0% found this document useful (0 votes)
2 views

PMCC-05

The document outlines the relay test for motor feeder protection conducted for Indian Oil Corp. Ltd. on May 12, 2025, by Technip Energies with Toyo as the consultant. It includes detailed measurements of current and voltage, as well as results from various tests such as pickup and timing tests for instantaneous overcurrent and time overcurrent. The testing kit details and checks for equipment integrity are also documented, confirming the tests were performed successfully.

Uploaded by

kumaranarun550
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

PMCC-05

The document outlines the relay test for motor feeder protection conducted for Indian Oil Corp. Ltd. on May 12, 2025, by Technip Energies with Toyo as the consultant. It includes detailed measurements of current and voltage, as well as results from various tests such as pickup and timing tests for instantaneous overcurrent and time overcurrent. The testing kit details and checks for equipment integrity are also documented, confirming the tests were performed successfully.

Uploaded by

kumaranarun550
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 104

RELAY TEST FOR MOTOR FEEDER PROTECTION

TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING : 12.05.2025


CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO. :
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETAILS
FEEDER TO
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS MCC(SS-041-MCC- MAKE / MODLE SR. NO. CALIB. VALIDITY
FDR NAME
07)/3A
FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802 2306123 28.01.2026
SR. NO. RATED VOLTAGE 415V
81 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURRENT(A)
R 1 798
Y 1 799
B 1 798

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAGE(V)
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.287
Y 7.8 0.292
B 7.8 0.29

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ) IOCL (EMT) IOCL (T)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED BY
51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec) OPERATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05 4.842 2.067
Y 1.8 4.5 4.813 2.05 4.852 2.059
B 1.8 4.5 4.813 2.05 4.849 2.061

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec) OPERATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898 2.136 0.908

Y 0.4 1 2.106 0.898 2.14 0.891

B 0.4 1 2.106 0.898 2.143 0.897

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK OK


FAULT RECORDER CHECK : OK WATCH DOG CHECK OK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK OK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK OK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK OK
DR TRIGGER CHECK OK PSL AS PER SCHEME OK

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ) IOCL (EMT) IOCL (T)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
FEEDER TO
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS MCC(SS-041-MCC- MAKE / MODLE
FDR NAME
08)/3B
FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
69 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 796
Y 1 798
B 1 796

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.29
Y 7.8 0.288
B 7.8 0.289

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05
Y 1.8 4.5 4.813 2.05
B 1.8 4.5 4.813 2.05

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898
Y 0.4 1 2.106 0.898

B 0.4 1 2.106 0.898

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 12.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
796
798
796

MEASURED VOLTAGE(V)
410
410
410

CURRENT
76
76
76
D TIME(Sec)
29
288
289

IOCL (EMT) IOCL (T)


REVIEWED BY

OPERATED TIME(Sec)
2*Iset 5*Iset
4.848 2.066
4.844 2.062
4.834 2.061

OPERATED TIME(Sec)
2*Iset 5*Iset
2.139 0.903
2.121 0.912

2.127 0.89

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
FEEDER TO
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS ASB(SS-041-ASB- MAKE / MODLE
FDR NAME
02)/4A
FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
68 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 796
Y 1 796
B 1 797

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.288
Y 7.8 0.286
B 7.8 0.289

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05
Y 1.8 4.5 4.813 2.05
B 1.8 4.5 4.813 2.05

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898
Y 0.4 1 2.106 0.898

B 0.4 1 2.106 0.898

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 12.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
796
796
797

MEASURED VOLTAGE(V)
410
410
410

CURRENT
76
76
76
D TIME(Sec)
288
286
289

IOCL (EMT) IOCL (T)


REVIEWED BY

OPERATED TIME(Sec)
2*Iset 5*Iset
4.856 2.059
4.846 2.061
4.821 2.065

OPERATED TIME(Sec)
2*Iset 5*Iset
2.152 0.905
2.142 0.909

2.137 0.902

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS SPARE/4B MAKE / MODLE
FDR NAME

FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
82 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 797
Y 1 798
B 1 797

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.286
Y 7.8 0.286
B 7.8 0.289

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05
Y 1.8 4.5 4.813 2.05
B 1.8 4.5 4.813 2.05

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898
Y 0.4 1 2.106 0.898

B 0.4 1 2.106 0.898

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 12.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
797
798
797

MEASURED VOLTAGE(V)
410
410
410

CURRENT
76
76
76
D TIME(Sec)
286
286
289

IOCL (EMT) IOCL (T)


