0% found this document useful (0 votes)
9 views10 pages

PSV

The document outlines the specifications and requirements for the Hess Phase II project, including various ASME and API standards. It details vendor documentation, inspection and testing requirements, and specific remarks regarding material identification and testing procedures. The document emphasizes compliance with industry standards for safety and quality assurance in the fabrication and testing of equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views10 pages

PSV

The document outlines the specifications and requirements for the Hess Phase II project, including various ASME and API standards. It details vendor documentation, inspection and testing requirements, and specific remarks regarding material identification and testing procedures. The document emphasizes compliance with industry standards for safety and quality assurance in the fabrication and testing of equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

INTERNATIONAL SPECIFICATION
ASME BI 6.34
ASME B16.5
ASME B 16.20
ASME B46.1
ASME SECTION VIII
ANSI/ASME PTC25.3
API RP 520
API 521
API STD 526
API RP 527
API 2000

NACE MR-01-75
TYPICAL VDS REQUIREMENT HESS PHASE 2
VENDOR DOCUMENT SCHEDULE √
PROGRESS REPORT √
BROCHURE OF PROCURED EQUIPMENT √
FABRICATION / PRODUCTION SCHEDULE √
CERTIFICATE OF COMPLIANCE √
TECHNICAL QUERY √
GENERAL ARRANGEMENT DRAWING √
NAMEPLATE DRAWING √
NDE RADIOGRAPHY TEST RESULT √
NDE LIQUID PENETRANT TEST RESULT √
POSITIVE MATERIAL IDENTIFICATION (PMI) TEST REPORT √
HYDROSTATIC TEST RESULT √
FACTORY ACCEPTANCE TEST REPORT √
MATERIAL TEST CERTIFICATE AND MILL CERT √
PAINTING REPORT √
INSTRUMENT DATASHEET/SIZING CALCULATION √
INSPECTION TEST PLAN √
NON-DESTRUCTIVE EXAMINATION RADIOGRAPHY PROCEDURES √
NDE LIQUID PENETRANT TEST PROCEDURE √
POSITIVE MATERIAL IDENTIFICATION (PMI) TEST PROCEDURE √
HYDROTEST PROCEDURES √
FACTORY ACCEPTANCE TEST PROCEDURES √
SURFACE PREPARATION & PAINTING PROCEDURES √
PRESERVATION, PACKING AND SHIPPING PROCEDURES √
VENDOR DATA INDEX √
VENDOR DATABOOK √
OPERATING AND MAINTENANCE MANUAL √
SPARE PART LIST FOR 2 YEARS OPERATION √
ISO 9001 CERTIFICATE √
ASME UV STAMP CERTIFICATE √
INSTRUMENT CALIBRATION CERTIFICATE √

TYPICAL INSPECTION AND TESTING REQUIREMENT HESS PHASE II

NDE RADIOGRAPHY
NDE LIQUID PENETRANT
NDE MAGNETIC PARTICLE TEST
POSITIVE MATERIAL IDENTIFICATION (PMI)
SPECIFICATION
Valves — Flanged, Threaded and Welding End
Pipe Flanges and Flanged Fittings
Metallic Gaskets for Pipe Flanges: Ring-Joint, Spiral-Wound, Jacketed
Surface Texture (Surface Roughness, Waviness, and Lay)
Boiler and Pressure Vessel Code
Performance Test Code — Safety and Relief Valves
Sizing, Selection and Installation of Pressure Relieving Devices in Refineries
Pressure Relieving and De-Pressuring Systems
Flanged Steel Safety Relief Valves
Seat Tightness of Safety Relief Valves with Metal to Metal
Tank Venting
Petroleum and Natural Gas Industries Materials for use in H2S
Containing Environments in Oil and Gas Production
PROJECT

PROJECT
HESS PHASE II
REMARKS

REMARKS

1. Castings shall be subject to 100% inspection of


internal and external surfaces by magnetic
particle or dye penetration methods as per ASME
B16.34.

2.Positive Material Identification (PMI) – PMI shall be


done as per DEP 31.10.00.10. PMI will be applicable
to Alloy Steel and Stainless steel material.

3.Fugitive Emission Test - Fugitive Emission test


wherever specified in datasheet shall be done based
on MESC SPE 77/312.

4. RT shall be as per approved NDT sketch and in full


compliance with ASME B16.34 as a minimum.

5.All critical areas of castings specified in ASME


B16.34, shall be subjected to 100% RT, also 100%
DP/MP on full casting.
wherever specified in datasheet shall be done based
on MESC SPE 77/312.

4. RT shall be as per approved NDT sketch and in full


compliance with ASME B16.34 as a minimum.

5.All critical areas of castings specified in ASME


B16.34, shall be subjected to 100% RT, also 100%
DP/MP on full casting.