0% found this document useful (0 votes)
2 views

Estimator Program

The document provides detailed specifications for various structural components, including beams, scaffolding, and formworks, along with their dimensions, weights, and quantities required for construction. It includes calculations for vertical and horizontal supports, as well as materials needed for concrete columns and footings. Additionally, it outlines the standard weights of different sizes of bars used in the construction process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Estimator Program

The document provides detailed specifications for various structural components, including beams, scaffolding, and formworks, along with their dimensions, weights, and quantities required for construction. It includes calculations for vertical and horizontal supports, as well as materials needed for concrete columns and footings. Additionally, it outlines the standard weights of different sizes of bars used in the construction process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 37

Section Length (m) Mass(kg)

W24X68 186.04 18,891.74


W27X114 411.35 69,826.61
W18X86 150.46 19,230.89
W27X146 117 25,535.17
W14X30 591.5 26,446.48
W6X9 115.87 1,568.91
W6X15 22 492.35
W16X36 123.94 6,637.31
SCAFFOLDINGS FOR BEAMS
FOR 2X3X10 VERTICAL SUPPORT:

TOTAL LENGTH 1.23


CONSTANT X6
BOARD FOOT 7.38
CONSTANT BF/5
NO. OF PIECES 1.476

FOR 2X2X10 HORIZONTAL SUPPORT:

TOTAL LENGTH 1.23


CONSTANT X21
BOARD FOOT 25.83
CONSTANT BF/3.33
NO. OF PIECES 7.8

SUMMARY:
NO. OF PIECES BOARD FOOT
2"X3"X10' VERTICAL SUPPORT 1.6974 8.487
2"X2"X10' HORIZONTAL SUPPORT 8.9 25.83
4" Nails 1.032585 1.032585
SCAFFOLDINGS FOR COLUMNS
FOR 2X3X10 VERTICAL SUPPORT:
NO. OF COLUMNS 8
HEIGHT OF COLUMN 4.2 (footing to roof beam)
TOTAL HEIGHT 33.6
CONSTANT X7
BOARD FOOT 235.2
CONSTANT BF/5
NO. OF PIECES 47.04

FOR 2X2X10 HORIZONTAL SUPPORT:


NO. OF COLUMNS 8
HEIGHT OF COLUMN 4.2 (footing to roof beam)
TOTAL HEIGHT 33.6
CONSTANT X21
BOARD FOOT 705.6
CONSTANT BF/3.33
NO. OF PIECES 211.9

FOR 2X2X10 DIAGONAL BRACES:


NO. OF COLUMNS 8
HEIGHT OF COLUMN 4.2 (footing to roof beam)
TOTAL HEIGHT 33.6
CONSTANT X11.7
BOARD FOOT 393.12
CONSTANT BF/3.33
NO. OF PIECES 118.1

SUMMARY:
NO. OF PIECES BOARD FOOT
2"X3"X10' VERTICAL SUPPORT 54.096 270.48
2"X2"X10' HORIZONTAL SUPPORT 243.7 705.6
2"X2"X10' DIAGONAL BRACES 135.8 452.088
4" Nails 28.2072 kg
FORMWORKS FOR COLUMNS
FOR 1/4X4X8 ORDINARY PLYWOOD:
SIZE OF COLUMN 0.25
CONSTANT X4SIDES
HEIGHT OF COLUMN 4.2 (footing to roof beam)
AREA OF COLUMN 4.2
NO. OF COLUMNS 8
TOTAL AREA 33.6
CONSTANT X0.46
NO. OF PIECES 13.416667

FOR 2X2X10 COCO LUMBER:


SIZE OF COLUMN 0.25
CONSTANT X4SIDES
HEIGHT OF COLUMN 4.2 (footing to roof beam)
AREA OF COLUMN 4.2
NO. OF COLUMNS 8
TOTAL AREA 33.6
CONSTANT X29.67
BDFT 457.78338

