0% found this document useful (0 votes)
29 views8 pages

R2B-P2-204-02-H-HD-10051 - Rev.00 - WASH WATER PUMPS (GA-51008AB)

This document is a mechanical datasheet for wash water pumps used in the Phase II refinery project at Dos Bocas, Tabasco. It includes specifications for pump design, operating conditions, and performance metrics, as well as construction details and materials used. The document is intended for use by PTI-Infraestructura de Desarrollo and Samsung Ingeniería, and is marked as confidential.

Uploaded by

gyves97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views8 pages

R2B-P2-204-02-H-HD-10051 - Rev.00 - WASH WATER PUMPS (GA-51008AB)

This document is a mechanical datasheet for wash water pumps used in the Phase II refinery project at Dos Bocas, Tabasco. It includes specifications for pump design, operating conditions, and performance metrics, as well as construction details and materials used. The document is intended for use by PTI-Infraestructura de Desarrollo and Samsung Ingeniería, and is marked as confidential.

Uploaded by

gyves97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

PHASE II OF REFINERY IN DOS

BOCAS (HDN, HDDI, HDTGO, REF)


Page 1 / 8
Doc. TITLE MECHANICAL DATASHEET
Rev. 00
Contract Doc. No. R2B-P2-204-02-H-HD-10051 Contract No. PTI-ID-O-003-3-2020
Contractor
Contractor Doc. No. SO6625-EJ2E-TDS-P2204049 SO6625
Job. No.

MECHANICAL DATASHEET
WASH WATER PUMPS
(GA-51008A/B)

BETWEEN

PTI-Infraestructura de Desarrollo, S.A. de C.V.

AND

Samsung Ingeniería Manzanillo, S.A. de C.V. /


Asociados Constructores DBNR, S.A. de C.V.

“COMPLEMENTARY ENGINEERING, PROCUREMENT, CONSTRUCTION AND SUPPORT DURING TESTS AND


STARTUP OF THE PLANTS: HYDRODESULPHURIZATION PLANT ULSD No. 1, HYDRODESULPHURIZATION
PLANT ULSD No. 2, GAS OIL HYDRODESULPHURIZATION PLANT, NAPHTHA HYDRODESULPHURIZATION
PLANT No. 1, NAPHTHA HYDRODESULPHURIZATION PLANT No. 2 AND NAPHTHA REFORMING PLANT FOR
THE REFINERY IN DOS BOCAS, PARAÍSO, TABASCO” (PHASE II)

Contract No. PTI-ID-O-003-3-2020

00 09 DEC 22 AS-BUILT KW Lee BK Hwang MH Lim


0 04 MAR 21 ISSUED FOR CONSTRUCTION YS Jeong YB Kim MH Lim
A 25 FEB 20 ISSUED FOR REVIEW BK Hwang YB Kim MH Lim

Rev Date Description Prepared by Reviewed by Approved by

This document, including any patented or patentable features, embodies confidential information of Samsung Ingeniería Manzanillo, S.A. de C.V.
and its use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to
use the document for any purpose other than specifically permitted in writing by Samsung Ingeniería Manzanillo, S.A. de. C.V.
PHASE II OF REFINERY IN DOS
BOCAS (HDN, HDDI, HDTGO, REF)

Page 2 / 8
Doc. TITLE MECHANICAL DATASHEET Rev. 00
Contract Doc. No. R2B-P2-204-02-H-HD-10051 Contract No. PTI-ID-O-003-3-2020

Contractor
Contractor Doc. No. SO6625-EJ2E-TDS-P2204049 SO6625
Job. No.

