16.(QSP-16) Process for Inspection & Testing
16.(QSP-16) Process for Inspection & Testing
: QSP/16
REV. No. : 01
TITLE: PROCESS FOR INSPECTION & TESTING DATE : 08/03/2022
1. PURPOSE: To define a procedure for identifying inspection and testing status of a product
regarding conformance and nonconformance of the same with reference to inspection & testing
parameters, to ensure that the only conforming products are used processed and dispatched.
2. SCOPE: This procedure is applicable to all the products lying at various stages of operations
in the Plant.
4. PROCESS DESCRIPTION :
Sr. Responsibilit
Activity Ref. Doc.
No. y
5.1 For Incoming Items : R.I In charge ----
Stores shall identify incoming items by putting an R.I In charge
5.1.1 ---
identification tag allocated a batch no. for each lot.
Quality assurance department shall check the material as R.I In charge
Incoming Inspection
per the incoming inspection standard or Procedure and tag
Standard-F/QA/01
the lot indicating the status of the lot.
Incoming
for the accepted material in “Green (Colour) ok
Inspection Report-
5.1.2 tag"
F/QA/02 Material
for the rejected material in "Red " (Colour) Rejected
Tags
tag”
Acceptance/Rejction
for the material inspected waiting for the final
/Hold-F/QA/08
decision in "Yellow" colour Hold Tag.
Receiving stores department shift the OK material to the R.I In charge
5.1.3 ----
main store and rejected material to the rejection Area.
Receipt Inspection of Incoming Material:
5.2.3 In case of urgent items, required Goods Receipt cum R.I In charge ----
Inspection Note may be generated on urgent basis and
sent to the QA for the purpose of putting Goods Receipt
cum Inspection Note NO. On the inspection report, tags
and other related documents. Inspection is not carried out
unless Goods Receipt cum Inspection Note NO. Is
Page 1 of 6
QUALITY SYSTEM PROCESS DOC. No. : QSP/16
REV. No. : 01
TITLE: PROCESS FOR INSPECTION & TESTING DATE : 08/03/2022
generated.
5.3.1 If the material is sent to subcontractor for further Prod. Engg. ----
operations, deptt. Head PE is responsible to ensure
traceability of such material at subcontractor's end. This
Page 2 of 6
QUALITY SYSTEM PROCESS DOC. No. : QSP/16
REV. No. : 01
TITLE: PROCESS FOR INSPECTION & TESTING DATE : 08/03/2022
c)
5.3.8 Deptt. head QA ensures preparing of Vendor quality rating QA Engg ----
Page 3 of 6
QUALITY SYSTEM PROCESS DOC. No. : QSP/16
REV. No. : 01
TITLE: PROCESS FOR INSPECTION & TESTING DATE : 08/03/2022
Page 4 of 6
QUALITY SYSTEM PROCESS DOC. No. : QSP/16
REV. No. : 01
TITLE: PROCESS FOR INSPECTION & TESTING DATE : 08/03/2022
PDIR after approval from the deptt. head QA shall Pre Dispatch
distribute as follows. One copy to customer. Final Quality
5.5.7 Inspection Report-
Inspector
F/QA/18
a) One copy for the office record.
Page 5 of 6
QUALITY SYSTEM PROCESS DOC. No. : QSP/16
REV. No. : 01
TITLE: PROCESS FOR INSPECTION & TESTING DATE : 08/03/2022
---------
Page 6 of 6