0% found this document useful (0 votes)
13 views1 page

Control Panels Ibm 52 Tata

The document is a technical drawing for a control panel designed by Nikitech Electric Pvt. Ltd. for the IBM 52 Bar Bending project, dated 08.02.2023. It includes details such as project specifications, customer information, and a list of components. The drawing is intended for approval and outlines the design and manufacturing details.

Uploaded by

Muniswamy Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Control Panels Ibm 52 Tata

The document is a technical drawing for a control panel designed by Nikitech Electric Pvt. Ltd. for the IBM 52 Bar Bending project, dated 08.02.2023. It includes details such as project specifications, customer information, and a list of components. The drawing is intended for approval and outlines the design and manufacturing details.

Uploaded by

Muniswamy Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8

A A

EMG-2
3

15

VPR
B B
-0V
18

1
4

C C

+ - 24VAC -C3

213-1 213-2

213-1
D 11 D

-C2 -C1 -C1 -C4


1/10

2/10

208-1

208-2

208-1

208-3

208-1

208-7

213-1

225-3

213-1

225-3

213-1

227-1

227-1

229-1
Y/G
PE
U
R

V
Y

W
B
R

E E

-C3 -C4

USE
8
1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

F F

Design and Manufactured by:


NIKITECH ELECTRIC PVT. LTD., Date 08.02.2023 Project : IBM 52 BAR BENDING - TATA PROJECTS DESCRIPTION: Scale Qty : 10 Nos.
#627/3, Plot No. 36B, NTTF Circle, Peenya
CONTROL CIRCUIT
- - - - NEPL Drawn MS Customer : M/s. INNOMAC ENGINEERING LTD. NTS Rev No: R-0
2nd Phase, Peenya Industrial Area,
-
08.02.2023
-
DRAWING FOR APPROVAL
- -
R-0 Bengaluru - 560 058. Checked SJS Consultant : - CONTROL PANEL IBM 52 BAR BENDING Format Sheet: 03
SJS
DATE REVISION COMMENTS NAME REV E-mail : [email protected] Approved SJS End User : - Drg. No. : NEPL/J--/23-24 Job No. : NEPL/J--/23-24 A3 Total Sheets: 04
1 2 3 4 5 6 7 8

You might also like