SUMMARY:
NO. OF PIECES
1/4"X4'X8' ORDINARY PLYWOOD: 13.416666666667 sheets
2"X2"X10' COCO LUMBER: 457.783375 bdft
1" Finishing Nails 1.28 kg
2 1/2" Nails 3.09 kg
FORMWORKS FOR BEAMS
FOR 1/4X4X8 ORDINARY PLYWOOD:

SIZE OF BEAM (SIDES) 0.4


TOTAL SPAN 2.55
CONSTANT X2SIDES
AREA 2.04

SIZE OF BEAM (BOTTOM) 0.2


TOTAL SPAN 2.55
AREA 0.51

TOTAL AREA 2.55


CONSTANT X0.40
NO. OF PIECES 1.02

FOR 2X2X10 COCO LUMBER FRAMING:

TOTAL AREA 2.55


CONSTANT X6.4
BOARD FOOT 16.32
CONSTANT X3.33
NO. OF PIECES 54.3

SUMMARY:
NO. OF PIECES
FOR 1/4X4X8 ORDINARY PLYWOOD: 1.02 sheet
FOR 2X2X10 COCO LUMBER: 54.35 bdft
1" Finishing Nails 0.10 kg
2 1/2" Common Wire Nails 0.15 kg
P
FOR SQUARE FOOTING
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow

Thickness 0.30
Width 1.50
No. of bars 7.00 one way only

THICKNESS
No. of footing
on this size 13.00

Materials needed:
Cement 90.82 bags
Sand 5.05 cu.m. Compacted base c
Gravel 10.09 cu.m. Thk (m)
bars 26.16 length specify diameter 0.10
Tie wire 4.93 klg. 0.20
Gravel Base 5.07 0.30
Footing total 8.77 cu.m. 0.40
0.50
FORMS 0.60
1.80 Sq. Mtrs for one footing only
23.40 Sq. Mtrs for total No. of footing

Standard weight of plain & deformed bars


Size 1.0 m 6.0 m One way 2 way 15% allo
kgs kgs kgs kgs kgs
8 mmǿ 0.40 2.37 10.33 20.67 23.77
10 mmǿ 0.62 3.70 16.13 32.27 37.11
12 mmǿ 0.89 5.33 23.24 46.48 53.45
16 mmǿ 1.58 9.47 41.29 82.59 94.97
20 mmǿ 2.47 14.80 64.53 129.07 148.43
25 mmǿ 3.85 23.12 100.81 201.63 231.87
28 mmǿ 4.83 29.00 126.45 252.90 290.84
30 mmǿ 5.55 33.29 145.16 290.32 333.86
32 mmǿ 6.31 37.88 165.17 330.35 379.90
36 mmǿ 7.99 47.95 209.08 418.16 480.89
just type "0" zero on the yellow box

0.67 6.07
0.34
1.75
24.5
4.491667
637.00

WIDTH

Compacted base course ( total footings)


No allowance 30% Allowance
3.90 cu m 5.07 cu m
7.80 cu m 10.14 cu m
11.70 cu m 15.21 cu m
15.60 cu m 20.28 cu m
19.50 cu m 25.35 cu m
23.40 cu m 30.42 cu m

247.758875
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just typ

COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING


vol 10.088
tot.ht. 5.450 Height col. 4.85 Number of column
tot lngth 566.80 Side 1 col. 0.40 this size 13
strp L 1.600 Side 2 col. 0.40
s1 0.100 Thickness of footing (TF)
s2 3.000 Number of for this column 0.30
s3 - vertical bars 8.00
rem S 15.67 Special Ties -
no. S 31.67 Confinement of stirrups:
no. jt. 88.67 No. of stirrups S1 1 S1 Spaced at 0.050
eS - No. of stirrups S2 15 S2 Spaced at 0.100
No. of stirrups S3 0 S3 Spaced at -
rest spaced at 0.150

Materials needed:
Cement 104.41 bags
Sand 5.80 cu.m.
Gravel 11.60 cu.m.
Vertical bars 103.13 lnght specify diameter 16
Stirrups 109.78 lnght specify diameter
Tie wire 22.17 klg.
Concrete Vol. 11.60 klg.

