NO. OF PIECES BOARD FOOT
2"X3"X10' VERTICAL SUPPORT 1.6974 8.487
2"X2"X10' HORIZONTAL SUPPORT 8.9 25.83
4" Nails 1.032585 1.032585
SCAFFOLDINGS FOR COLUMNS
FOR 2X3X10 VERTICAL SUPPORT:
NO. OF COLUMNS 8
HEIGHT OF COLUMN 4.2 (footing to roof beam)
TOTAL HEIGHT 33.6
CONSTANT X7
BOARD FOOT 235.2
CONSTANT BF/5
NO. OF PIECES 47.04
SUMMARY:
NO. OF PIECES BOARD FOOT
2"X3"X10' VERTICAL SUPPORT 54.096 270.48
2"X2"X10' HORIZONTAL SUPPORT 243.7 705.6
2"X2"X10' DIAGONAL BRACES 135.8 452.088
4" Nails 28.2072 kg
FORMWORKS FOR COLUMNS
FOR 1/4X4X8 ORDINARY PLYWOOD:
SIZE OF COLUMN 0.25
CONSTANT X4SIDES
HEIGHT OF COLUMN 4.2 (footing to roof beam)
AREA OF COLUMN 4.2
NO. OF COLUMNS 8
TOTAL AREA 33.6
CONSTANT X0.46
NO. OF PIECES 13.416667
SUMMARY:
NO. OF PIECES
1/4"X4'X8' ORDINARY PLYWOOD: 13.416666666667 sheets
2"X2"X10' COCO LUMBER: 457.783375 bdft
1" Finishing Nails 1.28 kg
2 1/2" Nails 3.09 kg
FORMWORKS FOR BEAMS
FOR 1/4X4X8 ORDINARY PLYWOOD:
SUMMARY:
NO. OF PIECES
FOR 1/4X4X8 ORDINARY PLYWOOD: 1.02 sheet
FOR 2X2X10 COCO LUMBER: 54.35 bdft
1" Finishing Nails 0.10 kg
2 1/2" Common Wire Nails 0.15 kg
P
FOR SQUARE FOOTING
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow
Thickness 0.30
Width 1.50
No. of bars 7.00 one way only
THICKNESS
No. of footing
on this size 13.00
Materials needed:
Cement 90.82 bags
Sand 5.05 cu.m. Compacted base c
Gravel 10.09 cu.m. Thk (m)
bars 26.16 length specify diameter 0.10
Tie wire 4.93 klg. 0.20
Gravel Base 5.07 0.30
Footing total 8.77 cu.m. 0.40
0.50
FORMS 0.60
1.80 Sq. Mtrs for one footing only
23.40 Sq. Mtrs for total No. of footing
0.67 6.07
0.34
1.75
24.5
4.491667
637.00
WIDTH
247.758875
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just typ
Materials needed:
Cement 104.41 bags
Sand 5.80 cu.m.
Gravel 11.60 cu.m.
Vertical bars 103.13 lnght specify diameter 16
Stirrups 109.78 lnght specify diameter
Tie wire 22.17 klg.
Concrete Vol. 11.60 klg.
FORMS
1.60 Mtrs (Total Width)
7.76 Sq. Mtrs (Area for one column)
100.88 Sq. Mtrs (Total No. of column)
Stirrup - rest
NOTE:If stirrups spaced
Height up to bottom of 2nd floor slab only
Stirrup - S3
Stirrup - S2
104.41
5.80
Stirrup - S1
11.60
103.133333
Thickness 109.78
Footing (TF) 22.17
100.88
Stirrups
0.01 m specify diameter
FOR CONCRETE COLU
Fill up only the yellow box, do not save after using this estimate, if you want to era
COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FL
Materials needed:
Cement 25.23 bags
Sand 1.40 cu.m.
Gravel 2.80 cu.m.
Vertical bars 179.40 m specify diameter (15
Stirrups 36.54 lnght specify diameter
Tie wire 5.37 klg.
Concrete Vol. 2.80 klg.
SIDE 2
SLAB 2ND FLOOR
Height from ground floor line to ceiling of preceeding
STIRRUP - S3
25.23
1.40
2.80
STIRRUP - S2
16 179.4
STIRRUP - S1
floor
36.54
GROUND FLOOR S 5.37
3.00
Stirrups FORMS
kgs 3.00 Sq m
135.21
FOR CONCRETE COLUMN
### Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
r2
### COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING
###
vo
###
to Height col. - Number of column
###
to Diameter - this size -
###
st
###
s1 Thickness of footing (TF)
###
s2 Number of for this column -
###
s3 vertical bars -
###
re
###
no Confinement of stirrups:
###
no No. of stirrups S1 0 S1 Spaced at -
No. of stirrups S2 0 S2 Spaced at -
No. of stirrups S3 0 S3 Spaced at -
rest spaced at -
Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Vertical bars - m specify diameter
Stirrups #DIV/0! lnght specify diameter
Tie wire #DIV/0! klg.
