DDA - Piling Completion Certificate Request Form

The document is a request for a Piling Completion Certificate, requiring specific documentation to be available on site, including approved test results and drawings. Both the contractor and consultant certify the accuracy of the submitted information and agree to the consequences of any false documentation. The request includes sections for contact details and signatures of both parties involved.

Uploaded by

arbaazrasalkar01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

DDA - Piling Completion Certificate Request Form

The document is a request for a Piling Completion Certificate, requiring specific documentation to be available on site, including approved test results and drawings. Both the contractor and consultant certify the accuracy of the submitted information and agree to the consequences of any false documentation. The request includes sections for contact details and signatures of both parties involved.

Uploaded by

arbaazrasalkar01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PILING COMPLETION CERTIFICATE REQUEST

Plot Number
Piling Permit Number
Consultant
Contractor
Submission Details Initial Submission
(Tick Appropriate Box) Re-submission

Note
The following to be available on site:
1. All piles test approved by consultant
2. Approved drawings by DDA
3. As Built Drawings and table stamped by Consultant and Contractor
4. Copy of Piling Inspection Approval (Comments Sheet)

CONTRACTOR & CONSULTANT

• We hereby certify that the information, data and documents provided with this application are true, genuine and correct
to the best of my knowledge. In case of default/failure to comply with any of the aforesaid conditions or the documents
submitted by us is found false/forged, our application will be rejected forfeiting any applicable fees paid.
• We hereby undertake that the above completion is checked and found to be consistent with the zoning affairs approved
drawings, specifications, building construction workmanship and industrial safety.

Contractor Consultant

Contact Person Contact Person

Contact No. Contact No.

Date Date

Signature & Signature &


Stamp Stamp