 0.0397 0.0755 0.1185 0.1345
Elevation Angle
Ordinate from Soffit Y (rad) 1100 527 268 126 121
Ordinate from C/L Z (rad) 0 0 0 0 0
Plan Angle φ (rad) 0.000 0.000 0.000 0.000 0.000
Cumulative
Change in Plan ∆Σφ (rad) 0.0000 0.0000 0.0000 0.0000 0.0000
Angle
Total Change in
Angle θ= (rad) 0.000 0.040 0.075 0.119 0.134
Force after Friction Loss Px (t) 232.07 228.22 225.22 221.67 219.18
% Loss due to Friction 0.00 1.66 2.95 4.48 5.56
Design of Superstructure
Design Calculation Cable 1
Design of Superstructure
Design Calculation Cable 1
Design of Superstructure
Design Calculation Cable 2
Cable2
Projected Length = 30700 mm Wobble coeff. k = 0.0020 per m
Cable Type = 18K 13 Mod. of Elasticity Es = 1.950E+07 t/m^2
Type of Duct = HDPE Ratio of Jacking force to UTS = 0.729
Coeff. of Friction, µ = 0.170 Slip at Live Anchorage s = 6 mm
Profile in Elevation Profile in Plan
a (mm) 1000 (dy/dx)L 0.140 p (mm) 1000 q(m) 3.51 apR1 -0.007 p1(mm) 1000
b(mm) 7015 (d2y/dx2)L 0.020 q(mm) 3507.5 apL1 0.007 cp2 68.3 q1(mm) 3509
d(mm) 7015 rL (m) 51.669 r (mm) 3507.5 cp1 68.3 t1(m) 3.509 r1(mm) 3509
c(mm) 14670 (dy/dx)R -0.140 s (mm) 14670 q1(m) 3.509 (dz/dx) R1 -0.051 s1(mm) 14670
e(mm) 1000 (d2y/dx2)R -0.020 t (mm) 3507.5 (dz/dx) L1 0.051 (d2z/d2x) R1 2.850 t1(mm) 3509
Y1(mm) 750 Rr (m) -51.669 u (mm) 3507.5 (d2z/d2x) L1 0.015 RpR1 (m) 3.5E-01 u1(mm) 3509
Y6(mm) 750 θL( rad) 0.139 v (mm) 1000 RpL1 (m) 6.86E+01 u(m) 3.5E+00 v1(mm) 1000
Y3(mm) 120 θR( rad) -0.139 Z1 (mm) 0 r(m) 3.51 apR2 0.007 LP(mm) 30706
Y4(mm) 120 Length 30700 Z2 (mm) 0 apL2 -0.007 cp2 68.3
Y2(mm) 610 a1 (mm) 1010 Z3 (mm) 90 cp2 68.3 u1(m) 3.509
Y5(mm) 610 b1(mm) 7038 Z4 (mm) 180 r1(m) 3.509 (dz/dx) R2 0.051
o
θL( ) 7.957 c1(mm) 14670 Z5 (mm) 180 (dz/dx) L2 -0.0513 (d2z/d2x) R2 0.015
o
θR( ) -7.957 d1(mm) 7038 Z6 (mm) 90 (d2z/d2x) L2 -0.015 RpR2 (m) 6.9E+01
aL(per m) 9.9620E-03 e1(mm) 1010 Z7 (mm) 0 RpL2 (m) -6.9E+01
aR(per m) -9.9620E-03 Le(mm) 30765 Z8 (mm) 0 t(m) 3.5
Design of Superstructure
Design Calculation Cable 2
Distance from
Stressing X (m) 0.000 5.000 8.575 12.863 17.150
Anchorage
Elevation Angle α (rad) 0.1389 0.0600 0.0000 0.0000 0.0000
Cumulative
Change in Σ∆α (rad) 0.0000 0.0789 0.1389 0.1389 0.1389
Elevation Angle
Ordinate from Soffit Y (rad) 750 211 120 120 120
Ordinate from C/L Z (rad) 0 113 180 180 180
Plan Angle φ (rad) 0.000 0.044 0.000 0.000 0.000
Cumulative
Change in Plan ∆Σφ (rad) 0.0000 -0.0585 -0.1025 -0.1025 -0.1025
Angle
Total Change in
Angle θ= (rad) 0.000 0.098 0.173 0.173 0.173
Force after Friction Loss Px (t) 245.72 239.25 234.56 232.56 230.57
% Loss due to Friction 0.00 2.63 4.54 5.36 6.17