DIAMETER
Stirrup - rest
NOTE:If stirrups spaced
Height up to bottom of 2nd floor slab only
Stirrup - S3
Stirrup - S2
Stirrup - S1
Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
ra COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
###
###
VO Height col. - Number of column
###
###
TO Diameter - this size -
###
S1
###
S2
###
S3 Number of
###
RE vertical bars -
###
RE
###
NO Confinement of stirrups:
###
S No. of stirrups S1 0 S1 Spaced at -
###
TO No. of stirrups S2 0 S2 Spaced at -
###
TI No. of stirrups S3 0 S3 Spaced at -
rest spaced at -
Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Vertical bars - lnght specify diameter
Stirrups #DIV/0! lnght specify diameter
Tie wire #DIV/0! klg.
STIRRUP - REST
NOTE:If stirrups spaced
uniformly, type "0" zero on
"no. of stirrups" yellow box
STIRRUP - S3
STIRRUP - S2
STIRRUP - S1
Width 0.40
Thickness 0.25
Length 5.11
.
No. of Longitudinal bars 3
Spacing of Transverse bars 0.30
Materials needed:
5.29 Cement 5.29 bags
0.29 Sand 0.29 cu.m.
0.59 Gravel 0.59 cu.m.
Def. Bars 4.32 lnght
0.30 Tie wire 0.30 klg.
vol
### Footing total 0.51 cu.m.
long
15 4.32 Standard weight of plain & deformed bars
trans Size 1.0 m 6.0 m Vert Bars Stirrups
18 kgs kgs kgs kgs
### 8 mmǿ 0.40 2.37
10 mmǿ 0.62 3.70
12 mmǿ 0.89 5.33 23.04
16 mmǿ 1.58 9.47 40.94
20 mmǿ 2.47 14.80 63.98
25 mmǿ 3.85 23.12 99.95
28 mmǿ 4.83 29.00 125.38
30 mmǿ 5.55 33.29 143.92
32 mmǿ 6.31 37.88 163.77
36 mmǿ 7.99 47.95 207.30
want to erase just type "0" zero on the yellow box
Natural ground
CHB
Longitudinal bars
Transverse bars
Thickness
Width
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase j
STIRRUPS - S1
vol. 64.8
main 1,944.00
HEIGHT
L strp 2.60
s1 1.80
s2 0.75
s3 0.90
rest 1.05 WIDTH L/2
s4 6.25
tot s 21.25 Height 0.80
tot L 1,989.00 Width 0.50
joints 9180 Length 4.50
tie 3213
No. of beams Confinement of stirrups:
this size 36.00 No. of stirrups S1 9
No. of stirrups S2 3
Number of No. of stirrups S3 3
main bars 12.00
2.10
Forms 9.45
Total 340.20
L/4 L/2
Materials needed:
S1 Spaced at 0.100 Cement 670.68 bags
S2 Spaced at 0.125 Sand 37.26 cu.m.
S3 Spaced at 0.150 Gravel 74.52 cu.m.
rest spaced at 0.200 Main bars 179.82 lenght
Stirrups 364.65 lenght
Tie wire 61.79 kgs.
Main bars 8,314.88 kgs.
Beam total 64.80 cu.m.
Mtrs ( Total Width)
Sq. Mtrs( 1 Beam only )
Sq. Mtrs( Total No. of Beams)
STIFFINER
No. of bars 4 pcs
eformed bars size 16 mm dia.
Stirrups 648 lm
kgs 59.94 length
2,698.41 7.4
18.94
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on
STIRRUPS - S1
STIRRUPS - S2
STIRRUPS - S3
HEIGHT
Height 0.35
Width 0.25
LENGTH O.C. OF COLUMN
Length 2.15
STIRRUPS - S3
STIRRUPS - REST
L/4 L/2
H O.C. OF COLUMN
Materials needed:
Cement 1.95 bags 1.95
Sand 0.11 cu.m. 0.11
Gravel 0.22 cu.m. 0.22
Main bars 3.18 lnght 3.18
Stirrups 3.45 lnght 3.45
Tie wire 0.84 klg. 0.84
Beam total 0.19 cu.m. 2.04
o. of Beams)
FOR CHB WALLING/PARTITION
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" ze
you may include height from zocallo to ceiling
Total length 70.00
Using 4"x8"x16" 1
Using 6"x8"x16" -
Class A
FOR PLASTERING (class "B") METHOD,
CHOOSE BY TYPING " 1 " ONE ON YELLOW Less: OPENNINGS on one floor onl
BOX BELOW
Description
Plastering 1 side only Door 1
Plastering 2 sides - Door 2
Door 3
Materials needed: Door 4
Cement 182.40 bags Door 5
Sand 21.23 cu.m. Door 6
Def. Bars 188.92 pcs. specify diameter
C.H.B. 3,310.56 pcs. specify size (thickness)
Tie wire 18.89 klg.
