Boq for Coal Firing With Mill-Abcd

The document outlines the balance of work required for coal firing in the boiler area, detailing various equipment and tasks that need to be completed, such as commissioning of valves, erection of lines, and testing of systems. It specifies the status of different components, indicating which tasks are pending and which have been completed. Additionally, it includes a list of required gates and dampers for the boiler light-up process, along with their erection and actuator completion status.

Uploaded by

jp mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views11 pages

Boq for Coal Firing With Mill-Abcd

The document outlines the balance of work required for coal firing in the boiler area, detailing various equipment and tasks that need to be completed, such as commissioning of valves, erection of lines, and testing of systems. It specifies the status of different components, indicating which tasks are pending and which have been completed. Additionally, it includes a list of required gates and dampers for the boiler light-up process, along with their erection and actuator completion status.

Uploaded by

jp mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

U#1 BALANCE OF WORK FOR COAL FIRING I

SL NO Equipment
1

2
3
4
5 Coal Mill
6
7
8
9

10
11
12
Coal feeder
13
14
15
16
17 Pressure Parts
18
19
20
21 MRHS
22
23

24

25
W/B & LRSB

26
27
28
29
30
SCAPH
31
32
33 Logic
34
ASLD
35
36
Seal Air System
Seal Air System
37
38
39
40 APRDS

41

42

ESP
43
44
U#1 BALANCE OF WORK FOR COAL FIRING IN BOILER AREA

DESCRIPTION
ALL MILLS MDV TO BE COMMISSIONED

All MILLS SEAL AIR VALVE COMMISSIONING


ALL MILLS CLASIFIER SETTING
MILL INERTING LINE ERECTION COMPLETION
MILL INERTING LINE COMPLETE INSULATION
Mill E/F/G/H side Hot PA / Cold PA/MIX air Duct ATT
MILL-C HAGheavy air leakage to be arrested
MILL MOTOR CURRENT TO BE PROVIDED IN DCS
Clean Air Flow Test To be done for all the mills
Dirty Air Flow Test to be done .
ALL FEEDERS SEAL AIR VALVE COMMISSIONING
All FEEDERS I/L GATE LIMIT SWITCH CONNECTION PENDING .
All FEEDERS SEAL AIR VALVE COMMISSIONING
All FEEDERS EMPTYING-OUT CHUTE ERECTION PENDING
ALL COAL FEEDERS VIEW GLASS SEAL AIR VALVE CONNECTION PENDING .
feder inlet sampling line to be provided
Drum/MS Safety Valves Floating Pending
Boiler Right side MS ERV / Both left & Right HRH ERVs to be made ready .
Boiler Right side MS ERV / Both left & Right HRH ERVs to be made ready .
MILL REJECT HANDLING SYSTEM ERECTION COMPLETION .
MRHS ALL KGV VALVES OF Mill A/B/C/D OPERATION CHECKING PENDING .
MRHS COMPRESSOR ERECTION
MRHS CONVEYING LINE ERECTION COMPLETION
MRHS SILO ERECTION COMPLETION
WALL BLOWERS LOCAL MOTORISED OPERATION TO BE CHECKED

LRSB MOTORS TO BE FITTED


LOCAL OPERATION TO BE CHECKED

ALL WALLBLOWERS DRAIN SOLENOID VALVES (5 NOS.) TO BE COMMISSIONED .


All WB ,LRSB,LRTP FROM DCS
Wall blowers Drain station oriffice to be erected.
Scaph Supply line insulation to be done .
Scaph Supply Control Valves (2 nos.) to be commissioned .
Scaph Coils Indivisual Steam Supply station MIVs Handwheel missing
Air Line erection to the Control Valves pending
IGNITION ENERGY PERMIT LOGIC IMPLEMENTATION
ASLD SYSTEM AIR LINE READINESS
ASLD SYSTEM REMOTE CHECKING & DCS READINESS .
BLEED AIR TO WINDBOX DP SOLENOID VALVE TO BE COMMISIONED
SEAL AIR DP ACROSS DYNAVANE FILTER TO BE COMMISSIONED IN DCS
MS to PRDS Supply line Bypass Motorised Control V/V ASV-74 to be erected .
CRH to PRDS Supply line Motorised V/V ASV-28 Actuator Not fitted
CRH to PRDS Supply line Motorised V/V ASV-25 Local & Remote Trial Pending .
HT to LT PRDS Desuperheater Sray line Motorised CV CDV-93 Actuator is not
commissioned due to card issue
Pass-B LTMSB/ACP to be Charged
Pass-C LTMSB I/C-2 to be charged
Pass-A LTMSB I/C-2 to be charged
Still Air Charging to be Done in all Passes
Still Air Load test to be Done in all Passes
COAL FIRING IN BOILER AREA
DATE-19-10-2024
RESPONSIBILITY REMARK
1. Mill-A/B/C/D MDV Operation to be checked
C&I
2. Limit switchES to be fitted .
C&I Only E/F/G/H Pending .
BOILER
BOILER
BOILER
Boiler
Boiler
C&I/ELECTRICAL
BOILER / C&I / OPERATION
BOILER / C&I / OPERATION
BOILER/C&I
C&I
BOILER/C&I
Boiler
Boiler
Boiler
Boiler
Boiler
C&I
BOILER
C&I

BOILER
BOILER
BOILER 1. Only WB-47/68/69/74 Local operation checked.
2. Total 8/176 motors local operation checked.