REVISION HISTORY

Rev. Date Description


A 25 FEB 20 ISSUED FOR REVIEW
0 04 MAR 21 ISSUED FOR CONSTRUCTION
00 09 DEC 22 AS-BUILT

* Note:
This page records all revisions on the procedures.
CENTRIFUGAL PUMP DATA SHEET
(GA-51008A/B)

1 APPLICABLE TO: AS BUILT APPLICABLE NTL/INTNTL STANDARD: API-610 11th Rev


2 FOR PTI-ID UNIT HDDI
3 SITE Dos Bocas, Mexico SERVICE WASH WATER PUMPS
4 NO. REQ 2 PUMP SIZE 3" x 3" TYPE BB5 No. STAGES 10
5 MANUFACTURER HYOSUNG GOODSPRINGS MODEL SBR80/10 SERIAL NO. 2051606-009, 010

6 LIQUID CHARACTERISTICS
7 Units Maximum Minimum Note SERVICE : CONTINUOUS

8 LIQUID TYPE OR NAME : Skimmed Water or BFW Max & min values refer • IF INTERMITTENT NO. OF STARTS : 2
(1)
9 VAPOR PRESSURE : kg/cm² a 1.476 only to the property PUMPS OPERATE IN:
10 RELATIVE DENSITY(1,8) : - 0.915 listed CORROSION DUE TO : (6.12.1.9)
11 SPECIFIC HEAT : kcal/(kg-K) EROSION DUE TO : (6.12.1.9)
12 VISCOSITY(1,8) : cP 0.311 H2S CONCENTRATION (ppm) : (6.12.1.12)

13 OPERATING CONDITIONS (6.1.2) CHLORIDE CONCENTRATION (ppm) :


14 Units Maximum Rated Normal Minimum PARTICULATE SIZE (DIA IN MICRONS)

15 NPSHa Datum: C.L. Impeller PARTICULATE CONCENTRATION (PPM)

16 PUMPING TEMPERATURE(8) : °C 165 110 110


17 FLOW (1,8) : m3/h 54.1 49.2
18 DISCHARGE PRESSURE(7) : (6.3.2) kg/cm2g 81.1
19 SUCTION PRESSURE(7) : kg/cm2g 4.2
(7)
20 DIFFERENTIAL PRESSURE : kg/cm2 76.9
21 DIFFERENTIAL HEAD(7) : m 840.5
22 NPSHA(2,7) : m 39
23 HYDRAULIC POWER(7) : kW 113.2

24 SITE AND UTILITY DATA


25 LOCATION: COOLING WATER :
26 OUTDOOR HEATED INLET RETURN DESIGN

27 MOUNTED AT : GRADE  TROPICALISATION REQD TEMP °C 32 MAX 46 80


28 ELECTRIC AREA CLASSIFICATION: CLASS: I 6.1.22 DIVISION 2 PRESS. kg/cm² g 6.0 MIN 2.1 10 NOTE 10
29 GROUP B&C&D TEMP CLASS T3 SOURCE Cooling Tower
30 SITE DATA : COOLING WATER CHLORIDE CONCENTRATION: <1000 ppm
31 ELEVATION (MSL) : 3.5~5.2 m BAROMETER : 1.034 kg/cm2a INSTRUMENT AIR : MAX 7.0 kg/cm² g MIN 6.0 kg/cm² g
32 RANGE OF AMBIENT TEMPS:MIN / MAX 10 / 48 °C STEAM
33 RELATIVE HUMIDITY: MIN / MAX 22 / 100 % DRIVERS HEATING
34 UNUSUAL CONDITIONS: DUST & FUMES TEMP °C Max
35 Min
36 UTILITY CONDITIONS : PRESS. kg/cm² g Max
37 ELECTRICITY : DRIVERS HEATING CONTROL SHUTDOWN Min
38 VOLTAGE 4000 127
39 PHASE 3 1
40 HERTZ 60 60