Note: Steel Reinforcement for CHB; Vertical bars - dist. @ 0.60m o.c., Horizontal bars - @ every 3 layers
ARTITION
u want to erase just type "0" zero on the yellow box
CEILING LINE Do 11.34
Wi 24.36
To 35.70
LESS OPENNINGS OF
WINDOWS & DOORS Ar 266
Ne 230.30
4"
ce 8.38
mo 90.74
FLOOR LINE
ce 75.45
sa 10.08
TOTAL LENGTH sa 8.38
s: OPENNINGS on one floor only, CHB quantity for another floor must be done separately.
Area No. of units Description Area No. of units ce 0.792
3.78 1 Window 1 11.52 1 sa 182.40
5.04 1 Window 2 2.88 1 18.46
2.52 1 Window 3 6.72 1 ce1 face
- - Window 4 2.52 1 ce -
- - Window 5 0.72 1 ve -
- - Window 6 - - ho 490.54
495.15
Total window opennings 985.68
for this floor only 24.36 sq.m.
rs - @ every 3 layers
Cement
Sand
area Def. Bars
2,993.90 785.7 291 582 C.H.B.
6" 1115.1 413 826 Tie wire
14.37 213.472 76.24 76.24
174.80 2114.272 1560.48 1484.24
129.34 11745.95556
19.43 326.276543
14.37
1.526
- ### ### Size of CHB A B C D
- ### ### 4" 0.792 0.522 0.394 0.328
2 face ### ### 6" 1.526 1.018 0.763 0.633
- - ### 8" 2.26 1.5 1.125 0.938
- - ###
- -
4" 6" 8"
A 0.792 1.526 2.26
B 0.522 1.018 1.5
C 0.394 0.763 1.125
D 0.328 0.633 0.938
16.3921542 bags
1.82071946 cu.m.
17.8248019 pcs.
283.955 pcs.
1.78248019 klg.
FOR TWO WAY CONCRETE SLAB
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the ye
WIDTH
###
###
###
### 0.150 m. o.c. -
(m)
###
###
###
### 0.175 m. o.c. -
###
###
###
### 0.200 m. o.c. -
###
###
###
### 0.225 m. o.c. -
###
###
###
### 0.250 m. o.c. -
###
###
###
### 0.275 m. o.c. -
###
###
###
### 0.300 m. o.c. -
###
###
L/2 L / 4 Spaced at ___
Length 1.83
Width 1.50 LENGTH (m)
Thickness 0.30 Materials needed:
Cement 8.50 bags
No. of Slab this size 1.00 Sand 0.47 cu.m.
Gravel 0.94 cu.m.
Def. Bars - pcs.
Tie wire - klg.
specify diameter
FOR CONCRETE FLOORIN
vol 3.50 Fill up only the yellow box, do not save after using this estimate, if you wa
bar hor 24.33333 121.67
bar vert 17.66667 123.67 For ground floor only: (REINFORCED CONCRETE FLOOR)
tot 245.33
tie 429.8889 107.4722 Width 7.00
Length 5.00
Thickness 0.10
Note: If flooring is not reinforced,leave bar spacing blank
Bar Spacing
bothways 0.30
Note: If you are not using tiles, just leave tile size blank
Choose size of tiles you will use by
area 35 typing one "1" on the box below Materials needed:
0.01 - 4" x 4" - Cement
0.04 - 8" x 8" - Sand
0.09 - 12" x 12" - Gravel
0.16 - 16" x 16" - Def. Bars
0.36 97 24" x 24" 1 Tiles
Tie wire
97 Concrete
OR CONCRETE FLOORING
after using this estimate, if you want to erase just type "0" zero on the yellow box
ONCRETE FLOOR)
Reinforced bars
WIDTH LENGTH
Materials needed:
31.50 bags 1800
2.01 cu.m. 350
4.02 cu.m. 700
44.98 lnght specify diamete 1890
112 pcs. specify size
2.07 klg. 39.2
3.50 cu m 4779.2
LENGTH 7.9 M
WIDTH 28.35 M
THICKNESS 0.1 M
NO OF SLAB 2
Spacing of Rebar 15 cm
Length of Rebar 6m
MATERIALS NEEDED
Cement 403.137 bags
Sand 22.3965 cu.m
Gravel 44.793 cu.m
Rebar 1371.562 length
TW 141.5459 kg
2"x3"x10' coco lumber 2038.082 bdft
One Way Slab
F TIE WIRE ON A ONE WAY REINFORCED CONCRETE SLAB IN KILOGRAMS PER SQUARE METER
LENGTH OF STEEL BARS
6M 7.5M 9M 12M
0.4 0.3 0.4 0.3 0.4 0.3 0.4
0.632 0.462 0.616 0.46 0.614 0.448 0.598
0.422 0.307 0.409 0.295 0.394 0.293 0.391
0.303 0.217 0.289 0.214 0.285 0.207 0.276
0.224 0.162 0.216 0.158 0.21 0.153 0.204
0.175 0.126 0.168 0.125 0.167 0.12 0.16
0.147 0.102 0.135 0.099 0.132 0.095 0.126
0.118 0.086 0.114 0.081 0.108 0.077 0.103
R SQUARE METER