Design of Superstructure
Design Calculation Cable 2
Design of Superstructure
Design Calculation Cable 2
Design of Superstructure
Design Calculation Cable 3
Cable3
Projected Length = 30700 mm Wobble coeff. k = 0.0020 per m
Cable Type = 18K 13 Mod. of Elasticity Es = 1.950E+07 t/m^2
Type of Duct = HDPE Ratio of Jacking force to UTS = 0.729
Coeff. of Friction, µ = 0.170 Slip at Live Anchorage s = 6 mm
Profile in Elevation Profile in Plan
a (mm) 1000 (dy/dx)L 0.118 p (mm) 1000 q(m) 1.38 apR1 0.047 p1(mm) 1000
b(mm) 2764 (d2y/dx2)L 0.043 q(mm) 1382 apL1 -0.047 cp2 10.6 q1(mm) 1386
d(mm) 2764 rL (m) 24.003 r (mm) 1382 cp1 10.6 t1(m) 1.386 r1(mm) 1386
c(mm) 23172 (dy/dx)R -0.118 s (mm) 23172 q1(m) 1.386 (dz/dx) R1 0.130 s1(mm) 23172
e(mm) 1000 (d2y/dx2)R -0.043 t (mm) 1382 (dz/dx) L1 -0.130 (d2z/d2x) R1 2.850 t1(mm) 1386
Y1(mm) 400 Rr (m) -24.003 u (mm) 1382 (d2z/d2x) L1 -0.094 RpR1 (m) 3.6E-01 u1(mm) 1386
Y6(mm) 400 θL( rad) 0.117 v (mm) 1000 RpL1 (m) -1.09E+01 u(m) 1.4E+00 v1(mm) 1000
Y3(mm) 120 θR( rad) -0.117 Z1 (mm) 0 r(m) 1.38 apR2 -0.047 LP(mm) 30716
Y4(mm) 120 Length 30700 Z2 (mm) 0 apL2 0.047 cp2 10.6
Y2(mm) 282 a1 (mm) 1007 Z3 (mm) -90 cp2 10.6 u1(m) 1.386
Y5(mm) 282 b1(mm) 2770 Z4 (mm) -180 r1(m) 1.386 (dz/dx) R2 -0.130
o
θL( ) 6.704 c1(mm) 23172 Z5 (mm) -180 (dz/dx) L2 0.1302 (d2z/d2x) R2 -0.094
o
θR( ) -6.704 d1(mm) 2770 Z6 (mm) -90 (d2z/d2x) L2 0.094 RpR2 (m) -1.1E+01
aL(per m) 2.1264E-02 e1(mm) 1007 Z7 (mm) 0 RpL2 (m) 1.1E+01
aR(per m) -2.1264E-02 Le(mm) 30726 Z8 (mm) 0 t(m) 1.4
Design of Superstructure
Design Calculation Cable 3
2
Mod. of Elasticity Es = 1.95E+07 t/m Length of CableL = = 30.700m
Ratio of Jacking force to UTS = 0.729 Jacking force Po = = 246 t
Slip at Live Anchorage
s = 6.000 mm
At any distance "x", from Live Anchorage, PRESTRESS Force after Friction loss = Px = P0e-(µθ
µθ+kx)
µθ
Distance from
Stressing X (m) 0.000 5.000 8.575 12.863 17.150
Anchorage
Elevation Angle α (rad) 0.1170 0.0000 0.0000 0.0000 0.0000
Cumulative
Change in Σ∆α (rad) 0.0000 0.1170 0.1170 0.1170 0.1170
Elevation Angle
Ordinate from Soffit Y (rad) 400 120 120 120 120
Ordinate from C/L Z (rad) 0 -180 -180 -180 -180
Plan Angle φ (rad) 0.000 0.000 0.000 0.000 0.000
Cumulative
Change in Plan ∆Σφ (rad) 0.0000 0.2590 0.2590 0.2590 0.2590
Angle
Total Change in
Angle θ= (rad) 0.000 0.284 0.284 0.284 0.284
Force after Friction Loss Px (t) 245.72 231.80 230.15 228.18 226.24
% Loss due to Friction 0.00 5.67 6.34 7.14 7.93
Area of Px diag (tm) 1193.810 825.739 982.670 974.053
Total Area of Px diag (tm)
3976.272
Average Cable Force after Friction Loss, P (t) 129.520