41 PERFORMANCE DRIVER (7.1.5)


42 PROPOSAL CURVE NO. R2B-P2-204-03-H-CDD-MGA135-01131 RPM 3576 Driver Type MOTOR
43 As Tested Curve No. GEAR
44 IMPELLER DIA.: RATED 211 MAX. 230 MIN. 202 mm VARIABLE SPEED REQUIRED NO
45 RATED POWER 200.1 kW EFFICIENCY 56.6 (%) SOURCE OF VARIABLE SPEED
46 RATED CURVE BEP FLOW (at rated impeller dia) 70.8 m3/h OTHER
47 MIN FLOW : THERMAL gpm STABLE 24.6 m3/h MANUFACTURER Hyundai Electric
48 PREFERRED OPERATING REGION (6.1.11) 49.6 to 84.4 m3/h NAMEPLATE POWER 260 kW
49 ALLOWABLE OPERATING REGION 24.6 to 84.4 m3/h Nominal RPM 3600
50 MAX HEAD @ RATED IMPELLER 940.9 m RATED LOAD RPM 3576
51 MAX POWER @ RATED IMPELLER (6.8.9) 236.5 kW FRAME OR MODEL 315
52 NPSH3 AT RATED FLOW : 4.1 m ORIENTATION HORIZONTAL
53 CL PUMP TO U/S BASEPLATE 0.8 m LUBE SELF OIL
54 NPSH MARGIN AT RATED FLOW : 34.90 m BEARING TYPE:
55 SPECIFIC SPEED (6.1.9) gpm,rpm,ft 815.76 RADIAL SLEEVE
56 SUCTION SPECIFIC SPEED LIMIT gpm,rpm,ft 11,000 THRUST N/A
57 SUCTION SPECIFIC SPEED gpm,rpm,ft 7,859.2 STARTING METHOD Open Valve (Fully-Loaded)
58 MAX. ALLOW. SOUND PRESS. LEVEL REQD (6.1.14) [email protected] (dBA) SEE DRIVER DATA SHEET R2B-P2-204-03-H-HD-MGA135-01136
59 EST MAX SOUND PRESS. LEVEL 85 (dBA)
60 MAX. SOUND POWER LEVEL REQ'D (6.1.14)
61 EST MAX SOUND POWER LEVEL

DATA SHEET No. R2B-P2-204-02-H-HD-10051 Rev: 00 SHEET 2 of 8


CENTRIFUGAL PUMP DATA SHEET
(GA-51008A/B)

1 CONSTRUCTION Rev
2 API PUMP TYPE: BB5 [Based on API 610 definitions] CASING MOUNTING: CENTERLINE
3 CASING TYPE: (6.3.10) DIFFUSER
4 NOZZLE CONNECTIONS: (6.5.5) OH3 BACKPULLOUT LIFTING DEVICE REQD. (9.1.2.6)

5 Size Facing Rating Position CASE PRESSURE RATING:

6 SUCTION 3" RTJ 900# TOP MAWP : (6.3.6) 98.9 kg/cm2g @ 150 °C

7 DISCHARGE 3" RTJ 900# TOP HYDROTEST : 148.3 kg/cm2g @ AMB °C


8 PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)
9 No. Size Type Facing Rating Posn. HYDROTEST OH PUMP AS ASSEMBLY
10 BALANCE/LEAK OFF SUCT'N PRESS. REGIONS DESIGNED FOR MAWP YES
11 DRAIN 1 1" WN RTJ 1500 BOT ROTATION: (VIEWED FROM COUPLING END) CW
12 VENT • IMPELLERS INDIVIDUALLY SECURED : YES
13 PRESSURE GAGE • BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION :
14 TEMP GAGE • PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS
15 WARM-UP LINE ROTOR:
16 SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3)
17 Drain Valve Supplied By SUPPLIER First Critical Speed Wet (Multi stage pumps only) YES
18 DRAINS MANIFOLDED NO COMPONENT BALANCE TO ISO 1940 G1.0 NO
19 VENT Valve Supplied By SELF VENTING SHRINK FIT -LIMITED MOVEMENT IMPELLERS (9.2.2.3) NO
20 VENTS MANIFOLDED NO
21 THREADED CONS FOR PIPELINE SERVICE & < 50°C (6.4.3.2) NO COUPLING:(7.2.3) (7.2.13.f)
22 SPECIAL FITTINGS FOR TRANSITIONING (6.4.3.3) NO MANUFACTURER PT COUPLING
23 CYLINDRICAL THREADS REQUIRED (6.4.3.8) NO MODEL THOMAS-71
24 GUSSET SUPPORT REQUIRED NO RATING (kW/100 RPM) 15.89
25 MACHINED AND STUDDED CONNECTIONS (6.4.3.12) NO SPACER LENGTH 300 mm
26 VS 6 DRAIN N/A SERVICE FACTOR Min. 1.5
27 DRAIN TO SKID EDGE YES RIGID NO
28 COUPLING WITH HYDRAULIC FIT (7.2.10) NO
29 MATERIAL (6.12.1.1) COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3) YES
30 APPENDIX H CLASS S-6 COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11)
31 MIN DESIGN METAL TEMP (6.12.4.1) 10 °C
32 REDUCED-HARDNESS MATERIALS REQ'D (6.12.1.12.1) COUPLING IN COMPLIANCE WITH (7.2.4) API 610 compliant
33 Applicable Hardness Standard (6.12.1.12.3) NA COUPLING GUARD STANDARD PER (7.2.13.a)
34 BARREL : ASTM A266 Gr.2 Window on Coupling Guard YES
35 CASE : ASTM A182 F6a
36 DIFFUSERS ASTM A743 CA6NM BASEPLATE
37 IMPELLER(9) : ASTM A743 CA6NM API BASEPLATE NUMBER : As per manufacturer
38 IMPELLER WEAR RING : ASTM A479 Tp 410 BASEPLATE CONSTRUCTION (7.3.14) FULL TOP DECKING
39 CASE WEAR RING : ASTM A479 Tp 410 BASEPLATE DRAINAGE (7.3.1) Entire Baseplate Drain Rim
40 SHAFT: ASTM A276 Tp 410 MOUNTING : GROUTED
41 Bowl (if VS-type) NON-GROUT CONSTRUCTION : (7.3.13) NOT REQUIRED
42 Inspection Class Level 2 VERTICAL LEVELING SCREWS : REQUIRED

