DDA - Suspension of Work at Site Request Form

The document is a request form for the suspension of work at a construction site, requiring specific details such as plot and permit numbers, and the reason for suspension. It outlines necessary documents, including a letter from the consultant and an undertaking letter from the owner. The requester must certify the accuracy of the information provided and assumes full liability for the suspended works.

Uploaded by

arbaazrasalkar01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views1 page

DDA - Suspension of Work at Site Request Form

The document is a request form for the suspension of work at a construction site, requiring specific details such as plot and permit numbers, and the reason for suspension. It outlines necessary documents, including a letter from the consultant and an undertaking letter from the owner. The requester must certify the accuracy of the information provided and assumes full liability for the suspended works.

Uploaded by

arbaazrasalkar01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SUSPENSION OF WORK AT SITE REQUEST

Plot Number Permit Number


Consultant
Contractor
Reason for Suspension of
Work at Site

Submission Details Initial Submission


(Tick Appropriate Box) Re-submission

DOCUMENTS REQUIRED

1. Letter from Consultant explaining the status at site and the method/procedure of implementing the suspension
2. Undertaking Letter from owner (Template No. ZA-DC-F-66)
3. Site Requirement Compliance Checklist

Terms and Conditions


• I hereby certify that the information, data and documents provided with this application are true, genuine and correct to the best
of my knowledge. In case of default/failure to comply with any of the aforesaid conditions or the documents submitted by us is
found false/forged, our application will be rejected forfeiting any applicable fees paid.
• I hereby undertake full liability for the suspended construction works at the site including HSE measures.

REQUESTER DETAILS

Contractor Consultant

Contact Person Contact Person

Contact No. Contact No.

Date Date

Signature & Signature &


Stamp Stamp

Owner Master Developer (if applicable)

Contact Person Contact Person

Contact No. Contact No.

Date Date

Signature & Signature &


Stamp Stamp

ZA-DC-F-65 Issue 7, Rev 0