% Average Friction Loss 47.29%
Cable Extension (mm) 115
Design of Superstructure
Design Calculation Cable 3
Design of Superstructure
Design Calculation Cable 3
Design of Superstructure
Design Calculation Cable Summary
Design of Superstructure
6. PRESTRESS SUMMARY
STAGE - 1
X F CGfrom bot. Fh Fv
SECTION
(m) (t) (m) (t) (t)
Support 1.050 841.2 0.922 834.3 -107.4
5.00 L 5.000 869.3 0.431 867.0 -51.0
7.49 L 8.540 881.6 0.283 881.0 -23.0
11.24 L 12.285 892.6 0.216 892.6 -4.9
14.980 L 16.030 895.3 0.214 895.3 -2.0
STRESS SUMMARY
2
Top t/m 0.0 369.2 491.9 610.5 650.1 > -152.9 OK
2
Bottom t/m 0.1 -433.0 -576.9 -716.1 -762.5 < 1529.1 OK
Top t/m2 797.6 130.8 -153.3 -229.9 -199.1 > -152.9 Check
Bottom t/m2 782.2 2332.7 2707.1 2831.2 2803.1 < 1529.1 Check
Top of Deck t/m2 -5.5 -45.3 -59.1 -74.7 -80.5 > -249.4 OK
Top of Girder t/m2 768.0 399.2 222.3 243.6 307.1 > -152.9 OK
2
Bottom of Girder t/m 738.6 1935.4 2192.3 2212.2 2150.3 < 1529.1 Check
Top of Deck t/m2 20.5 132.2 261.2 321.5 338.1 > -249.4 OK
Top of Girder t/m2 767.8 488.9 405.7 476.4 554.5 > 0 OK
Bottom of Girder t/m2 555.8 1410.8 1417.0 1301.4 1199.8 < 1019.4 Check
Top of Deck t/m2 171.4 780.0 1608.8 2083.3 2022.6 > -249.4 OK
Top of Girder t/m2 872.9 918.1 1298.5 1643.6 1670.6 > 0 OK
2
Bottom of Girder t/m 340.4 309.6 -873.8 -1693.5 -1663.8 < 1019.4 OK
Stress after Differential Shrinkage & Creep (at service condition with Live Load)
Top of Deck t/m2 133.4 745.1 1573.8 2048.4 1987.7 > -249.4 OK
Top of Girder t/m2 938.1 986.4 1366.8 1711.9 1738.9 > 0 OK
Bottom of Girder t/m2 303.2 276.3 -907.1 -1726.8 -1697.1 < 1019.4 OK
Design Calculation Cable 4
Cable4
Projected Length = 30700 mm Wobble coeff. k = 0.0020 per m
Cable Type = 17K 13 Mod. of Elasticity Es = 1.950E+07 t/m^2
Type of Duct = HDPE Ratio of Jacking force to UTS = 0.729
Coeff. of Friction, µ = 0.170 Slip at Live Anchorage s = 6 mm
Profile in Elevation Profile in Plan
a (mm) 1000 (dy/dx)L 0.127 p (mm) 1000 q(m) 1.38 apR1 0.000 p1(mm) 1000
b(mm) 13000 (d2y/dx2)L 0.010 q(mm) 1382 apL1 0.000 cp2 1909924.0 q1(mm) 1382
d(mm) 13000 rL (m) 105.111 r (mm) 1382 cp1 1909924.0 t1(m) 1.382 r1(mm) 1382
c(mm) 2700 (dy/dx)R -0.127 s (mm) 23172 q1(m) 1.382 (dz/dx) R1 0.000 s1(mm) 23172
e(mm) 1000 (d2y/dx2)R -0.010 t (mm) 1382 (dz/dx) L1 0.000 (d2z/d2x) R1 0.000 t1(mm) 1382
Y1(mm) 1450 Rr (m) -105.111 u (mm) 1382 (d2z/d2x) L1 0.000 RpR1 (m) -1.9E+06 u1(mm) 1382
Y6(mm) 1450 θL( rad) 0.126 v (mm) 1000 RpL1 (m) 1.91E+06 u(m) 1.4E+00 v1(mm) 1000
Y3(mm) 500 θR( rad) -0.126 Z1 (mm) 0 r(m) 1.38 apR2 0.000 LP(mm) 30700
Y4(mm) 500 Length 30700 Z2 (mm) 0 apL2 0.000 cp2 1909924.0