1. 36/80 Motors fixed By erection


BOILER / C&I 2. 41/80 Motors Handed over By electrical to Boiler
3. 0/80 LRSB Motors Local Opeartion Checked .
BOILER
ELECTRICAL/C&I
BOILER
BOILER
BOILER/C&I
BOILER
BOILER
C&I
C&I
C&I
C&I
C&I
BOILER
BOILER
BOILER

ELECTRICAL

ELECTRICAL

ELECTRICAL / Mech
ELECTRICAL / Mech
GATE & DAMPER REQUIRED FOR BOIL
DATE-18/10/2024 UNIT-2
SL NO. ERECTION ACTUATOR ERECTION
Description
COMPLETION COMPLECTION
1 IDF-B Inlet Gate LHS DONE NOT ERECTED
2 IDF-B Inlet Gate RHS DONE NOT ERECTED
3 IDF-B Outlet Gate LHS DONE ERECTED
4 IDF-B Outlet Gate RHS DONE ERECTED
5 IDF-A Inlet Gate LHS DONE NOT ERECTED
6 IDF-A Inlet Gate RHS DONE NOT ERECTED
7 ESP Inlet Pass C LHS DONE NOT ERECTED
8 ESP Inlet Pass C RHS DONE NOT ERECTED
9 ESP Inlet Pass D LHS DONE NOT ERECTED
10 ESP Inlet Pass D RHS DONE NOT ERECTED
11 ESP Outlet Pass C LHS DONE NOT ERECTED
12 ESP Outlet Pass C RHS DONE NOT ERECTED
13 ESP Outlet Pass D LHS DONE NOT ERECTED
14 ESP Outlet Pass D RHS DONE NOT ERECTED
15 APH-B Gas Inlet-1 Damper LHS DONE ERECTED
16 APH-B Gas Inlet-2 Damper RHS DONE ERECTED
17 APH-B Gas Outlet-1 Damper LHS DONE ERECTED
18 APH-B Gas Outlet-2 Damper RHS DONE ERECTED
19 APH-A Gas Inlet-1 Damper LHS DONE ERECTED
20 APH-A Gas Inlet-2 Damper RHS DONE NOT ERECTED
21 APH-A Gas Outlet-1 Damper LHS DONE NOT ERECTED
22 APH-A Gas Outlet-2 Damper RHS DONE NOT ERECTED
23 FDF-B Outlet Gate DONE ERECTED
24 SCAPH-B Inlet Damper DONE ERECTED
25 SCAPH-B Outlet Damper DONE ERECTED
26 SCAPH-B Bypass Damper DONE ERECTED
27 APH B Outlet Secondary air Damper DONE ERECTED
28 FDF-A Outlet Gate DONE ERECTED
29 SCAPH-A Inlet Damper DONE ERECTED
30 SCAPH-A Outlet Damper DONE ERECTED
31 SCAPH-A Bypass Damper DONE ERECTED
32 APH A Outlet Secondary air Damper DONE NOT ERECTED
33 ESP Inlet Pass A LHS NOT DONE NOT ERECTED
34 ESP Inlet Pass A RHS NOT DONE NOT ERECTED
35 ESP Inlet Pass B LHS NOT DONE NOT ERECTED
36 ESP Inlet Pass B RHS NOT DONE NOT ERECTED

DONE NOT ERECTED


37 ESP Outlet Pass A LHS
38 ESP Outlet Pass A RHS DONE NOT ERECTED
39 ESP Outlet Pass B LHS DONE NOT ERECTED
40 ESP Outlet Pass B RHS DONE NOT ERECTED

TOTAL-40 NOS
UIRED FOR BOILER LIGHT UP
UNIT-2
Motorised Operation (From
Remote Operation REMARK
Local)

FOR ISOLATION PURPOSE


FOR ISOLATION PURPOSE

FOR ISOLATION PURPOSE


FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
DONE DONE COMMISSIONED

FOR ISOLATION PURPOSE


FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE

FOR ISOLATION PURPOSE


FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE
FOR ISOLATION PURPOSE

TAL-40 NOS
FROM ID FAN-A TO ID
FAN OUT LET GATE
DUCT NOT ERECTED.