FORMS
1.60 Mtrs (Total Width)
7.76 Sq. Mtrs (Area for one column)
100.88 Sq. Mtrs (Total No. of column)

Standard weight of plain & deformed bars


Size 1.0 m 6.0 m Vertical Bars Stirrups
kgs kgs kgs kgs
8 mmǿ 0.40 2.37 40.74
10 mmǿ 0.62 3.70 63.60 406.18
12 mmǿ 0.89 5.33 91.62
16 mmǿ 1.58 9.47 162.78
20 mmǿ 2.47 14.80 254.40
25 mmǿ 3.85 23.12 397.41
28 mmǿ 4.83 29.00 498.48
30 mmǿ 5.55 33.29 572.22
32 mmǿ 6.31 37.88 651.12
36 mmǿ 7.99 47.95 824.21
you want to erase just type "0" zero on the yellow box

OOR CEILING SIDE 1


SIDE 2

Stirrup - rest
NOTE:If stirrups spaced
Height up to bottom of 2nd floor slab only

uniformly, type "0" zero on


"no. of stirrups" yellow box

Stirrup - S3

Stirrup - S2
104.41
5.80
Stirrup - S1
11.60
103.133333

Thickness 109.78
Footing (TF) 22.17
100.88

Stirrups
0.01 m specify diameter
FOR CONCRETE COLU
Fill up only the yellow box, do not save after using this estimate, if you want to era
COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FL

VOL. 2.4375 Height col. 3.00 Number of column


TOT.HE 42.90 172 Side 1 col. 0.25 this size
S1 0.10 Side 2 col. 0.25
S2 3.00
S3 - Number of
REST S (0.10) vertical bars 4.00
REST S P -0.66667
NO. OF 15.333333 Confinement of stirrups:
S LENG 1.00 No. of stirrups S1 1 S1 Spaced at
TOT L F 199.33333 No. of stirrups S2 15 S2 Spaced at
TIE 279.07 No. of stirrups S3 0 S3 Spaced at
rest spaced at

Materials needed:
Cement 25.23 bags
Sand 1.40 cu.m.
Gravel 2.80 cu.m.
Vertical bars 179.40 m specify diameter (15
Stirrups 36.54 lnght specify diameter
Tie wire 5.37 klg.
Concrete Vol. 2.80 klg.

Standard weight of plain & deformed bars


Size 1.0 m 6.0 m Vertical Bars
kgs kgs kgs
8 mmǿ 0.40 2.37
10 mmǿ 0.62 3.70
12 mmǿ 0.89 5.33
16 mmǿ 1.58 9.47 283.15
20 mmǿ 2.47 14.80 442.52
25 mmǿ 3.85 23.12 691.29
28 mmǿ 4.83 29.00 867.10
30 mmǿ 5.55 33.29 995.37
32 mmǿ 6.31 37.88 1,132.61
36 mmǿ 7.99 47.95 1,433.71
OR CONCRETE COLUMN
is estimate, if you want to erase just type "0" zero on the yellow box
LINE TO PRECEEDING FLOOR CEILING
SIDE 1
r of column
13

SIDE 2
SLAB 2ND FLOOR
Height from ground floor line to ceiling of preceeding

0.050 STIRRUP - REST


0.100
NOTE:If stirrups spaced
- uniformly, type "0" zero on
0.150 "no. of stirrups" yellow box

STIRRUP - S3
25.23
1.40
2.80
STIRRUP - S2
16 179.4
STIRRUP - S1
floor

36.54
GROUND FLOOR S 5.37
3.00

Stirrups FORMS
kgs 3.00 Sq m

135.21
FOR CONCRETE COLUMN
### Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
r2
### COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING
###
vo
###
to Height col. - Number of column
###
to Diameter - this size -
###
st
###
s1 Thickness of footing (TF)
###
s2 Number of for this column -
###
s3 vertical bars -
###
re
###
no Confinement of stirrups:
###
no No. of stirrups S1 0 S1 Spaced at -
No. of stirrups S2 0 S2 Spaced at -
No. of stirrups S3 0 S3 Spaced at -
rest spaced at -

Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Vertical bars - m specify diameter
Stirrups #DIV/0! lnght specify diameter
Tie wire #DIV/0! klg.