REVIEWED BY

OPERATED TIME(Sec)
2*Iset 5*Iset
4.849 2.065
4.83 2.061
4.837 2.067

OPERATED TIME(Sec)
2*Iset 5*Iset
2.13 0.9
2.137 0.909

2.134 0.899

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
RECTOR FEED
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS BOOSTER MAKE / MODLE
FDR NAME
PUMP/5B
MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015046 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
36 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 199
Y 1 199
B 1 199

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 8.1 8.1
Y 8.1 8.1
B 8.1 8.1
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 8.1 0.492
Y 8.1 0.434
B 8.1 0.447

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.329
Y 0.15 0.343
B 0.15 0.478

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.1
Y 1.16 1.16 2 12.44
B 1.16 1.16 2 12.21

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 73.92


Y 1.16 74.05 74.54
B 1.16 74.05 74.19

48 START UP
Iset=2.91 Td=48sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 48.75
Y 2.91 2.91 48 48.29
B 2.91 2.91 48 48.1

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 02.06.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
199
199
199

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
492
434
447

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
329
343
478

OPERATING TIME
(mSec.)
12.1
12.44
12.21
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

73.92
74.54
74.19

OPERATING TIME
(mSec.)
48.75
48.29
48.1

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / FRACTIONATOR EQUIP
MAKE/ TAG. NO. SIEMENS MAKE / MODLE
FDR REFLUX PUMP/6A NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015080 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
91 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 200
Y 1 200
B 1 200

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 8.1 8.1
Y 8.1 8.1
B 8.1 8.1
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 8.1 0.407
Y 8.1 0.487
B 8.1 0.492

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.439
Y 0.15 0.487
B 0.15 0.492

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.47
Y 1.16 1.16 2 12.93
B 1.16 1.16 2 12.42

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.89


Y 1.16 74.05 74.39
B 1.16 74.05 74.5

48 START UP
Iset=2.91 Td=48sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 48.43
Y 2.91 2.91 48 48.08
B 2.91 2.91 48 48.24

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 02.06.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
200
200
200

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
407
487
492

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
439
487
492

OPERATING TIME
(mSec.)
12.47
12.93
12.42
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.89
74.39
74.5

OPERATING TIME
(mSec.)
48.43
48.08
48.24

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS SPARE/6B MAKE / MODLE
FDR NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015081 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
00 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 199
Y 1 199
B 1 199

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 8.1 8.1
Y 8.1 8.1
B 8.1 8.1
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 8.1 0.478
Y 8.1 0.427
B 8.1 0.418

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.371
Y 0.15 0.382
B 0.15 0.478

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.81
Y 1.16 1.16 2 12.37
B 1.16 1.16 2 12.62

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.71


Y 1.16 74.05 74.08
B 1.16 74.05 73.92

48 START UP
Iset=2.91 Td=48sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 48.81
Y 2.91 2.91 48 48.34
B 2.91 2.91 48 47.92

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 02.06.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
199
199
199

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
478
427
418

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
371
382
478

OPERATING TIME
(mSec.)
12.81
12.37
12.62
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.71
74.08
73.92

OPERATING TIME
(mSec.)
48.81
48.34
47.92

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / DISEL PRODUCT EQUIP
MAKE/ TAG. NO. SIEMENS MAKE / MODLE
FDR PUMP/7A NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015046 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
39 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 199
Y 1 199
B 1 199

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.1 7.05
Y 7.1 7.05
B 7.1 7.05
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.1 0.485
Y 7.1 0.482
B 7.1 0.488

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.371
Y 0.15 0.382
B 0.15 0.478

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.2 1.16 2 12.02
Y 1.2 1.16 2 12.01
B 1.2 1.16 2 12.01

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.45


Y 1.16 74.05 74.21
B 1.16 74.05 74.13

48 START UP
Iset=2.91 Td=43sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 43.12
Y 2.91 2.91 48 43.05
B 2.91 2.91 48 43.31

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 13.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
199
199
199

MEASURED VOLTAGE(V)
410
410
410

CURRENT
05
05
05

D TIME(Sec)
485
482
488

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
371
382
478

OPERATING TIME
(mSec.)
12.02
12.01
12.01
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.45
74.21
74.13

OPERATING TIME
(mSec.)
43.12
43.05
43.31

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS SPARE/7B MAKE / MODLE
FDR NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015080 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
93 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 199
Y 1 199
B 1 199

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.1 7.05
Y 7.1 7.05
B 7.1 7.05
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.1 0.484
Y 7.1 0.489
B 7.1 0.487