43 BEARINGS AND LUBRICATION (6.10.1.1) LONGITUDINAL DRIVER POSITIONING SCREWS : REQUIRED


44 BEARING (TYPE / NUMBER): (6.11.4) SUPPLIED WITH :  GROUT AND VENT HOLES YES
45 RADIAL SLEEVE / BGP-55  DRAIN CONNECTION YES
46 THRUST BALL / 7308BDB MOUNTING PADS SIZED FOR BASEPLATE LEVELING (7.3.5) YES
47 REVIEW AND APPROVE THRUST BEARING SIZE : (9.2.5.2.4) MOUNTING PADS TO BE MACHINED (7.3.6) YES
48 PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET NO
49 LUBRICATION : (6.10.2.2) (6.11.3) (9.6.1) PURGE OIL MIST OTHER
50 PRESSURE LUBE SYSTEM TO ISO 10438- (9.2.6.5)
50 ISO 10438 DATA SHEETS ATTACHED
51 Pressurized Lube Oil System mtd on pump baseplate REMARKS :
52 Location of Pressurized Lube Oil System mounted on baseplate : Balancing Line Type : Internal
53
54 INTERCONNECTING PIPING PROVIDED BY
55
56 OIL VISC. ISO GRADE 68
57 CONSTANT LEVEL OILER : REQUIRED

DATA SHEET No. R2B-P2-204-02-H-HD-10051 Rev: 00 SHEET 3 of 8


CENTRIFUGAL PUMP DATA SHEET
(GA-51008A/B)