Standard weight of plain & deformed bars


Size 1.0 m 6.0 m Vertical Bars Stirrups
kgs kgs kgs kgs
8 mmǿ 0.40 2.37
10 mmǿ 0.62 3.70 #DIV/0!
12 mmǿ 0.89 5.33 -
16 mmǿ 1.58 9.47 -
20 mmǿ 2.47 14.80 -
25 mmǿ 3.85 23.12 -
28 mmǿ 4.83 29.00 -
30 mmǿ 5.55 33.29 -
32 mmǿ 6.31 37.88 -
36 mmǿ 7.99 47.95 -
t to erase just type "0" zero on the yellow box

DIAMETER

Stirrup - rest
NOTE:If stirrups spaced
Height up to bottom of 2nd floor slab only

uniformly, type "0" zero on


"no. of stirrups" yellow box

Stirrup - S3

Stirrup - S2

Stirrup - S1

Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
ra COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
###
###
VO Height col. - Number of column
###
###
TO Diameter - this size -
###
S1
###
S2
###
S3 Number of
###
RE vertical bars -
###
RE
###
NO Confinement of stirrups:
###
S No. of stirrups S1 0 S1 Spaced at -
###
TO No. of stirrups S2 0 S2 Spaced at -
###
TI No. of stirrups S3 0 S3 Spaced at -
rest spaced at -

Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Vertical bars - lnght specify diameter
Stirrups #DIV/0! lnght specify diameter
Tie wire #DIV/0! klg.

Standard weight of plain & deformed bars


Size 1.0 m 6.0 m Vertical Bars Stirrups
kgs kgs kgs kgs
8 mmǿ 0.40 2.37
10 mmǿ 0.62 3.70
12 mmǿ 0.89 5.33
16 mmǿ 1.58 9.47
20 mmǿ 2.47 14.80
25 mmǿ 3.85 23.12
28 mmǿ 4.83 29.00
30 mmǿ 5.55 33.29
32 mmǿ 6.31 37.88
36 mmǿ 7.99 47.95
o erase just type "0" zero on the yellow box
G FLOOR CEILING
DIAMETER

SLAB 2ND FLOOR


Height from ground floor line to ceiling of preceeding floor

STIRRUP - REST
NOTE:If stirrups spaced
uniformly, type "0" zero on
"no. of stirrups" yellow box

STIRRUP - S3

STIRRUP - S2

STIRRUP - S1

GROUND FLOOR SLAB


FOR ZOCALLO
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zer

Width 0.40
Thickness 0.25
Length 5.11
.
No. of Longitudinal bars 3
Spacing of Transverse bars 0.30

Materials needed:
5.29 Cement 5.29 bags
0.29 Sand 0.29 cu.m.
0.59 Gravel 0.59 cu.m.
Def. Bars 4.32 lnght
0.30 Tie wire 0.30 klg.
vol
### Footing total 0.51 cu.m.
long
15 4.32 Standard weight of plain & deformed bars
trans Size 1.0 m 6.0 m Vert Bars Stirrups
18 kgs kgs kgs kgs
### 8 mmǿ 0.40 2.37
10 mmǿ 0.62 3.70
12 mmǿ 0.89 5.33 23.04
16 mmǿ 1.58 9.47 40.94
20 mmǿ 2.47 14.80 63.98
25 mmǿ 3.85 23.12 99.95
28 mmǿ 4.83 29.00 125.38
30 mmǿ 5.55 33.29 143.92
32 mmǿ 6.31 37.88 163.77
36 mmǿ 7.99 47.95 207.30
want to erase just type "0" zero on the yellow box