Y2(mm) 1323 a1 (mm) 1008 Z3 (mm) 0 cp2 1909924.0 u1(m) 1.382
Y5(mm) 1323 b1(mm) 13035 Z4 (mm) 0 r1(m) 1.382 (dz/dx) R2 0.000
o
θL( ) 7.219 c1(mm) 2700 Z5 (mm) 0.001 (dz/dx) L2 0.0000 (d2z/d2x) R2 0.000
o
θR( ) -7.219 d1(mm) 13035 Z6 (mm) 0 (d2z/d2x) L2 0.000 RpR2 (m) 1.9E+06
aL(per m) 4.8718E-03 e1(mm) 1008 Z7 (mm) 0 RpL2 (m) -1.9E+06
aR(per m) -4.8718E-03 Le(mm) 30785 Z8 (mm) 0 t(m) 1.4
Design of Superstructure
Design Calculation Cable 4
Distance from
Stressing X (m) 0.000 5.000 8.575 12.863 17.150
Anchorage
Elevation Angle α (rad) 0.1260 0.0875 0.0528 0.0111 -0.0044
Cumulative
Change in Σ∆α (rad) 0.0000 0.0385 0.0732 0.1149 0.1304
Elevation Angle
Ordinate from Soffit Y (rad) 1450 895 643 506 501
Ordinate from C/L Z (rad) 0 0 0 0 0
Plan Angle φ (rad) 0.000 0.000 0.000 0.000 0.000
Cumulative
Change in Plan ∆Σφ (rad) 0.0000 0.0000 0.0000 0.0000 0.0000
Angle
Total Change in
Angle θ= (rad) 0.000 0.039 0.073 0.115 0.130
Force after Friction Loss Px (t) 232.07 228.26 225.30 221.80 219.33
% Loss due to Friction 0.00 1.64 2.92 4.43 5.49
Design of Superstructure
Design Calculation Cable 4
Design of Superstructure
Design Calculation Cable 4
Design of Superstructure
STRESS CHECK WITH 20% LOSS
Item Unit 1 2 3 4 5
Support End Varying L/4 3L/8 L/2
Chainage of Section from left support m 1.050 5.000 7.490 12.285 16.030
Dead Load Moments 1st Stage t-m -0.01 115.86 154.36 191.60 204.01
Dead Load Moments due to Deck Slab t-m 0.00 61.99 83.81 105.29 113.16
Stress release due to hardening of solid slab i.e density reduces from 2.6 to 2.5 t/m3
Cable
Top 0.319 -0.407 -0.639 -0.745 -0.749
Bottom 1.275 3.115 3.510 3.690 3.696
Stress due to (C+S+R)
Moment due to Live Load t-m 97.1 411.5 856.0 1119.1 1070.0
Stress after Differential Shrinkage & Creep (at service condition with Live Load)
Loss due to Friction & Slip t 157.9 129.8 117.5 106.5 103.8
Loss due to Elastic shortening t 23.2 23.2 23.2 23.2 23.2
% Loss due to Friction & Slip 15.8 13.0 11.8 10.7 10.4
Total Loss t 181.1 153.1 140.8 129.7 127.0
φ (inf,to) = 1.500
β (t,to) = for 21 days = 0.0000
28 days = 0.2322
56 days = 0.3496
90 days = 0.3698
φ (t,to) = 28 days = 0.3483
56 days = 0.5244
90 days = 0.5548
b εcu3 ηfcd
εcsu1
x λx Fc
d2
As2 d1
As1 εs2 Fs2
εs1 Fs1
εc3 0.0018 0.0018 Compression strain at peak stress for rectangular Stress distribution
εcu3 0.0035 0.0035 Ultimate compression strsin for rectangular stress distribution
12.Ultimate tensile strength of steel , fpu (Mpa) 1863.7 1863.7 1863.7 1863.7 1863.7
13.Prestressing Force after all Loss (Kn) 6940.57 7108.63 7183.53 7253.78 7271.34