1 INSTRUMENTATION SEAL SUPPORT SYSTEM MOUNTING Rev


2 SEE ATTACHED API-670 DATA SHEET SEAL SUPPORT SYSTEM MOUNTED ON PUMP BASEPLATE
3 ACCELEROMETER (7.4.2.1) (7.5.1.4) YES
4 Number of Accelerometers N/A IDENTIFY LOCATION ON BASEPLATE
5 Mounting Location of Accelerometers
6 INTERCONNECTING PIPING BY Supplier
7 PROVISION FOR MTG ONLY (6.10.2.10)
8 Number of Accelerometers MECHANICAL SEAL (6.8.1)
9 Mounting Location of Accelerometers SEE ATTACHED ISO 21049/API 682 DATA SHEET NO
10 ADDITIONAL CENTRAL FLUSH PORT (6.8.9) NO
11 FLAT SURFACE REQUIRED (6.10.2.11) YES HEATING JACKET REQ'D. (6.8.11) NO
12 Number of Accelerometers
13 Mounting Location of Accelerometers HEATING AND COOLING (6.1.17)
14 COOLING REQ'D YES
15 VIBRATION PROBES (7.4.2.2) COOLING WATER PIPING PLAN K
16 PROVISIONS FOR VIB. PROBES N/A COOLING WATER PIPING PIPE
17 NUMBER PER RADIAL BEARING FITTINGS
18 NUMBER PER AXIAL BEARING COOLING WATER PIPING MATERIALS CS
COOLING WATER REQUIREMENTS:
19 MONITORS AND CABLES SUPPLIED BY (7.4.2.4) BEARING HOUSING 1.1 m³/hr
20 HEAT EXCHANGER 3.0 m³/hr
21 TEMPERATURE (7.4.2.3) TOTAL COOLING WATER 4.1 m³/hr
22 PROVISIONS FOR TEMP PROBES N/A HEATING MEDIUM
23 RADIAL BEARING TEMP. OTHER
24 NUMBER PER RADIAL BEARING HEATING PIPING
25 THRUST BEARING TEMP.
26 NUMBER PER THRUST BEARING ACTIVE SIDE PIPING & APPURTENANCES

27 NUMBER PER THRUST BEARING INACTIVE SIDE MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)
28 TEMP. GAUGES (WITH THERMOWELLS) (9.1.3.6) VENT N/A
29 PRESSURE GAUGE TYPE DRAIN YES
30 Remarks COOLING WATER YES
31 TAG ALL ORIFICES (7.5.2.4) YES
32 SOCKET WELD CONN ON SEAL GLAND (7.5.2.8) NO
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65

DATA SHEET No. R2B-P2-204-02-H-HD-10051 Rev: 00 SHEET 4 of 8


CENTRIFUGAL PUMP DATA SHEET
(GA-51008A/B)

1 SURFACE PREPARATION AND PAINT TEST Rev


2 MANUFACTURER'S STANDARD YES SHOP INSPECTION (8.1.1) Yes
3 OTHER (SEE BELOW) YES PERFORMANCE CURVE
4 SPECIFICATION NO. ET–053–PEMEX-2019, NRF-009-PEMEX-2019 & DATA APPROVAL PRIOR TO SHIPMENT. YES
5 TEST WITH SUBSTITUTE SEAL (8.3.3.2.b) NO
6 PUMP: MATERIAL CERTIFICATION REQUIRED CASING YES
7 PUMP SURFACE PREPARATION Sa2.5 (6.12.1.8) IMPELLER YES
8 PRIMER Barrier 77 SHAFT YES
9 FINISH COAT RAL9010 OTHER
10 CASTING REPAIR WELD PROCEDURE APPR REQD NO
BASEPLATE: (6.12.2.5) (6.12.3.1)
11 BASEPLATE SURFACE PREPARATION Sa2.5 INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)
12 PRIMER: Barrier 77 (6.12.3.4.e) MAG PARTICLE NO
13 FINISH COAT RAL8001 RADIOGRAPHY YES
14 DETAILS OF LIFTING DEVICES LIFTING LUG LIQUID PENETRANT YES
15 ULTRASONIC NO
16 SHIPMENT: (8.4.1) INSPECTION REQUIRED FOR CASTINGS
17 EXPORT BOXING REQUIRED YES MAG PARTICLE NO
18 OUTDOOR STORAGE MORE THAN 12 MONTHS YES RADIOGRAPHY NO
LIQUID PENETRANT YES
19 SPARE ROTOR ASSEMBLY PACKAGED FOR: ULTRASONIC NO
20 ROTOR STORAGE ORIENTATION (9.2.8.2) N/A HARDNESS TEST REQUIRED (8.2.2.7) YES
21 SHIPPING & STORAGE CONTAINER FOR VERT STORAGE (9.2.8.3) ADDNL SUBSURFACE EXAMINATION (6.12.1.5) (8.2.1.3) NO
22 N/A FOR
23 N2 PURGE (9.2.8.4) N/A METHOD
24 SPARE PARTS PMI TESTING REQUIRED (8.2.2.8) YES
25 START-UP YES COMPONENTS TO BE TESTED
26 NORMAL MAINTENANCE CASING, IMPELLER, SHAFT
27 WEIGHTS kg RESIDUAL UNBALANCE TEST (J.4.1.2) NO