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.401
Y 0.15 0.365
B 0.15 0.312

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.2 1.16 2 12.02
Y 1.2 1.16 2 12.1
B 1.2 1.16 2 12.07

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.23


Y 1.16 74.05 74.41
B 1.16 74.05 74.34

48 START UP
Iset=2.91 Td=43sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 43.32
Y 2.91 2.91 48 43.31
B 2.91 2.91 48 43.32

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 13.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
199
199
199

MEASURED VOLTAGE(V)
410
410
410

CURRENT
05
05
05

D TIME(Sec)
484
489
487

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
401
365
312

OPERATING TIME
(mSec.)
12.02
12.1
12.07
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.23
74.41
74.34

OPERATING TIME
(mSec.)
43.32
43.31
43.32

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
FEEDER TO
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS MCC(SS-041-MCC- MAKE / MODLE
FDR NAME
07) BUS B/15A
FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
57 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 794
Y 1 796
B 1 796

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.281
Y 7.8 0.273
B 7.8 0.292

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05
Y 1.8 4.5 4.813 2.05
B 1.8 4.5 4.813 2.05

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898
Y 0.4 1 2.106 0.898

B 0.4 1 2.106 0.898

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 12.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
794
796
796

MEASURED VOLTAGE(V)
410
410
410

CURRENT
76
76
76
D TIME(Sec)
281
273
292

IOCL (EMT) IOCL (T)


REVIEWED BY

OPERATED TIME(Sec)
2*Iset 5*Iset
4.85 2.057
4.858 2.061
4.843 2.062

OPERATED TIME(Sec)
2*Iset 5*Iset
2.335 0.98
2.339 0.979

2.336 0.98

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
FEEDER TO
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS MCC(SS-01-MCC- MAKE / MODLE
FDR NAME
08)/3A
FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
72 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 796
Y 1 796
B 1 796

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.283
Y 7.8 0.281
B 7.8 0.3

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05
Y 1.8 4.5 4.813 2.05
B 1.8 4.5 4.813 2.05

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898
Y 0.4 1 2.106 0.898

B 0.4 1 2.106 0.898

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 12.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
796
796
796

MEASURED VOLTAGE(V)
410
410
410

CURRENT
76
76
76
D TIME(Sec)
283
281
.3

IOCL (EMT) IOCL (T)


REVIEWED BY

OPERATED TIME(Sec)
2*Iset 5*Iset
4.854 2.059
4.859 2.06
4.848 2.058

OPERATED TIME(Sec)
2*Iset 5*Iset
2.341 0.978
2.34 0.98

2.344 0.981

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
FEEDER TO
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS ASB(SS-041-MCC- MAKE / MODLE
FDR NAME
07)/16A
FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
74 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 796
Y 1 794
B 1 796

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.279
Y 7.8 0.254
B 7.8 0.267

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05
Y 1.8 4.5 4.813 2.05
B 1.8 4.5 4.813 2.05

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898
Y 0.4 1 2.106 0.898

B 0.4 1 2.106 0.898

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 12.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
796
794
796

MEASURED VOLTAGE(V)
410
410
410

CURRENT
76
76
76
D TIME(Sec)
279
254
267

IOCL (EMT) IOCL (T)


REVIEWED BY

OPERATED TIME(Sec)
2*Iset 5*Iset
4.848 2.064
4.846 2.059
4.849 2.063

OPERATED TIME(Sec)
2*Iset 5*Iset
2.344 0.98
2.349 0.982

2.341 0.987

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
FEEDER TO
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS MCC(SS-041-MCC- MAKE / MODLE
FDR NAME
07)/16B
FEEDER
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015040 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
77 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 800/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 796
Y 1 796
B 1 796

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 INSTATANEOUS OVER CURRENT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.8 7.76
Y 7.8 7.76
B 7.8 7.76
B.TIMING TEST
Iset = 7.76 Td = 0.25
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.8 0.28
Y 7.8 0.289
B 7.8 0.27

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

51 TIME OVERCURRENT
Iset = 0.9 A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 1.8 4.5 4.813 2.05
Y 1.8 4.5 4.813 2.05
B 1.8 4.5 4.813 2.05

51N TIME EARTH FAULT


Iset = 0.2A TMS = 0.21 CURVE=IEC NI

INJECTED CURRENT9A) CALCULATED TIME(Sec)


PHASE 2*Iset 5*Iset 2*Iset 5*Iset
R 0.4 1 2.106 0.898
Y 0.4 1 2.106 0.898

B 0.4 1 2.106 0.898

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN

NAME

DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 12.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
796
796
796