14.Ultimate Flexural Capacity
15. Assume neutral axis from compression
175.26 175.26 175.26 175.26 175.26
flange, X (mm)
16.Total Compression, C (KN) 3921 3921 3921 3921 3921
17. Initial Prestress, fpe (Mpa) 990 1014 1025 1035 1038
18. Initial strain in tendon 0.0051 0.0052 0.0053 0.0053 0.0053
19. Strain due to bending in tendon 0.018 0.028 0.031 0.032 0.032
20. Total strain in tendon 0.0231 0.0330 0.0360 0.0374 0.0375
21. fpu/1.15 (MPa) 1620.6 1620.6 1620.6 1620.6 1620.6
22.Corresponding Strain 0.013 0.013 0.013 0.013 0.013
23. 0.9*fpu/1.15 (MPa) 1458.5 1458.5 1458.5 1458.5 1458.5
24.Corresponding Strain 0.007 0.007 0.007 0.007 0.007
25. Fb (Mpa) 1620.6 1620.6 1620.6 1620.6 1620.6
2
26. Area of Steel , As (m ) 0.007 0.007 0.007 0.007 0.007
27. Total Tension, T (KN) 11357 11357 11357 11357 11357
28. T-C 7436 7436 7436 7436 7436
29. CG of Compression Zone from compressive
88 88 88 88 88
flange (mm)
30. Z (mm) 990 1481.9 1629.2 1696.6 1698.8
31. Flexural Capacity, Mu =T*Z (KNm) 11242 16829 18503 19268 19293
Status OK OK NOT OK NOT OK NOT OK
Check for Ultimate Shear Shear Corresponding to Maximum Moment
2
ii) 0.072 x (SQRT(fck))/fyk mm /m 13.7 9.1 9.9 10.3 10.3
2
Governing Shear reinforcement mm /m 23.7 11.1 11.1 11.1 11.1
Shear RF Due to ultimate loads, A sv/Sv = 2
mm /m 8506 6384 3223 2552 1313
VEd/(z*fywd)
Design Shear Reinforcement/web mm2/m 4253 3192 1612 1276 657
Spacing 110 125 150 200 200
Bar Dia 20 16 16 12 12
Reinforcement provided 2856 1608 1340 565 565
Not OK Not OK Not OK Not OK Not OK
Check for Ultimate Shear Maximum Shear & Corresponding Moment
F = EC α ∆t Α
2
EC = 2.74E+06 t/m
0
α = 1.20E-05 / C
∆t = Temperature differential
A = X - sectional Area Where temp. differential is ∆t
TEMPERATURE GRADIENT
( FOR CONCRETE SUPERSTRUCTURE )
AT MID-SPAN
200
h
3 0
200
0.8
250 1.04
4
2.1
Element
1 2 3 4 TOTAL
No.
Width 1.582 0.750 0.250 0.550
Height 0.250 0.400 0.941 0.409
Area 0.396 0.300 0.235 0.225 1.156
Y 0.125 0.450 1.120 1.795
A*Y 0.049 0.135 0.264 0.404 0.852
A*Y^2 0.0062 0.0608 0.2953 0.7253 1.088
T 5.65 0.00 0.00 1.04
A*T 2.235 0.000 0.000 0.233 2.468
A*T*Y 0.279 0.000 0.000 0.419 0.698
As per Dr. V. K . Raina's book ''Concrete Bridge Practice Analysis ,Design and Economics'' Chapter 30.
For checking of stresses with thermal effects only 50% Live load will be considered
And Permissible stresses increased by 15%
77.2 + =
-3.7
-100.1
-232.0 -332.1
Consider 1 mt strip
Area of steel required = 1/2 x 0.000 x 961.276
2.4 x 1.15
2
= 0.0 cm /m
2
Provide 10 φ @ 250 mm/m = 3.1 cm /m OK
AT SUPPORT
200
3
0
200
0.8
250
2.1
Element
1 2 3 TOTAL
No.