28 ITEM No PUMP DRIVER COOLER BASE TOTAL NOTIFICATION OF SUCCESSFUL SHOP


29 GA-51008A 2100 2150 200 2800 7250 PERFORMANCE TEST (8.1.1.c) (8.3.3.5) YES
30 GA-51008B 2100 2150 200 2800 7250 BASEPLATE TEST (7.3.21) NO
31 HYDROSTATIC WIT
32 HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2) N/A
33 OTHER PURCHASER REQUIREMENTS PERFORMANCE TEST WIT
34 COORDINATION MEETING REQUIRED (10.1.3) YES TEST IN COMPLIANCE WITH (8.3.3.2) 8.3.3.2
35 MAXIMUM DISCHARGE PRESSURE TO INCLUDE TEST DATA POINTS TO (8.3.3.3) 8.3.3.3
36 MAX RELATIVE DENSITY YES TEST TOLERANCES TO (8.3.3.4) TABLE 15
37 OPERATION TO TRIP SPEED NO NPSH (8.3.4.3.1) (8.3.4.3.4) (Note 16) N/A
38 MAX DIA. IMPELLERS AND/OR NO OF STAGES NO NPSH-1ST STG ONLY (8.3.4.3.2) N/A
39 CONNECTION DESIGN APPROVAL (9.2.1.4) NO NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3) N/A
40 TORSIONAL ANALYSIS / REPORT (6.9.2.10) NO TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6) N/A
41 PROGRESS REPORTS YES RETEST ON SEAL LEAKAGE (8.3.3.2.d) N/A
42 OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5) NO RETEST REQUIRED AFTER FINAL HEAD ADJ (8.3.3.7.b) N/A
43 ADDITIONNAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1) COMPLETE UNIT TEST (8.3.4.4.1) N/A
44 YES SOUND LEVEL TEST (8.3.4.5) WIT
45 LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3) NO CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6) OBSERVE
46 MODAL ANALYSIS REQUIRED (9.3.9.2) NO LOCATION OF CLEANLINESS INSPECTION @ SUPPLIER'S
47 DYNAMIC BALANCE ROTOR (6.9.4.4) YES NOZZLE LOAD TEST N/A
48 INSTALLATION LIST IN PROPOSAL (10.2.3.l) NO CHECK FOR CO-PLANAR MOUNTING PAD SURFACES N/A
49 VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3) MECHANICAL RUN TEST UNTIL OIL TEMP STABLE WIT(One per Service)
50 NO 4 HR. MECH RUN AFTER OIL TEMP STABLE (8.3.4.2.1) WIT(One per Service)
51 TRANSIENT TORSIONAL RESPONSE (6.9.2.4) NO 4 HR. MECH RUN TEST (8.3.4.2.2) WIT(One per Service)
52 BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6) NO
IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e) NO BRG HSG RESONANCE TEST (8.3.4.7) N/A
53 CASING RETIREMENT THICKNESS DRAWING (10.3.2.3) NO STRUCTURAL RESONANCE TEST (9.3.9.2) N/A
54 FLANGES RQD IN PLACE OF SKT WELD UNIONS (7.5.2.8) NO REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST
55 INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3) YES (9.2.7.5) NON-WIT
56 CONNECTION BOLTING (7.5.1.7) AUXILIARY EQUIPMENT TEST (8.3.4.6) WIT
57 CADMIUM PLATED BOLTS PROHIBITED EQUIPMENT TO BE INCLUDED IN AUXILLIARY TESTS
58 VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.c) YES
59 VENDOR SUBMIT TEST PROCEDURES (8.3.1.1) YES LOCATION OF AUXILIARY EQUIPENT TEST
60 SUBMIT INSPECTION CHECK LIST (8.1.5) YES
61 IMPACT TEST (6.12.4.3) PER EN 13445
62 PER ASME SECTION VIII N/A
REMOVE CASING AFTER TEST N/A