Natural ground

CHB

Longitudinal bars

Transverse bars

Thickness

Width
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase j
STIRRUPS - S1

vol. 64.8
main 1,944.00

HEIGHT
L strp 2.60
s1 1.80
s2 0.75
s3 0.90
rest 1.05 WIDTH L/2
s4 6.25
tot s 21.25 Height 0.80
tot L 1,989.00 Width 0.50
joints 9180 Length 4.50
tie 3213
No. of beams Confinement of stirrups:
this size 36.00 No. of stirrups S1 9
No. of stirrups S2 3
Number of No. of stirrups S3 3
main bars 12.00

using 12.0 meters/length

2.10
Forms 9.45
Total 340.20

Standard weight of plain & deformed bars


Size 1.0 m 12.0 m Vert Bars
kgs kgs kgs
8 mmǿ 0.40 2.37
10 mmǿ 1.23 7.40
12 mmǿ 0.89 5.33 958.44
16 mmǿ 3.16 18.94 3,405.79
20 mmǿ 2.47 14.80 2,661.34
25 mmǿ 7.71 46.24 8,314.88
28 mmǿ 4.83 29.00 5,214.78
30 mmǿ 5.55 33.29 5,986.21
32 mmǿ 6.31 37.88 6,811.58
36 mmǿ 7.99 47.95 8,622.37
NCRETE BEAM
s estimate, if you want to erase just type "0" zero on the yellow box
STIRRUPS - S1
STIRRUPS - S2
STIRRUPS - S3
STIRRUPS - REST

L/4 L/2

LENGTH O.C. OF COLUMN

Materials needed:
S1 Spaced at 0.100 Cement 670.68 bags
S2 Spaced at 0.125 Sand 37.26 cu.m.
S3 Spaced at 0.150 Gravel 74.52 cu.m.
rest spaced at 0.200 Main bars 179.82 lenght
Stirrups 364.65 lenght
Tie wire 61.79 kgs.
Main bars 8,314.88 kgs.
Beam total 64.80 cu.m.
Mtrs ( Total Width)
Sq. Mtrs( 1 Beam only )
Sq. Mtrs( Total No. of Beams)

STIFFINER
No. of bars 4 pcs
eformed bars size 16 mm dia.
Stirrups 648 lm
kgs 59.94 length

2,698.41 7.4

18.94
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on
STIRRUPS - S1
STIRRUPS - S2
STIRRUPS - S3
HEIGHT

WIDTH L/2 L/4

Height 0.35
Width 0.25
LENGTH O.C. OF COLUMN
Length 2.15

No. of beams Confinement of stirrups:


this size 1.00 No. of stirrups S1 1 S1 Spaced at 0.050
No. of stirrups S2 12 S2 Spaced at 0.075
Number of No. of stirrups S3 S3 Spaced at
main bars 8.00 rest spaced at 0.150

using 6.0 meters length rebars

Mtrs ( Total Width)


Forms 2.04 Sq. Mtrs( 1 Beam only )
Total 2.04 Sq. Mtrs( Total No. of Beams)

Standard weight of plain & deformed bars


Size 1.0 m 6.0 m Vert Bars Stirrups
kgs kgs kgs kgs
8 mmǿ 0.40 2.37
10 mmǿ 0.62 3.70 12.75
12 mmǿ 0.89 5.33 16.96
16 mmǿ 1.58 9.47 30.13
20 mmǿ 2.47 14.80 47.09
25 mmǿ 3.85 23.12 73.57
28 mmǿ 4.83 29.00 92.28
30 mmǿ 5.55 33.29 105.93
32 mmǿ 6.31 37.88 120.53
36 mmǿ 7.99 47.95 152.58
ase just type "0" zero on the yellow box

STIRRUPS - S3
STIRRUPS - REST

L/4 L/2

H O.C. OF COLUMN

Materials needed:
Cement 1.95 bags 1.95
Sand 0.11 cu.m. 0.11
Gravel 0.22 cu.m. 0.22
Main bars 3.18 lnght 3.18
Stirrups 3.45 lnght 3.45
Tie wire 0.84 klg. 0.84
Beam total 0.19 cu.m. 2.04

o. of Beams)
FOR CHB WALLING/PARTITION
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" ze
you may include height from zocallo to ceiling
Total length 70.00