Width 1.507 0.750 0.550
Height 0.250 0.423 1.327
Area 0.377 0.317 0.730 1.424
Y 0.125 0.462 1.337
A*Y 0.047 0.146 0.975 1.169
A*Y^2 0.0059 0.0676 1.3037 1.377
T 5.65 -0.04 0.00
A*T 2.129 -0.013 0.000 2.116
A*T*Y 0.266 -0.006 0.000 0.260
As per Dr. V. K . Raina's book ''Concrete Bridge Practice Analysis ,Design and Economics'' Chapter 30.
For checking of stresses with thermal effects only 50% Live load will be considered
And Permissible stresses increased by 15%
38.0 + =
Consider 1 mt strip
Area of steel required = 1/2 x 0.033 x 136.2
2.4 x 1.15
2
= 0.8 cm /m
2
Provide 16 φ @ 150 mm/m = 13.4 cm /m OK
10. TEMPERATURE
F = EC α ∆t Α
2
EC = 2.74E+06 t/m
0
α = 1.20E-05 / C
∆t = Temperature differential
A = X - sectional Area Where temp. differential is ∆t
TEMPERATURE GRADIENT
( FOR CONCRETE SUPERSTRUCTURE )
AT MID-SPAN
250
3
0
150
4 0
2.1
Element
1 2 3 4 TOTAL
No.
Width 1.507 0.750 0.250 0.550
Height 0.250 0.400 0.941 0.409
Area 0.377 0.300 0.235 0.225 1.137
Y 0.125 0.450 1.120 1.795
A*Y 0.047 0.135 0.264 0.404 0.850
A*Y^2 0.006 0.061 0.295 0.725 1.087
T 6.300 -0.80 0.000 0.000
A*T 2.374 -0.240 0.000 0.000 2.134
A*T*Y 0.297 -0.108 0.000 0.000 0.189
εo Sum(A) - θ X Sum(A*T) = α * Sum( A*T)
εo Sum(A*Y) - θ X Sum(A*Y^2) = α * Sum( A*Y*T)
For checking of stresses with thermal effects only 50% Live load will be considered
And Permissible stresses increased by 15%
71.6 + =
-24.5
AT SUPPORT
250
3
0
150
2.1
Element
1 2 3 TOTAL
No.
Width 1.507 0.750 0.550
Height 0.250 0.423 1.327
Area 0.377 0.317 0.730 1.424
Y 0.125 0.462 1.337
A*Y 0.047 0.146 0.975 1.169
A*Y^2 0.0059 0.0676 1.3037 1.377
T 6.30 -0.98 0.00
A*T 2.374 -0.312 0.000 2.061
A*T*Y 0.297 -0.144 0.000 0.153
εo Sum(A) - θ X Sum(A*T) = α * Sum( A*T)
εo Sum(A*Y) - θ X Sum(A*Y^2) = α * Sum( A*Y*T)
For checking of stresses with thermal effects only 50% Live load will be considered
And Permissible stresses increased by 15%
820.4 858.3
37.9
65.5 + =
Consider 1 mt strip
Area of steel required = 1/2 x 0.071 x 341.967
2.4 x 1.15
2
= 4.4 cm /m
2
Provide 16 φ @ 150 mm/m = 13.4 cm /m OK
12.SHEAR CONNECTORS
At Support
VL = VAeY/I
VL = Longitudinal shear per unit length
V = Vertical shear
Ae = Area of transformed section on one side of interface
Y = Distance of centroid of the area under consideration from NA of compostie section
I = Moment of Inertia of section
V = 1.5*(29.114154+14.826215625+23.7)+2.5*221.089822024472
= 654.19 t
2
Ae = 1.5535*0.25 = 0.388 m
Y = 2-1.185-0.25/2 = 0.690 m
4
I= = 0.540 m
VL = 654.19*0.39*0.690/0.5396 = 324.73 t
2
As = The cross section area of anchorage connector = 2262 mm
fu = The ultimate tensile strength of steel = 410 Mpa
VL = VAeY/I
2
Ae = 1.5535*0.25 = 0.388 m
Y = 2-1.259-0.25/2 = 0.616 m
4
I= = 0.4705 m
VL = 624.93*0.388*0.616/0.4705 = 317.62 T
2
As = The cross section area of anchorage connector = 1916 mm
fu = The ultimate tensile strength of steel = 410 Mpa
AT 7.49 m
VL = VAeY/I
V = 1.5*(13.257792624+7.55389375+12.8)+2.5*112.165111234705
= 330.83 T
2
Ae = 1.5535*0.25 = 0.388 m
Y = 2-1.259-0.25/2 = 0.616 m
4
I= = 0.471 m
VL = 330.83*0.388*0.616/0.4705 = 168.14 T
-3
Ultimate Shear capacity, Qu = As * fu * 10
2
As = The cross section area of anchorage connector = 1916 mm
fu = The ultimate tensile strength of steel = 410 Mpa
B.0 Design of End Cross Girder at Temporary Lifting Condition / Jack up condition
The end cross girder is designed as a continuous deep beam for bearing replacement condition, continuous over knife
supports at the jack locations. The CL of jacks are taken to be 1061 mm from the CL of main girder. The reaction of main
girder due to (DL+SIDL) are applied as load at the girder location as shown below.