MEASURED VOLTAGE(V)
410
410
410

CURRENT
76
76
76
D TIME(Sec)
28
289
27

IOCL (EMT) IOCL (T)


REVIEWED BY

OPERATED TIME(Sec)
2*Iset 5*Iset
4.848 2.067
4.852 2.057
4.859 2.062

OPERATED TIME(Sec)
2*Iset 5*Iset
2.336 0.988
2.334 0.981

2.332 0.983

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
RECTOR FEED
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS BOOSTER MAKE / MODLE
FDR NAME
PUMP/18A
MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015080 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
88 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 199
Y 1 199
B 1 199

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 8.1 8.1
Y 8.1 8.1
B 8.1 8.1
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 8.1 0.498
Y 8.1 0.478
B 8.1 0.469

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.396
Y 0.15 0.414
B 0.15 0.432

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.21
Y 1.16 1.16 2 12.13
B 1.16 1.16 2 12.37

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.13


Y 1.16 74.05 74.27
B 1.16 74.05 74.09

48 START UP
Iset=2.91 Td=48sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 48.44
Y 2.91 2.91 48 48.73
B 2.91 2.91 48 48.12

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 31.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
199
199
199

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
498
478
469

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
396
414
432

OPERATING TIME
(mSec.)
12.21
12.13
12.37
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.13
74.27
74.09

OPERATING TIME
(mSec.)
48.44
48.73
48.12

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS SPARE/18B MAKE / MODLE
FDR NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015081 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
02 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 198
Y 1 199
B 1 199

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 8.1 8.1
Y 8.1 8.1
B 8.1 8.1
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 8.1 0.483
Y 8.1 0.472
B 8.1 0.432

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.421
Y 0.15 0.399
B 0.15 0.372

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.32
Y 1.16 1.16 2 12.73
B 1.16 1.16 2 12.42

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.71


Y 1.16 74.05 74.73
B 1.16 74.05 74.45

48 START UP
Iset=2.91 Td=48sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 48.24
Y 2.91 2.91 48 48.11
B 2.91 2.91 48 48.78

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 31.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
198
199
199

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
483
472
432

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
421
399
372

OPERATING TIME
(mSec.)
12.32
12.73
12.42
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.71
74.73
74.45

OPERATING TIME
(mSec.)
48.24
48.11
48.78

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / DIESL PRODUCT EQUIP
MAKE/ TAG. NO. SIEMENS MAKE / MODLE
FDR PUMP/19A NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015081 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
01 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 199
Y 1 198
B 1 198

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.1 7.1
Y 7.1 7.1
B 7.1 7.1
B.TIMING TEST
Iset = 7 .05 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.1 0.435
Y 7.1 0.441
B 7.1 0.472

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.13 0.13
Y 0.13 0.13
B 0.13 0.13

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.13 0.324
Y 0.13 0.376
B 0.13 0.339

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.43
Y 1.16 1.16 2 12.13
B 1.16 1.16 2 12.17

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.12


Y 1.16 74.05 74.23
B 1.16 74.05 74.46

48 START UP
Iset=2.91 Td=48sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 48.23
Y 2.91 2.91 48 48.19
B 2.91 2.91 48 48.13

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 31.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
199
198
198

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
435
441
472

CURRENT
13
13
13

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
324
376
339

OPERATING TIME
(mSec.)
12.43
12.13
12.17
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.12
74.23
74.46

OPERATING TIME
(mSec.)
48.23
48.19
48.13

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS SPARE/19B MAKE / MODLE
FDR NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015080 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
94 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 200/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 199
Y 1 198
B 1 198

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 7.1 7.1
Y 7.1 7.1
B 7.1 7.1
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 7.1 0.471
Y 7.1 0.479
B 7.1 0.473

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.13 0.13
Y 0.13 0.13
B 0.13 0.13

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.13 0.432
Y 0.13 0.412
B 0.13 0.473

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.21
Y 1.16 1.16 2 12.72
B 1.16 1.16 2 12.93

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 73.96


Y 1.16 74.05 74.23
B 1.16 74.05 74.61

48 START UP
Iset=2.91 Td=48sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 48.31
Y 2.91 2.91 48 48.24
B 2.91 2.91 48 48.93

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 31.05.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
199
198
198

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
471
479
473

CURRENT
13
13
13

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
432
412
473

OPERATING TIME
(mSec.)
12.21
12.72
12.93
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

