P2
P2
ALL WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE PROVISIONS OF THE LAV LAVATORY SP SOIL PIPE
PHILIPPINE NATIONAL PLUMBING CODE, THE NATIONAL BUILDING CODE OF THE WC WATER CLOSET CB CATCH BASIN
PHILIPPINES. FD FLOOR DRAIN SH SHOWER HEAD
CO CLEANOUT SV SHOWER VALVE
OTHER TRADES SHALL COORDINATE THE DRAWING WITH OTHER TRADE VSTR VENT STACK THRU ROOF SF FAUCET
DRAWINGS AND TECHNICAL SPECIFICATIONS. ST SEPTIC TANK HB HOSE BIBB
DS DOWNSPOUT MH MANHOLE
ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR
HD HOUSE DRAINAGE GV GATE VALVE
PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE
KS KITCHEN SINK CV CHECK VALVE
DESIGNER.
1 2 1 2 1 2
2 3 2 3 2 3
LANAI
WC
LAUNDRY
AREA
A A A
SH
FD CO FD
WC
KS
KS
BEDROOM 1
DINING KITCHEN LAV
SINK
AREA SH BEDROOM 2 BEDROOM 3
WC FD
4"Ø PPR SANTARY 4"Ø PPR SANTARY
4"Ø PPR SANTARY PIPE RISER TO PIPE RISER FROM PIPE RISER FROM
THIRD FLOOR GROUND FLOOR GROUND FLOOR
B HALLWAY B B
LAV
CO
FD
LIVING WC
AREA SH
HALLWAY LAV
CO
WC
LAV MASTER'S
BEDROOM
FAMILY/OFFICE/
GUEST ROOM
C C C
STORAGE
OPEN
SEPTIC VAULT
D D D
PORCH PORCH
FL-1
1 4 1 4 1 4
5 5 5