Drawing1 Model
Drawing1 Model
Recommending Approval:
Approved:
4200
FLL BASEMENT
2Ø16 2Ø16 #20@130 C/C
200
±2000
200
Ø12@200 TOP
& BOT BOTH WAYS
2300
BAR 1 BAR 1
200
20mm @130 bothways C/C
TYPICAL ELEVATION OF ELEVATOR PIT
2300
BAR 3
EW2
BAR 2
400
400
BAR 2 BAR 2
200 200
EW2
SCHEDULE OF REINFORCEMENTS FOR EW2
BAR 3
FLOOR BAR 1 BAR 2 VERTICAL HORIZONTAL COLUMN TIES
4TH - DECK 8Ø25
2F - 3F
LGF - 2F
8Ø25
8Ø25
8Ø25
Ø12@250 Ø10@250
8Ø25
8Ø25
Ø10 TIES - 2/SET
4@100, REST@150
Ø12@250 Ø10@200
Ø16@250 Ø12@250
Ø10 TIES - 2/SET
4@100, REST@150
Ø10 TIES - 2/SET
4@100, REST@150
200
CONCURED BY:
NOTE :
USE Ø10 CLAMPS @ 500mm O.C. VERT / HOR. SPACING FOR BAR 3
DATE:
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JESS VLADIMIR L. HINOGUIN
ELEVATOR PIT AND SHEAR WALL DETAILS ENGINEER II
REGION VII
CONSTRUCTION OF A PREPARED: S
ELVIS G. CALUNOD
FOUR-STOREY MULTIPURPOSE BUILDING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER
POBLACION, MEDELLIN, CEBU IN ANTIPOLO, MEDELLIN, CEBU DATE: DATE: DATE: DATE: 05 15 113
NATHANIEL G. MANGUBAT
ENGINEER II