HEIGHT just for a single floor


Height 3.80 1 floor

TO DESIGNATE WHAT SIZE OF CHB YOU'RE


USING, TYPE " 1" ONE ON THE YELLOW BOX
BELOW

Using 4"x8"x16" 1
Using 6"x8"x16" -
Class A
FOR PLASTERING (class "B") METHOD,
CHOOSE BY TYPING " 1 " ONE ON YELLOW Less: OPENNINGS on one floor onl
BOX BELOW
Description
Plastering 1 side only Door 1
Plastering 2 sides - Door 2
Door 3
Materials needed: Door 4
Cement 182.40 bags Door 5
Sand 21.23 cu.m. Door 6
Def. Bars 188.92 pcs. specify diameter
C.H.B. 3,310.56 pcs. specify size (thickness)
Tie wire 18.89 klg.
Note: Steel Reinforcement for CHB; Vertical bars - dist. @ 0.60m o.c., Horizontal bars - @ every 3 layers
ARTITION
u want to erase just type "0" zero on the yellow box
CEILING LINE Do 11.34
Wi 24.36
To 35.70
LESS OPENNINGS OF
WINDOWS & DOORS Ar 266
Ne 230.30
4"
ce 8.38
mo 90.74
FLOOR LINE
ce 75.45
sa 10.08
TOTAL LENGTH sa 8.38
s: OPENNINGS on one floor only, CHB quantity for another floor must be done separately.
Area No. of units Description Area No. of units ce 0.792
3.78 1 Window 1 11.52 1 sa 182.40
5.04 1 Window 2 2.88 1 18.46
2.52 1 Window 3 6.72 1 ce1 face
- - Window 4 2.52 1 ce -
- - Window 5 0.72 1 ve -
- - Window 6 - - ho 490.54
495.15
Total window opennings 985.68
for this floor only 24.36 sq.m.
rs - @ every 3 layers
Cement
Sand
area Def. Bars
2,993.90 785.7 291 582 C.H.B.
6" 1115.1 413 826 Tie wire
14.37 213.472 76.24 76.24
174.80 2114.272 1560.48 1484.24
129.34 11745.95556
19.43 326.276543
14.37

1.526
- ### ### Size of CHB A B C D
- ### ### 4" 0.792 0.522 0.394 0.328
2 face ### ### 6" 1.526 1.018 0.763 0.633
- - ### 8" 2.26 1.5 1.125 0.938
- - ###
- -
4" 6" 8"
A 0.792 1.526 2.26
B 0.522 1.018 1.5
C 0.394 0.763 1.125
D 0.328 0.633 0.938
16.3921542 bags
1.82071946 cu.m.
17.8248019 pcs.
283.955 pcs.
1.78248019 klg.
FOR TWO WAY CONCRETE SLAB
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the ye

###V For bar spacing, choose by tping "1"


on the yellow box below
###A
USE SPACING OF
tie
bars
wireBar Spacing MAIN
###
###
###
### 0.100 m. o.c. - REINFORCEMENT
###
###
###
### 0.125 m. o.c. -

WIDTH
###
###
###
### 0.150 m. o.c. -

(m)
###
###
###
### 0.175 m. o.c. -
###
###
###
### 0.200 m. o.c. -
###
###
###
### 0.225 m. o.c. -
###
###
###
### 0.250 m. o.c. -
###
###
###
### 0.275 m. o.c. -
###
###
###
### 0.300 m. o.c. -
###
###
L/2 L / 4 Spaced at ___
Length 1.83
Width 1.50 LENGTH (m)
Thickness 0.30 Materials needed:
Cement 8.50 bags
No. of Slab this size 1.00 Sand 0.47 cu.m.
Gravel 0.94 cu.m.
Def. Bars - pcs.
Tie wire - klg.