1.06m 2.12m
Since the jack will be operated from single console, hence the loads from bearings will be equally divided into all jeacks.
L= 1.5 D= 1.700 m
L/D = 0.882 < 1 for continuous beam
Lever arm Z = 0.5L = 0.75 m
2
Required Top Ast for max support M =M/(σst*Z) =130.000/(0.75*1.33*200) = 65.16 cm
33% overstressing considered for temporary condition
2
Minimum Area of steel required = 0.2/100*1.7*0.6*10000 = 20.40 cm
Details of zone 1
Depth of zone is 0.2D = 340 mm
Fraction of reinforcement to be provided in this zone = 0.230
2
Ast to be provided in this zone = 14.97 cm
Provide 25 dia bars, Nos of bars required = 3.1 No of bar provided = 5
2
Hence Ast Provided = 24.55 cm OK
Details of zone 2
0.3D on either side of mid depth and distributed uniformly
0.3D = 510 mm
2
Ast to be provided in this zone = 50.20 cm This reinforcement is added with side face reinf.
Provide 25 dia bars, Nos of bars required =11
2
Hence Ast Provided= 54 cm
2
Total Ast Provided for Hogging Moment = 78.55 cm
Provide 4 nos 25 f + 4 nos 20 f + 2 nos 20 f
Provided Ast = 38.5 cm2
Hanging reinforcement
It is considered 50% of Longitudinal reaction will hang
Force for Hanging reinforcement of Outer Girder = 60.00 t
Force for Hanging reinforcement of Inner Girder = 55.00 t
At Outer GirderLocation
Required Ast as hanging R/F =60.0*100/1.33*200 = 22.6 cm2
33% overstressing
Provide 2L 16 dia Stirrups 5 nos = 20.1 cm2 NOT OK
400
550
2
A1 = 0.27*0.27 = 0.0729 m
2
A2 = 0.4*0.4 = 0.1600 m
2
fb from (i) = 21333.3 KN/m
2
fb from (ii) = 24000.0 KN/m
2
Hence fb = 21333 KN/m
2
fb developed = 31477 KN/m
Hence Not OK
Hence no hoop reinforcement is required as per design. But from detailing point of view
hoop reinforcement has been provided. CEB-FIP model code has been used to calculate
the increase in permissible bearing stress.
2
Increase in permissible stress = ∆F / A1 = 5736.0 KN/m
2
Required permissible stress = = 10143.7 KN/m
Hence not OK
2Ypo = = 400
2Yo = = 270
Ypo / Yo = = 0.68
Fbst / Pk = = 0.1175225
Fbst = = 410.74 KN
2
Allowable stress in steel = 0.87fy = 0.87*410 = 356.7 N/mm
2
Ast required = 410.741058941059* 1000 / 356.7 = 1152 mm
Provide Nos. 4
Dia. 16
legged 2
2
Area of Steel provided 1608 mm
OK
This reinforcement shall be provided in a zone 0.2 Yo = 40 mm from face to
2Yo = 400 mm
Therefore, revised spacing of the spiral shall be 50 mm
14.Untensioned Reinforcement
b) In bottom bulb
0.18 % of Area
=(0.18/100*55*100)
2
= 9.90 cm /m
Minimum reinforcement provided in the bottom bulb ( vertical shear stirrups
+ additional reinf in bottom bulb)
c) In top bulb
0.18 % of Area
=(0.18/100*75*100)
2
= 13.50 cm /m
Minimum reinforcement provided in the top bulb ( vertical shear stirrups
+ additional reinf in top bulb)