DATA SHEET No. R2B-P2-204-02-H-HD-10051 Rev: 00 SHEET 5 of 8


CENTRIFUGAL PUMP DATA SHEET
(GA-51008A/B)

1 PRESSURE VESSEL DESIGN CODE REFERENCES Rev


2 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER
3 STANDARD DESIGN USED FOR PRESSURE VESSEL FOR THE CASING DESIGN
4 CASTING FACTORS USED IN DESIGN ( ET-050-PEMEX-2019)
5 SOURCE OF MATERIAL PROPERTIES
6 WELDING AND REPAIRS
7 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO ET-050-PEMEX-2019 IF NO PURCHASER PREFERENCE IS STATED)
8 ALTERNATE WELDING CODES AND STANDARDS
9 WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD)
10 WELDER/OPERATOR QUALIFICATION
11 WELDING PROCEDURE QUALIFICATION AS PER APPROVED ITP &
12 NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS QUALITY DOCUMENTS
13 MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES
14 POSTWELD HEAT TREATMENT
15 POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS
16
17 MATERIAL INSPECTION
18 THESE REFERENCES MUST BE LISTED BY THE PURCHASER DEFAULT TO ET-050-PEMEX-2019 YES
ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE ET-050-PEMEX-2019) (8.2.2.5)
19 TYPE OF INSPECTION METHOD FOR FABRICATIONS FOR CASTINGS
20 RADIOGRAPHY
21 ULTRASONIC INSPECTION
22 MAGNETIC PARTICLE INSPECTION AS PER APPROVED ITP & QUALITY DOCUMENTS
23 LIQUID PENETRANT INSPECTION
24 VISUAL INSPECTION (all surfaces)
25
26 REMARKS :
27 R2B-P2-204-03-H-PPI-MGA135-01006_INSPECTION AND TEST PLAN FOR PUMP
28 R2B-P2-204-03-H-PRT-MGA135-01007_INSPECTION AND TEST PROCEDURE FOR PUMP

29 (Including Hydro test, Balancing test, Mechanical running test, Performance test)
30 R2B-P2-204-03-H-PND-MGA135-01014_NDE PROCEDURE
31 R2B-P2-204-03-H-IPM-MGA135-01015_PMI PROCEDURE
32 R2B-P2-204-03-H-PSL-MGA135-01019_WPS & PQR
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

DATA SHEET No. R2B-P2-204-02-H-HD-10051 Rev: 00 SHEET 6 of 8


CENTRIFUGAL PUMP DATA SHEET
(GA-51008A/B)

1 Remark: Rev
2 1) Operation temperature 110°C.
3 2) Available NPSH is 38.912 m (127.7 ft).
4 3) Maximum operation temperature 120°C
5 4) Pump materials according to table H-1 of the ANSI / API STD 610 ed. 11 (ISO 13709-2009). Applies NACE STD MR 0103-2012
6 and MR 0175 / ISO 15156 Part 1-2-3 edition 2.
7 5) Deleted.
8 6) Pump drivers are premium efficiency electric motors.
9 7) Deleted.
10 8) Conditions indicated are based on the BME SOR, the Design case shown in the supplementary information.
11 9) Deleted.
12 10) Allowable pressure drop for cooling water system : 1 kg/cm2.
13 11) Design temperature : 150°C
14 12) Deleted.
15 13) Seal Plan : 23/61
16
17 General Remarks:
18 a) Pump and auxiliary system must be design according to ET-050-PEMEX-2019 ANSI /API STD 610 Ed. 11 (ISO 1379-2009).
19 b) Pump equipment paint must comply with ET-053-PEMEX-2019 and ET-009-PEMEX-2019.
20 c) Electric motors must be designed according to ET-048-PEMEX-2019, ET-095-PEMEX-2019 and ANSI/API STD 541.
21 d) Mechanical seal must be designed according to ANSI / API STD 682 4th.
22 e) Lubrication system must be designed according to ANSI / API STD 614, Ed. 5 ISO 10438-2007.
23 f) The pumps will be driven by electric motors.
24
25

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

DATA SHEET No. R2B-P2-204-02-H-HD-10051 Rev: 00 SHEET 7 of 8

You might also like