73.96
74.23
74.61

OPERATING TIME
(mSec.)
48.31
48.24
48.93

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY
RELAY TEST FOR MOTOR FEEDER PROTECTION
TEST FORMAT NO : TEIL-BR09-OHCU-ELE-F062 -REV -00 DATE OF TESTING
CLIENT : M/S INDIAN OIL CORP. LTD. REPORT NO.
CONSULTANT : M/S TOYO
CONTRACTOR : M/S TECHNIP ENERGIES
PROJECT : OHCU + FGTU BR 9 EXP PROJECT
RELAY DETAILS TESTING KIT DETA
LOCATION PNL / EQUIP
MAKE/ TAG. NO. SIEMENS SPARE/20B MAKE / MODLE
FDR NAME

MOTOR
MODEL NO. 7SJ66 FUNCTION
PROTECTION
3PH
GF23015081 INJECTIO WUHAN / HT 802
SR. NO. RATED VOLTAGE 415V
04 N KIT
AUX SUP. 110V DC PT RATIO 415/110V

MEASUREMENT CHECKS
CURRENT: (PHASE CT- 350/1 A)
PHASE INJECTED CURRENT(A) MEASURED CURREN
R 1 350
Y 1 350
B 1 350

VOLTAGE MEASUREMENT
PHASE INJECTED VOLTAGE(V) MEASURED VOLTAG
RY 110 410
YB 110 410
BR 110 410

50 OVER CURRENT
A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 8.1 8.1
Y 8.1 8.1
B 8.1 8.1
B.TIMING TEST
Iset = 8.07 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 8.1 0.532
Y 8.1 0.487
B 8.1 0.429

50N EARTH FAULT


A.PICKUP TEST
PHASE INJECTED CURRENT PICKUP CURRENT
R 0.15 0.15
Y 0.15 0.15
B 0.15 0.15

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED

B.TIMING TEST
Iset = 0.15 Td = 0.05
PHASE INJECTED CURRENT OPERATED TIME(Sec)
R 0.15 0.472
Y 0.15 0.386
B 0.15 0.391

50 LOCKED ROTOR

Iset=1.16 Td=2 Startup time=10sec


OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT (mSec.)
R 1.16 1.16 2 12.39
Y 1.16 1.16 2 12.1
B 1.16 1.16 2 12.74

49 THERMAL OVERLOAD
IAlarm= 0.58 Time constant=3.4mins
INJECTED CURRENT INJECTED CURRENT
(2 TIMES) (5 TIMES)
PHASE INJECTED CURRENT(A)
CALCULATED TRIP TIME (SEC) CALCULATED TRIP TIME (S

R 1.16 74.05 74.11


Y 1.16 74.05 74.24
B 1.16 74.05 74.73

48 START UP
Iset=2.91 Td=43sec
OPERATING OPERATING TIM
PHASE SET CURRENT SET TIME (SEC)
CURRENT
R 2.91 2.91 48 43.14
Y 2.91 2.91 48 43.07
B 2.91 2.91 48 43.32

EVENTS RECORDER CHECK : OK DATE AND TIME CHECK


FAULT RECORDER CHECK : OK WATCH DOG CHECK
CONTROL CKT TIGHTNESS CHECK OK SCHEME CHECK
CT / PT WIRE TIGTNESS CHECK OK COMM PORT CHECK
SERVICE SETTING RESTORATION OK RELAY DUST FREE CHECK
DR TRIGGER CHECK OK PSL AS PER SCHEME

SIGN
NAME
DATE
TEN/KEL TPI TEIPL IOCL (PJ)
PERFORMED BY CHECKED BY WITNESSED BY REVIEWED
OTECTION
OF TESTING : 02.06.2025
RT NO. :

TESTING KIT DETAILS

SR. NO. CALIB. VALIDITY

2306123 28.01.2026

MEASURED CURRENT(A)
350
350
350

MEASURED VOLTAGE(V)
410
410
410

CURRENT
.1
.1
.1

D TIME(Sec)
532
487
429

CURRENT
15
15
15

IOCL (EMT) IOCL (T)


REVIEWED BY

D TIME(Sec)
472
386
391

OPERATING TIME
(mSec.)
12.39
12.1
12.74
NJECTED CURRENT
(5 TIMES)

ULATED TRIP TIME (SEC)

74.11
74.24
74.73

OPERATING TIME
(mSec.)
43.14
43.07
43.32

AND TIME CHECK OK


H DOG CHECK OK
ME CHECK OK
PORT CHECK OK
DUST FREE CHECK OK
S PER SCHEME OK

IOCL (EMT) IOCL (T)


REVIEWED BY