Standard weight of plain & deformed bars


Size 1.0 m 6.0 m Vert Bars Stirrups
kgs kgs kgs kgs
8 mmǿ 0.40 2.37
10 mmǿ 0.62 3.70
12 mmǿ 0.89 5.33
16 mmǿ 1.58 9.47
20 mmǿ 2.47 14.80
25 mmǿ 3.85 23.12
28 mmǿ 4.83 29.00
30 mmǿ 5.55 33.29
32 mmǿ 6.31 37.88
36 mmǿ 7.99 47.95
st type "0" zero on the yellow box

paced at ___ L/2

specify diameter
FOR CONCRETE FLOORIN
vol 3.50 Fill up only the yellow box, do not save after using this estimate, if you wa
bar hor 24.33333 121.67
bar vert 17.66667 123.67 For ground floor only: (REINFORCED CONCRETE FLOOR)
tot 245.33
tie 429.8889 107.4722 Width 7.00
Length 5.00
Thickness 0.10
Note: If flooring is not reinforced,leave bar spacing blank
Bar Spacing
bothways 0.30

Note: If you are not using tiles, just leave tile size blank
Choose size of tiles you will use by
area 35 typing one "1" on the box below Materials needed:
0.01 - 4" x 4" - Cement
0.04 - 8" x 8" - Sand
0.09 - 12" x 12" - Gravel
0.16 - 16" x 16" - Def. Bars
0.36 97 24" x 24" 1 Tiles
Tie wire
97 Concrete
OR CONCRETE FLOORING
after using this estimate, if you want to erase just type "0" zero on the yellow box

ONCRETE FLOOR)

Reinforced bars

WIDTH LENGTH

Materials needed:
31.50 bags 1800
2.01 cu.m. 350
4.02 cu.m. 700
44.98 lnght specify diamete 1890
112 pcs. specify size
2.07 klg. 39.2
3.50 cu m 4779.2
LENGTH 7.9 M
WIDTH 28.35 M
THICKNESS 0.1 M
NO OF SLAB 2
Spacing of Rebar 15 cm
Length of Rebar 6m

MATERIALS NEEDED
Cement 403.137 bags
Sand 22.3965 cu.m
Gravel 44.793 cu.m
Rebar 1371.562 length
TW 141.5459 kg
2"x3"x10' coco lumber 2038.082 bdft
One Way Slab

Quantity of Reinforcing bars in a o

BAR NUMBER OF STEEL B


SPACING METE
area 447.93 CM 6M
volumne 44.793 10.0 3.764
12.5 3.062
15.0 2.584
17.5 2.232
20.0 1.98
22.5 1.786
25.0 1.627

QUANTITY OF TIE WIRE ON A ONE


BAR LENGTH OF S
SPACING 6M
CM 0.3
10.0 0.474
12.5 0.316
15.0 0.228
17.5 0.168
20.0 0.132
22.5 0.11
25.0 0.089
Reinforcing bars in a one-way reinforced concrete slab

NUMBER OF STEEL BARS PER SQUARE


METER
7.5M 9M 12M
2.937 2.421 1.769
2.381 1.934 1.427
2.004 1.636 1.197
1.726 1.4 1.033
1.528 1.258 0.914
1.369 1.109 0.810
1.25 1.014 0.736

F TIE WIRE ON A ONE WAY REINFORCED CONCRETE SLAB IN KILOGRAMS PER SQUARE METER
LENGTH OF STEEL BARS
6M 7.5M 9M 12M
0.4 0.3 0.4 0.3 0.4 0.3 0.4
0.632 0.462 0.616 0.46 0.614 0.448 0.598
0.422 0.307 0.409 0.295 0.394 0.293 0.391
0.303 0.217 0.289 0.214 0.285 0.207 0.276
0.224 0.162 0.216 0.158 0.21 0.153 0.204
0.175 0.126 0.168 0.125 0.167 0.12 0.16
0.147 0.102 0.135 0.099 0.132 0.095 0.126
0.118 0.086 0.114 0.081 0.108 0.077 0.103
R SQUARE METER